About this file
This is a Mooring Analysis Report prepared by AtkinsRealis for the Canaveral Port Authority (CPA) dated March 6, 2025, analyzing mooring requirements for Cruise Terminal 10 (CT10) at Port Canaveral, Florida. The analysis evaluates the feasibility of safely mooring three of the world's largest cruise ships—Royal Caribbean's Oasis of the Seas and Icon of the Seas, and MSC's Worldclass—at the terminal under sustained wind conditions of 40 knots with a maximum vessel excursion of ±0.5 meters (1.6 feet). The study focuses on wind as the primary environmental variable and follows Oil Companies International Marine Forum (OCIMF) standards, which recommend maintaining mooring line tensions at no more than 50% of breaking line strength. The analysis includes mooring arrangements for both starboard and port side configurations and provides detailed wind rose diagrams and load analysis results for each vessel and mooring configuration.
The report concludes that to achieve safe mooring conditions, CT10 requires three significant infrastructure upgrades: the addition of three new 200 metric ton mooring bollards with monopile foundations (labeled Bollards A, B, and C), construction of a new toe wall and bulkhead to deepen the berth pocket to -35.0 feet MLLW, and installation of scour protection mattress at the toe wall/bulkhead area. The existing foam-filled fenders are assumed to be in good condition and suitable for use without upgrades, though the report notes that larger diameter fenders may be considered if fender compression becomes problematic during operations. The report recommends that passenger movements cease when wind speeds exceed 35 knots and that vessels begin preparations to depart if sustained winds are anticipated to exceed 40 knots. A rough order of magnitude cost estimate is included, though it excludes soft costs such as design, permitting, and bonding, and assumes Buy America requirements if federal funding is used.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP-25-16_Selection_Committee_Evaluation_&_Ranking_Selections_Presentations_Waived-Approved.pdf | ||
| RFP-25-16_Selection_Committee_Evaluation_&_Ranking_Selections_Presentations_Waived.pdf | ||
| RFP-25-16_Addendum_1_Combined.pdf | ||
| RFP-25-16_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_10.15.25.pdf | ||
| RFP-25-16_Port_Canaveral_CT_10_Feasibility_Study_Final_Report_06.09.2025.pdf | ||
| 00_11_19_Request_for_Proposal-KDP-VNL-KDP.pdf | ||
| RFP-25-16_Solicitation_Document.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AtkinsRéalis - Baseline / Référence
PORT CANAVERAL
CT10 MOORING
ANALYSIS REPORT
Mooring Analysis Memo Canaveral Port Authority
March 6, 2025
PORT CANAVERAL CT10 MOORING
ANALYSIS FINAL.docx CT10 Mooring Analysis
1.0 | March 6, 2025 2
Notice
This document and its contents have been prepared and are intended solely as information for Canaveral Port Authority and use in relation to Mooring Analysis memo
AtkinsRealis USA Inc. assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents.
This document has 24 pages including the cover.
Document history
Document title: Mooring Analysis Memo
Document reference: CT10 Mooring Analysis Report
Revision Purpose description Originated Checked Reviewed Authorized Date
1.0 Final report DMM AA AF DMM 03/06/2025
Client signoff
Client Canaveral Port Authority
Project PORT CANAVERAL CT10 MOORING ANALYSIS
Job number 100113218
Client signature/date
ANALYSIS FINAL.docx
1.0 | March 6, 2025 3
Contents
Introduction
Mooring Assessment
Fender Assessment
Mooring Analysis Results
Conclusion
Rough Order of Magnitude Estimate
Appendix A. Mooring Arrangements with Recommended Marine Improvements
Figures
Figure 1 – Existing Condition of Existing Mooring bollards at CT10
Figure 2 – RCL Oasis of the Seas – Starboard Side Mooring
Figure 3 – RCL Icon of the Seas – Starboard Side Mooring
Figure 4 – MSC Worldclass – Starboard Side Mooring
Figure 5 – RCL Oasis of the Seas – Port Side Mooring
Figure 6 – RCL Icon of the Seas – Port Side Mooring
Figure 7 – MSC Worldclass – Port Side Mooring
Figure 8 – OPTIMOOR Fender Curve for 6.5ft diameter x 11ft long high-capacity foam filled fender
Figure 9 – RCL Oasis of the Seas – Starboard Side Mooring
Figure 10 – RCL Icon of the Seas – Starboard Side Mooring
Figure 11 – MSC Worldclass – Starboard Side Mooring
Figure 12 – RCL Oasis of the Seas – Port Side Mooring
Figure 13 – RCL Icon of the Seas – Port Side Mooring
Figure 14 – MSC Worldclass – Port Side Mooring
Figure 15 – RCL Oasis of the Seas – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 4
Figure 16 – RCL Icon of the Seas – Starboard Side Mooring
Figure 17 – MSC Worldclass – Starboard Side Mooring
Figure 18 – Recommended Mooring Improvements for CT10 for safe mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 5
MOORING ANALYSIS MEMO
Introduction
This mooring analysis memo summarizes the findings of a mooring analysis performed for the design vessels to berth at
Cruise Terminal 10 (CT10) at Port Canaveral. This analysis was performed in keeping with the standards and practices from previous mooring analysis reports that have been performed and prepared for the Canaveral Port Authority (CPA).
The goal of this mooring analysis is to determine what marine upgrades may be required to safely moor the desired vessels considered in this study at CT10. The existing bollards at CT10 were gathered from past documents provided by CPA for consideration of this study. No inspection or assessment of the capacity of these bollards was included as part of this study. See Figure 1 for the existing conditions used for this mooring analysis study. The following sections briefly cover that process and end with findings and conclusions.
Figure 1 – Existing Condition of Existing Mooring bollards at CT10
Mooring Assessment
Basis of Analysis
For this mooring analysis, wind was the primary environmental variable for consideration of this study. The berth at
CT10 is very protected from waves and passing ship affects. There is a turning basin nearby, however, those affects are not expected to impact the results from this study, as it is unlikely for ships to be maneuvering in the turning basin with the sustained wind speeds analyzed in this study. No passing ship effects, berthing analysis, or dynamic analysis was used for this study.
ANALYSIS FINAL.docx
1.0 | March 6, 2025 6
The wind speed for this mooring analysis focused around achieving a safe mooring line configuration of at least 40 knots with a 60-second sustained wind.
The ship movement for this analysis considers a max vessel excursion (movement) of +/- 0.5 meters, which results in
1.6 feet of movement in any direction (surge, sway, or heave). The purpose of this limit is to follow the industry standard of maximum typical movement for a ship to accommodate the connection to the passenger boarding bridge (PBB). The actual limit each PBB can accommodate may be greater than this limit, however, it is unlikely ship operations for passenger movements would occur during high-wind events that were considered in this mooring analysis.
Vessel and Mooring Line Parameters
The following are the ship parameters used for this mooring analysis. These values were provided by each cruise line for the use of this study. This study follows the recommendations from OCIMF, which state a limit of 50% of breaking line strength (BLS) should be used for any mooring line. Exceeding this limit will result in a reduced factor of safety below recommendations from Oil Companies International Marine Forum (OCIMF).
ANALYSIS FINAL.docx
1.0 | March 6, 2025 7
Mooring Arrangements
The following are the mooring arrangements considered for each vessel in this study. A total of 3 new bollards (labeled as Bollards *A, *B and *C in the figures below) are new bollards that are recommended for safe mooring at CT10.
These recommendations are covered at the end of this report and included in the mooring exhibits in Appendix A.
Figure 2 – RCL Oasis of the Seas – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 8
Figure 3 – RCL Icon of the Seas – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 9
Figure 4 – MSC Worldclass – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 10
Figure 5 – RCL Oasis of the Seas – Port Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 11
Figure 6 – RCL Icon of the Seas – Port Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 12
Figure 7 – MSC Worldclass – Port Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 13
Fender Assessment
This mooring analysis considered the existing foam filled fenders are to be used without improvements. This analysis assumes the existing fenders are in good working condition. No evaluation or inspection of the mooring fenders was performed as part of this study. The load deflection profile used for fender properties are shown below.
Figure 8 – OPTIMOOR Fender Curve for 6.5ft diameter x 11ft long high-capacity foam filled fender
Mooring Analysis Results
A mooring analysis using the quasi-static mode was run in OPTIMOOR to determine the results of the mooring analysis for wind. Since the berth is sheltered from waves and current, these effects were ignored for this analysis. The ships are partially shielded from wind due to the surrounding terminal buildings, but this wind shielding was ignored for this analysis.
The following figures are the wind rose for each mooring configuration for each vessel in the study. The plots depict the limits where each element meets the target limit. The line colors correspond to the limits on the right side of the wind rose plot.
ANALYSIS FINAL.docx
1.0 | March 6, 2025 14
Figure 9 – RCL Oasis of the Seas – Starboard Side Mooring
Figure 10 – RCL Icon of the Seas – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 15
Figure 11 – MSC Worldclass – Starboard Side Mooring
Figure 12 – RCL Oasis of the Seas – Port Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 16
Figure 13 – RCL Icon of the Seas – Port Side Mooring
Figure 14 – MSC Worldclass – Port Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 17
The following figures depict the results of the mooring analysis for using a 40 knot wind (60-second wind) in all directions. The values for mooring lines, fenders, bollards, and ship movement are the maximum values recorded during the analysis. The results for each element do not necessarily occur at the same time. For the mooring line results, there is a cell titled “Worst Direction” and the angle displayed (in degrees) relates to the worst-case wind direction for that particular mooring line and the corresponding max line tension.
For each analysis, the mooring line tension, fender compression, bollard loading, and ship movement (surge, sway, and heave) were checked. For sway, an inward way that exceeds the target limit of 1.6 feet is expected, as that relates to the compression of the foam filled fenders, which have a max design compression of 3.9 feet.
Figure 15 – RCL Oasis of the Seas – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 18
Figure 16 – RCL Icon of the Seas – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 19
Figure 17 – MSC Worldclass – Starboard Side Mooring
ANALYSIS FINAL.docx
1.0 | March 6, 2025 20
Conclusion The mooring analysis concludes that the ships considered in this study can meet the OCIMF recommendation of 50% of breaking line strength for sustained winds up to 40 knots. To achieve this condition, the following is a list of mooring upgrades that will be required at CT10:
1. The addition of three (3) 200 metric ton mooring bollards with monopile foundations, shown as Bollards *A, *B, and *C.
a. 150 metric ton bollards are a minimum, the cruise lines may require 200 mT bollards for new bollards, thus it is recommended to go with the higher capacity bollards to avoid potential safety concerns with the cruise lines in the future.
2. The construction of a new toe wall and bulkhead to deepen the berth pocket at CT10.
3. Scour protection mattress at the toe wall/bulkhead area of the deepened berth pocket.
See Figure 18 for a summary of these recommendations.
Figure 18 – Recommended Mooring Improvements for CT10 for safe mooring
At the direction of CPA, the recommended new bollard to the west (labeled Bollard *C in the analysis results) was positioned to not be any further west than the existing mooring dolphin with four (4) 150 metric ton bollards, to avoid potentially encroaching into the agreed limits of the nearby federal channel. This limitation does cause some reduced benefits for the longer vessels, like Icon of the Seas, as the resulting mooring line angles are not optimal.
The vessels considered in this study are the largest cruise ships currently in use anywhere in the world, they are very susceptible to wind effects. For this reason, it is recommended ship passenger movements cease when wind speeds are expected to exceed 35 knots. These ships, in particular Icon of the Seas, should begin making preparations to leave the berth if sustained winds are anticipated to exceed 40 knots to avoid the risk of breaking mooring lines or overloading mooring bollards.
ANALYSIS FINAL.docx
1.0 | March 6, 2025 21
Starboard Side Mooring provides the best overall mooring results. Port side mooring will require the vessels to be situated within the expanded berth pocket to achieve improved mooring line angles, particularly to the eastern mooring bollards. This may cause the minimum separation from the bow of the vessel to be less than 60 feet from the nearest adjacent bulkhead element.
If fender compression becomes a problem during operation, CPA may want to consider upgrading fenders to a larger diameter. This must be carefully coordinated with a passenger boarding bridge (PBB) study to ensure reach is not an issue. This should be considered if fender compression and separation from existing PBBs becomes an issue.
The ship passenger doors were evaluated for starboard and port side mooring for the 3 design vessels in this study. All ships appear to be within the existing terminal door envelope, which should allow two (2) PBBs to connect to each vessel at the desired upper passenger doors for each ship. See Appendix A for the mooring plan layouts with terminal door envelope and ship shell doors depicted for each mooring configuration.
Rough Order of Magnitude Estimate
A rough order of magnitude (ROM) cost estimate has been prepared as part of this study. The following elements are considered for this ROM. This estimate is based on historical construction costs for similar elements. No calculations or engineering for the design of these elements were performed. It is assumed the design for the mooring bollard monopiles, bulkhead, scour protection, and other related elements will be performed with the input of a geotechnical engineer to make recommendations on pile driving, scour, and stability recommendations. There is a deck structural infill section that is required to allow for the necessary PBB movement (see exhibits in appendix). This infill section was previously included in a CT10 waterside modifications bid package in 2019, but was not built. Dredge volume for the deepened berth pocket was not included in this ROM estimate.
This ROM estimate assumes Buy America requirements for domestically sourced materials, should federal funding be used for any of these projects. Costs may be subject to escalation or impacts from tariffs, which have not been included in this estimate. This estimate does not include soft costs, such as design, permitting, bonding, insurance, or other associated costs.
APPENDICES
ANALYSIS FINAL.docx
1.0 | March 6, 2025 23
Appendix A. Mooring Arrangements with Recommended Marine Improvements
X
X
X
X
X
XXXXX
X
X
X
X
X
STOP
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X X X X
X X
XX
X
X X
X X
X X
X
X X
X X
X X
X X X X
X
X X X X X X
X X X X
X X X X X X X
X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
F
STOPSTOP
F
W
W
W
Schindler Sc hi nd le r
Sc hi nd le rSchindler e.2 e.3 e.4 e.5 e.6 e.7 e.8 e.9 e.10 e.11 e.11.3 e.12
4.6 4.9
5.8 7 8 9 10 11 12 13 14 15 16 17 184.7 5.9
PL
O
T
DA
TE
FI
LE
N
AM
E:
M ar
3,
- 2 :5
5p m
C:
\U se rs
\d ea b2
2\ O ne Dr ive C or p\
At kin sR éa lis \P or t C an av er al
P ro je ct s
- P ro je ct s\
CT
F ea sib ilit y St ud y\
D ra wi ng s\
M oo rin g
Ex hi bi ts
\D
RA
W
IN
G S\
CT
M oo rin g
- R
CC
L O
AS
IS
ST
AR
BO
AR
D.
dw g
IS
SU
ED
F
O R
R
EV
D
AT
E
IS
SU
ED
F O
R R
EV
D
AT
E
SHEET NO. REV.
C
LI
EN
T:
SH
EE
T
TI
TL
E
PROJECT ENG:
CHECKED:
APPROVED:
DRAWN:
JOB NO.:
PR
O
JE
C
T:
LOCAL OFFICE:
2671 W. EAU GALLIE BLVD.
MELBOURNE, FL. 32935
SUITE 104
TEL. 321.242.4942
FAX. 321.242.6101
100113218
CORPORATE OFFICE:
4030 W. BOY SCOUT BLVD.
TAMPA, FLORIDA 33607
FBPR CERTIFICATE OF
AUTHORIZATION NO.24
www.atkinsrealis.com
CT
F
EA
SI
BI
LI
TY
S
TU
DY
M
OO
RI
NG
E
XH
IB
IT
S
CA
NA
VE
RA
L
PO
RT
A
UT
HO
RI
TY
D
ES
ID
ER
IO
M
AL
D
O N
AD
O
FL
O
R
ID
A R
EG
. N
O .7
D. MALDONADO
A. DeABREU
D. MALDONADO
-1
8-
IS
SU
ED
F
O R
B
ID
N
CT10 - RCCL OASIS OF THE SEAS STARBOARD MOORING PLAN
SCALE: 1" = 50'
C.T. 10
C.T. 8
WEST TURNING BASIN
EX-1A
FEDERAL CHANNEL LIMITS
RC
C
L O
A
SI
S O
F
TH
E
SE
A S
ST
A
RB
O
A
RD
M O
O
RI
N G
P
LA
N
BERTH BOX LIMITS
(TYP)113
(TYP)
125WS125FS125WS
WS 100
100100WS125125 WS
FS
(TYP)
LEGEND
POTABLE WATER STATION
FUEL STATION
91 MT BOLLARD
100 MT T-HEAD BOLLARD
113 MT BOLLARD
125 MT T-HEAD BOLLARD
150 MT T-HEAD BOLLARD
WS
FS
SUBMERGED TOE WALL
EXTEND TOE WALL
NEW BULKHEAD WALL
DREDGE TO -35.0' MLLW
NEW 200 MT MONOPILE
SHORE MOORING DOLPHINS
NEW 200 MT MOORING BOLLARD
AND MONOPILE STRUCTURE WITH
WALKWAY PLATE
FILL-IN DECK
AutoCAD SHX Text M
AutoCAD SHX Text
ET
AutoCAD SHX Text M
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
MHH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
COV. BRICK PAVERS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
FORKLIFT CROSSING SIGN
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
GRATED CHANNEL
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
SECSTRPlanLeftPit(-50,-1150,350,1150) AutoCAD SHX Text
STORES
AutoCAD SHX Text
%%UOASIS CLASS
AutoCAD SHX Text LOA = 361.88m (1187.3')
AutoCAD SHX Text DRAFT = 9.15m (30.0')
AutoCAD SHX Text BEAM = 47.02m (154.3')
AutoCAD SHX Text +4.64m (15.2')
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
PAX
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text +4.64m (15.2')
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +4.64m (15.2')
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text
STAGE STORES
AutoCAD SHX Text +9.6m (31.5')
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
PAX/TENDER
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
SPARE PARTS
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
PAX
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
GARBAGE
AutoCAD SHX Text
STORES
AutoCAD SHX Text +3.71m (12.1')
AutoCAD SHX Text
STORES
AutoCAD SHX Text +3.71m (12.1')
AutoCAD SHX Text +3.70m (12.1')
AutoCAD SHX Text -20
AutoCAD SHX Text -10
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
BOW THRUSTERS
AutoCAD SHX Text
FWD ESCALATOR PAX/LUGGAGE
AutoCAD SHX Text
AFT ESCALATOR PAX/TENDER
AutoCAD SHX Text #5
AutoCAD SHX Text #1
AutoCAD SHX Text #7
AutoCAD SHX Text #9
AutoCAD SHX Text #17
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text
SCALE: 1" = 50'-0"
X
X
X
X
XXXXX
X
X
X
X
X
STOP
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X X X X
X X
XX
X
X X
X X
X X
X
X X
X X
X X
X X X X
X
X X X X X X
X X X X
X X X X X X X
X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
F
STOPSTOP
F
W
W
W
Schindler Sc hi nd le r
Sc hi nd le rSchindler e.2 e.3 e.4 e.5 e.6 e.7 e.8 e.9 e.10 e.11 e.11.3 e.12
4.6 4.9
5.8 7 8 9 10 11 12 13 14 15 16 17 184.7 5.9
IC
O
N O
F TH
E SEAS
LO
A = 1197.64' (364.96m
BEAM
= 159.13' (48.50m
D R
AFT = 29.86' (9.10m
BU
N
KER
EL. + 41.50'
PR
O
VISIO
N
EL. + 41.50'
FW
BU
N
KER
EL. + 41.50'
C R
EW
/LU
G G
AG
E
EL. + 41.50'
FW
BU
N
KER
EL. + 41.50'
LN
G
BU
N
KER
EL. + 41.50'
LN
G
BU
N
KER
EL. + 41.50'
G
AR
BAG
E
EL. + 41.50'
LU
G
G
AG
E
EL. + 41.50'
C R
EW
/LU
G G
AG
E
EL. + 41.50'
SH
O
R E C
O N
N
EL. + 41.50'
PASSEN
G
ER
S
EL. + 41.50'
SPAR
E PAR
TS
EL. + 41.50'
BU
N
KER
EL. + 41.50'
PASSEN
G
ER
S
EL. + 32.56'
PASSEN
G
ER
S
EL. +32.56'
PASSEN
G
ER
S
EL. + 32.56'
LU
G
G
AG
E
EL. + 41.50'
PILO
T/LU
G G
AG
E
EL. + 41.50'
BO
W
TH
R
U
STER
S
PL
O
T
DA
TE
FI
LE
N
AM
E:
M ar
3,
- 1 1:
am
C:
\U se rs
\d ea b2
2\ O ne Dr ive C or p\
At kin sR éa lis \P or t C an av er al
P ro je ct s
- P ro je ct s\
CT
F ea sib ilit y St ud y\
D ra wi ng s\
M oo rin g
Ex hi bi ts
\D
RA
W
IN
G S\
CT
M oo rin g
- R
CC
L
IC
O N
- S
TA
RB
O
AR
D.
dw g
IS
SU
ED
F
O R
R
EV
D
AT
E
IS
SU
ED
F O
R R
EV
D
AT
E
SHEET NO. REV.
C
LI
EN
T:
SH
EE
T
TI
TL
E
PROJECT ENG:
CHECKED:
APPROVED:
DRAWN:
JOB NO.:
PR
O
JE
C
T:
LOCAL OFFICE:
2671 W. EAU GALLIE BLVD.
MELBOURNE, FL. 32935
SUITE 104
TEL. 321.242.4942
FAX. 321.242.6101
100113218
CORPORATE OFFICE:
4030 W. BOY SCOUT BLVD.
TAMPA, FLORIDA 33607
FBPR CERTIFICATE OF
AUTHORIZATION NO.24
www.atkinsrealis.com
CT
F
EA
SI
BI
LI
TY
S
TU
DY
M
OO
RI
NG
E
XH
IB
IT
S
CA
NA
VE
RA
L
PO
RT
A
UT
HO
RI
TY
D
ES
ID
ER
IO
M
AL
D
O N
AD
O
FL
O
R
ID
A R
EG
. N
O .7
D. MALDONADO
A. DeABREU
D. MALDONADO
-1
8-
IS
SU
ED
F
O R
B
ID
N
CT10 - RCCL ICON OF THE SEAS STARBOARD MOORING PLAN
SCALE: 1" = 50'
C.T. 10
C.T. 8
EX-2A
FEDERAL CHANNEL LIMITS
RC
C
L
IC
O N
O F
TH
E
SE
A
S
ST
A
RB
O A
RD
M
O O
RI
N
G P
LA
N
BERTH BOX LIMITS
WEST TURNING BASIN
(TYP)113
(TYP)
125WS125
FS125WSWS 100100100WS125125 WS
FS
(TYP)
LEGEND
POTABLE WATER STATION
FUEL STATION
91 MT BOLLARD
100 MT T-HEAD BOLLARD
113 MT BOLLARD
125 MT T-HEAD BOLLARD
150 MT T-HEAD BOLLARD
WS
FS
SUBMERGED TOE WALL
EXTEND TOE WALL
NEW BULKHEAD WALL
FILL-IN DECK
DREDGE TO -35.0' MLLW
NEW 200 MT MONOPILE
SHORE MOORING DOLPHINS
NEW 200 MT MOORING BOLLARD
AND MONOPILE STRUCTURE WITH
WALKWAY PLATE
AutoCAD SHX Text M
AutoCAD SHX Text
ET
AutoCAD SHX Text M
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
MHH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
COV. BRICK PAVERS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
FORKLIFT CROSSING SIGN
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
GRATED CHANNEL
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
SECSTRPlanLeftPit(-50,-1150,350,1150) AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
X
X
X
X
XXXXX
X
X
X
X
X
STOP
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X X X X
X X
XX
X
X X
X X
X X
X
X X
X X
X X
X X X X
X
X X X X X X
X X X X
X X X X X X X
X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
F
STOPSTOP
F
W
W
W
Schindler Sc hi nd le r
Sc hi nd le rSchindler e.2 e.3 e.4 e.5 e.6 e.7 e.8 e.9 e.10 e.11 e.11.3 e.12
4.6 4.9
5.8 7 8 9 10 11 12 13 14 15 16 17 184.7 5.9
STER
N
TH
R
U
STER
S
BO
W
TH
R
U
STER
S
M
SC
W O
R
LD
C
LASS
LO
A = 1093.5'
BEAM
= 154.3'
D R
AFT = 30'
PAX D
O
O R
FW
D
EL. + 31.94'
PAX D
O
O R
FW
D
EL. + 21.25'
PAX D
O
O R
FW
D
EL. + 31.94'
PAX D
O
O R
FW
D
EL. + 21.25'
C R
EW
/LU
G G
AG
E
EL. + 4.63'
PR
O
VISIO
N
S
EL. + 4.63'
PAX D
O
O R
FW
D
EL. + 21.25'
C R
EW
/LU
G G
AG
E
EL. + 4.63'
PL
O
T
DA
TE
FI
LE
N
AM
E:
M ar
3,
- 3 :0
5p m
C:
\U se rs
\d ea b2
2\ O ne Dr ive C or p\
At kin sR éa lis \P or t C an av er al
P ro je ct s
- P ro je ct s\
CT
F ea sib ilit y St ud y\
D ra wi ng s\
M oo rin g
Ex hi bi ts
\D
RA
W
IN
G S\
CT
M oo rin g
- M
SC
W O
RL
D
CL
AS
S
- S
TA
RB
O
AR
D.
dw g
IS
SU
ED
F
O R
R
EV
D
AT
E
IS
SU
ED
F O
R R
EV
D
AT
E
SHEET NO. REV.
C
LI
EN
T:
SH
EE
T
TI
TL
E
PROJECT ENG:
CHECKED:
APPROVED:
DRAWN:
JOB NO.:
PR
O
JE
C
T:
LOCAL OFFICE:
2671 W. EAU GALLIE BLVD.
MELBOURNE, FL. 32935
SUITE 104
TEL. 321.242.4942
FAX. 321.242.6101
100113218
CORPORATE OFFICE:
4030 W. BOY SCOUT BLVD.
TAMPA, FLORIDA 33607
FBPR CERTIFICATE OF
AUTHORIZATION NO.24
www.atkinsrealis.com
CT
F
EA
SI
BI
LI
TY
S
TU
DY
M
OO
RI
NG
E
XH
IB
IT
S
CA
NA
VE
RA
L
PO
RT
A
UT
HO
RI
TY
D
ES
ID
ER
IO
M
AL
D
O N
AD
O
FL
O
R
ID
A R
EG
. N
O .7
D. MALDONADO
A. DeABREU
D. MALDONADO
-1
8-
IS
SU
ED
F
O R
B
ID
N
CT10 - MSC WORLD CLASS STARBOARD MOORING PLAN
SCALE: 1" = 50'
C.T. 8
EX-3A
FEDERAL CHANNEL LIMITS
M
SC
W
O
RL
D C
LA
SS
S
TA
RB
O
A
RD
M O
O
RI
N G
P
LA
N
BERTH BOX LIMITS
WEST TURNING BASIN
LEGEND
POTABLE WATER STATION
FUEL STATION
91 MT BOLLARD
100 MT T-HEAD BOLLARD
113 MT BOLLARD
125 MT T-HEAD BOLLARD
150 MT T-HEAD BOLLARD
WS
FS
C.T. 10
(TYP)
(TYP)
125WS125FS125WSWS
100100WS125125 WS
FS
(TYP) 125
SUBMERGED TOE WALL
EXTEND TOE WALL
NEW BULKHEAD WALL
FILL-IN DECK
DREDGE TO -35.0' MLLW
NEW 200 MT MONOPILE
SHORE MOORING DOLPHINS
NEW 200 MT MOORING BOLLARD
AND MONOPILE STRUCTURE
WITH WALKWAY PLATE
AutoCAD SHX Text M
AutoCAD SHX Text
ET
AutoCAD SHX Text M
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
MHH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
COV. BRICK PAVERS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
FORKLIFT CROSSING SIGN
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
GRATED CHANNEL
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
SECSTRPlanLeftPit(-50,-1150,350,1150) AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
X
X
X
X
XXXXX
X
X
X
X
X
STOP
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X X X X
X X
XX
X
X X
X X
X X
X
X X
X X
X X
X X X X
X
X X X X X X
X X X X
X X X X X X X
X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
F
STOPSTOP
F
W
W
W
Schindler Sc hi nd le r
Sc hi nd le rSchindler e.2 e.3 e.4 e.5 e.6 e.7 e.8 e.9 e.10 e.11 e.11.3 e.12
4.6 4.9
5.8 7 8 9 10 11 12 13 14 15 16 17 184.7 5.9
PL
O
T
DA
TE
FI
LE
N
AM
E:
M ar
3,
- 2 :5
3p m
C:
\U se rs
\d ea b2
2\ O ne Dr ive C or p\
At kin sR éa lis \P or t C an av er al
P ro je ct s
- P ro je ct s\
CT
F ea sib ilit y St ud y\
D ra wi ng s\
M oo rin g
Ex hi bi ts
\D
RA
W
IN
G S\
CT
M oo rin g
- R
CC
L O
AS
IS
PO
RT
SI
DE
.d wg
IS
SU
ED
F
O R
R
EV
D
AT
E
IS
SU
ED
F O
R R
EV
D
AT
E
SHEET NO. REV.
C
LI
EN
T:
SH
EE
T
TI
TL
E
PROJECT ENG:
CHECKED:
APPROVED:
DRAWN:
JOB NO.:
PR
O
JE
C
T:
LOCAL OFFICE:
2671 W. EAU GALLIE BLVD.
MELBOURNE, FL. 32935
SUITE 104
TEL. 321.242.4942
FAX. 321.242.6101
100113218
CORPORATE OFFICE:
4030 W. BOY SCOUT BLVD.
TAMPA, FLORIDA 33607
FBPR CERTIFICATE OF
AUTHORIZATION NO.24
www.atkinsrealis.com
CT
F
EA
SI
BI
LI
TY
S
TU
DY
M
OO
RI
NG
E
XH
IB
IT
S
CA
NA
VE
RA
L
PO
RT
A
UT
HO
RI
TY
D
ES
ID
ER
IO
M
AL
D
O N
AD
O
FL
O
R
ID
A R
EG
. N
O .7
D. MALDONADO
A. DeABREU
D. MALDONADO
-1
8-
IS
SU
ED
F
O R
B
ID
N
CT10 - RCCL OASIS OF THE SEAS PORTSIDE MOORING PLAN
SCALE: 1" = 50'
C.T. 10
C.T. 8
EX-1B
FEDERAL CHANNEL LIMITS
RC
C
L O
A
SI
S O
F
TH
E
SE
A S
PO
RT
SI
D
E M
O O
RI
N
G P
LA
N
BERTH BOX LIMITS
WEST TURNING BASIN
(TYP)
(TYP)
125WS125FS125WS
WS
100100100WS125
WS
FS
(TYP)
LEGEND
POTABLE WATER STATION
FUEL STATION
91 MT BOLLARD
100 MT T-HEAD BOLLARD
113 MT BOLLARD
125 MT T-HEAD BOLLARD
150 MT T-HEAD BOLLARD
WS
FS
SUBMERGED TOE WALL
EXTEND TOE WALL
NEW BULKHEAD WALL
FILL-IN DECK
DREDGE TO -35.0' MLLW
NEW 200 MT MONOPILE
SHORE MOORING DOLPHINS
NEW 200 MT MOORING BOLLARD
AND MONOPILE STRUCTURE WITH
WALKWAY PLATE
AutoCAD SHX Text M
AutoCAD SHX Text
ET
AutoCAD SHX Text M
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
MHH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
COV. BRICK PAVERS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
FORKLIFT CROSSING SIGN
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
GRATED CHANNEL
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
SECSTRPlanLeftPit(-50,-1150,350,1150) AutoCAD SHX Text
STORES
AutoCAD SHX Text
%%UOASIS CLASS
AutoCAD SHX Text LOA = 361.88m (1187.3')
AutoCAD SHX Text DRAFT = 9.15m (30.0')
AutoCAD SHX Text BEAM = 47.02m (154.3')
AutoCAD SHX Text +4.64m (15.2')
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
PAX
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text +4.64m (15.2')
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +4.64m (15.2')
AutoCAD SHX Text
FW BUNKER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text L
AutoCAD SHX Text
C GANGWAY
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text +13.5m (44.3')
AutoCAD SHX Text
MAIN PAX
AutoCAD SHX Text
STAGE STORES
AutoCAD SHX Text +9.6m (31.5')
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
PAX/TENDER
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
SPARE PARTS
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
PAX
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
LUGGAGE
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
GARBAGE
AutoCAD SHX Text
STORES
AutoCAD SHX Text +3.71m (12.1')
AutoCAD SHX Text
STORES
AutoCAD SHX Text +3.71m (12.1')
AutoCAD SHX Text +3.70m (12.1')
AutoCAD SHX Text -20
AutoCAD SHX Text -10
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
WSYM>U.WTR91>Y.410-XY/T :00:91583 :POLLARI :
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
UNDER
AutoCAD SHX Text +3.64m (11.9')
AutoCAD SHX Text
BOW THRUSTERS
AutoCAD SHX Text
FWD ESCALATOR PAX/LUGGAGE
AutoCAD SHX Text
AFT ESCALATOR PAX/TENDER
AutoCAD SHX Text #5
AutoCAD SHX Text #1
AutoCAD SHX Text #7
AutoCAD SHX Text #9
AutoCAD SHX Text #17
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
X
X
X
X
XXXXX
X
X
X
X
X
STOP
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X X X X
X X
XX
X
X X
X X
X X
X
X X
X X
X X
X X X X
X
X X X X X X
X X X X
X X X X X X X
X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
F
STOPSTOP
F
W
W
W
Schindler Sc hi nd le r
Sc hi nd le rSchindler e.2 e.3 e.4 e.5 e.6 e.7 e.8 e.9 e.10 e.11 e.11.3 e.12
4.6 4.9
5.8 7 8 9 10 11 12 13 14 15 16 17 184.7 5.9
IC
O
N O
F
TH
E
SE
AS
LO
A
.6 4'
(3
.9 6m
BE
AM
.1 3'
(4 8.
m
D
R
AF
T
.8
6' (9
.1 0m
BU
N
KE
R
EL
1.
PR
O
VI
SI
O N
EL
1.
FW
B
U N
KE
R
EL
1.
C R
EW
/L
U G
G
AG
E
EL
1.
FW
B
U N
KE
R
EL
1.
LN
G
B U
N
KE
R
EL
1.
LN
G
B U
N
KE
R
EL
1.
G
AR
BA
G
E
EL
1.
LU
G
G
AG
E
EL
1.
C
R
EW
/L U
G G
AG
E
EL
1.
SH
O
R E
C O
N N
EL
1.
PA
SS
EN
G
ER
S
EL
1.
SP
AR
E
PA
R
TS
EL
1.
BU
N
KE
R
EL
1.
PA
SS
EN
G
ER
S
EL
2.
PA
SS
EN
G
ER
S
EL
.5
6'
PA
SS
EN
G
ER
S
EL
2.
LU
G
G
AG
E
EL
1.
PI
LO
T/
LU
G G
AG
E
EL
1.
BO
W
T H
R U
ST
ER
S
PL
O
T
DA
TE
FI
LE
N
AM
E:
M ar
3,
- 2 :5
1p m
C:
\U se rs
\d ea b2
2\ O ne Dr ive C or p\
At kin sR éa lis \P or t C an av er al
P ro je ct s
- P ro je ct s\
CT
F ea sib ilit y St ud y\
D ra wi ng s\
M oo rin g
Ex hi bi ts
\D
RA
W
IN
G S\
CT
M oo rin g
- R
CC
L
IC
O N
- P O
RT
SI
DE
.d wg
IS
SU
ED
F
O R
R
EV
D
AT
E
IS
SU
ED
F O
R R
EV
D
AT
E
SHEET NO. REV.
C
LI
EN
T:
SH
EE
T
TI
TL
E
PROJECT ENG:
CHECKED:
APPROVED:
DRAWN:
JOB NO.:
PR
O
JE
C
T:
LOCAL OFFICE:
2671 W. EAU GALLIE BLVD.
MELBOURNE, FL. 32935
SUITE 104
TEL. 321.242.4942
FAX. 321.242.6101
100113218
CORPORATE OFFICE:
4030 W. BOY SCOUT BLVD.
TAMPA, FLORIDA 33607
FBPR CERTIFICATE OF
AUTHORIZATION NO.24
www.atkinsrealis.com
CT
F
EA
SI
BI
LI
TY
S
TU
DY
M
OO
RI
NG
E
XH
IB
IT
S
CA
NA
VE
RA
L
PO
RT
A
UT
HO
RI
TY
D
ES
ID
ER
IO
M
AL
D
O N
AD
O
FL
O
R
ID
A R
EG
. N
O .7
D. MALDONADO
A. DeABREU
D. MALDONADO
-1
8-
IS
SU
ED
F
O R
B
ID
N
CT10 - RCCL ICON OF THE SEAS PORTSIDE MOORING PLAN
SCALE: 1" = 50'
C.T. 10
C.T. 8
EX-2B
FEDERAL CHANNEL LIMITS
RC
C
L
IC
O N
O F
TH
E
SE
A
S
PO
RT
SI
D E
M O
O
RI
N G
P
LA
N
BERTH BOX LIMITS
WEST TURNING BASIN
(TYP)
(TYP)
125WS125FS125WSWS 100100100WS125
WS
FS
(TYP)
LEGEND
POTABLE WATER STATION
FUEL STATION
91 MT BOLLARD
100 MT T-HEAD BOLLARD
113 MT BOLLARD
125 MT T-HEAD BOLLARD
150 MT T-HEAD BOLLARD
WS
FS
EXTEND TOE WALL
NEW BULKHEAD WALL
FILL-IN DECK
DREDGE TO -35.0' MLLW
NEW 200 MT MONOPILE
SHORE MOORING DOLPHINS
SUBMERGED TOE WALL
NEW 200 MT MOORING BOLLARD
AND MONOPILE STRUCTURE WITH
WALKWAY PLATE
AutoCAD SHX Text M
AutoCAD SHX Text
ET
AutoCAD SHX Text M
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
MHH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
COV. BRICK PAVERS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
FORKLIFT CROSSING SIGN
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
GRATED CHANNEL
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
SECSTRPlanLeftPit(-50,-1150,350,1150) AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
X
X
X
X
XXXXX
X
X
X
X
X
STOP
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X
X X X X X
X X
XX
X
X X
X X
X X
X
X X
X X
X X
X X X X
X
X X X X X X
X X X X
X X X X X X X
X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
F
STOPSTOP
F
W
W
W
Schindler Sc hi nd le r
Sc hi nd le rSchindler e.2 e.3 e.4 e.5 e.6 e.7 e.8 e.9 e.10 e.11 e.11.3 e.12
4.6 4.9
5.8 7 8 9 10 11 12 13 14 15 16 17 184.7 5.9
ST
ER
N
TH
R U
ST
ER
S
BO
W
TH
R
U
ST
ER
S M
SC
W O
R
LD
C
LA
SS
LO
A
.5
BE
AM
.3
D
R
AF
T
PA
X
D O
O R
F W
D
EL
1.
PA
X
D O
O R
F W
D
EL
1.
PA
X
D O
O R
F W
D
EL
1.
PA
X
D O
O R
F W
D
EL
1.
C R
EW
/L
U G
G
AG
E
EL
.6 3'
PR
O
VI
SI
O N
S
EL
.6 3'
PA
X
D O
O R
F W
D
EL
1.
C R
EW
/L
U G
G
AG
E
EL
.6 3'
PL
O
T
DA
TE
FI
LE
N
AM
E:
M ar
3,
- 2 :4
8p m
C:
\U se rs
\d ea b2
2\ O ne Dr ive C or p\
At kin sR éa lis \P or t C an av er al
P ro je ct s
- P ro je ct s\
CT
F ea sib ilit y St ud y\
D ra wi ng s\
M oo rin g
Ex hi bi ts
\D
RA
W
IN
G S\
CT
M oo rin g
- M
SC
W O
RL
D
CL
AS
S
- P
O
RT
SI
DE
.d wg
IS
SU
ED
F
O R
R
EV
D
AT
E
IS
SU
ED
F O
R R
EV
D
AT
E
SHEET NO. REV.
C
LI
EN
T:
SH
EE
T
TI
TL
E
PROJECT ENG:
CHECKED:
APPROVED:
DRAWN:
JOB NO.:
PR
O
JE
C
T:
LOCAL OFFICE:
2671 W. EAU GALLIE BLVD.
MELBOURNE, FL. 32935
SUITE 104
TEL. 321.242.4942
FAX. 321.242.6101
100113218
CORPORATE OFFICE:
4030 W. BOY SCOUT BLVD.
TAMPA, FLORIDA 33607
FBPR CERTIFICATE OF
AUTHORIZATION NO.24
www.atkinsrealis.com
CT
F
EA
SI
BI
LI
TY
S
TU
DY
M
OO
RI
NG
E
XH
IB
IT
S
CA
NA
VE
RA
L
PO
RT
A
UT
HO
RI
TY
D
ES
ID
ER
IO
M
AL
D
O N
AD
O
FL
O
R
ID
A R
EG
. N
O .7
D. MALDONADO
A. DeABREU
D. MALDONADO
-1
8-
IS
SU
ED
F
O R
B
ID
N
CT10 - MSC WORLD CLASS PORTSIDE MOORING PLAN
SCALE: 1" = 50'
C.T. 10
C.T. 8
EX-3B
FEDERAL CHANNEL LIMITS
M
SC
W
O
RL
D C
LA
SS
P O
RT
SI
D E
M O
O
RI
N G
P
LA
N
BERTH BOX LIMITS
WEST TURNING BASIN
(TYP)
(TYP)
125WS125FS125WSWS
100100WS125125 WS
FS
(TYP)
LEGEND
POTABLE WATER STATION
FUEL STATION
91 MT BOLLARD
100 MT T-HEAD BOLLARD
113 MT BOLLARD
125 MT T-HEAD BOLLARD
150 MT T-HEAD BOLLARD
WS
FS
SUBMERGED TOE WALL
EXTEND TOE WALL
NEW BULKHEAD WALL
FILL-IN DECK
DREDGE TO -35.0' MLLW
NEW 200 MT MONOPILE
SHORE MOORING DOLPHINS NEW 200 MT MOORING BOLLARD
AND MONOPILE STRUCTURE WITH
WALKWAY PLATE
AutoCAD SHX Text M
AutoCAD SHX Text
ET
AutoCAD SHX Text M
AutoCAD SHX Text
EXIT SIGN
AutoCAD SHX Text
MHH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
COV. BRICK PAVERS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
FORKLIFT CROSSING SIGN
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
SLS 10 MPH
AutoCAD SHX Text
GRATED CHANNEL
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text R
SECSTRPlanLeftPit(-50,-1150,350,1150) AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text N2
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
Desi Maldonado, PE
AtkinsRealis USA Inc.
2671 W. Eau Gallie Blvd.
Suite 104
Melbourne, FL 32935
Tel: +1 321 242 4942
Mobile: 321.345.3511
Desiderio.Maldonado@atkinsrealis.com
© AtkinsRealis USA Inc. except where stated otherwise
File details come from the government source that posted it. Updated .