This is a feasibility study final report for the Canaveral Port Authority regarding Cruise Terminal 10 Landside Improvements. The document presents a comprehensive analysis of terminal reconfiguration options designed to accommodate larger vessels with approximately 7,000 passenger capacity. The study evaluates two primary design options, 5C-A (CPA Preferred Option) and 5C-B, with detailed comparisons to existing conditions across multiple operational areas. Option 5C-A includes reorganized east parking with 21 intermodal bus spaces, reorganized west parking with 14 shuttle spaces and 22 staff/CBP spaces, 25,887 square feet of baggage laydown area, 19,180 square feet of seating, 6 baggage scanning lanes, and 9 security screening lanes. The project scope encompasses site and traffic improvements including one new vehicle lane. The study details a phased construction approach across five phases to maintain cruise terminal operations during non-ship days and night shifts, with minimal disturbance to CBP Federal Inspection Service areas.

Option 5C-A presents advantages including additional baggage laydown space, two ramps from concourse to baggage laydown, limited disturbance to bus parking, and an enlarged CBP queuing area, though disadvantages include bifurcated baggage laydown hall, increased walking distances from baggage pickup to CBP, limited sidewalk areas for pedestrian movement, and reduced intermodal bus spaces due to larger security screening egress stairs. Option 5C-B offers an expanded footprint with 30,892 square feet of baggage laydown area and approximately 17 new pickup and drop-off spaces but carries a rough order of magnitude exceeding $50 million. The feasibility study includes detailed axonometric views, floor plans, site improvement diagrams, circulation analyses, and construction phase diagrams across both building levels, providing comprehensive visualization of terminal renovations and expansions necessary to support increased cruise passenger volumes.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Port Canaveral CT 10 Feasibility Study - 100%

106.09.2025

Agenda

• Introductions

• Meeting Objectives

• Comparative Analysis-Program Requirement / Updated Priorities

• Revised Study Options 5C-A & 5C-B

• Revised Study CPA Preferred Option 5C-A_3D Images

• Revised Study CPA Preferred Option 5C-A_Site Improvement

206.09.2025

Existing CT 10 Site plan

306.09.2025

Level 1

06.09.2025

Existing Cruise Terminal 10: CIRCULATION DIAGRAMS

Level 2

Existing Cruise Port Comparison: CT 1 CT 3 CT 10

Level 1

Level 2

Level 1

Level 2

06.09.2025 5

Level 1

Level 2

Level 1

Level 2

Cruise Port Terminal 10 Comparison: Existing, CPA Preferred Option 5C-A, Option 5C-B

Existing Plan CPA Preferred Option 5C-A Plan Option 5C-B Plan

Level 2

CPA Preferred Option 5C-A: CIRCULATION DIAGRAMS

Features:

• Reorganized east parking with 21 intermodal bus spaces

• Reorganized west parking with 14 shuttle spaces and 22 staff/CBP spaces

• 25,887 sf of baggage laydown area

• 19,180 sf of seating

• 6 baggage scanning lanes

• 9 security screening lanes

• Site and traffic improvement with one new lane

Pros

• Additional baggage laydown space

• Two ramps from Concourse to baggage laydown

• Limited disturbance to bus parking

• Enlarged CBP queuing area

Cons

• Bifurcated baggage laydown hall

• Increased walking distance from baggage pick up to CBP

• Limited sidewalk area for pedestrian movement

• Larger egress stair from security screening reduces intermodal bus spaces

Option 5C-A: Embarking Passenger Security remains on Level 2 & Bag Screening at remote location

Level 2

(1)

(2)

3 (3)

(4) (5)

(6)

(7)

06.09.2025 8

Option 5C-A: Axonometric View

Level 1_View from South to North

906.09.2025

New Mechanical room

West baggage laydown

CBP primary inspection CBP queueing

East baggage laydown

New ramp

New crew lounge

Existing crew check-in

New baggage scanning

Intermodal bus parking

New shuttle bus parking

New storage

New storage

Option 5C-A: Axonometric View

Level 2_View from South to North

1006.09.2025

New canopy New break room

New office New VIP seating

General seating New check-in counters

New mobile check-in tables

New embark passenger security New ramp

Queueing New stair

Existing passenger bridge Existing canopy

New canopy New baggage scanning

New elevators

Option 5C-A: Roof Plan

Roof Plan

1106.09.2025

Cruise Terminal 10

Existing Parking GarageExisting Parking Garage

Existing Parking Garage

Existing Parking Garage

New Canopy (22,377 SF)

Exist. Canopy

New Bldg.

Exist. Canopy New Canopy

New Canopy

Exist. CanopyExist. Roof Exist. RoofExist. Roof

Exist. Roof Exist. Roof

New Roof

Exist. Roof New Roof

Building Expansion

Building Expansion

Exist.

Canopy

New Canopy

New Roof

(3,316 SF)

(7,630 SF)

New Roof

Option 5C-A: Enlarged Plan

1206.09.2025

Option 5C-A: Enlarged Plan

1306.09.2025

East Parking Reconfiguration

Existing _ Intermodal Parking Option 5C-A _ Intermodal Parking

Features:

• Reorganized east parking with 21 intermodal bus spaces

• Provided more space for pedestrian movements

(1)

(2)

West Parking Reconfiguration

Existing _ Shuttle Bus Parking Option 5C-A _ Shuttle Bus Parking

Features:

• Reorganized west parking with 14 shuttle spaces

• Reorganized west parking with 22 staff/CBP spaces

• Provided more space for pedestrian movements

(1) (2)

1 3

06.09.2025

(3)

• Provided a new vehicle lane

Traffic Lane and Site Improvement

Existing Traffic Lanes

New Traffic Lanes

(1)

Option 5C-A: Exterior Perspective View

Level 1_East Entrance

1706.09.2025

View

Option 5C-A: Exterior Perspective View

Level 1_East Entrance

1806.09.2025

Option 5C-A: Embark Passenger Security Comparison

1906.09.2025

Existing _ Embark Passenger Security Option 5C-A _ Embark Passenger Security

Features:

• New CBP room

• New stairs, escalator and elevators

• New scanner location

(1) (2)

(3)

Features:

• Existing rooms and walls to be demolished

• Existing stairs, escalators and elevators to be demolished

• Existing scanners to be relocated

• Existing ramp to be demolished

• Existing deck to be demolished

(1) (2)

(3) (4) (5)

Option 5C-A: Interior Perspective View

Level 2_Embark Passenger Security

2006.09.2025

Option 5C-A: Check-in & Seating Comparison

2106.09.2025

Existing _ Check-in & Seating Option 5C-A _ Check-in & Seating

Features:

• New check-in counters

• New mobile check-in tables

• New break room

• New elevators

• New offices/IT/storage

• New restroom addition

(1) (2)

(3)

Features:

• Existing check-in counters to be demolished

• Existing break room to be demolished

• Existing elevator and escalator to be demolished

• Existing stair to be demolished

• Existing rooms to be demolished

(4)

(1) (2)

(3) (4)

(5) (5) (6)

1 2

65 5

Level 2_Check-in & Seating

2206.09.2025

Option 5C-A: East Baggage Laydown Comparison

1606.09.2025

Existing _ East Baggage Laydown Option 5C-A _ Enlarged East Baggage Laydown

Features:

• Enlarged baggage laydown area

• New interior ramp

• New storage room

• New exterior stair and escalators

Features:

• Existing exterior elevator, stairs, and escalator to be demolished

• Existing interior ramp and storage room to be demolished

• Existing scanners to be relocated

(2)

(3)

(1) (2) (3)

(4)

Level 1_East Baggage Laydown

2406.09.2025

Option 5C-A: West Baggage Laydown Comparison

2506.09.2025

Existing _ West Baggage Laydown Option 5C-A _ Enlarged West Baggage Laydown

Features:

• Enlarged baggage laydown area

• Two new elevators

• New storage room

• New mechanical room

• New egress stair

(1) (2) (3)

Features:

• Existing elevator and escalator to be demolished

• Existing stair, corridor, and storage room to be demolished

(4)

(1) (2)

(5)

Option 5C-A: CBP - Primary and Secondary Comparison

2606.09.2025

Existing _ CBP Primary Option 5C-A _ CBP Primary

Features:

• New podiums

• New north wall and doors

• New restrooms, shower and break room

• New mail/copy room

(1) (2)

(3)

Features:

• Existing booths to be demolished

• Existing north wall and doors to be demolished

• Existing restrooms, shower and break room to be demolished

• Existing mail/copy room to be demolished

(4)

(2)

(3) (4)

23 4

Level 1_CBP Primary Inspection

2706.09.2025

Option 5C-A: Construction Phase Diagram

2806.09.2025

Construction Phase 1

Construction Phase 2

Construction Phase 3

Level 2_NEW

Level 1_NEW

Level 2_EXIST.

Level 1_EXIST.

Construction Phase 4

1g

1e1d

1b

1c

a. Relocation of propane farm and FPL transformer, new lift station, roadway modifications, parking and canopies

b. New mechanical room and equipment and relocate transformer

c. New exterior egress stair at south

d. New grand stair and temp walkway/partitions to screening

e. New crew lounge

f. New canopy at east intermodal and roadway modification

g. New baggage scanning

a. Demolish interior stair and refill with a new slab

b. Demolish exterior stair, escalator, elevator, and exterior deck

c. Temporarily reconfigure east intermodal for south bus parking

2b

2a

a. New escalators and stair

b. New passenger security area (temp. connect to existing elevator)

c. Demolish portion of the slab at embark passenger security area for new east ramp

d. Demolish portion of east ramp

e. Demolish existing exterior stair, deck and mechanical equipment

f. Demolish walls at existing baggage scanning area

3f

3e

3a

3b

a. New east ramp

b. Demolish grand stair and restroom

c. New elevators, canopies and restrooms

4a

2c & 4c

1a

1f

3c & 3d

a. Demolish elevator

Construction Phase 5

5a 4b

Temporarily Block off in Construction Phase 2-4

Option 5C-A: Construction Phase Diagram

2906.09.2025

Interior Renovation _ Ongoing Phases

Level 2_NEW

Level 1_NEW

Level 2_EXIST.

Level 1_EXIST.

• Demolish escalator and elevator at west baggage laydown

• Demolish storage and corridor walls at west baggage laydown

• Demolish walls and booths at primary CBP

• New elevators at west baggage laydown

• New storage room at west baggage laydown

• New walls , podiums, and rooms at primary CBP

• New interior finishes

Level one

• Demolish escalator and elevator at west and fill with a new slab

• Demolish offices and break room

• Demolish counters

• New elevators at west

• New offices, IT room, storage room, and break room

• New check-in counters

• New VIP and general seatings

• New soffits (add alternate)

• New or expanded restroom

• New interior finishes

Level two

• Reorganized east parking with 21 intermodal bus spaces

• Reorganized west parking with 10 shuttle spaces and 22 staff/CBP spaces

• 30,892 sf of baggage laydown area

• 19,180 sf of seating

• 6 baggage scanning lanes

• 9 security screening lanes

• Site and traffic improvement with approx. 17 new pickup and drop off spaces

Pros

• Additional baggage laydown space

• Two ramps from Concourse to baggage laydown

• Limited disturbance to bus parking

• Enlarged CBP queuing area

Cons

• ROM is over $50M

• Bifurcated baggage laydown hall

• Increased walking distance from baggage pick up to CBP

• Limited sidewalk area for pedestrian movement

• Larger egress stair from security screening reduces intermodal bus spaces

Option 5C-B: Embarking Passenger Security remains on Level 2 & Bag Screening at remote location

Level 2

(1)

(2)

3 (3)

(4) (5)

(6)

(7)7

Program Analysis

3206.09.2025

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slide 21
Slide 22
Slide 23
Slide 24
Slide 25
Slide 26
Slide 27
Slide 28
Slide 29
Slide 30
Slide 31
Slide 32

File details come from the government source that posted it. Updated .