Department of Public Works Solar Photovoltaic Carport Project
Solicitation number
2158
Issued by
Tolland County, Waterbury City, Connecticut

About this file

This is a Site Plan document for RFP 2158 prepared for the Vernon Public Works Department in Vernon, Connecticut, detailing specifications for a photovoltaic carport system installation at 375 Hartford Turnpike. The project involves the design and installation of a 225.180 kilowatt direct current solar photovoltaic system with a 200 kilowatt alternating current capacity, projected to generate 252.80 megawatt-hours of electricity annually. The system will consist of four CPS SCA50KTL-DO US-480 inverters rated at 50 kilowatts each and 417 Longi Solar LR5-72HBD-540M modules rated at 540 watts each, arranged in a carport configuration with a tilt of 7 degrees and azimuths of 79.34 and 258.21 degrees. The site plan indicates the installation of solar panels mounted on carport structures, with associated electrical infrastructure including an AC disconnect, net revenue electricity meter, photovoltaic isolation switch, and AC combiner, connected to an existing utility transformer at Vernon Department of Public Works through a dedicated trench pathway for the new electrical service.

The plan was prepared by CSW Energy, with an owner's representative office located at 1 Prestige Drive, Suite 103, Meriden, Connecticut 06450. The document is noted as "Not for Construction" and indicates that equipment specifications are subject to change. The site plan was revised on February 27, 2026, with Version 2 representing the current status, and serves as a technical reference document for the proposed solar installation at the municipal facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AS NOTED

EX-C02/27/2026

N

VERNON DPW

EXISTING UTILITY TRANSFORMER

POINT OF INTERCONNECTION FOR

NEW ELECTRICAL SERVICE

DEDICATED TO SOLAR PROJECT

TRENCH PATH

NEW SOLAR AC DISCONNECT,

NRES METER, PV ISOLATION

SWITCH AND AC COMBINER

INVERTER MOUNTS

AT CARPORT (TYP.)

PV MODULE (TYP.) PARCEL BOUNDARY

AutoCAD SHX Text Scale

AutoCAD SHX Text Project

AutoCAD SHX Text Date

AutoCAD SHX Text Sheet

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text Date

AutoCAD SHX Text D.B.

AutoCAD SHX Text Project Info

AutoCAD SHX Text OWNER'S REPRESENTATIVE 1 PRESTIGE DRIVE, SUITE 103, MERIDEN, CT 06450 CSWENERGY.COM

AutoCAD SHX Text VERNON PUBLIC WORKS DEPARTMENT PV CARPORT SYSTEM 375 HARTFORD TPKE VERNON CT 06066

AutoCAD SHX Text PV CARPORT SYSTEM INFO: 225.180 KW DC STC 200.000 KW AC 252.80 MWH ANNUAL PRODUCTION (4) CPS SCA50KTL-DO US-480 (50 KW AC) (417) LONGI SOLAR LR5-72HBD-540M (540W STC) TILT = 7° AZIMUTH = 79.34°, 258.21° ROW SPACING = O.8' METER:-- ACCOUNT:-- NOT FOR CONSTRUCTION *EQUIPMENT SPECIFICATION SUBJECT TO CHANGE