This is a pricing schedule for Request For Proposal No. 200000001868 issued by the State of Michigan Department of Natural Resources for utility-scale solar energy development leases. The RFP solicits proposals for solar photovoltaic systems to be developed on two sites: the Groveland Mine Site and the 7 Mile Pit Site. Bidders are required to submit detailed project proposals for each site, including descriptive project names, proposed acreage during the development phase, estimated installed power capacity in megawatts-AC, and estimated annual energy generation in megawatt-hours. The contract structure includes two distinct phases: a Development Lease period with site control and a Surface Use Lease period covering construction and operations with a fixed 25-year term.

Bidders must submit fixed-price proposals for both the Development phase and the Surface Use Lease phase on a per-acre-year basis. The pricing schedule requires bidders to specify the estimated duration of the development term and the estimated final acreage to be leased during the construction and operations phase. Contractors certifying their proposals must attest that prices were determined independently without consultation or agreement with other bidders, and multiple proposals for the same project must be mutually exclusive. The pricing schedule must be submitted in a modifiable format such as Microsoft Excel or Word, with optional non-modifiable PDF submissions permitted. Failure to complete the pricing schedule as requested may result in proposal disqualification.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Enter company name here.

STATE OF MICHIGAN

Request For Proposal No. 200000001868 Utility-Scale Solar Energy Development Lease Department of Natural Resources

SCHEDULE B

PRICING

1. The Contractor must provide a pricing schedule for the proposed Contract Activities using the table as included in this Schedule B. The pricing schedule should be submitted in a modifiable format (e.g.. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.

2. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.

3. If the Contractor submits multiple proposals for the same project, each proposal shall be exclusive of the other(s).

4. Groveland Mine Site:

Column A - Bidders should enter a descriptive name for each project proposal.
Column B – indicate the acreage during Development phase.
Column C – indicate the estimated installed power capacity of the proposed solar PV system, in megawatts-AC.
Column D – indicate the estimated annual energy quantity produced by the proposed solar PV system in megawatt hours (KWh).
Columns E - Enter a fixed price proposal for the proposed acreage during the Development phase.
Column F – Enter an estimated duration of the Development phase.
Column G – Enter the estimated acreage to be leased during the Surface Use Lease period (construction and operations).
Column H - Enter a fixed price proposal for the Surface Use Lease period (construction and operations).
Column I - Term is fixed for initial 25 year period. (Not to be altered by the bidder)
Column J - Comments are optional for Contractor as needed to clarify any specific items or purposes.

5. 7 Mile Pit Site:

Column A - Bidders should enter a descriptive name for each project proposal.
Column B – indicate the acreage during Development phase.
Column C – indicate the estimated installed power capacity of the proposed solar PV system, in megawatts-AC.
Column D – indicate the estimated annual energy quantity produced by the proposed solar PV system in megawatt hours (KWh).
Columns E - Enter a fixed price proposal for the proposed acreage during the Development phase.
Column F – Enter an estimated duration of the Development phase.
Column G – Enter the estimated acreage to be leased during the Surface Use Lease period (construction and operations).
Column H - Enter a fixed price proposal for the Surface Use Lease period (construction and operations).
Column I - Term is fixed for initial 25 year period. (Not to be altered by the bidder)
Column J - Comments are optional for Contractor as needed to clarify any specific items or purposes.

Groveland Mine Site

RFP 200000001868 Schedule B - Pricing - Groveland Mine Site
Development LeaseSurface Use LeaseGeneral
Proposal NameFixed Development Size (acres)Estimated AC Capacity (MWAC)Estimated Annual Energy Generation (MWh)Fixed Development Period Lease Bid ($/acre-year)
[Site Control]Estimated Development TermEstimated Final Size (acres)Fixed Surface Use Lease Bid ($/acre/year)
[Construction/Ops]Fixed Term (25 years)Comment
Bidder InputBidder InputBidder InputBidder InputBidder InputBidder InputBidder InputBidder InputDo not alterBidder Input
e.g. Groveland SolarTBD acresTBD MWacTBD MWh$/acre-yearTBD yearsTBD acres$TBD /acre-year25 yearsInsert specific comments, storage details, etc.

7 Mile Pit Site

RFP 200000001868 Schedule B - Pricing - 7 Mile Pit Site
Development LeaseSurface Use LeaseGeneral
Proposal NameDevelopment Size (acres)Estimated AC Capacity (MWAC)Estimated Annual Energy Generation (MWh)Development Period Lease Bid ($/acre-year)
[Site Control]Estimated Development TermEstimated Final Size (acres)Surface Use Lease Bid ($/acre/year)
[Construction/Ops]Fixed Term (25 years)Comment
Bidder InputBidder InputBidder InputBidder InputBidder InputBidder InputBidder InputBidder InputDo not alterBidder Input
e.g. 7 Mile SolarTBD acresTBD MWacTBD MWh$/acre-yearTBD yearsTBD acres$TBD /acre-year25 yearsInsert specific comments, storage details, etc.

File details come from the government source that posted it. Updated .