This document contains Request for Information (RFI) transmittals related to the Benton Harbor High School Boiler Replacement project in Berrien County, Michigan. The project, which has an architect of record (C2AE) and a project number of 23-0327, involves the replacement of the school's boiler system. The RFIs cover questions about the location of the generator and transfer switch, as well as inquiries about the inverter and main gear submittals. The architect has provided responses to the RFIs, indicating that the contractor may provide a voluntary bid alternate to relocate the generator and automatic transfer switch, and that they will share the submittals once received from the vendor.
The related state and local contract opportunity is for the Boiler Replacement for FPE Elem & Benton Harbor High School, located in Berrien County, Michigan. The project involves boiler replacement work at two schools within the jurisdiction of Berrien County and the Bergland CDP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 230327_240126_HS_Drawings.zip | ZIP file | |
| Addendum 1 Pt2.pdf | ||
| Addendum 1 Pt3.pdf | ||
| Addendum 2-4.pdf | ||
| 230327_240126_ProjectManual Part 1 of 2.pdf | ||
| 230327_240126_ProjectManual Part 2 of 2.pdf | ||
| 230327_240126_Elem_Drawings.pdf | ||
| Addendum 1 Pt1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI TRANSMITTAL
Date: 2-22-24 Name: Benton Harbor High School Boiler Replacement Architect C2AE.
Project # 23-0327 Dated 1-26-24.
Addendum 01 dated 2-15-24.
Re: Location of generator & transfer switch.
1) Drawing calls out an inverter on panel EM. What is this for? There are no specs or model #s to quote.
Very truly yours, BEAUDOIN ELECTRICAL CONSTRUCTION, INC.
James Pudell James Pudell, Estimator & Project Manager RFI B.H. High School boiler replacement
1) The inverter is required for emergency lighting. Additional information will be included within upcoming addendum.
J. Etters, C2AE February 26, 2024
RFI TRANSMITTAL
Date: 2-22-24 Name: Benton Harbor High School Boiler Replacement Architect C2AE.
Project # 23-0327 Dated 1-26-24.
Addendum 01 dated 2-15-24.
Re: Location of generator & transfer switch.
1) Addendum #1 calls out for the 80KW generator to be located by stairs #14 to the north.
Can we locate the generator back to the original drawing # E101 dated 1-26-24, locating the generator by the main gas line. We would mount the transfer switch in the main boiler room and run a feed conduit down tunnel to janitor room 10A and intersect conduit feeding Gym PNL. Northeast Corner.
2) Are there any submittals on the main gear that the school is purchasing?
Very truly yours, BEAUDOIN ELECTRICAL CONSTRUCTION, INC.
James Pudell James Pudell, Estimator & Project Manager RFI B.H. High School boiler replacement
1) Contractor may provide voluntary bid alternate to relocate generator and ATS.
2) We will share clean submittals when we receive them from the vendor.
J. Etters, C2AE February 26, 2024
| RFI Inverter B.H. High School boiler replacement_Response_240226 |
| RFI B.H. High School boiler replacement_Response_240226 |