This document is an addendum to a state and local contract opportunity for the Boiler Replacement for Fair Plain East Elementary and Benton Harbor High School in Berrien County, Michigan. The project is being led by the Benton Harbor Area Schools and administered by the engineering firm C2AE. The addendum provides updates and revisions to the project specifications, drawings, and appendices, including the addition of new sections for a gas-engine-driven generator set and transfer switch. Key changes include the addition of a new standby generator and automatic transfer switch at the high school, as well as revisions to the mechanical and electrical plans for both school locations.
The contract opportunity requires the furnishing and installation of the new boiler, generator, and transfer switch equipment. Pricing terms, funding sources, and other contractual details are not explicitly provided in this addendum document. However, the overall project appears to be proceeding with the bidding and procurement process, with the addendum issued to provide updated information to prospective contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 230327_240126_HS_Drawings.zip | ZIP file | |
| Addendum 1 Pt2.pdf | ||
| Addendum 1 Pt3.pdf | ||
| 230327_240126_ProjectManual Part 1 of 2.pdf | ||
| 230327_240126_ProjectManual Part 2 of 2.pdf | ||
| RFI and Response.pdf | ||
| Addendum 2-4.pdf | ||
| 230327_240126_Elem_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
50 Louis St. NW Suite 200 Grand Rpaids, MI 49503
616.454.9414 www.c2ae.com
Addendum #1
The following changes, revisions, modifications, etc. shall be incorporated into the contract documents, specifications, and plans.
BID FORM
A1.1 The Bidder shall acknowledge receipt of Addenda #1 by indicating so in the spaces provided on the Bid Form.
SPECIFICATIONS
A1.2 Refer to Table of Contents (reissued):
Table of Contents is being reissued to include new specifications and changes to the appendices.
A1.3 Refer to Section 263213.16 – Gas-Engine-Driven Generator Sets (issued):
Issue specification section in its entirety. Furnish and install new standby generator at the High School.
A1.4 Refer to Section 263600 – Transfer Switches (issued):
Issue specification section in its entirety. Furnish and install new automatic transfer switch at the High School.
A1.5 Refer to Appendix (not reissued):
Revise title from Appendix to Appendix 1
A1.6 Refer to Appendix 2 (issued):
Add Appendix 2 in its entirety to include paint chip sample results.
DRAWINGS
A1.7 HIGH SCHOOL: Refer to Building Plan View - Reference (issued):
Add reference sheet that shows approximate panel locations and proposed standby generator and ATS location.
Project No.: 23-0327 Date: February 16, 2024
Project: Boiler Replacement for Fair Plain East Elementary and Benton Harbor High School Benton Harbor Area Schools Berrien County, Michigan
A/E Firm: C2AE
Project Manager: Steve Jurczuk
Owner: Benton Harbor Area Schools 870 Colfax Avenue Benton Harbor, MI 49022
Addendum #1 Boiler Repalcement
Benton Harbor Area Schools
A1.8 HIGH SCHOOL: Refer to Sheet MD-100 MECHANICAL DEMOLITION PLAN (reissued):
Revise keynote. Add demolition of water heaters and remove new piping from plan.
A1.9 HIGH SCHOOL: Refer to Sheet M-100 MECHANICAL PLAN (reissued):
Add pipe sizes, key notes, hydronic piping revisions, floor drains and sanitary piping to plan.
A1.10 HIGH SCHOOL: Refer to Sheet M-103 MECHANICAL PLAN - ROOF (reissued):
Add natural gas piping to serve emergency generator and add notes to roof plan.
A1.11 HIGH SCHOOL: Refer to Sheet M-501 MECHANICAL DETAILS (reissued):
Delete hydronic coil detail, revise note on boiler vent detail, and add various details.
A1.12 HIGH SCHOOL: Refer to Sheet M-701 MECHANICAL DIAGRAMS & SCHEMATICS (reissued):
Revise system schematics.
A1.13 HIGH SCHOOL: Refer to Sheets E-501 (reissued):
Revise one-line diagram.
A1.14 HIGH SCHOOL: Refer to Sheet E-503 (issued):
Add new sheet for addition of standby generator.
A1.15 FAIR PLAIN EAST ELEMENTARY: Refer to Sheet MD-100 MECHANICAL DEMOLITION PLAN (not reissued):
Revise keynote callout to demolition symbol callout.
A1.16 FAIR PLAIN EAST ELEMENTARY: Refer to Sheet M-100 MECHANICAL PLAN (reissued):
Add keynote for owner furnished Modsync boiler control panel and intake air louver for domestic water heater.
Boiler Replacement for Fair Plain East Elementary and Benton Harbor High School
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 1
02/16/2024 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
001113 Advertisement For Bids 002113 Instructions to Bidders
AIA Document A701 – 2018, Instructions to Bidders 002213 Supplementary Instructions to Bidders 002600 Procurement Substitution Procedures 003126 Existing Hazardous Material Information 004113 Bid Form - Stipulated Sum (single-prime Contract) 004313 Bid Security Forms
AIA Document A310 – 2010, Bid Bond (Draft) Iran Economic Sanctions Act Certificate Affidavit of Bidders, Familial Relationship Disclosure
004321 Allowance Form 004373 Proposed Schedule Of Values Form 004393 Bid Submittal Checklist 005213 Agreement Forms
AIA Document A101 – 2017, Standard Form of Agreement Between Owner and Contractor, Stipulated Sum (Draft)
007213 General Conditions – Stipulated Sum AIA Document A201 – 2017, General Conditions of the Contract for Construction
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary 012100 Allowances 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013300 Submittal Procedures 013516 Alteration Project Procedures 014000 Quality Requirements 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017700 Closeout Procedures
Page 3 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 2
02/16/2024 TABLE OF CONTENTS
017823 Operation and Maintenance Data 017900 Demonstration and Training 019113 General Commissioning Requirements
DIVISION 02 - EXISTING CONDITIONS
024119 Selective Demolition
DIVISION 03 - CONCRETE
030130 Maintenance of Cast-In-Place Concrete 031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete
DIVISION 05 - METALS
055000 Metal Fabrications
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry 061600 Sheathing
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071326 Self-Adhering Sheet Waterproofing 075423 Thermoplastic-Polyolefin (TPO) Roofing 077100 Roof Specialties 077200 Roof Accessories 078413 Penetration Firestopping 078443 Joint Firestopping 079200 Joint Sealants
DIVISION 08 - OPENINGS
084523 Fiberglass-Sandwich-Panel Assemblies
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230519 Meters and Gauges for HVAC Piping
230523.12 Ball Valves for HVAC Piping
230523.14 Check Valves for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting, and Balancing for HVAC
Page 4 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 3
02/16/2024 TABLE OF CONTENTS
230719 HVAC Piping Insulation 230800 Commissioning of HVAC 230923 Direct Digital Control (DDC) System for HVAC
230923.11 Control Valves
230923.12 Control Dampers
230923.22 Position Instruments
230923.23 Pressure Instruments
230923.27 Temperature Instruments
230993.11 Sequence of Operations for HVAC DDC
231123 Facility Natural-Gas Piping 232113 Hydronic Piping 232116 Hydronic Piping Specialties 232123 Hydronic Pumps 232213 Steam and Condensate Piping 232216 Steam and Condensate Heating Piping Specialties 232513 Water Treatment for Closed-Loop Hydronic Systems 232519 Water Treatment for Steam System Feedwater 235116 Fabricated Breechings and Accessories 235123 Gas Vents 235216 Condensing Boilers 235243 Fuel-Fired Vertical Tubeless Steam Boilers 235313 Boiler Feedwater Pumps
238239.16 Propeller Unit Heaters
DIVISION 26 - ELECTRICAL
260000 General Electrical Requirements 260001 Electrical Service Entrance 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems
260533.13 Conduits for Electrical Systems
260533.16 Boxes and Covers for Electrical Systems
260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260553 Identification for Electrical Systems
260573.13 Short-Circuit Studies
260573.16 Coordination Studies
260573.19 Arc-Flash Hazard Analysis
Page 5 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 4
02/16/2024 TABLE OF CONTENTS
262416 Panelboards 262726 Wiring Devices
263213.16 Gas-Engine-Driven Generator Sets (ADM1)
263600 Transfer Switches (ADM1) 265000 Lighting
DIVISION 31 - EARTHWORK
312000 Earth Moving 315000 Excavation Support and Protection
DIVISION 32 - EXTERIOR IMPROVEMENTS
321313 Concrete Paving 321373 Concrete Paving Joint Sealants
APPENDIX 1 (ADM1)
Request for Substitution Form Electronic Media Release, Disclaimer and Release of Claims Form AIA Document G716-2004, Request for Information (Draft) State of Michigan, Prevailing Wage Rates, Berrien County, dated February 8, 2022
APPENDIX 2 (ADM1)
Paint-Chip Sample Results - Boiler Room, Fair Plain East Elementary School, 1998 Union
Ave., Benton Harbor, MI 49022, prepared by Villa Environmental Consultants, Inc. dated February 13, 2024
Paint-Chip Sample Results - Boiler Room, Benton Harbor High School, 870 Colfax Avenue, Benton Harbor, MI 4902, prepared by Villa Environmental Consultants, Inc. dated February 13, 2024
END OF TABLE OF CONTENTS
Page 6 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 1
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
SECTION 263213.16 - GAS-ENGINE-DRIVEN GENERATOR SETS (ADM1)
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Engine.
2. Gas fuel system.
3. Control and monitoring.
4. Generator overcurrent and fault protection.
5. Generator, exciter, and voltage regulator.
6. Outdoor generator-set enclosure.
B. Related Requirements:
1. Section 263600 "Transfer Switches" for transfer switches including sensors and relays to initiate automatic-starting and -stopping signals for engine generators.
1.2 DEFINITIONS
A. EPS: Emergency power supply.
B. EPSS: Emergency power supply system.
C. LP: Liquefied petroleum.
D. Operational Bandwidth: The total variation from the lowest to highest value of a parameter over the range of conditions indicated, expressed as a percentage of the nominal value of the parameter.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
2. Include thermal damage curve for generator.
3. Include time-current characteristic curves for generator protective device.
4. Include fuel consumption in cubic feet per hour (cubic meters per hour) at 0.8 power factor at 0.5, 0.75 and 1.0 times generator capacity.
5. Include generator efficiency at 0.8 power factor at 0.5, 0.75, and 1.0 times generator capacity.
6. Include generator characteristics, including, but not limited to, kilowatt rating, efficiency, reactances, and short-circuit current capability.
B. Shop Drawings:
1. Include plans and elevations for engine generator and other components specified.
Page 7 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 2
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
3. Identify fluid drain ports and clearance requirements for proper fluid drain.
4. Design calculations for selecting vibration isolators and seismic restraints and for designing vibration isolation bases.
5. Vibration Isolation Base Details: Detail fabrication including anchorages and attachments to structure and to supported equipment. Include base weights.
6. Include diagrams for power, signal, and control wiring. Complete schematic, wiring, and interconnection diagrams showing terminal markings for EPS equipment and functional relationship between all electrical components.
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For engine generators to include in emergency, operation, and maintenance manuals.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Fuses: One for every 10 of each type and rating, but no fewer than one of each.
2. Filters: One set each of lubricating oil, fuel, and combustion-air filters.
1.6 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace components of packaged engine generators and associated auxiliary components that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Two years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. Caterpillar, Inc.; Electric Power Division.
2. Cummins Power Generation.
3. Generac.
4. Kohler Power Systems.
5. Rolls-Royce Solutions America Inc.
B. Source Limitations: Obtain packaged engine generators and auxiliary components through one source from a single manufacturer.
Page 8 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 3
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
2.2 PERFORMANCE REQUIREMENTS
A. B11 Compliance: Comply with B11.19.
B. NFPA Compliance:
1. Comply with NFPA 37.
2. Comply with NFPA 70.
3. Comply with NFPA 110 requirements for Level 1 EPSS.
C. UL Compliance: Comply with UL 2200.
D. Engine Exhaust Emissions: Comply with EPA Tier requirements and applicable state and local government requirements.
E. Noise Emission: Comply with applicable state and local government requirements for maximum noise level at adjacent property boundaries due to sound emitted by engine generator including engine, engine exhaust, engine cooling-air intake and discharge, and other components of installation.
F. Environmental Conditions: Engine generator system shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability:
1. Ambient Temperature: 5 to 104 deg F.
2. Relative Humidity: Zero to 95 percent.
3. Altitude: Sea level to 1000 feet.
2.3 ENGINE GENERATOR ASSEMBLY DESCRIPTION
A. Factory-assembled and -tested, water-cooled engine, with brushless generator and accessories.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a testing agency acceptable to authorities having jurisdiction, and marked for intended location and use.
C. Power Rating: Standby.
D. EPSS Class: Engine generator shall be classified as Class 96 according to NFPA 110.
E. Service Load: Refer to the Drawings for kW/kVA.
F. Power Factor: 0.8, lagging.
G. Frequency: 60 Hz.
H. Voltage: 208 V ac.
I. Phase: Three-phase, four wire, wye.
Page 9 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 4
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
J. Induction Method: Naturally aspirated or turbocharged.
K. Governor: Adjustable isochronous, with speed sensing.
L. Mounting Frame: Structural steel framework to maintain alignment of mounted components without depending on concrete foundation. Provide lifting attachments sized and spaced to prevent deflection of base during lifting and moving.
M. Capacities and Characteristics:
1. Power Output Ratings: Nominal ratings as indicated at 0.8 power factor excluding power required for the continued and repeated operation of the unit and auxiliaries.
2. Nameplates: For each major system component to identify manufacturer's name and address, and model and serial number of component.
N. Engine Generator Performance:
1. Steady-State Voltage Operational Bandwidth: 3 percent of rated output voltage from no load to full load.
2. Transient Voltage Performance: Not more than 20 percent variation for 50 percent step-load increase or decrease. Voltage shall recover and remain within the steady-state operating band within three seconds.
3. Steady-State Frequency Operational Bandwidth: 0.5 percent of rated frequency from no load to full load.
4. Steady-State Frequency Stability: When system is operating at any constant load within the rated load, there shall be no random speed variations outside the steady-state operational band and no hunting or surging of speed.
5. Transient Frequency Performance: Less than 5 percent variation for 50 percent step-load increase or decrease. Frequency shall recover and remain within the steady-state operating band within five seconds.
6. Output Waveform: At no load, harmonic content measured line to line or line to neutral shall not exceed 5 percent total and 3 percent for single harmonics.
Telephone influence factor, determined according to NEMA MG 1, shall not exceed 50 percent.
7. Sustained Short-Circuit Current: For a three-phase, bolted short circuit at system output terminals, system shall supply a minimum of 250 percent of rated full-load current for not less than 10 seconds and then clear the fault automatically, without damage to generator system components.
8. Start Time:
a. Comply with NFPA 110, Type 10 system requirements.
2.4 GAS ENGINE
A. Fuel: Natural gas.
B. Rated Engine Speed: 1800 rpm.
Page 10 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 5
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
C. Lubrication System: Engine or skid-mounted.
1. Filter and Strainer: Rated to remove 90 percent of particles 5 micrometers and smaller while passing full flow.
2. Thermostatic Control Valve: Control flow in system to maintain optimum oil temperature. Unit shall be capable of full flow and is designed to be fail-safe.
3. Crankcase Drain: Arranged for complete gravity drainage to an easily removable container with no disassembly and without use of pumps, siphons, special tools, or appliances.
D. Jacket Coolant Heater: Electric-immersion type, factory installed in coolant jacket system. Comply with UL 499 and with NFPA 110 requirements for Level 1 equipment for heater capacity.
E. Integral Cooling System: Closed loop, liquid cooled, with radiator factory mounted on engine generator mounting frame and integral engine-driven coolant pump.
1. Coolant: Solution of 50 percent ethylene-glycol-based antifreeze and 50 percent water, with anticorrosion additives as recommended by engine manufacturer.
2. Size of Radiator: Adequate to contain expansion of total system coolant from cold start to 110 percent load condition.
3. Temperature Control: Self-contained, thermostatic-control valve modulates coolant flow automatically to maintain optimum constant coolant temperature as recommended by engine manufacturer.
4. Coolant Hose: Flexible assembly with inside surface of nonporous rubber and outer covering of aging-, ultraviolet-, and abrasion-resistant fabric.
a. Rating: 50-psig maximum working pressure with coolant at 180 deg F, and noncollapsible under vacuum.
b. End Fittings: Flanges or steel pipe nipples with clamps to suit piping and equipment connections.
F. Muffler/Silencer:
1. Critical type, sized as recommended by engine manufacturer and selected with exhaust piping system to not exceed engine manufacturer's engine backpressure requirements.
a. Minimum sound attenuation of 25 dB at 500 Hz.
b. Sound level measured at a distance of 25 feet from exhaust discharge after installation is complete shall be 78 dBA or less.
G. Air-Intake Filter: Heavy-duty, engine-mounted air cleaner with replaceable dry-filter element and "blocked filter" indicator.
H. Starting System: 12 or 24-V electric, with negative ground.
1. Components: Sized so they are not damaged during a full engine-cranking cycle with ambient temperature at maximum specified in "Performance Requirements" Article.
2. Cranking Motor: Heavy-duty unit that automatically engages and releases from engine flywheel without binding.
3. Cranking Cycle: As required by NFPA 110 for system level specified.
Page 11 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 6
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
4. Battery: Lead acid, with capacity within ambient temperature range specified in "Performance Requirements" Article to provide specified cranking cycle at least three times without recharging.
5. Battery Cable: Size as recommended by engine manufacturer for cable length indicated. Include required interconnecting conductors and connection accessories.
6. Battery-Charging Alternator: Factory mounted on engine with solid-state voltage regulation and 35 A minimum continuous rating.
7. Battery Charger: Current-limiting, automatic-equalizing and float-charging type designed for lead-acid batteries. Unit shall comply with UL 1236 and include the following features:
a. Operation: Equalizing-charging rate of 10 A shall be initiated automatically after battery has lost charge until an adjustable equalizing voltage is achieved at battery terminals. Unit shall then be automatically switched to a lower float-charging mode and shall continue to operate in that mode until battery is discharged again.
b. Automatic Temperature Compensation: Adjust float and equalize voltages for variations in ambient temperature from minus 40 deg F to 140 deg F to prevent overcharging at high temperatures and undercharging at low temperatures.
c. Automatic Voltage Regulation: Maintain constant output voltage regardless of input voltage variations up to plus or minus 10 percent.
d. Ammeter and Voltmeter: Flush mounted in door. Meters shall indicate charging rates.
e. Safety Functions: Sense abnormally low battery voltage and close contacts providing low battery voltage indication on control and monitoring panel.
Sense high battery voltage and loss of ac input or dc output of battery charger. Either condition shall close contacts that provide a battery-charger malfunction indication at system control and monitoring panel.
f. Enclosure and Mounting: NEMA 250, Type 1, wall-mounted cabinet.
2.5 GAS FUEL SYSTEM
A. Natural Gas Piping: Comply with requirements in Section 231123 "Facility Natural Gas Piping."
B. Gas Train: Comply with NFPA 37.
C. Engine Fuel System:
D. Natural Gas, Vapor-Withdrawal System:
1. Carburetor.
2. Fuel-Shutoff Solenoid Valves: NRTL-listed, normally closed, safety shutoff valves; one for each fuel source.
3. Fuel Filters: One for each fuel type.
4. Manual Fuel Shutoff Valves: One for each fuel type.
5. Flexible Fuel Connectors: Minimum one for each fuel connection.
Page 12 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 7
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
2.6 CONTROL AND MONITORING
A. Automatic Starting System Sequence of Operation: When mode-selector switch on the control and monitoring panel is in the automatic position, remote-control contacts in one or more separate automatic transfer switches initiate starting and stopping of engine generator. When mode-selector switch is switched to the on position, engine generator starts. The off position of same switch initiates generator-set shutdown.
When engine generator is running, specified system or equipment failures or derangements automatically shut down engine generator and initiate alarms.
B. Provide minimum run time control set for 15 minutes with override only by operation of a remote emergency-stop switch.
C. Comply with UL 508A.
D. Configuration:
1. Operating and safety indications, protective devices, basic system controls, and engine gages shall be grouped in a common control and monitoring panel mounted on the engine generator. Mounting method shall isolate the control panel from generator-set vibration. Panel shall be powered from the engine generator battery.
E. Control and Monitoring Panel:
1. Digital controller with integrated LCD, controls, and microprocessor, capable of local and remote control, monitoring, and programming, with battery backup.
2. Instruments: Located on the control and monitoring panel and viewable during operation.
a. Engine lubricating-oil pressure gage.
b. Engine-coolant temperature gage.
c. DC voltmeter (alternator battery charging).
d. Running-time meter.
e. AC voltmeter, connected to a phase selector switch.
f. AC ammeter, connected to a phase selector switch.
g. AC frequency meter.
h. Generator-voltage adjusting rheostat.
3. Controls and Protective Devices: Controls, shutdown devices, and common visual alarm indication, including the following:
a. Cranking control equipment.
b. Run-Off-Auto switch.
c. Control switch not in automatic position alarm.
d. Overcrank alarm.
e. Overcrank shutdown device.
f. Low water temperature alarm.
g. High engine temperature prealarm.
h. High engine temperature.
i. High engine temperature shutdown device.
j. Overspeed alarm.
k. Overspeed shutdown device.
Page 13 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 8
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
l. Coolant low-level alarm.
m. Coolant low-level shutdown device.
n. EPS supplying load indicator.
o. Battery high-voltage alarm.
p. Low cranking voltage alarm.
q. Battery-charger malfunction alarm.
r. Battery low-voltage alarm.
s. Lamp test.
t. Contacts for local and remote common alarm.
u. Remote manual stop shutdown device.
v. Hours of operation.
w. Engine generator metering, including voltage, current, Hz, kW, kVA, and power factor.
F. Connection to Datalink:
1. A separate terminal block, factory wired to Form C dry contacts, for each alarm and status indication.
2. Provide connections for datalink transmission of indications to remote data terminals via ModBus.
G. Remote Alarm Annunciator: An LED indicator light labeled with proper alarm conditions shall identify each alarm event, and a common audible signal shall sound for each alarm condition. Silencing switch in face of panel shall silence signal without altering visual indication. Connect so that after an alarm is silenced, clearing of initiating condition will reactivate alarm until silencing switch is reset. Cabinet and faceplate are surface- or flush-mounting type to suit mounting conditions indicated.
1. Overcrank alarm.
2. Coolant low-temperature alarm.
3. High engine temperature prealarm.
4. High engine temperature alarm.
5. Low lube oil pressure alarm.
6. Overspeed alarm.
7. Low coolant level alarm.
8. Low cranking voltage alarm.
9. Contacts for local and remote common alarm.
10. Audible-alarm silencing switch.
11. Control switch not in automatic position alarm.
12. Lamp test.
13. Low cranking voltage alarm.
14. Generator overcurrent protective device not closed.
H. Remote Emergency-Stop Switch: Flush; wall mounted, unless otherwise indicated; and labeled. Push button shall be protected from accidental operation.
I. Supporting Items: Include sensors, transducers, terminals, relays, and other devices and include wiring required to support specified items. Locate sensors and other supporting items on engine or generator, unless otherwise indicated.
Page 14 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 9
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
2.7 GENERATOR OVERCURRENT AND FAULT PROTECTION
A. Overcurrent protective devices shall be coordinated to optimize selective tripping when a short circuit occurs.
1. Overcurrent protective devices for the entire EPSS shall be coordinated to optimize selective tripping when a short circuit occurs. Coordination of protective devices shall consider both utility and EPSS as the voltage source.
2. Overcurrent protective devices for the EPSS shall be accessible only to authorized personnel.
B. Generator Overcurrent Protective Device:
1. Molded-case circuit breaker, electronic-trip type; 100 percent rated; complying with UL 489:
a. Tripping Characteristics: Adjustable long-time and short-time delay and instantaneous.
b. Trip Settings: Selected to coordinate with generator thermal damage curve.
c. Shunt Trip: Connected to trip breaker when engine generator is shut down by other protective devices.
d. Mounting: Adjacent to or integrated with control and monitoring panel.
C. Ground-Fault Indication: Comply with NFPA 70, "Emergency System" signals for ground fault.
1. Indicate ground fault with other engine generator alarm indications.
2.8 GENERATOR, EXCITER, AND VOLTAGE REGULATOR
A. Comply with NEMA MG 1.
B. Drive: Generator shaft shall be directly connected to engine shaft. Exciter shall be rotated integrally with generator rotor.
C. Electrical Insulation: Class H or Class F.
D. Stator-Winding Leads: Brought out to terminal box to permit future reconnection for other voltages if required. Provide 12 lead alternator.
E. Range: Provide broad range of output voltage by adjusting the excitation level.
F. Construction shall prevent mechanical, electrical, and thermal damage due to vibration, overspeed up to 125 percent of rating, and heat during operation at 110 percent of rated capacity.
G. Enclosure: Dripproof.
H. Instrument Transformers: Mounted within generator enclosure.
Page 15 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 10
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
I. Voltage Regulator: Solid-state type, separate from exciter, providing performance as specified and as required by NFPA 110.
1. Adjusting Rheostat on Control and Monitoring Panel: Provide plus or minus 5 percent adjustment of output-voltage operating band.
2. Maintain voltage within 30 percent on one step, full load.
3. Provide anti-hunt provision to stabilize voltage.
4. Maintain frequency within 15 percent and stabilize at rated frequency within 5 seconds.
J. Strip Heater: Thermostatically controlled unit arranged to maintain stator windings above dew point.
K. Windings: Two-thirds pitch stator winding and fully linked amortisseur winding.
L. Subtransient Reactance: 12 percent, maximum.
2.9 OUTDOOR GENERATOR-SET ENCLOSURE
A. Description:
1. Vandal-resistant, sound-attenuating, weatherproof steel or aluminum housing, wind resistant up to 100 mph. Multiple panels shall be lockable and provide adequate access to components requiring maintenance. Panels shall be removable by one person without tools. Instruments and control shall be mounted within enclosure.
a. Sound Attenuation Level: 1.
2. Prefabricated or pre-engineered galvanized-steel-clad, integral structural-steel-framed, walk-in enclosure, erected on concrete foundation.
B. Structural Design and Anchorage: Comply with ASCE/SEI 7 for wind loads up to 100 mph.
C. Hinged Doors: With padlocking provisions.
D. Muffler Location: Within enclosure.
E. Engine Cooling Airflow through Enclosure: Maintain temperature rise of system components within required limits when unit operates at 110 percent of rated load for 2 hours with ambient temperature at top of range specified in system service conditions.
1. Louvers: Fixed-engine, cooling-air inlet and discharge. Storm-proof and drainable louvers prevent entry of rain and snow.
F. Convenience Outlets: Factory wired, GFCI. Arrange for external electrical connection.
2.10 FINISHES
A. Indoor and Outdoor Enclosures and Components: Manufacturer's standard finish over corrosion-resistant pretreatment and compatible primer.
Page 16 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 11
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
2.11 SOURCE QUALITY CONTROL
A. Prototype Testing: Factory test engine generator using same engine model, constructed of identical or equivalent components and equipped with identical or equivalent accessories.
1. Tests: Comply with IEEE 115 and with NFPA 110, Level 1 Energy Converters.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas, equipment bases, and conditions, with Installer present, for compliance with requirements for installation and other conditions affecting packaged engine generator performance.
B. Examine roughing-in for piping systems and electrical connections. Verify actual locations of connections before packaged engine generator installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service according to requirements indicated:
1. Notify Owner no fewer than ten working days in advance of proposed interruption of electrical service.
2. Do not proceed with interruption of electrical service without Owner's written permission.
3.3 INSTALLATION
A. Comply with NECA 1 and NECA 404.
B. Comply with packaged engine generator manufacturers' written installation and alignment instructions and with NFPA 110.
C. Equipment Mounting:
1. Install packaged engine generators on cast-in-place concrete equipment bases.
Comply with requirements for equipment bases and foundations specified in Section 033000 "Cast-in-Place Concrete."
2. Coordinate size and location of concrete bases for packaged engine generators.
Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified with concrete.
D. Install packaged engine generator to provide access, without removing connections or accessories, for periodic maintenance.
Page 17 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 12
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
E. Gaseous Fuel Piping:
1. Natural gas piping, valves, and specialties for gas distribution are specified in
Section 231123 "Facility Natural Gas Piping."
F. Electrical Wiring: Install electrical devices furnished by equipment manufacturers but not specified to be factory mounted.
3.4 CONNECTIONS
A. Piping installation requirements are specified in other Sections. Drawings indicate general arrangement of piping and specialties.
B. Connect fuel piping adjacent to packaged engine generator to allow service and maintenance.
C. Gaseous Fuel Connections:
1. Connect fuel piping to engines with a gate valve and union and flexible connector.
2. Install manual shutoff valve in a remote location to isolate gaseous fuel supply to the generator.
3. Vent gas pressure regulators outside building a minimum of 60 inches from building openings.
D. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
E. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables." Provide a minimum of one 90-degree bend in flexible conduit routed to the engine generator from a stationary element.
F. Balance single-phase loads to obtain a maximum of 10 percent unbalance between any two phases.
3.5 IDENTIFICATION
A. Identify system components according to Section 260553 "Identification for Electrical Systems."
B. Install a sign indicating the generator neutral is bonded to the main service neutral at the main service location.
3.6 FIELD QUALITY CONTROL
A. Manufacturer’s Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.
Page 18 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263213.16 - 13
02/16/2024 GAS-ENGINE-DRIVEN GENERATOR SETS
B. Tests and Inspections:
1. Perform tests recommended by manufacturer.
2. NFPA 110 Acceptance Tests: Perform tests required by NFPA 110 that are additional to those specified here, including, but not limited to, single-step full-load pickup test.
a. Provide and connect a portable load bank as required for full-load testing.
3. System Integrity Tests: Methodically verify proper installation, connection, and integrity of each element of engine generator system before and during system operation. Check for air, exhaust, and fluid leaks.
4. Noise Level Tests: Measure A-weighted level of noise emanating from generator-set installation, including engine exhaust and cooling-air intake and discharge, at four locations on the property line, and compare measured levels with required values.
C. Coordinate tests with tests for transfer switches and run them concurrently.
D. Leak Test: After installation, charge exhaust, coolant, and fuel systems and test for leaks. Repair leaks and retest until no leaks exist.
E. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation for generator and associated equipment.
F. Retest: Correct deficiencies identified by tests and observations and retest until specified requirements are met.
G. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation resistances, time delays, and other values and observations.
Attach a label or tag to each tested component indicating satisfactory completion of tests.
3.7 MAINTENANCE SERVICE
A. Initial Maintenance Service: Beginning at Substantial Completion, provide 12 months' full maintenance by skilled employees of manufacturer's designated service organization. Include quarterly exercising to check for proper starting, load transfer, and running under load. Include routine preventive maintenance as recommended by manufacturer and adjusting as required for proper operation. Provide parts and supplies same as those used in the manufacture and installation of original equipment.
3.8 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain packaged engine generators.
END OF SECTION 263213.16
Page 19 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263600 - 1
02/16/2024 TRANSFER SWITCHES
SECTION 263600 - TRANSFER SWITCHES (ADM1)
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Contactor-type automatic transfer switches.
2. Transfer switch accessories.
1.2 ACTION SUBMITTALS
A. Product Data:
1. Contactor-type automatic transfer switches.
2. Transfer switch accessories.
B. Product Data Submittals: For each product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for transfer switches.
2. Include rated capacities, operating characteristics, electrical characteristics, and accessories.
C. Shop Drawings:
1. Include plans, elevations, sections, details showing minimum clearances, conductor entry provisions, gutter space, and installed features and devices.
2. Include material lists for each switch specified.
3. Single-Line Diagram: Show connections between transfer switch, power sources, and load; and show interlocking provisions for each combined transfer switch and bypass/isolation switch.
1.3 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For each type of product to include in emergency, operation, and maintenance manuals. Also include the following:
1. Features and operating sequences, both automatic and manual.
2. List of all factory or field settings of relays, time delays, etc.
1.4 FIELD CONDITIONS
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service:
1. Notify Owner no fewer than ten business days in advance of proposed interruption of electrical service.
2. Do not proceed with interruption of electrical service without Owner's written permission.
Page 20 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263600 - 2
02/16/2024 TRANSFER SWITCHES
1.5 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace components of transfer switch or transfer switch components that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 18 months from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. Comply with NEMA ICS 1.
C. Comply with NFPA 110.
D. Comply with UL 1008 unless the requirements of these Specifications are stricter.
E. Indicated Current Ratings: Apply as defined in UL 1008 for continuous loading and total system transfer, including tungsten filament lamp loads not exceeding 30 percent of switch ampere rating, unless otherwise indicated.
F. Tested Fault-Current Closing and Short-Circuit Ratings: Adequate for duty imposed by protective devices at installation locations in Project under the fault conditions indicated, based on testing according to UL 1008.
1. Short-time withstand capability for three cycles.
G. Repetitive Accuracy of Solid-State Controls: All settings shall be plus or minus 2 percent or better over an operating temperature range of minus 20 to plus 70 deg C.
H. Resistance to Damage by Voltage Transients: Components shall meet or exceed voltage-surge withstand capability requirements when tested according to IEEE C62.62. Components shall meet or exceed voltage-impulse withstand test of
NEMA ICS 1.
I. Electrical Operation: Accomplish by a nonfused, momentarily energized solenoid or electric-motor-operated mechanism. Switches for emergency or standby purposes shall be mechanically and electrically interlocked in both directions to prevent simultaneous connection to both power sources unless closed transition.
J. Neutral Switching: Where four-pole switches are indicated, provide neutral pole switched simultaneously with phase poles.
K. Neutral Terminal: Solid and fully rated unless otherwise indicated.
Page 21 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263600 - 3
02/16/2024 TRANSFER SWITCHES
L. Heater: Equip switches exposed to outdoor temperatures and humidity, and other units indicated, with an internal heater. Provide thermostat within enclosure to control heater.
M. Battery Charger: For generator starting batteries.
1. Float type, rated 10A.
2. Ammeter to display charging current.
3. Fused ac inputs and dc outputs.
N. Annunciation, Control, and Programming Interface Components: Devices at transfer switches for communicating with remote programming devices, annunciators, or annunciator and control panels shall have communication capability matched with remote device.
O. Factory Wiring: Train and bundle factory wiring and label, consistent with Shop Drawings, by color-code or by numbered or lettered wire and cable with printed markers at terminations. Color-coding and wire and cable markers are specified in Section 260553 "Identification for Electrical Systems."
1. Designated Terminals: Pressure type, suitable for types and sizes of field wiring indicated.
2. Power-Terminal Arrangement and Field-Wiring Space: Suitable for top, side, or bottom entrance of feeder conductors as indicated.
3. Control Wiring: Equipped with lugs suitable for connection to terminal strips.
4. Accessible via front access.
P. Enclosures: General-purpose NEMA 250, Type 3R, complying with NEMA ICS 6 and UL 508, unless otherwise indicated.
2.2 CONTACTOR-TYPE AUTOMATIC TRANSFER SWITCHES
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. ABB, Electrification Business.
2. Caterpillar, Inc.; Electric Power Division.
3. Cummins Power Generation.
4. Eaton.
5. Generac.
6. Kohler Power Systems.
7. Rolls-Royce Solutions America Inc.
B. Comply with Level 1 equipment according to NFPA 110.
C. Switch Characteristics: Designed for continuous-duty repetitive transfer of full-rated current between active power sources.
1. Limitation: Switches using molded-case switches or circuit breakers or insulated-case circuit-breaker components are unacceptable.
2. Switch Action: Double throw; mechanically held in both directions.
Page 22 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263600 - 4
02/16/2024 TRANSFER SWITCHES
3. Contacts: Silver composition or silver alloy for load-current switching. Contactor-style automatic transfer-switch units, rated 600 A and higher, shall have separate arcing contacts.
4. Conductor Connectors: Suitable for use with conductor material and sizes.
5. Material: Tin-plated aluminum or hard-drawn copper, 98 percent conductivity.
6. Main and Neutral Lugs: Mechanical type.
7. Ground Lugs and Bus-Configured Terminators: Mechanical type.
8. Ground bar.
9. Connectors shall be marked for conductor size and type according to UL 1008.
D. Automatic Open-Transition Transfer Switches: Interlocked to prevent the load from being closed on both sources at the same time.
1. Sources shall be mechanically and electrically interlocked to prevent closing both sources on the load at the same time.
E. Electric Nonautomatic Switch Operation: Electrically actuated by push buttons designated "Normal Source" and "Alternative Source." Switch shall be capable of transferring load in either direction with either or both sources energized.
F. Digital Communication Interface: Matched to capability of remote annunciator or annunciator and control panel.
G. Automatic Transfer-Switch Controller Features:
1. Controller operates through a period of loss of control power.
2. Undervoltage Sensing for Each Phase of Normal and Alternate Source: Sense low phase-to-ground voltage on each phase. Pickup voltage shall be adjustable from 85 to 100 percent of nominal, and dropout voltage shall be adjustable from 75 to 98 percent of pickup value. Factory set for pickup at 90 percent and dropout at 85 percent.
3. Voltage/Frequency Lockout Relay: Prevent premature transfer to generator.
Pickup voltage shall be adjustable from 85 to 100 percent of nominal. Factory set for pickup at 90 percent. Pickup frequency shall be adjustable from 90 to 100 percent of nominal. Factory set for pickup at 95 percent.
4. Time Delay for Retransfer to Normal Source: Adjustable from zero to 30 minutes, and factory set for 10 minutes. Override shall automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored.
5. Test Switch: Simulate normal-source failure.
6. Switch-Position Pilot Lights: Indicate source to which load is connected.
7. Source-Available Indicating Lights: Supervise sources via transfer-switch normal-and emergency-source sensing circuits.
a. Normal Power Supervision: Green light with nameplate engraved "Normal
Source Available."
b. Emergency Power Supervision: Red light with nameplate engraved
"Emergency Source Available."
8. Unassigned Auxiliary Contacts: Two normally open, single-pole, double-throw contacts for each switch position, rated 10 A at 240-V ac.
Page 23 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263600 - 5
02/16/2024 TRANSFER SWITCHES
9. Transfer Override Switch: Overrides automatic retransfer control so transfer switch will remain connected to emergency power source regardless of condition of normal source. Pilot light indicates override status.
10. Engine Starting Contacts: One isolated and normally closed, and one isolated and normally open; rated 10 A at 32-V dc minimum.
11. Engine Shutdown Contacts:
a. Time delay adjustable from zero to five minutes, and factory set for five minutes. Contacts shall initiate shutdown at remote engine-generator controls after retransfer of load to normal source.
12. Engine-Generator Exerciser: Solid-state, programmable-time switch starts engine generator and transfers load to it from normal source for a preset time, then retransfers and shuts down engine after a preset cool-down period. Initiates exercise cycle at preset intervals adjustable from 7 to 30 days. Running periods shall be adjustable from 10 to 30 minutes. Factory settings shall be for 7-day exercise cycle, 20-minute running period, and 5-minute cool-down period.
Exerciser features include the following:
a. Exerciser Transfer Selector Switch: Permits selection of exercise with and without load transfer.
b. Push-button programming control with digital display of settings.
c. Integral battery operation of time switch when normal control power is unavailable.
2.3 TRANSFER SWITCH ACCESSORIES
A. Remote Annunciator and Control System:
1. Source Limitations: Same manufacturer as transfer switch in which installed.
2. Include the following functions for indicated transfer switches:
a. Indication of sources available, as defined by actual pickup and dropout settings of transfer-switch controls.
b. Indication of switch position.
c. Indication of switch in test mode.
d. Indication of failure of digital communication link.
e. Key-switch or user-code access to control functions of panel.
f. Control of switch-test initiation.
g. Control of switch operation in either direction.
3. Malfunction of annunciator, annunciation and control panel, or communication link shall not affect functions of automatic transfer switch. In the event of failure of communication link, automatic transfer switch automatically shall revert to standalone, self-contained operation. Automatic transfer-switch sensing, controlling, or operating function shall not depend on remote panel for proper operation.
4. Remote Annunciation and Control Panel: Solid-state components. Include the following features:
a. Controls and indicating lights grouped together for each transfer switch.
b. Label each indicating light control group. Indicate transfer switch it controls, location of switch, and load it serves.
c. Digital Communication Capability: Matched to that of transfer switches supervised.
Page 24 of 52 Addendum #1
Benton Harbor Area Schools Berrien County, MI
C2AE © Project #23-0327 263600 - 6
02/16/2024 TRANSFER SWITCHES
d. Mounting: Flush, modular, steel cabinet unless otherwise indicated.
2.4 SOURCE QUALITY CONTROL
A. Factory Tests: Test and inspect components, assembled switches, and associated equipment according to UL 1008. Ensure proper operation. Check transfer time and voltage, frequency, and time-delay settings for compliance with specified requirements.
Perform dielectric strength test complying with NEMA ICS 1.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Floor-Mounting Switch: Anchor to floor by bolting.
1. Install transfer switches on cast-in-place concrete equipment base(s). Comply with requirements for equipment bases and foundations specified in Section 033000 "Cast-in-Place Concrete."
2. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases.
3. Provide workspace and clearances required by NFPA 70.
B. Annunciator and Control Panel Mounting: Flush in wall unless otherwise indicated.
C. Identify components according to Section 260553 "Identification for Electrical Systems."
D. Set field-adjustable intervals and delays, relays, and engine exerciser clock.
E. Comply with NECA 1.
3.2 CONNECTIONS
A. Wiring to Remote Components: Match type and number of cables and conductors to generator sets, control, and communication requirements of transfer switches as recommended by manufacturer. Increase raceway sizes at no additional cost to Owner if necessary to accommodate required wiring.
B. Wiring Method: Install cables in raceways and cable…