- Solicitation number
- RFP - BHA - 240000001444
- Issued by
- Berrien County, Bergland CDP, Michigan
About this file
This document is an Addendum for a Boiler Replacement project for Benton Harbor High School in Benton Harbor, Michigan. The project involves the installation of new steam boilers and associated piping, pumps, and controls to serve the school's existing heating hot water system. The mechanical plans and details provided in the addendum outline the scope of work, including the relocation and reuse of existing equipment where possible. No specific bid due dates or award information is provided in this document.
The addendum includes mechanical general notes detailing requirements for conflicts between standards, minimum quantities, coordination with other trades, and compliance with local codes. Pricing terms, funding sources, and set-asides are not discussed. The document serves to provide additional details and clarifications to the overall scope of the boiler replacement project for the high school facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 230327_240126_Elem_Drawings.pdf | ||
| Addendum 1 Pt1.pdf | ||
| Addendum 2-4.pdf | ||
| 230327_240126_HS_Drawings.zip | ZIP file | |
| Addendum 1 Pt2.pdf | ||
| 230327_240126_ProjectManual Part 1 of 2.pdf | ||
| 230327_240126_ProjectManual Part 2 of 2.pdf | ||
| RFI and Response.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EX-DWST
EXISTING DOMESTIC WATER
STORAGE TANK, EXPANSION
TANK AND ALL ASSOCIATED
PIPING TO REMAIN.
EX-ET
CP-1
P-1
P-2 P-3 P-4
B-1 B-2
CP-2
ET-1
EX-12" SS
EX-10" SS
OUTLINE OF PENTHOUSE
MECHANICAL ROOM ABOVE.
NEW HYDRONIC PUMPS TO
SERVE EXISTING HEATING
HOT WATER SYSTEM. REFER
TO SYSTEM SCHEMATIC.
6" COMBUSTION
VENT THRU ROOF
10" EXHAUST
FLUE THRU ROOF
6" COMBUSTION
VENT THRU ROOF
10" EXHAUST
FLUE THRU ROOF
6" COMBUSTION
VENT THRU ROOF
10" EXHAUST
FLUE THRU ROOF
6" COMBUSTION
VENT THRU ROOF
10" EXHAUST
FLUE THRU ROOF
M-300
M-300
10" EXHAUST
FLUE THRU
ROOF10" EXHAUST
FLUE THRU ROOF
10" COMBUSTION
VENT THRU ROOF
B-3 B-4 B-5 B-6
M1M1
M5M5
M1M1
M1M1
CP-3
EX
-1
0" S
S
CONDENSATE
RECEIVER APPROX
200' DOWN TUNNEL
FROM BOILER ROOM
12" SSTO SECONDARY SYSTEM PUMPS
FROM SECONDARY SYSTEM
EX-4" HHWR
EX-4" HHWS
EXISTING RELOCATED DOMESTIC
WATER HEATER ON NEW
HOUSEKEEPING PAD.
COORDINATE RELOCATION WITH
NEW ELECTRICAL WORK AND FINAL
PANEL CLEARANCE ON WALL. 2
M-300
M-300
P-B1 P-B2
UH-2
UH-1
EX-NATURAL GAS METER AND SERVICE ENTRANCE.
5 PSIG SERVICE TO HS BOILER ROOM AND TO MAIN
ACROSS ROOF TO GYM UNITS, SEE NG ROOF PLAN
ON SHEET M103.
4" NG
FWS-1
BDT-1
EX
-4
IA
EX-DWH
EX
-3
HH
W S
ELEC EQUIP CLEARANCE
MIN 4'-0". DO NOT INSTALL
ANY PIPING OR EQUIPMENT
IN OR OVER THIS AREA.
2" H
HW
S
AS-1
4" HHWR
4" HHWS&R TO/FROM
BOILERS, TYP. REFER
TO SCHEMATIC FOR
ISOLATION VALVE
AT BRANCH ETC.
FIELD LOCATE RELOCATED NG
PRV FROM COAL BUNKER,
REFER TO DEMO DWGS. VERIFY
RELOCATED PRV CAPACITY FOR
NEW LOAD.
1" H
HW
R1"
H
HW
S
1" HHWS&R
TO UH
10" SS
12" SS
SS
2" CD EXISTING CONDENSATE,
FIELD VERIFY IN USE. CONNECT TO
NEW CP-1
FIELD ROUTE CONDENSATE FROM CP
TO FLOOR DRAIN IN ADJACENT ROOM
1" CD
REFER TO
SCHEMATIC
FOR PIPING
REFER TO SCHEMATIC
FOR PIPING
M3M3M4M4
M6M6
M7M7
M8M8
M10M10
M9M9
M9M9
SUMP
3" S
AN
4" SAN
EXISTING DOMESTIC WATER SERVICE AND PIPING RUNS ALONG THIS
WALL APPROX 4'-0" AFF. THIS TO REMAIN IN PLACE FOR REUSE.
EXIST ROOF CONDUCTOR CLEAN OUT ON WALL, COORDINATE
HOUSEKEEPING PAD AND MODIFY AS REQUIRED TO ALLOW ACCESS
TO CLEAN OUT.
M11M11 M12M12
M13M13
6" S
S
TY
P
AL
L
EX HHWS&R
TO REMAIN
EXIST HHWS&R TO REMAIN
3" HHWS
3" HHWR
SS
CONFIRM EXISTING STEAM PIPE SIZE
AND MATCH SIZE.
4" HHWS
MECHANICAL GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
IF COMPLIANCE WITH TWO OR MORE DIFFERING STANDARDS, REQUIREMENTS, DRAWINGS OR
SPECIFICATIONS, OR ANY COMBINATION THEREOF, IS SPECIFIED AND THESE ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST STRINGENT REQUIREMENT. THE MOST STRINGENT REQUIREMENT WILL BE THE BETTER QUALITY OR
GREATER QUANTITY OF WORK, AND WILL TYPICALLY BE THE MORE EXPENSIVE OPTION. REFER
UNCERTAINTIES AND REQUIREMENTS THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO ENGINEER
FOR A DECISION BEFORE PROCEEDING.
THE QUANTITY OR QUALITY LEVEL SHOWN OR SPECIFIED SHALL BE THE MINIMUM PROVIDED OR PERFORMED. THE ACTUAL INSTALLATION MAY COMPLY EXACTLY WITH THE MINIMUM QUANTITY OR QUALITY SPECIFIED, OR IT MAY EXCEED THE MINIMUM WITHIN REASONABLE LIMITS. TO COMPLY WITH THESE REQUIREMENTS, INDICATED NUMERIC VALUES ARE MINIMUM OR MAXIMUM, AS APPROPRIATE, FOR THE CONTEXT OF REQUIREMENTS. REFER UNCERTAINTIES TO ENGINEER FOR A DECISION BEFORE
PROCEEDING.
DESIGN DOCUMENTS MUST BE REPRODUCED IN THEIR ENTIRETY, INCLUDING ALL PLANS,
SPECIFICATIONS, AND FRONT END DOCUMENTS.
ONLY COMPLETE DOCUMENT SETS ARE TO BE DISTRIBUTED TO SUBCONTRACTORS AND SUPPLIERS OF
THE CONTRACTOR DURING BIDDING OR CONSTRUCTION.
FAILURE TO REVIEW AND COMPLY WITH A FULL SET OF CONTRACT DOCUMENTS WILL NOT BE
ACCEPTED AS A VALID REASON FOR FAILURE TO MEET THE REQUIREMENTS OF THE PLANS AND
SPECIFICATIONS.
ALL MECHANICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL ORDINANCES, CODES, AND LAWS. FOR PURPOSES OF THIS DESIGN, THE CODES FOR THE STATE OF MICHIGAN WERE USED AS THE
BASIS.
COORDINATE LOCATIONS OF ALL DEVICES WITH ARCHITECTURAL AND ELECTRICAL PRIOR TO ROUGH- IN. ALL CONFLICTS WITH FINISHES, ADJACENT CONSTRUCTION, AND CONSTRUCTION DOCUMENTS ARE TO GENERATE AN RFI FROM THE MECHANICAL CONTRACTOR TO THE ARCHITECT/ENGINEER PRIOR TO
PROCEEDING AND COMPLETION OF WORK.
CONTRACTOR SHALL FURNISH AND INSTALL ISOLATION AND BALANCING VALVES AT ALL HYDRONIC (HHW AND CHW) COILS, AND BALANCING VALVES AT EACH DISTRIBUTION LOOP ON THE RETURN PIPE.
CONTRACTOR SHALL LOCATE VALVES TO ALLOW FOR ACCESS WITHIN 3 ’ AFTER CONSTRUCTION IS
COMPLETE.
MECHANICAL CONTRACTOR SHALL COORDINATE ROOF PENETRATIONS WITH ROOFING CONTRACTOR
OR ROOFING MANUFACTURER TO AVOID DAMAGE TO ROOFING SYSTEM.
MECHANICAL CONTRACTOR SHALL PROVIDE WATER PROOF SHEET METAL CAP, INSULATED
(EQUIVALENT TO ROOF) FOR ALL DEMOLISHED ROOF PENETRATIONS.
A TEST AND BALANCE (TAB) IS REQUIRED FOR THE WORK.
ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH MOTOR STARTERS COMPATIBLE WITH
CONTROLS SYSTEM. COORDINATE WITH CONTROLS AND ELECTRICAL CONTRACTORS.
IN UNFINISHED AREAS, INSTALL ALL MECHANICAL CONTROL DEVICES (THERMOSTATS, ROOM SENSORS, REMOTE TEST STATIONS, SMOKE DAMPER INDICATORS, ETC.) RECESSED IN WEB OF COLUMNS TO
PREVENT DAMAGE.
PROVIDE EMERGENCY SHUTOFF AT BOILER ROOM EXIT DOORS TO SHUTDOWN ALL BOILERS PER CSD-1
REQUIREMENTS
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S O
LID
TH
E
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
LO
RS
(866) 454-3923 | WWW.C2AE.COM
PROJ. #:
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:5
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
M .rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
M-100
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
M
EC
H A N
IC
A L P
LA
N
A01 ADDENDUM 1 15FEB2024
1/4" = 1'-0"
MECHANICAL - BOILER ROOM
MECHANICAL KEYNOTES
KEY VALUE KEYNOTE TEXT
M1 UTILIZE EXISTING WALL OPENINGS FOR NEW HYDRONIC PIPING.
M3 FIELD ROUTE FEEDWATER PIPING FROM FEEDWATER SYSTEM TO BOILERS PER
MFG REQUIREMENTS. CONNECT TO EXISTING DOMESTIC WATER FOR MAKEUP.
M4 FIELD ROUTE PIPING TO/FROM BLOWDOWN TANK PER MFG REQUIREMENTS.
EXTEND DRAIN TO NEW FLOOR DRAINS.
M5 FIELD ROUTE EXISTING APPROX 2" CONDENSATE RETURN FROM EXISTING WALL
PENETRATION TO NEW CP. REUSE EXISTING VERTICAL HEADER TO CR.
M6 FIELD ROUTE EXISTING CONDENSATE RETURNS FROM THE DEMOLISHED
OVERHEAD FEEDWATER TANK LOCATION TO THE NEW FLOOR MOUNTED
FEEDWATER TANK LOCATION. APPROX FOUR CONDENSATE RETURNS FROM 1" TO
2" IN SIZE.
M7 EXISTING CONDENSATE RECEIVER IS LOCATED ON FLOOR IN ROOM WITH AHU,
PLACE NEW UNIT IN SAME LOCATION. RECONNECT EXISTING PIPING TO/FROM CP.
REPLACE EXISTING PIPING FROM CEILING TO UNIT. REFER TO DETAIL 2 ON SHEET
M-501.
M8 INSTALL STEAM BOILER SO THAT ALL MFG REQUIRED CLEARANCES ARE
OBTAINED, TYP ALL BOILERS STEAM AND HYDRONIC. DO NOT BLOCK AREA ABOVE
STEAM BOILERS SO THAT VERTICAL DISTANCE FOR COIL PULL IS MAINTAINED.
M9 REFER TO ARCH SHEET A100 FOR NEW FLOOR DRAIN LOCATIONS. PROVIDE
JOSAM MODEL 30000-S OR EQUAL, 5" x 5" COATED CAST IRON BODY FLOOR DRAIN, TWO PIECE BODY WITH DOUBLE DRAINAGE FLANGE, WEEPHOLES, BOTTOM
OUTLET AND AJUSTABLE SATIN NICKELOY SQUARE STRAINER.5" ROUND CAST
IRON FLOOR DRAIN WITH GRATE AND 3" SANITARY CONNECTION. INSTALL CAST
IRON DRAIN PIPING TO EXISTING IN FLOOR SUMP. SAW CUT FLOOR AS REQUIRED
AND PATCH.
M10 CONNECT NEW FLOOR DRAIN TO EXISTING SANITARY PIPING.
M11 FIELD LOCATE NEW DDC CONTROL PANEL ON WALL.
M12 REFER TO ELECTRICAL DRAWINGS FOR BOILER EMERGENCY SHUTDOWN
SWITCHES AND LOCATIONS.
M13 FIELD LOCATE NEW OWNER FURNISHED MODSYNC BOILER CONTROL PANEL FOR
STEAM BOILERS. MOUNT ON WALL OR CREATE UNISTRUT SUPPORT FROM FLOOR.
A01
A01
Page 46 of 52 Addendum #1
MECHANICAL GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
IF COMPLIANCE WITH TWO OR MORE DIFFERING STANDARDS, REQUIREMENTS, DRAWINGS OR
SPECIFICATIONS, OR ANY COMBINATION THEREOF, IS SPECIFIED AND THESE ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST STRINGENT REQUIREMENT. THE MOST STRINGENT REQUIREMENT WILL BE THE BETTER QUALITY OR
GREATER QUANTITY OF WORK, AND WILL TYPICALLY BE THE MORE EXPENSIVE OPTION. REFER
UNCERTAINTIES AND REQUIREMENTS THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO ENGINEER
FOR A DECISION BEFORE PROCEEDING.
THE QUANTITY OR QUALITY LEVEL SHOWN OR SPECIFIED SHALL BE THE MINIMUM PROVIDED OR PERFORMED. THE ACTUAL INSTALLATION MAY COMPLY EXACTLY WITH THE MINIMUM QUANTITY OR QUALITY SPECIFIED, OR IT MAY EXCEED THE MINIMUM WITHIN REASONABLE LIMITS. TO COMPLY WITH THESE REQUIREMENTS, INDICATED NUMERIC VALUES ARE MINIMUM OR MAXIMUM, AS APPROPRIATE, FOR THE CONTEXT OF REQUIREMENTS. REFER UNCERTAINTIES TO ENGINEER FOR A DECISION BEFORE
PROCEEDING.
DESIGN DOCUMENTS MUST BE REPRODUCED IN THEIR ENTIRETY, INCLUDING ALL PLANS,
SPECIFICATIONS, AND FRONT END DOCUMENTS.
ONLY COMPLETE DOCUMENT SETS ARE TO BE DISTRIBUTED TO SUBCONTRACTORS AND SUPPLIERS OF
THE CONTRACTOR DURING BIDDING OR CONSTRUCTION.
FAILURE TO REVIEW AND COMPLY WITH A FULL SET OF CONTRACT DOCUMENTS WILL NOT BE
ACCEPTED AS A VALID REASON FOR FAILURE TO MEET THE REQUIREMENTS OF THE PLANS AND
SPECIFICATIONS.
ALL MECHANICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL ORDINANCES, CODES, AND LAWS. FOR PURPOSES OF THIS DESIGN, THE CODES FOR THE STATE OF MICHIGAN WERE USED AS THE
BASIS.
COORDINATE LOCATIONS OF ALL DEVICES WITH ARCHITECTURAL AND ELECTRICAL PRIOR TO ROUGH- IN. ALL CONFLICTS WITH FINISHES, ADJACENT CONSTRUCTION, AND CONSTRUCTION DOCUMENTS ARE TO GENERATE AN RFI FROM THE MECHANICAL CONTRACTOR TO THE ARCHITECT/ENGINEER PRIOR TO
PROCEEDING AND COMPLETION OF WORK.
CONTRACTOR SHALL FURNISH AND INSTALL ISOLATION AND BALANCING VALVES AT ALL HYDRONIC (HHW AND CHW) COILS, AND BALANCING VALVES AT EACH DISTRIBUTION LOOP ON THE RETURN PIPE.
CONTRACTOR SHALL LOCATE VALVES TO ALLOW FOR ACCESS WITHIN 3 ’ AFTER CONSTRUCTION IS
COMPLETE.
MECHANICAL CONTRACTOR SHALL COORDINATE ROOF PENETRATIONS WITH ROOFING CONTRACTOR
OR ROOFING MANUFACTURER TO AVOID DAMAGE TO ROOFING SYSTEM.
MECHANICAL CONTRACTOR SHALL PROVIDE WATER PROOF SHEET METAL CAP, INSULATED
(EQUIVALENT TO ROOF) FOR ALL DEMOLISHED ROOF PENETRATIONS.
A TEST AND BALANCE (TAB) IS REQUIRED FOR THE WORK.
ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH MOTOR STARTERS COMPATIBLE WITH
CONTROLS SYSTEM. COORDINATE WITH CONTROLS AND ELECTRICAL CONTRACTORS.
IN UNFINISHED AREAS, INSTALL ALL MECHANICAL CONTROL DEVICES (THERMOSTATS, ROOM SENSORS, REMOTE TEST STATIONS, SMOKE DAMPER INDICATORS, ETC.) RECESSED IN WEB OF COLUMNS TO
PREVENT DAMAGE.
PROVIDE EMERGENCY SHUTOFF AT BOILER ROOM EXIT DOORS TO SHUTDOWN ALL BOILERS PER CSD-1
REQUIREMENTS
EX-2" NG EX-16" DUCT
EX-CONDENSING
UNIT TO REMAIN
EX-4" NG
M2M2 M2M2
M2M2
TO/FROM BOILER
ROOM, TO REMAIN
REFER TO
STRUCTURAL
FOR CHIMINEY
WORK
MECHANICAL PENTHOUSE
NEW STANDBY GENERATOR,
REFER TO ELECTRICAL DRAWINGS
FOR LOCATION. APPROX 80 KW
WITH 1000 CFH DEMAND
EXISTING NATURAL GAS SERVICE
ENTRANCE AND METER. 2" NG LINE
AT 5 PSIG PRESSURE RUNS FROM
SERVICE ENTRANCE ACROSS
HS ROOF, UNDER COURTYARD AND
ACROSS ROOF TO GYM AS SHOWN.
FIELD VERIFY NG PRESSURE IN
THIS 2" LINE.
TWO EXISTING 2" VALVED
CONNECTIONS. UTILIZE ONE
CONNECTION TO SERVE NEW
STANDBY GENERATOR.
APPROX 100' LF FROM UPPER
ROOF TO GRADE AT STANDBY
GENERATOR LOCATION. FIELD ROUTE 2"
NG LINE FROM EXISTING VALVED CONNECTION
TO STANDBY GENERATOR, PROVIDE PRV TO
REDUCE NG PRESSURE FROM 6 PSIG TO 11" W.C.,
VERIFY REQURIED PRESSURE WITH FINAL GENERATOR
SELECTION.
APPROX 10'-0" VERTICAL DROP
THREE EXISTING RTU'S WITH
PRESSURE REGULATING VALVES
AND DROPS THRU ROOF INTO
LASSROOMS BELOW. FIELD VERIFY
CLASSROOM DROPS HAVE
PRESSURE REGULATOR INSTALLED.
NEW TO EXISTING
PIPE CONNECTION
TWO NG FIRED RTU. THESE UNITS
WILL OPERATE ON STANDBY
GENERATOR. 1200 CFH EACH FOR
TOTAL OF 2400 CFH NG DEMAND.
NG LOAD INFORMATION WITH STANDBY GENERATOR OPERATING
RTU 1 & 2 SERVING GYM: 2400 CFH
STANDBY GENERATOR: 1100 CFH
TOTAL LOAD: 3500 CFH IN 2" LINE RUNNING APPROX 1,000 FT AT 5 PSIG PRESSURE.
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:0 1 P M
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
M .rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
M-103
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
M
EC
H A N
IC
A L P
LA
N R O O F
1/4" = 1'-0"
MECHANICAL PLAN - ROOF
A01 ADDENDUM 1 15FEB2024
MECHANICAL KEYNOTES
KEY VALUE KEYNOTE TEXT
M2 SEAL BOILER FLUES ROOF PENETRATION WEATHER TIGHT, SEE DETAIL.
1/2" = 1'-0"
NG ROOF PLAN
A01
A01 A01
A01
Page 47 of 52 Addendum #1
CODE
APPROVED CAP
VENTILATED ROOF
SLEEVE
SHEET METAL FLASHING
ROOF
GUSSET PLATES
STORM COLLAR
ANGLE SUPPORTS
ON FOUR SIDES
TYPE "B" FLUE
" M
IN
IM
U M
PLATE WASHER
1/4"x5"x5"
FLOOR TOPPING
PRECAST HOLLOW
CORE SLAB
CLEVIS PIPE HANGER
250 LB. MAX.
18" LONG 16 GAUGE
PIPE SHIELD
INSULATED PIPE WITH
VAPOR BARRIER
ALL THREAD THRU
CONCRETE FLANK 1ST
FLOOR. SEE DETAIL X,
SHEET X FOR CONN. AT
2ND FLOOR
1/2" Ø THREADED ROD
90° SECTION OF RIGID
INSULATION MIN. 12" LONG
(TYP. FOR ALL PIPING)
"U" BOLT
EXISTING CONCRETE
SLAB AND JOIST
FRAMING
1/2"Ø ROD
PS210
FIG. 66
RIGID FIBERGLASS
INSULATION (1"
THICK) (TYP.)
PS210
PS925
THREADED EYE
ROD
"GRINNELL" FIG.
260 PIPE HANGER
"GRINNELL" FIG.
167 INSULATION
SHIELD (MIN. 18
GAUGE, 12" LONG,
180°) (TYP.)
CALCIUM SILICATE
RIGID INSULATION
INSERT (TYP.)
"GRINNELL" FIG.
66 BEAM
ATTACHMENT 8
"POWER STRUT"
PS 925 JOINT
CONNECTOR
"POWER
STRUT" PS
210 CHANNEL
PLAN VIEW
AS REQUIRED (MIN. 24")
12".
3/8"Ø HILTI KH-EZ I WITH 1/2-13 INTERNAL
THREADS FOR 1/2" DIA. RODS FOR #500
NO
TI
FY
E
NG
IN
EE
R
IF
1/4
3 1
/4" M
IN
; F
IE
LD
V
ER
IF
Y
AN
D
INCOMING
GAS LINE
LUBRICATED
PLUG VALVE
DIRT LEG
EQUIPMENT
UNION
PIPE REDUCER FROM
BRANCH PIPE SIZE TO
UNIT CONNECTION SIZE.
PROVIDE AT UNIT.
HIGH CONDENSATE LEVEL
-PUMP ON
-CHECK VALVE OPEN
-CONDENSATE CAN FLOW
INTO RECEIVER.
LOW CONDENSATE LEVEL
-PUMP OFF
-CHECK VALVE CLOSED
-CONDENSATE CAN FLOW
INTO RECEIVER.
PUMP
RECEIVER
HHWR
HHWS
HH
W
R
'PETE'S' TEST PLUG (TYP.)
CHECK VALVE
(TYP.)
STRAINER (TYP.)
RELIEF VALVE (TYP.)
BOILER (TYP.)
6" CONCRETE
PAD
HH
W
S
BUTTERFLY
VALVE (TYP.)
FROM SYSTEM
TO SYSTEM
M
UNION (TYP.)
ACID NEUTRALIZATION KIT.
ROUTE CONDENSATE TO DRAIN.
BOILER E-STOP
PER CSD-1
REQUIREMENTSNOTE: AIR INTAKE AND EXHAUST OPENING SHOULD BE
SEPARATED PER NFGC TO PREVENT FLUE GAS
RECIRCULATION DURING DIFFERENT WIND CONDITIONS.
PVC PIPE
ADHESIVE SEAL
STORM COLLAR
ADJUSTABLE FLASHING
SCREENED INLET
ADJUSTABLE
FLASHING
EXHAUST DUCT IS
DOWNWIND OF AIR
INTAKE OPENING
ROOF SUPPORT
MIN. 4 FT
M
IN
. 2 F T.
TEE OR CAP PER
BOILER MFG
REQUIREMENT
M
IN
F T.
MANUFACTURER
APPROVED EXHAUST
PIPE AND RAIN CAP
DOUBLE-WALL
THIMBLE
SCREENED INLET
FULL SIZE DRAIN TO
FLOOR SINK
PRESSURE REDUCING
VALVE SET AT 12 PSIG
DIELECTRIC UNION: LOCATE
AT CHANG OF PIPE MATERIAL
AND AT ALL FERROUS TO
NON-FERROUS MATERIAL
CONNECTIONS
1" BYPASS WITH BALL
VALVE
SEE PLUMBING PLAN
FOR CONTINUATION
BLADDER TYPE
EXPANSION TANK
1" TO SYSTEM
PUMP SUCTION
ASME PRESSURE RELIEF
VALVE SET AT 75 PSIG
OUTLET GRILLE
CONTROL VALVE WITH
THERMOSTAT
CONTROL
OR DANFOSS SELF-
CONTAINED CONTROL
VALVE. SEE PLANS FOR
TYPE AND LOCATION.
BALL
VALVE
(TYP.)
HHWS CIRCUIT SETTER
HHWR
UNION (TYP.)
PRESSURE SENSING TAPS FOR
FLOW MEASUREMENT (TYP.)
MULTI-PURPOSE VALVE
PRESSURE GAUGE (0-60 PSI RANGE)
FLEX CONNECTOR (TYP.)
GAUGE ISOLATION VALVE (TYP.)
PUMP
COUPLING
GUARD
MOTOR
GROUT-FILLED
EQUIPMENT BASE
4" CONCRETE
HOUSEKEEPING PAD
LUG-STYLE
BUTTERFLY
VALVE
SUCTION
DIFFUSER
APPROX. 8'-0"
CEILING HEIGHT
EXIST CP
SUPPORT FROM
CEILING.
INSULATE ALL
EXISTING PIPE
BEING REUSED.
MOUNT ON 4"
HOUSE KEEPING
PAD, FIELD VERIFY
HEIGHT AVAILABLE
FLOOR LINE
1/8" C.I.
BEND
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE
CLEANOUT & ACCESS
COVER. TOP OF COVER
TO BE FLUSH WITH
TOP OF FLOOR
ADJUSTABLE SHANK
CLAMPING COLLAR
TILE BED
FLOOR TILE
3'-0"x3'-0"x4 LB.
PER SF LEAD PAN
CONNECT
TO P-TRAP
DRIP LEG (TYP.)
LP STEAM LINE
CAP (TYPICAL)3/4" DRAIN
(ALTERNATE LOCATIONS)
FROM DRIP
CONNECTION
3/4" MIN
3/8" TEST CONNECTION
DRIP RETURN
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
RECOMMENDED PIPE SIZING CHART
PIPE SIZE (INCHES)
FLOW (GPM)
COPPER IRON
3/4"
1"
1-1/4"
1-1/2"
2"
2-1/2"
0-3.5
6-12
10-20
20-40
35-75
60-120
N/A
3.5-7
3"
4"
5"
6"
8"
10"
12"
0-4
7.5-15
11-24
21-45
35-75
65-125
125-275
250-450
350-800
800-1500
1500-2500
2500-5000
4-7.5
N/A
N/A
N/A
N/A
N/A
INSTALL ISOLATION VALVES ON EACH BRANCH
OR RUNOUT. CONFIRM THAT VALVE IS
ACCESSIBLE TO MAINTENANCE STAFF.
ISOLATION VALVE SHALL BE A BALL VALVE
FOR PIPE UNDER 6", AND A BUTTERFLY VALVE
FOR PIPE 6" AND ABOVE.
BRANCH OR RUNOUT PIPING SHALL TAKE OFF
THE SIDE OR TOP OF THE MAIN TO PREVENT
DEBRIS IN THE BRANCH.
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:0
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
M .rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
M-501
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
M
EC
H A N
IC
A L D
ET
A
IL
S
A01 ADDENDUM 1 15FEB2024
12" = 1'-0"9 FLUE THRU ROOF
12" = 1'-0"8 PIPE - ALL-THREAD ROD FROM STRUCTURE
12" = 1'-0"5 PIPE - HANGER FROM CONCRETE DECK
12" = 1'-0"7 GAS - EQUIPMENT CONNECTION
12" = 1'-0"1 STEAM - CONDENSATE UNIT
12" = 1'-0"3 HYDRONICS - BOILER PIPING WITH ACID NEUTRALIZATION
1/4" = 1'-0"4 BOILER - VENTING DETAIL
12" = 1'-0"10 HYDRONICS - EXPANSION TANK
12" = 1'-0"11 HYDRONICS - UNIT HEATER
12" = 1'-0"6 PUMP - END SUCTION WITH SUCTION DIFFUSER
A01
A01
NOT TO SCALE2 CP-3 EXISTING CONDITION DETAIL
12" = 1'-0"12 FLOOR CLEANOUT DETAIL
12" = 1'-0"13 FLOOR DRAIN DETAIL
NOT TO SCALE14 STEAM - TRAP DETAIL
NOT TO SCALE15 HYDRONICS - PIPE SIZING CHART
12" = 1'-0"16 PIPE - BRANCH OFF MAIN
Page 48 of 52 Addendum #1
BOILER-1 BOILER-2 BOILER-3
ISOLATION VALVE (TYP.)
EXISTING STEAM HEADER
CONDENSATE / FEED
WATER RECEIVER
TANK (ELEVATED)
BLOWDOWN DRAIN
STEAM TO HHW
HEAT
EXCHANGER
OLD VALVE
NEWER VALVE
4" SS
6" SS
10" SS
12" SS
P-1
P-2
P-3
P-4
HEATING HOT
WATER PUMPS
NEW STEAM
CONTROL VALVE
ABANDONED
DOMESTIC HOT
WATER TANK
(ELEVATED)
TO/FROM
BLDG
TO/FROM
BLDG
TO/FROM BLDG
1.
NOTES:
REFER TO MECHANICAL DETAILS FOR ADDITIONAL
INFORMATION.
B-1 B-1
HH
W
R
HH
W
S
HH
W
S
TO SYSTEM
CHECK VALVE (TYP.)
ISOLATION VALVE (TYP.)
P-1 P-2
P-3
HH
W
S
HH
W
R
HH
W
S
P-4
STRAINER (TYP.)
RELIEF VALVE (TYP.)
LOW WATER CUT-OFF
SWITCH (TYP.)
PRESSURE/TEMP GAUGE (TYP.)
AQUASTAT (TYP.)
UNION (TYP.) 3/4" ASME PRESSURE
RELIEF VALVE SET AT
75 PSIG
3/4" BYPASS
DIELECTRIC UNION: LOCATE
AT CHANGE OF PIPE
MATERIAL AND AT ALL
FERROUS TO NON-FERROUS
MATERIAL CONNECTIONS
3/4" CW
PRESSURE REDUCING
VALVE SET AT 20 PSIG
FULL SIZE DRAIN
TO FLOOR DRAIN
FULL SIZED RAIN
TO FLOOR DRAIN
FULL SIZED RAIN
TO FLOOR DRAIN
BALL VALVE (TYP.)
MANUAL SHUT-OFF VALVE
GAS PRESSURE REGULATOR
MANUAL SHUT-OFF VALVE
GAS PRESSURE REGULATOR
AIR VENT
BOILER E-STOP PER
CSD-1 REQUIREMENTS
P-3 P-4 HH
W
R
FROM BLDG
SYSTEM
AS-1
ET-1
CONNECTION 3 TO 5
PIPE DIA APART
CHEMICAL TREATMENT \
CONNECTION
M M
EX-PRV
B-1 B-2
EX-LPS MAIN
CR-1
M
B-2
M
B-2 BO
IL
ER
-1
BO
IL
ER
-2
BO
IL
ER
-3
ISOLATION VALVE (TYP.)
STEAM HEADER
FEED WATER
RECEIVER TANK
BL
OW
DO
W
N
TA
NK
BO
IL
ER
-4
TO BOILERS
STEAM TO BLDG
STEAM TO BLDG
STEAM TO BLDG
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:0
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
M .rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
M-701
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
M
EC
H A N
IC
A L D
IA
G
RA
M S S C H
EM
A
TI
C S
NOT TO SCALE1 EXISTING STEAM - BOILER ROOM SCHEMATIC
12" = 1'-0"2 PROPOSED HYDRONICS - BOILER - PRIMARY-SECONDARY SCHEMATIC
A01 ADDENDUM 1 15FEB2024
12" = 1'-0"4 PROPOSED STEAM BOILER SCHEMATIC DIAGRAM
12" = 1'-0"3 PROPOSED STEAM - BOILER ROOM SCHEMATIC
A01
Page 49 of 52 Addendum #1
MDP 120/208V
3PH/4W 3000A
0A
0A
A
**MDP PREPURCHASED. CONTRACTOR RESPONSIBLE FOR INSTALLING AND RECONNECTING EXISTING LOADS.**
LOAD SUMMARY
INDIANA ELECTRIC POWER ENERGY METERED MAXIMUM
DEMAND FROM 02/2022 - 12/2023 (MAX AT 9/2022):
ESTIMATED DEMOLITON LOAD:
PROPOSED ADDITIONAL LOAD:
ESTIMATED TOTAL NEW LOAD:
WIRE SIZES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
(8) 4"C, 4-500 kCM, 1#3 G EACH
(4) 3"C, 4-600 kCM, 1#3 G EACH
(2) 3"C, 4-500 kCM, 1#3 G EACH
(2) 3 1/2"C, 4-350 kCM, #1 AWG G 3"C, 4-500 kCM, 1#3 G
3"C, 4/0 AWG, 1#4 G
2 1/2"C, 4-3/0 AWG, 1#6 G
1 1/2"C, 3-#3 AWG, 1#8 G
1"C, 3-#8 AWG, 1#10 G
3/4"C, #10 AWG, 1#10 G
3/4"C, 3-#12 AWG, 1#12 G
EX. LOADEX. LOAD
J JJ
2 5 5
A
UTILITY
M
500 kVA
12470GY/7200V - 208Y/120V
3PH, 4W
XFMR - PAD MOUNTP
S
0A
0A
PP 3RD
FLOOR
400A
J
0A
PANEL -Z
600A
J
0A
OLD LT
TUNNEL
400A
J
0A
DP2
PANEL
800A
J
0A
BP
PANEL
BOILER
RM
J
0A
0A
JAN.
CLOSET
PANEL
200A
AA
PANEL
100A
J
0A
B PANEL
CLASSROOM
200A
J
5A
EX. LOAD
J
0A
0A
PANEL -B
200A
PANEL -A
200A
J J
7 74
0A
EX. LOAD
J
A
A
EX. LOADEX. LOAD
J J
11 11
A
EX. LOAD
J
A
EX. LOAD
J
0A
0A
EX. LOADEX. LOAD
J J
8 8
0A
EX. LOAD
J
EM
PANEL
100A
INVERTER
0A
0A
0A
A
A
EX. LOADEX. LOAD
J J
11 11
A
EX. LOAD
J
A
EX. LOAD
J
A
BDP 120/208V
3PH/4W 400A
1315A
245A
204A
1275A
BOILER 4BOILER 3BOILER 2BOILER 1 BOILER 5
A
A
A
9 9 9
A
A
11 11
BOILER 6
A
PUMP P-B2PUMP P-B1
A
A
11 11
A.
B.
ONE LINE NOTES
RECONNECT ALL EXISTING ACTIVE LOADS FROM DEMOLISHED MDP TO NEW MDP.
CONTRACTOR TO FIELD VERIFY AND LABEL ALL UNMARKED / UNKNOWN CIRCUITS
CONNECTED TO EXISTING PANEL THAT ARE TO REMAIN. LABELS SHALL BE
INCLUDED ON NEW BREAKERS OF MDP AFTER NEW CIRCUITS ARE TERMINATED.
PANEL
CM 100A
FROM EXISTING FEED
PUMP P-2
PUMP P-1 PUMP P-3
PUMP P-4
ONE-LINE DIAGRAM
CONTINUED ON E-503
0A
SPARE
ATTACH TO WALL FRAMING OR OTHER
SUITABLE BUILDING COMPONENT
1/4" x 2" x 24" LONG
GROUND
BAR, INSULATORS
AND MOUNTING CLIPS
TWO HOLE
COMPRESSION
LUG
FINISHED
GRADE
#2/0 AWG BARE
STRANDED COPPER
CABLE (TYPICAL)
CONNECTION TO BE
MADE WITH HEAVY
DUTY EXOTHERMIC
PROCESS.
3/4" 10' 0"
MINIMUM COPPER
CLAD STEEL
GROUND ROD
2' 0" M
IN
4 AWG
COMMUNICATIONS
DUCT BANK GROUND
CONDUCTOR
4 AWG
COMMUNICATIONS ROOM
GROUND BUS
GROUNDING CONNECTION
TO BUILDING STEEL
SERVICE ENTRANCE
GROUND BUS
ADDITIONAL GROUNDING
CONNECTIONS AS REQUIRED
BY PROJECT
#2/0 AWG #1/0 AWG
#3/0 AWG
#4/0 AWG
#4/0 AWG
GROUNDING
RECEPTACLE
GROUNDING
RECEPTACLE
GROUNDING CONNECTION TO
WATER SERVICE
TO LIGHTNING ROD
PROTECTION GROUND RODS
EXOTHERMIC WELDS
(TYPICAL ALL)
GROUND ROD
(TYPICAL)
#4/0 AWG
EM STOP - PALM SWITCH W/ LEXAN
SHIELD BY CONTRACTOR MOUNTED
ADJACENT TO DOOR(S) IN MECH.
ROOM.
BOILER B-5
BOILER B-4
N
H
BOILER B-6
BOILER B-3
BOILER B-2
BOILER B-1
SHUNT TRIP COIL
120V CIRCUIT
NOT TO SCALE
BOILER EMERGENCY SHUTDOWN DETAIL1NOT TO SCALE
GROUNDING SYSTEM DETAIL2NOT TO SCALE
GROUND ROD DETAIL4 NOT TO SCALE
GROUND BUSBAR MOUNTING DETAIL3
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:3
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
E.
rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
E-501
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
O N E
LI
N E D
IA
G
RA
M D
ET
A
IL
S
A01 ADDENDUM 01 15FEB2024
NOT TO SCALE
PROPOSED ONE-LINE RISER DIAGRAM
A01
A01
Page 50 of 52 Addendum #1
A
ONE-LINE DIAGRAM
CONTINUED ON E-501
1600AF
600AT 60
0A
DP11B
600A
JANITOR
RM 10A
0A
0A
0A
0A
0A
5A
GYM PNL
NORTHEAST
CORNER
RLP
16/17
GYM PNL
SOUTH
DP11A
600A
JANITOR
RM 10A
ATS
200A
G
80 KW, 208V, 3PH/4W
NATURAL GAS
STANDBY GENERATOR
PANEL #2
RLP 19
PANEL
BY RM
224 (2ND
FLOOR)
RM 227
DIST.
PNL
RTU ABOVE
RM 226GYM PNL
WEST
600A
2 1/2"C, 4-3/0 AWG, 1#6 G
KEYNOTES
1.
2.
3.
4.
5.
6.
7.
A.
B.
C.
D.
8.
DEMOLISH LIGHTING CIRCUIT FROM PANEL RLP 19 TO WOMEN'S RESTROOM
(LISTED AS CIRCUIT 29 ON PANEL SCHEDULE).
DEMOLISH LIGHTING CIRCUIT FROM PANEL RLP 16/17 TO MEN'S RESTROOM
(LISTED AS CIRCUIT 28 ON PANEL SCHEDULE).
DEMOLISH FEED FROM PANEL DP11B.
DEMOLISH AHU CIRCUITS FROM PANEL DP21.
CONTRACTOR TO FIELD VERIFY BATHROOM EXHAUST FAN CIRCUIT
CONNECTION(S). DEMOLISH EXHAUST FAN CIRCUIT(S) FROM CURRENT FEED.
FURNISH AND INSTALL GENERATOR AND ATS NEAR NORTHWEST CORNER OF
GYM. FURNISH AND INSTALL CIRCUIT FROM ATS TO DP11B.
FURNISH AND INSTALL NEW CIRCUITS FROM GYM PANEL IN NORTHEAST
CORNER AS FOLLOWS:
20A, 120V FOR MEN'S AND WOMEN'S RESTROOM LIGHTING
20A, 120V FOR RESTROOM EXHAUST FANS
90A, 208V, 3 POLE FOR EACH AHU.
TO ATS.
CONTRACTOR TO CONFIRM LOAD ASSOCIATED WITH 100A, 208V, 3 POLE
BREAKER AND VERIFY WITH THAT IT IS NOT REQUIRED TO BE ON STANDBY
POWER.
AHU ON
GYM ROOF
AHU ON
GYM ROOF
4DP 21
225A
FROM EXISTING FEED
90A
90A
1600A, 208V, 3PH/4W
SWITCHGEAR IN BASEMENT B15
ADDITIONAL
LOADS
200A
1"C, MFR
RECOMMENDED CABLE ANN
1"C, 4#14
1"C, 8#14
1"C, 6#10, #10G
CONTROL PANEL
PANEL DP12
1.
2.
3.
GENERAL NOTES
DESIGN INTENT FOR STANDBY GENERATOR IS TO PROVIDE HEAT AND LIGHTS IN THE
GYM AND ADJACENT RESTROOMS FOR A COMMUNITY WARMING CENTER. ALL STANDBY
POWER TO BE FED FROM 225A PANEL IN THE NORTH EAST CORNER OF THE GYM.
ALL EXISTING ONE LINE CONNECTIONS SHOWN AND KEY NOTES ARE BASED ON FIELD
INVESTIGATIONS AND PANEL SCHEDULES AND HAVE NOT BEEN VERIFIED. EXISTING
DRAWINGS OR OTHER DOCUMENTATION IS NOT AVAILABLE.
CONTRACTOR MUST VERIFY ALL CONNECTIONS AND REPORT DISCREPANCIES TO THE
OWNER/ENGINEER BEFORE PROCEEDING WITH ANY SYSTEM MODIFICATIONS.
LOAD SUMMARY
ESTIMATED CURRENT LOAD:
PROPOSED ADDITIONAL LOAD:
ESTIMATED TOTAL NEW LOAD:
**100A, 208V, 3P BREAKER EXCLUDED
FROM CALCULATION.**
64.2A
88.5A
152.6A
EMERGENCY STOP
NOTES:
1. THE DESIGN IS BASED ON AN ALLOWABLE SOIL BEARING PRESSURE OF 2500 PSF. IF SUITABLE SOILS ARE NOT FOUND AT THE ELEVATIONS
SHOWN, EXCAVATE AND REPLACE WITH ENGINEERED FILL AS DIRECTED BY THE ENGINEER.
2. ALL CONCRETE SHALL ACHIEVE 4000 PSI AT 28 DAYS AND SHALL BE AIR ENTRAINED. CHAMFER EXPOSED EDGES 3/4".
3. PROVIDE OPENINGS FOR GENERATOR PRIMARY AND SECONDARY CONDUITS AS REQUIRED.
4. ADJUST PAD DIMENSIONS FOR EQUIPMENT SUPPLIED. PAD SHALL BE 12 INCHES LONGER AND WIDER THAN EQUIPMENT SUPPLIED.
5. FURNISH AND INSTALL (4) 3/4" x 10' GROUND RODS IN UNDISTRIBUTED SOIL NEAR PAD CORNERS. INTERCONNECT WITH #4/0 BARE COPPER GROUND CABLE. CONNECT TO TRANSFORMER GROUND LUG AND TO MAIN DISCONNECT GROUND BUS WITH #4/0 CABLE.
8"
MI
N.
3'
- 6
(2) #5 TOP AND BOTTOM
(TYPICAL ALL 4 SIDES)
#4 DOWEL @ 12" O.C.
2'-0"
2'-0"
#4 @ 12" O.C. 12" LOOSE SAND FILL
SEE NOTE 5
8"
PAD WIDTH
#4 @ 6" O.C.
3"CLEAR FROM BOTTOM
OF SLAB TO BAR
3"
" M
IN
FINISHED GRADE
85% COMPACTED
GRANULAR BACKFILL
6" WIDE POLYETHYLENE
MARKING TAPE WITH
BLACK LETTERS
3" MINIMUM SAND
BEDDING ALL AROUND
CABLE OR CONDUIT
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:3
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
E.
rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
E-503
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
G
EN
ER
A
TO
R D
ET
A
IL
S
A01 ADDENDUM 01 15FEB2024
NOT TO SCALE
ONE-LINE RISER DIAGRAM - GENERATOR
NOT TO SCALE
GENERATOR PAD DETAIL1NOT TO SCALE
TRENCHING DETAIL2
Page 51 of 52 Addendum #1
B-1
B-2
EX-P
EX-2" HHWR
EX-2" HHWS
EX-DWH
EX-WS
EX-HX
EX-6" SS
EX-6" SS
EX-3" DCW
EX
-1
1/ 2"
D
HW
EX-1 1/2" DHW
EX-1 1/2" DCW
M1M2M2
EXISTING DDC CONTROL
PANEL TO REMAIN
EX-CR
EXTEND CONDENSATE
PIPING TO BOILER FEEDWATER
CONNECTION.
3" VENT, EXTEND THRU ROOF
M4M4
20"X20" INTAKE LOUVER
BACKDRAFT DAMPER TO SERVE DWH.
GREENHECK MODEL ESD, 4" DRAINABLE
BLADE OR EQUAL.
COORDINATE WITH ARCH FOR
INSTALLATION. PROVIDE INTAKE
AIR PER CODE. SEAL EXT WALL
WEATHERTIGHT.
M5M5
M6M6
MECHANICAL GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
IF COMPLIANCE WITH TWO OR MORE DIFFERING STANDARDS, REQUIREMENTS, DRAWINGS OR SPECIFICATIONS, OR ANY COMBINATION THEREOF, IS SPECIFIED AND THESE ESTABLISH DIFFERENT OR CONFLICTING REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST STRINGENT REQUIREMENT. THE MOST STRINGENT REQUIREMENT WILL BE THE BETTER QUALITY OR GREATER QUANTITY OF WORK, AND WILL TYPICALLY BE THE MORE EXPENSIVE OPTION. REFER UNCERTAINTIES AND REQUIREMENTS THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO ENGINEER FOR A DECISION BEFORE
PROCEEDING.
THE QUANTITY OR QUALITY LEVEL SHOWN OR SPECIFIED SHALL BE THE MINIMUM PROVIDED OR PERFORMED. THE ACTUAL INSTALLATION MAY COMPLY EXACTLY WITH THE MINIMUM QUANTITY OR QUALITY SPECIFIED, OR IT MAY EXCEED THE MINIMUM WITHIN REASONABLE LIMITS. TO COMPLY WITH THESE REQUIREMENTS, INDICATED NUMERIC VALUES ARE MINIMUM OR MAXIMUM, AS APPROPRIATE, FOR THE CONTEXT OF REQUIREMENTS. REFER UNCERTAINTIES TO ENGINEER FOR A
DECISION BEFORE PROCEEDING.
DESIGN DOCUMENTS MUST BE REPRODUCED IN THEIR ENTIRETY, INCLUDING ALL PLANS, SPECIFICATIONS, AND FRONT END DOCUMENTS.
ONLY COMPLETE DOCUMENT SETS ARE TO BE DISTRIBUTED TO SUBCONTRACTORS AND SUPPLIERS OF THE CONTRACTOR DURING BIDDING OR CONSTRUCTION.
FAILURE TO REVIEW AND COMPLY WITH A FULL SET OF CONTRACT DOCUMENTS WILL NOT BE ACCEPTED AS A VALID REASON FOR FAILURE TO MEET THE
REQUIREMENTS OF THE PLANS AND SPECIFICATIONS.
ALL MECHANICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL ORDINANCES, CODES, AND LAWS. FOR PURPOSES OF THIS DESIGN, THE CODES FOR
THE STATE OF MICHIGAN WERE USED AS THE BASIS.
MECHANICAL CONTRACTOR SHALL COORDINATE ROOF PENETRATIONS WITH ROOFING CONTRACTOR OR ROOFING MANUFACTURER TO AVOID DAMAGE TO
ROOFING SYSTEM.
COORDINATE LOCATIONS OF ALL DEVICES WITH ARCHITECTURAL, STRUCTURAL, CIVIL, INTERIORS, AND ELECTRICAL PRIOR TO ROUGH-IN. ALL CONFLICTS WITH FINISHES, ADJACENT CONSTRUCTION AND CONSTRUCTION DOCUMENTS ARE TO GENERATE AN RFI FROM THE MECHANICAL CONTRACTOR TO THE ENGINEER
PRIOR TO PROCEEDING AND COMPLETION OF WORK
ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH MOTOR STARTERS COMPATIBLE WITH CONTROLS SYSTEM. COORDINATE WITH CONTROLS AND
ELECTRICAL CONTRACTORS.
IN UNFINISHED AREAS, INSTALL ALL MECHANICAL CONTROL DEVICES (THERMOSTATS, ROOM SENSORS, REMOTE TEST STATIONS, SMOKE DAMPER INDICATORS, ETC.) RECESSED IN WEB OF COLUMNS TO PREVENT DAMAGE.
PROVIDE EMERGENCY SHUTOFF AT BOILER ROOM EXIT DOORS TO SHUTDOWN ALL BOILERS PER CSD-1 REQUIREMENTS.
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:3
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
EL
EM
M .rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R
FA
IR
P
LA
IN
E
AS
T
EL
EM
EN
TA
RY
U
NI
O N
AV
EN
UE
, B
EN
TO
N
HA
RB
O R, M
IC
HI
G
AN
M-100
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
M
EC
H A N
IC
A L P
LA
N
1/4" = 1'-0"
MECHANICAL PLAN - BOILER ROOM
A01 ADDENDUM 01 15FEB2024
MECHANICAL KEYNOTES
KEY VALUE KEYNOTE TEXT
M1 10" EXHAUST FLUE AND 6" COMBUSTION AIR INTAKE THROUGH ROOF.
M2 INSTALL NEW BOILERS ON EXISTING 4" CONCRETE HOUSEKEEPING PAD, EXTEND EXISTING PAD AS REQUIRED. CONNECT PIPING TO EXISTING
STEAM MAIN. CONNECT TO EXISTING FEEDWATER SYSTEM.
M4 FIELD LOCATE NEW OWNER FURNISHED MODSYNC BOILER CONTROL PANEL FOR STEAM BOILERS. MOUNT ON WALL.
M5 EXISTING HEAT EXCHANGER, SUPPORT, AND HYDRONIC PIPING TO REMAIN. REVISE AS NECESSARY FOR NEW BOILER INSTALLATION.
M6 REFER TO ELECTRICAL DRAWINGS FOR BOILER EMERGENCY SHUTDOWN SWITCHES AND LOCATIONS.
A01
A01
A01
EXISTING WATER SERVICE ENTRANCE
AND PIPING TO REMAIN. CONNECT
TO SERVICE FOR BOILER MAKEUP.
Page 52 of 52 Addendum #1
File details come from the government source that posted it. Updated .