Addendum 1 Pt2.pdf

PDF 5 MB Posted

Attached to
Boiler Replacement for FPE Elem & Benton Harbor High School
Solicitation number
RFP - BHA - 240000001444
Issued by
Berrien County, Bergland CDP, Michigan

About this file

The document is an Addendum to a state and local contract opportunity for the Boiler Replacement for FPE Elem & Benton Harbor High School project in Berrien County, Michigan. The addendum provides details on the mechanical demolition scope of work, including the removal of existing steam mains, hydronic pumps, boilers, condensate receiver, and other related equipment and piping. The work is to be conducted at the Benton Harbor High School located at 870 Colfax Avenue, Benton Harbor, Michigan 49022. No specific bid dates, award dates, or contract term information is provided.

The addendum outlines the requirements for proper disposal, salvage, and relocation of certain equipment and materials. It also notes that no existing drawings are available, so the contractor shall verify existing field conditions. The contractor is responsible for any existing materials to remain that are damaged during the demolition process. The mechanical systems and equipment located in the area of demolition but used to serve other areas that are not being demolished shall be left in place or relocated as needed to maintain system operations.

View the file

Other files

File Type Posted
Addendum 2-4.pdf PDF
230327_240126_Elem_Drawings.pdf PDF
Addendum 1 Pt1.pdf PDF
230327_240126_ProjectManual Part 1 of 2.pdf PDF
230327_240126_ProjectManual Part 2 of 2.pdf PDF
RFI and Response.pdf PDF
230327_240126_HS_Drawings.zip ZIP file
Addendum 1 Pt3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 2 MIOSHA and EPA Lead Rules

LARA is an equal opportunity employer/program.

Auxiliary aids, services and other reasonable accommodations are available upon request to individuals with disabilities.

Construction Safety and Health Division

7150 Harris Drive P.O. BOX 30645 LANSING, MICHIGAN 48909-8145 www.michigan.gov/miosha (517) 322-1856

(Revised 06/20/2012) CSH Fact Sheet - #035

When employee exposures are at, or in excess, of the action level, but less than the eight-hour Permissible Exposure Limit (PEL) of 50ug/m3; the employer is required to implement routine air monitoring, medical surveillance, housekeeping, and training. Exposures in excess of the PEL require similar actions by the employer including, routine air monitoring, methods of complying with the PEL, the use of respiratory protection, the use of protective work clothing and equipment, housekeeping practices, hygiene facilities (i.e.

change areas, shower and hand washing facilities, and eating facilities), implementation of engineering and work practice controls through the development of a written compliance program, medical surveillance and medical removal protection, employee information and training, warning signs, and record keeping.

How to Avoid Hazards

The best way to prevent over-exposures to lead is to install and maintain engineering controls to eliminate or reduce the hazard. When employees are exposed above the PEL, the employer must develop a compliance program that includes engineering and work practice controls such as the following:

Conduct bulk material analysis to determine if lead is present.

Provide interim protection until air monitoring determines exposure levels.

Use exhaust ventilation and dust collection systems. For example, power tools used for grinding surfaces coated with lead containing paint can be equipped with dust collection systems. Use local exhaust ventilation where feasible.

Use wet methods or a vacuum equipped with a high efficiency particulate (HEPA) filter to clean work areas contaminated with lead materials. Do not dry sweep or use compressed air.

Comply with all requirements of Part 603 with regard to air monitoring, compliance program, use of protective work clothing and equipment, housekeeping, hygiene facilities, medical surveillance and medical removal protection, employee information and training, warning signs, and record keeping.

When engineering and work practice controls cannot be used or do not reduce exposure to an acceptable level, then the employer must provide respiratory protection. The type of respiratory protection required is based on the level of exposure determined by air monitoring. At a minimum, the respirator must be a half mask, air-purifying respirator with HEPA filters. Remember, the employer must then implement a respiratory protection program as required by MIOSHA Part 451, Respiratory Protection.

If respirators are used to protect employees, then a regulated area should be established to prevent unprotected employees from entering the exposure area.

For additional information on this subject, visit the following web sites at:

OSHA, Safety and Health Topics, Construction - Lead NIOSH, Preventing Lead Poisoning in Construction Workers NIOSH, Protecting Workers Exposed to Lead-Based Paint Hazards MIOSHA Consultation, Education, and Training Division

Additional information on the EPA RRP Rules: EPA Lead RRP Rules - Entity Compliance Guide

Page 41 of 52 Addendum #1

WOMEN'S RR

CLASSROOM

600A

225A - GYM

NORTHEAST

PANEL

RLP19A

225A

RLP17 (16?)

225A

DP11B, 600A

DP11A, 600A

SMALL PANEL. LIGHTING

CONTACTOR INSTALLED

BELOW PANEL.

MECH. CONTROLS.

DP-12, 400A

IT EQUIP.

TIME CLOCK PANEL. OWNER

INDICATED IT WAS NOT USED.

INCOMING GAS

SERVICE

MAIN UTILITY

TRANSFORMER

MDP

1600A BUSWAY

1600A SWITCHGEAR

BASEMENT

FIRST FLOOR

80KW

GENERATOR

AND ATS

N

JAN. 10A

CLASSROOM

GYMNASIUM

MEN'S RR

10B

STAIR

Page 42 of 52 Addendum #1

DP21, 225A

N

JAN. 266

Page 43 of 52 Addendum #1

N

225A BASEMENT PANEL

1600A SWITCHGEAR

EQUIPMENT STORAGE

B15

Page 44 of 52 Addendum #1

EX-B-1

EX-B-2

EX-B-3

EX

-1

0" S

S

DEMOLISH EXISTING

CONDENSATE /

FEEDWATER TANK,

SUPPORTS AND ALL

ANCILLARIES.

DEMOLISH EXISTING

ABANDONED DOMESTIC HOT

WATER TANK (ELEVATED)

EX-ET

EX-DWST

EX-DWB

EX-8" SS

EX-10" SS

EX-12" SS

EX-10" SS

EX-12" SS

EX-10" SS

EX

-1

2" S

S

EX

-1 0"

S S

EX

-1

0" S

S

EX-12" SS

EX-10" SS

EX-4" SS

EX-AS

EX-HX

EX-P-2

EX-P-3

EX-P-4EX-P-1

EX-10" SS

EX-4" NG

EX-6" SS

EX-4" SS

EX-3" HHWS

EX-4" HHWS

EX-3" HHWS

EX-4" HHWS

EX-4" HHWR

DEMOLISH EXISTING

CHILLER, CHILLED WATER

PUMPS, AND PIPING

ABANDONED IN THIS AREA.

FIELD VERIFY ALL

EXISTING ITEMS PRIOR TO

DEMOLITION SO AS TO

NOT IMPACT EXISTING

BUILDING OPERATIONS.

DEMOLISH EXISTING

NATURAL GAS PIPING,

FITTINGS, VALVES AND

ALL ANCILLARIES IN THIS

AREA

EX-CP-2

EX-CP-1

DEMOLISH EXISTING MANUAL CHEMICAL

FEED SYSTEM

M-300

M-300

D2D1

D3

D4

D4

D4

D5

D5

EX-4" HHWR

EX-CP-3D5

CONDENSATE

RECEIVER APPROX

200' DOWN TUNNEL

FROM BOILER ROOM

M-300

M-300

EXISTING SUMP PIT,

FIELD VERIFY NO

SERVICES TERMINATE

IN PIT.

D7

DUE CARE SALVAGE

D6

EXISTING NG PRESSURE

REGULATING STATION.

DUE CARE SALVAGE AND

RELOCATE INTO BOILER

ROOM TO SERVE NEW

BOILERS.

D8

D8

TO REMAIN

TO REMAIN

D9

D12

D12

MECHANICAL DEMOLITION NOTES:

1.

2.

3.

4.

5.

6.

7.

THE CONTRACTOR SHALL REVIEW THE ENTIRETY OF THE DRAWINGS AND SPECIFICATIONS BEFORE

ANY WORK IS STARTED.

ALL WORK TO BE DEMOLISHED IS NOTED WITH DASHED LINES, OR A DEMOLITION KEYNOTE, OR BOTH.

REVIEW THE DEMOLITION KEYNOTES PRIOR TO BEGINNING THE WORK.

EXCEPT FOR WHEN NOTED ON DRAWINGS, MECHANICAL EQUIPMENT AND SYSTEMS NOTED TO BE

REMOVED SHALL BE ENTIRELY DEMOLISHED, AND SHALL BECOME PROPERTY OF THE CONTRACTOR TO

REMOVE FROM THE SITE, WHILE FOLLOWING ALL CODES AND REQUIREMENTS.

ITEMS NOTED FOR SALVAGE SHALL BE REMOVED WITH DUE CARE TAKEN, AND RETURNED TO THE

OWNER IN A LIKE CONDITION TO IT'S PREVIOUS STATE.

DEMOLITION SHALL BE COORDINATED WITH OTHER TRADES. THE CONTRACTOR IS RESPONSIBLE FOR

ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED IN THE DEMOLITION PROCESS.

THESE DRAWINGS ARE COMPILED BY THE ARCHITECT AND ENGINEER FROM LIMITED FIELD

VERIFICATION OF EXISTING CONDITIONS. NO EXISTING DRAWINGS ARE AVAILABLE FOR REFERENCE.

THE CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS. AREAS OF WORK THAT DIFFER

GREATLY FROM THE DEMOLITION PLAN SHALL GENERATE AN RFI TO THE ENGINEER.

MECHANICAL SYSTEMS AND EQUIPMENT LOCATED IN THE AREA OF DEMOLITION BUT USED TO SERVE AREAS THAT ARE NOT TO BE DEMOLISHED SHALL BE LEFT TO REMAIN, OR RELOCATED IN SUCH A WAY

AS TO MAINTAIN THE ORIGINAL DESIGN INTENT OF THE SYSTEM.

W E

RE

C

YC

LE

C

HE

C

KE

D B Y:

D

ES

IG

N

ED

B Y:

AP

PR

O

VE

D B Y:

BL

AC

K

W

HI

TE

TH

E

BA

R

BE

LO

W S

HO

W S

G

RA

YS

C

AL

E

FR

O M W

HI

TE

T O S O

LID

TH

E

BA

R

BE

LO

W S

HO

W S

PR

IM

AR

Y C O

LO

RS

(866) 454-3923 | WWW.C2AE.COM

PROJ. #:

ISSUANCES

#DESCRIPTION DATE

COPYRIGHT C2AE.

NOT TO BE REPRODUCED OR DISTRIBUTED

WITHOUT PRIOR WRITTEN CONSENT.

ALL RIGHTS RESERVED.

PHASE

2/ /2 2:

:5

PM

Au to de sk D oc s:

Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/

HS

M .rv t

C he ck er

D es ig ne r

Ap pr ov er

BO

ILE

R

RE

PL

AC

EM

EN

T

FO

R H

IG

H

SC

HO

O L

C O

LF

AX

A

VE

NU

E

BE

NT

O N

HA

RB

O R, M

IC

HI

G

AN

MD100

23-0327

ISSUED FOR BIDDING

26JAN2024ISSUED FOR BIDDING

M

EC

H A N

IC

A L D

EM

O

LI

TI

O N P

LA

N

A01 ADDENDUM 1 15FEB2024

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - BOILER ROOM

MECHANICAL DEMOLITION KEYNOTES

KEY VALUE KEYNOTE TEXT

D1 DEMOLISH STEAM MAIN 6'-0" OUTSIDE OR TO CLOSEST FITTING OF BOILER ROOM.

PREPARE PIPE FOR CONNECTION TO NEW. CAP AND SEAL EXISTING PIPE DURING

CONSTRUCTION.

D2 DEMOLISH STEAM PIPE AND SUPPORTS AT REDUCER. CAP AND SEAL CONNECTION.

D3 DEMOLISH EXISTING HYDRONIC PUMPS IN THEIR ENTIRETY INCLUDING SUPPORTS

AND ANCILLARIES. CAP EXISTING PIPING AT WALL AND PREPARE FOR CONNECTION

TO NEW PIPING. PRIOR TO DEMOLITION PERFORM WATERSIDE TAB ON THE FOUR

EXISTING HYDRONIC PUMPS AND RECORD FLOW/PRESSURE INFORMATION. USE

EXISTING TAB INFORMATION TO VERIFY FINAL PUMP SELECTION. THERE ARE NO

EXISTGING DRAWINGS OF THIS SYSTEM OR EQUIPMENT.

D4 DEMOLISH DEMOLISH BOILERS, FLUES BACK TO CHIMNEY, AND ANCILLARIES.

REMOVE NG PIPING SERVING EXISTING BOILERS BACK TO MAIN AND CAP.

D5 DEMOLISH DEMOLISH EXISTING CONDENSATE RECEIVER AND ASSOCIATED

SUPPORTS/PIPING/CONTROLS/ANCILLARIES.

D6 DEMOLISH DEMOLISH ABANDONED UNIT AND SUPPORTS.

D7 DUE CARE SALVAGE EXISTING DOMESTIC HOT WATER HEATER AND PREPARE FOR

RELOCATION. COORDINATE WITH OWNER TO MINIMIZE DOMESTIC HOT WATER

SYSTEM SHUT DOWN.

D8 DEMOLISH EXISTING HYDRONIC SYSTEM AIR SEPARATOR, EXPANSION TANK, HEAT

EXCHANGER, SUPPORTS AND ALL ANCILLAIRES.

D9 DEMOLISH EXISTING PNEUMATIC CONTROL PANEL. PRIOR TO DEMOLITION VERIFY NO

PANEL ABANDONED AND NO PNUEMATIC CONTROLS BEING USED.

D12 DEMOLISH EXISTING ABANDONED DOMESTIC WATER HEATER. CUT AND CAP ALL

ASSOCIATED PIPING BACK TO MAIN. ABANDON HOUSEKEEPING PAD.

A01

A01

A01

Page 45 of 52 Addendum #1