Addendum 1 Pt2.pdf
PDF 5 MB Posted
- Solicitation number
- RFP - BHA - 240000001444
- Issued by
- Berrien County, Bergland CDP, Michigan
About this file
The document is an Addendum to a state and local contract opportunity for the Boiler Replacement for FPE Elem & Benton Harbor High School project in Berrien County, Michigan. The addendum provides details on the mechanical demolition scope of work, including the removal of existing steam mains, hydronic pumps, boilers, condensate receiver, and other related equipment and piping. The work is to be conducted at the Benton Harbor High School located at 870 Colfax Avenue, Benton Harbor, Michigan 49022. No specific bid dates, award dates, or contract term information is provided.
The addendum outlines the requirements for proper disposal, salvage, and relocation of certain equipment and materials. It also notes that no existing drawings are available, so the contractor shall verify existing field conditions. The contractor is responsible for any existing materials to remain that are damaged during the demolition process. The mechanical systems and equipment located in the area of demolition but used to serve other areas that are not being demolished shall be left in place or relocated as needed to maintain system operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2-4.pdf | ||
| 230327_240126_Elem_Drawings.pdf | ||
| Addendum 1 Pt1.pdf | ||
| 230327_240126_ProjectManual Part 1 of 2.pdf | ||
| 230327_240126_ProjectManual Part 2 of 2.pdf | ||
| RFI and Response.pdf | ||
| 230327_240126_HS_Drawings.zip | ZIP file | |
| Addendum 1 Pt3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 2 MIOSHA and EPA Lead Rules
LARA is an equal opportunity employer/program.
Auxiliary aids, services and other reasonable accommodations are available upon request to individuals with disabilities.
Construction Safety and Health Division
7150 Harris Drive P.O. BOX 30645 LANSING, MICHIGAN 48909-8145 www.michigan.gov/miosha (517) 322-1856
(Revised 06/20/2012) CSH Fact Sheet - #035
When employee exposures are at, or in excess, of the action level, but less than the eight-hour Permissible Exposure Limit (PEL) of 50ug/m3; the employer is required to implement routine air monitoring, medical surveillance, housekeeping, and training. Exposures in excess of the PEL require similar actions by the employer including, routine air monitoring, methods of complying with the PEL, the use of respiratory protection, the use of protective work clothing and equipment, housekeeping practices, hygiene facilities (i.e.
change areas, shower and hand washing facilities, and eating facilities), implementation of engineering and work practice controls through the development of a written compliance program, medical surveillance and medical removal protection, employee information and training, warning signs, and record keeping.
How to Avoid Hazards
The best way to prevent over-exposures to lead is to install and maintain engineering controls to eliminate or reduce the hazard. When employees are exposed above the PEL, the employer must develop a compliance program that includes engineering and work practice controls such as the following:
Conduct bulk material analysis to determine if lead is present.
Provide interim protection until air monitoring determines exposure levels.
Use exhaust ventilation and dust collection systems. For example, power tools used for grinding surfaces coated with lead containing paint can be equipped with dust collection systems. Use local exhaust ventilation where feasible.
Use wet methods or a vacuum equipped with a high efficiency particulate (HEPA) filter to clean work areas contaminated with lead materials. Do not dry sweep or use compressed air.
Comply with all requirements of Part 603 with regard to air monitoring, compliance program, use of protective work clothing and equipment, housekeeping, hygiene facilities, medical surveillance and medical removal protection, employee information and training, warning signs, and record keeping.
When engineering and work practice controls cannot be used or do not reduce exposure to an acceptable level, then the employer must provide respiratory protection. The type of respiratory protection required is based on the level of exposure determined by air monitoring. At a minimum, the respirator must be a half mask, air-purifying respirator with HEPA filters. Remember, the employer must then implement a respiratory protection program as required by MIOSHA Part 451, Respiratory Protection.
If respirators are used to protect employees, then a regulated area should be established to prevent unprotected employees from entering the exposure area.
For additional information on this subject, visit the following web sites at:
OSHA, Safety and Health Topics, Construction - Lead NIOSH, Preventing Lead Poisoning in Construction Workers NIOSH, Protecting Workers Exposed to Lead-Based Paint Hazards MIOSHA Consultation, Education, and Training Division
Additional information on the EPA RRP Rules: EPA Lead RRP Rules - Entity Compliance Guide
Page 41 of 52 Addendum #1
WOMEN'S RR
CLASSROOM
600A
225A - GYM
NORTHEAST
PANEL
RLP19A
225A
RLP17 (16?)
225A
DP11B, 600A
DP11A, 600A
SMALL PANEL. LIGHTING
CONTACTOR INSTALLED
BELOW PANEL.
MECH. CONTROLS.
DP-12, 400A
IT EQUIP.
TIME CLOCK PANEL. OWNER
INDICATED IT WAS NOT USED.
INCOMING GAS
SERVICE
MAIN UTILITY
TRANSFORMER
MDP
1600A BUSWAY
1600A SWITCHGEAR
BASEMENT
FIRST FLOOR
80KW
GENERATOR
AND ATS
N
JAN. 10A
CLASSROOM
GYMNASIUM
MEN'S RR
10B
STAIR
Page 42 of 52 Addendum #1
DP21, 225A
N
JAN. 266
Page 43 of 52 Addendum #1
N
225A BASEMENT PANEL
1600A SWITCHGEAR
EQUIPMENT STORAGE
B15
Page 44 of 52 Addendum #1
EX-B-1
EX-B-2
EX-B-3
EX
-1
0" S
S
DEMOLISH EXISTING
CONDENSATE /
FEEDWATER TANK,
SUPPORTS AND ALL
ANCILLARIES.
DEMOLISH EXISTING
ABANDONED DOMESTIC HOT
WATER TANK (ELEVATED)
EX-ET
EX-DWST
EX-DWB
EX-8" SS
EX-10" SS
EX-12" SS
EX-10" SS
EX-12" SS
EX-10" SS
EX
-1
2" S
S
EX
-1 0"
S S
EX
-1
0" S
S
EX-12" SS
EX-10" SS
EX-4" SS
EX-AS
EX-HX
EX-P-2
EX-P-3
EX-P-4EX-P-1
EX-10" SS
EX-4" NG
EX-6" SS
EX-4" SS
EX-3" HHWS
EX-4" HHWS
EX-3" HHWS
EX-4" HHWS
EX-4" HHWR
DEMOLISH EXISTING
CHILLER, CHILLED WATER
PUMPS, AND PIPING
ABANDONED IN THIS AREA.
FIELD VERIFY ALL
EXISTING ITEMS PRIOR TO
DEMOLITION SO AS TO
NOT IMPACT EXISTING
BUILDING OPERATIONS.
DEMOLISH EXISTING
NATURAL GAS PIPING,
FITTINGS, VALVES AND
ALL ANCILLARIES IN THIS
AREA
EX-CP-2
EX-CP-1
DEMOLISH EXISTING MANUAL CHEMICAL
FEED SYSTEM
M-300
M-300
D2D1
D3
D4
D4
D4
D5
D5
EX-4" HHWR
EX-CP-3D5
CONDENSATE
RECEIVER APPROX
200' DOWN TUNNEL
FROM BOILER ROOM
M-300
M-300
EXISTING SUMP PIT,
FIELD VERIFY NO
SERVICES TERMINATE
IN PIT.
D7
DUE CARE SALVAGE
D6
EXISTING NG PRESSURE
REGULATING STATION.
DUE CARE SALVAGE AND
RELOCATE INTO BOILER
ROOM TO SERVE NEW
BOILERS.
D8
D8
TO REMAIN
TO REMAIN
D9
D12
D12
MECHANICAL DEMOLITION NOTES:
1.
2.
3.
4.
5.
6.
7.
THE CONTRACTOR SHALL REVIEW THE ENTIRETY OF THE DRAWINGS AND SPECIFICATIONS BEFORE
ANY WORK IS STARTED.
ALL WORK TO BE DEMOLISHED IS NOTED WITH DASHED LINES, OR A DEMOLITION KEYNOTE, OR BOTH.
REVIEW THE DEMOLITION KEYNOTES PRIOR TO BEGINNING THE WORK.
EXCEPT FOR WHEN NOTED ON DRAWINGS, MECHANICAL EQUIPMENT AND SYSTEMS NOTED TO BE
REMOVED SHALL BE ENTIRELY DEMOLISHED, AND SHALL BECOME PROPERTY OF THE CONTRACTOR TO
REMOVE FROM THE SITE, WHILE FOLLOWING ALL CODES AND REQUIREMENTS.
ITEMS NOTED FOR SALVAGE SHALL BE REMOVED WITH DUE CARE TAKEN, AND RETURNED TO THE
OWNER IN A LIKE CONDITION TO IT'S PREVIOUS STATE.
DEMOLITION SHALL BE COORDINATED WITH OTHER TRADES. THE CONTRACTOR IS RESPONSIBLE FOR
ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED IN THE DEMOLITION PROCESS.
THESE DRAWINGS ARE COMPILED BY THE ARCHITECT AND ENGINEER FROM LIMITED FIELD
VERIFICATION OF EXISTING CONDITIONS. NO EXISTING DRAWINGS ARE AVAILABLE FOR REFERENCE.
THE CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS. AREAS OF WORK THAT DIFFER
GREATLY FROM THE DEMOLITION PLAN SHALL GENERATE AN RFI TO THE ENGINEER.
MECHANICAL SYSTEMS AND EQUIPMENT LOCATED IN THE AREA OF DEMOLITION BUT USED TO SERVE AREAS THAT ARE NOT TO BE DEMOLISHED SHALL BE LEFT TO REMAIN, OR RELOCATED IN SUCH A WAY
AS TO MAINTAIN THE ORIGINAL DESIGN INTENT OF THE SYSTEM.
W E
RE
C
YC
LE
C
HE
C
KE
D B Y:
D
ES
IG
N
ED
B Y:
AP
PR
O
VE
D B Y:
BL
AC
K
W
HI
TE
TH
E
BA
R
BE
LO
W S
HO
W S
G
RA
YS
C
AL
E
FR
O M W
HI
TE
T O S O
LID
TH
E
BA
R
BE
LO
W S
HO
W S
PR
IM
AR
Y C O
LO
RS
(866) 454-3923 | WWW.C2AE.COM
PROJ. #:
ISSUANCES
#DESCRIPTION DATE
COPYRIGHT C2AE.
NOT TO BE REPRODUCED OR DISTRIBUTED
WITHOUT PRIOR WRITTEN CONSENT.
ALL RIGHTS RESERVED.
PHASE
2/ /2 2:
:5
PM
Au to de sk D oc s:
Be nt on H ar bo r A re a Sc ho ol s Bo ile r R ep la ce m en t/
HS
M .rv t
C he ck er
D es ig ne r
Ap pr ov er
BO
ILE
R
RE
PL
AC
EM
EN
T
FO
R H
IG
H
SC
HO
O L
C O
LF
AX
A
VE
NU
E
BE
NT
O N
HA
RB
O R, M
IC
HI
G
AN
MD100
23-0327
ISSUED FOR BIDDING
26JAN2024ISSUED FOR BIDDING
M
EC
H A N
IC
A L D
EM
O
LI
TI
O N P
LA
N
A01 ADDENDUM 1 15FEB2024
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - BOILER ROOM
MECHANICAL DEMOLITION KEYNOTES
KEY VALUE KEYNOTE TEXT
D1 DEMOLISH STEAM MAIN 6'-0" OUTSIDE OR TO CLOSEST FITTING OF BOILER ROOM.
PREPARE PIPE FOR CONNECTION TO NEW. CAP AND SEAL EXISTING PIPE DURING
CONSTRUCTION.
D2 DEMOLISH STEAM PIPE AND SUPPORTS AT REDUCER. CAP AND SEAL CONNECTION.
D3 DEMOLISH EXISTING HYDRONIC PUMPS IN THEIR ENTIRETY INCLUDING SUPPORTS
AND ANCILLARIES. CAP EXISTING PIPING AT WALL AND PREPARE FOR CONNECTION
TO NEW PIPING. PRIOR TO DEMOLITION PERFORM WATERSIDE TAB ON THE FOUR
EXISTING HYDRONIC PUMPS AND RECORD FLOW/PRESSURE INFORMATION. USE
EXISTING TAB INFORMATION TO VERIFY FINAL PUMP SELECTION. THERE ARE NO
EXISTGING DRAWINGS OF THIS SYSTEM OR EQUIPMENT.
D4 DEMOLISH DEMOLISH BOILERS, FLUES BACK TO CHIMNEY, AND ANCILLARIES.
REMOVE NG PIPING SERVING EXISTING BOILERS BACK TO MAIN AND CAP.
D5 DEMOLISH DEMOLISH EXISTING CONDENSATE RECEIVER AND ASSOCIATED
SUPPORTS/PIPING/CONTROLS/ANCILLARIES.
D6 DEMOLISH DEMOLISH ABANDONED UNIT AND SUPPORTS.
D7 DUE CARE SALVAGE EXISTING DOMESTIC HOT WATER HEATER AND PREPARE FOR
RELOCATION. COORDINATE WITH OWNER TO MINIMIZE DOMESTIC HOT WATER
SYSTEM SHUT DOWN.
D8 DEMOLISH EXISTING HYDRONIC SYSTEM AIR SEPARATOR, EXPANSION TANK, HEAT
EXCHANGER, SUPPORTS AND ALL ANCILLAIRES.
D9 DEMOLISH EXISTING PNEUMATIC CONTROL PANEL. PRIOR TO DEMOLITION VERIFY NO
PANEL ABANDONED AND NO PNUEMATIC CONTROLS BEING USED.
D12 DEMOLISH EXISTING ABANDONED DOMESTIC WATER HEATER. CUT AND CAP ALL
ASSOCIATED PIPING BACK TO MAIN. ABANDON HOUSEKEEPING PAD.
A01
A01
A01
Page 45 of 52 Addendum #1