This is a Request for Bids (RFB 954100-01) issued by the Iowa Department of Administrative Services for road repair and tunnel infill work at the Iowa Correctional Institution for Women (ICIW), located at 420 Mill Street SW, Mitchellville, Iowa 50169, in Polk County. The project involves the removal of an existing underground tunnel structure, infilling portions with flowable mortar, and completing pavement and sidewalk repairs. Key bid items include topsoil furnishing (70 cubic yards), excavation of Class 10 material (655 cubic yards), subgrade preparation (480 square yards), capping of three existing tunnel sections (3 each), flowable mortar placement (1 lump sum), complete tunnel removal (1 lump sum), portland cement concrete pavement installation at 7 inches thick (403 square yards), pavement removal (140 square yards), sidewalk installation at 4 inches (14 square yards), temporary traffic control (1 lump sum), hydraulic seeding with bonded fiber matrix (3,700 square feet), and filter sock installation and removal (1,200 linear feet each). The contractor must coordinate with third-party testing agencies, complete work within specified timeframes to minimize disruption to facility operations, maintain full workforce during construction, and comply with erosion control and stormwater pollution prevention requirements per Iowa Statewide Urban Design and Specifications (SUDAS) standards.
The project specifications require concrete meeting 4,000 PSI strength at 28 days, all work conforming to the 2024 International Building Code and SUDAS standards, and compliance with Iowa Department of Corrections requirements for security fence coordination. Special inspection services will be performed by an owner-employed agency per the 2024 International Building Code Section 1704. The contractor assumes responsibility for temporary shoring and bracing, site inspection to verify existing conditions, verification of all dimensions prior to construction commencement, and repair of any damage caused to existing infrastructure or reinforcement. Suggested construction sequencing specifies installation of tunnel caps within and outside the security fence before tunnel removal and backfilling, with flowable mortar injection occurring after pavement completion. The project manual is available in IMPACS (Iowa's project management and contracting system), with sealed bid submission required. No incumbent information, specific award date, or renewal options are indicated in the provided documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB954100-01 - Project Manual (reduced size pdf).pdf | ||
| RFB954100-01 - Addendum 2.pdf | ||
| RFB954100-01 - Notice to Bidder.pdf | ||
| RFB954100-01 - Addendum 1.pdf | ||
| RFB954100-01 - Bid Form.pdf | ||
| Beeline and Blue Plans Portal.html | HTML file | |
| State Terms and Conditions.html | HTML file | |
| Bidding Documents and Drawing Sheets.html | HTML file | |
| 1430083-event.pdf | ||
| RFB954100-01 - Drawings and Project Manual.html | HTML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE PLANS FOR
DOC ICIW ROAD REPAIR AND TUNNEL INFILL
IOWA CORRECTIONAL INSTITUTION FOR WOMEN
CITY OF MITCHELLVILLE, POLK COUNTY, IOWA
VICINITY MAP
NOT TO SCALE
C.7
C.6
C.5
C.4
C.3
C.2
C.1
STRUCTURAL DETAILS
STRUCTURAL NOTES
DETAILS
DIMENSION AND LAYOUT PLAN
REMOVAL PLAN
GENERAL INFORMATION
TITLE SHEET
js u n d q u is t
V
P ro je c ts
\2 \1
.0
.0
\C
A D
D \C
D C
-T
IT
L
E .d g n
/2
/2
:2
:1
A
M
O R
D B
W F u ll
W e ig h tP
D F
.p lt c fg
C
S n y d e r\
B e n tl e y
\C o n fi g u ra ti o n
S e ts
\S A
A
C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \S
A A
S ta n d a rd s \P e n
T a b le s \d a te
.t b l C
S h e e t]
Sheet
Project No:
P ro je c t
N o
T e c h n ic ia n
E n g in e e r
M A
R K
R E
V
IS
IO
N
C h e c k e d B y
D a te
S h e e tT
R
S
D A
T E
B Y
S N
Y D
E R
A
S S
O C
IA
T
E S
IN
C
C.1
126.0792
D O
C I
C
IW
R O
A D
R E
P A
IR
A
N D
T U
N N
E L
L I
N F
IL
L
T
IT
L E
S H
E E
T
S
W S
N Y
D E
R B
L V
D
A N
K E
N Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
IO
W
A
M
IT
C H
E L
L V
IL
L
E
D A
S
.0
.0
C .1
/2
/2
J P
G T
N J
J D
S
INDEX OF SHEETS
E D
PRO
E
PRO
L
IC
E N S
E
FE IONFE IONSSSS
AL
EN
G
AL
EN
G
IN
E E R
IN
E E R
AIOW
State of Iowa.
Professional Engineer under the laws of the supervision and that I am a duly licensed was prepared by me or under my direct personal
I hereby certify that this engineering document
Tyler N. Jensen, P.E.
License Number
My License Renewal Date is December 31, 2027
Pages or sheets covered by this seal:
P24526
Date
P24526
JENSEN
TYLER N.
C.1-C.7
E L
M A
V E
N U
E S
W
JET STREET SW
S P
A C
E A
V E
N U
E S
W
M A
R K
E T
A V
E N
U E
S W
STREET SW
CARTER
1ST STREET SW
MILL STREET SW
HIGH STREET SW
2ND STREET SW
3RD STREET SW
MITCHELLVILLE, IA. 50169
420 MILL STREET SW.
IOWA CORRECTIONAL INSTITUTION FOR WOMEN
OWNER
RFB # 954100-01
DAS PROJECT # 9541
PROJECT INFORMATION
DAS # 9541.00
PROJECT AREA
07/23/2026
GENERAL NOTES:
COORDINATE WITH THIRD PARTY AGENCY FOR SCHEDULING TESTING FOR THE PROJECT.
OWNER TO PROVIDE THIRD PARTY TESTING AGENCY FOR THE PROJECT. CONTRACTOR TO
COMPLETE THE AREA AS SOON AS POSSIBLE TO MINIMIZE INCONVENIENCE TO THE OWNER.
HAS COMMENCED THE CONTRACTOR SHALL PUT FULL AND CONTINUOUS WORKFORCE TO
PERFORM WORK WITHIN SPECIFIED TIME OF CONSTRUCTION. ONCE WORK WITHIN A SPECIFIED AREA
THE CONTRACTOR IS EXPECTED TO PROVIDE ADEQUATE PERSONNEL AND EQUIPMENT TO
SUITABLE FOR THE ESTABLISHMENT OF VEGETATION, SUBJECT TO APPROVAL OF THE OWNER.
THE TOP SIX INCHES OF ALL DISTURBED AREAS WILL BE FREE OF ROCK AND DEBRIS AND WILL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE.
DAMAGED BY THE CONTRACTOR OUTSIDE THE CONSTRUCTION LIMITS SHALL BE REPLACED OR
CONSTRUCTION LIMITS AS PER CONTRACT. ANY VEGETATION OR INFRASTRUCTURE THAT IS
CONTRACTOR WILL RESTORE ALL SEEDING AND VEGETATION DAMAGED WITHIN THE
AND SIDEWALKS IS INCLUDED IN BID ITEM #2.
EARTHWORK FILL REQUIRED TO MEET 2.0% CROSS SLOPE ON PAVEMENT
DRAINAGE UNLESS OTHERWISE SHOWN ON TYPICAL DETAILS.
SURFACE RESTORATION. PROVIDE MINIMUM 1% SLOPE FOR ADEQUATE
CONTRACTOR TO MATCH EXISTING ELEVATIONS FOR ALL PAVEMENT AND
THERE IS NO SURVEY INCLUDED IN THE CONSTRUCTION DOCUMENTS.
IN WRITING PRIOR TO ACTIVITY.
CONSTRUCTION LIMITS UNLESS OTHERWISE AUTHORIZED BY THE OWNER
THE CONTRACTOR WILL CONFINE CONSTRUCTION ACTIVITIES TO WITHIN
FROM CONSTRUCTION DEBRIS.
CONCRETE DUST OR SPLATTER. CONTRACTOR TO CLEAN ALL SURFACES
PLASTIC IS TO BE PLACED ON FACE OF BUILDINGS TO PROTECT FROM
CONTRACTOR.
SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY
MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND
RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL
CONTROL MEASURES AS NECESSARY. CONTRACTOR SHALL ALSO BE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION
GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK.
THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL
ACTIVITIES IN A TIMELY MANNER.
STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION
FROM DEPARTMENT OF CORRECTIONS ROADWAYS, NEIGHBORING
THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS
APPROVED OFF-SITE WASTE SITE.
TO BE UNDESIRABLE TO BE INCORPORATED INTO THE PROJECT TO AN
CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED
CONSTRUCTION.
LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING
CONFLICTS BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE
DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR
ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF DESIGN.
DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE
DOCUMENTS. THIS IS CONSIDERED INCIDENTAL TO THE PROJECT.
RECONNECTED AND NOTED ACCORDINGLY ON THE AS-BUILT
ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE
AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN.
IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES
PRIOR TO ANY WORK WITHIN THE SECURITY FENCE.
BEGINNING WORK. CONTRACTOR TO COORDINATE WITH OWNER
NOTIFY OWNER AND ENGINEER AT LEAST 48 HOURS PRIOR TO
BARRICADES SHALL BE USED.
OBSTRUCT PORTIONS OF THE ROADWAY APPROPRIATE SIGNAGE AND
CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES
REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC
ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH
UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE
FOR REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT
UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN
DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH OF ALL
DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS NECESSARY
NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION
CITY OF MITCHELLVILLE AND OWNER PRIOR TO CONSTRUCTION..
ELECTRIC, AND COMMUNICATIONS AND COORDINATE WORK WITH THE
CONTRACTOR TO LOCATE FOR ALL UTILITIES INCLUDING NATURAL GAS,
DESIGN AND SPECIFICATIONS (SUDAS).
CONFORM TO THE CURRENT EDITION OF THE IOWA STATEWIDE URBAN
CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL1.
UTILITY QUALITY SERVICE LEVELS
UTILITY WARNING
THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS.
BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL AS
IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND UTILITIES OBTAINEDQUALITY LEVEL (A)
SUBSURFACE UTILITIES.
GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF
INFORMATION IS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE QUALITY LEVEL (B)
QUALITY D INFORMATION.
UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH
INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND QUALITY LEVEL (C)
INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR ORAL RECOLLECTIONS.QUALITY LEVEL (D)
APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI / ASCE 38-02 STANDARD.
QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY TYPE AND WHEN
INDICATED EXCEPT WHERE NOTED AS QUALITY LEVEL A.
UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION
ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE
COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN SERVICE OR
GUARANTEE THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN
INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
93.0
C
OC
FO
E
OE
4" G
4" HPG
8" W
8" S
12" ST12" ST
G
G
AST
UST
Features Existing Proposed
G
EB
W
LEGEND
8" W(*)
8" S(*)
4" G(*)
4" HPG(*)
C(*)
OC(*)
FO(*)
E(*)
OE(*)
DUCT(*)
93.
Soil Boring
Mailbox
Satellite Dish
Sign
Above Ground Storage Tank
Underground Storage Tank
Fence Post or Guard Post
Gas Apparatus
Gas Manhole
Gas Valve
Fiber Optic Handhole
Fiber Optic Manhole
Communication Handhole
Communication Manhole
Communication Pedestal
Traffic Sign
Electric Transformer
Electric Box
Yard Light
Street Light
Utility Pole with Transformer
Utility Pole with Light
Guy Anchor
Utility Pole
Well
Water Service Valve
Water Main Valve
Fire Hydrant on Building
Fire Hydrant
Double Storm Sewer Intake
Single Storm Sewer Intake
Storm Manhole
Storm Sewer with Size
Sanitary Manhole
(*) Denotes the survey quality service level for utilities
Test Hole Location for SUE w/ID
Duct Bank
Sanitary Sewer with Size
Water Main with Size
High Pressure Gas Main with Size
Gas Main with Size
Overhead Electric
Underground Electric
Fiber Optic
Overhead Communication
Communication
Coniferous Tree \ Shrub
Deciduous Tree \ Shrub
Tree Stump
Tree Line
Fence (Silt)
Fence (Wood)
Fence (Chain Link)
Fence (Barbed, Field, Hog)
Contour Elevation
Spot Elevation
G
G
AST
UST
G
EB
W
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
BID ITEMS
NO. DESCRIPTION UNITS QUANTITY
1 TOPSOIL, ON-SITE, CONTRACTOR FURNISH 70 CY
2 EXCAVATION, CLASS 10, CONTRACTOR FURNISH 655 CY
3 SUBGRADE PREPARATION 480 SY
4 CAPPING EXISTING TUNNEL 3 EA
5 FLOWABLE MORTAR (INCLUDING LABOR & MISC.) 1 LS
6 TUNNEL REMOVAL 1 LS
7 PAVEMENT, PCC, 7" 403 SY
8 REMOVAL OF PAVEMENT 140 SY
9 SIDEWALK, PCC, 4" 14 SY
10 TEMPORARY TRAFFIC CONTROL 1 LS
11 HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, BFM 3,700 SF
12 FILTER SOCK, 12 INCH 1,200 LF
13 FILTER SOCK, REMOVAL 1,200 LF
14 MOBILIZATION 1 LS
ITEM CODE
2010-D-1
2010-E
2010-G
2010-K-1
2010-L-1
2010-M-1
7010-A
7030-A-1
7030-E
8030-A
9010-B
9040-D-1
9040-D-2
11,020-A
17.
18.
19.
20.
js u n d q u is t
V
P ro je c ts
\2
\1
.0
.0
\C A
D D
\C D
C
-N
O T
E S
.d g n
/2
/2
:2
:2
A
M
O R
D B
W F u ll
W e ig h tP
D F
.p lt c fg
C
S n y d e r\
B e n tl e y
\C o n fi g u ra ti o n
S e ts
\S A
A
C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \S
A A
S ta n d a rd s \P e n
T a b le s \d a te
.t b l C
-G
E N
I N
F O
S h e e t]
Sheet
Project No:
P ro je c t
N o
T e c h n ic ia n
E n g in e e r
M A
R K
R E
V
IS
IO
N
C h e c k e d B y
D a te
S h e e tT
R
S
D A
T E
B Y
S N
Y D
E R
A
S S
O C
IA
T
E S
IN
C
C.2
126.0792
D O
C I
C
IW
R O
A D
R E
P A
IR
A
N D
T U
N N
E L
L I
N F
IL
L
G E
N E
R A
L I
N F
O R
M A
T
IO
N
S
W S
N Y
D E
R B
L V
D
A N
K E
N Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
IO
W
C H
E L
L V
IL
L
E
D A
S
.0
.0
.2
/2
J P
G T
N J
J
0 10
FEET
js u n d q u is t
V
P ro je c ts
\2
\1
.0
.0
\C A
D D
\C D
C
-D
E M
O .d g n
/2
/2
:0
:1
P
M
O R
D B
W F u ll
W e ig h tP
D F
.p lt c fg
C
S n y d e r\
B e n tl e y
\C o n fi g u ra ti o n
S e ts
\S A
A
C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \S
A A
S ta n d a rd s \P e n
T a b le s \d a te
.t b l C
S h e e t]
Sheet
Project No:
P ro je c t
N o
T e c h n ic ia n
E n g in e e r
M A
R K
R E
V
IS
IO
N
C h e c k e d B y
D a te
S h e e tT
R
S
D A
T E
B Y
S N
Y D
E R
A
S S
O C
IA
T
E S
IN
C
C.3
126.0792
D O
C I
C
IW
R O
A D
R E
P A
IR
A
N D
T U
N N
E L
L I
N F
IL
L
R E
M O
V A
L P
L A
N
S
W S
N Y
D E
R B
L V
D
A N
K E
N Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
IO
W
C H
E L
L V
IL
L
E
D A
S
.0
.0
.3
/2
J P
G T
N J
J
19'
.4
15.5'
.8
63.4'
7.0'
.5
.2
6'
16.3' 41.5'
.0
1A
3D
3D
1A
3E
3C
3B3A3B
3C
3B
3A~ ~
3L3N
3M
5'
KEYED NOTES
EXISTING LIGHTING AND ELECTRICAL
A. PROTECT LIGHT POLE
EXISTING SEWER
A. PROTECT INTAKES
MISCELLANEOUS
A. PROTECT BUILDING
B. PROTECT SIDEWALK
C. PROTECT PAVEMENT
D. PROTECT FENCE
E. REMOVE WOOD POST
F. PROTECT EXISTING CURB AND GUTTER
G. REFER TO SHEET C.6 FOR DRILLING DETAILS FOR TUNNEL
ACCESS HOLE FOR FLOWABLE MORTAR.
H. FINAL LOCATION OF ORANGE SAFETY FENCE TO BE
DETERMINED IN THE FIELD WITH OWNER AND ENGINEER.
I. TUNNEL REMOVAL LIMITS TO BE 5' FROM EDGE OF
SECURITY FENCE PAVEMENT.
J. TOTAL TUNNEL INFILL WITH FLOWABLE MORTAR IS
APPROXIMATELY 76 LF. CONTRACTOR TO FIELD VERIFY
BEFORE COMMENCING WORK.
K. TOTAL TUNNEL REMOVAL IS APPROXIMATELY 223 LF.
CONTRACTOR TO FIELD VERIFY PRIOR TO REMOVAL.
L. REMOVE TUNNEL TO APPROXIMATELY 5 FEET FROM
BUILDING WALL.
M. REMOVE TUNNEL MANHOLE. INCIDENTAL TO TUNNEL
REMOVAL.
N. REMOVE 30"x30" TUNNEL ACCESS. INCIDENTAL TO TUNNEL
REMOVAL.
LEGEND
PAVEMENT REMOVAL (HMA AND PCC)
TUNNEL REMOVAL
TUNNEL INFILL WITH FLOWABLE MORTAR
FULL DEPTH SAW CUT
ORANGE SAFETY FENCE (CONSTRUCTION LIMITS)
10'
3H
3G
3H
3H
3H
2A
2A
3I
3K
3J js u n d q u is t
V
P ro je c ts
\2 \1
.0
.0
\C
A D
D \C
D C
-S
IT
E
.d g n
/2
/2
:5
:0
A
M
O R
D B
W F u ll
W e ig h tP
D F
.p lt c fg
C
S n y d e r\
B e n tl e y
\C o n fi g u ra ti o n
S e ts
\S A
A
C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \S
A A
S ta n d a rd s \P e n
T a b le s \d a te
.t b l C
S h e e t]
Sheet
Project No:
P ro je c t
N o
T e c h n ic ia n
E n g in e e r
M A
R K
R E
V
IS
IO
N
C h e c k e d B y
D a te
S h e e tT
R
S
D A
T E
B Y
S N
Y D
E R
A
S S
O C
IA
T
E S
IN
C
C.4
126.0792
D O
C I
C
IW
R O
A D
R E
P A
IR
A
N D
T U
N N
E L
L I
N F
IL
L
D
IM
E N
S
IO
N A
N D
L A
Y O
U T
P L
A N
S
W S
N Y
D E
R B
L V
D
A N
K E
N Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
IO
W
C H
E L
L V
IL
L
E
D A
S
.0
.0
.4
/2
T N
J E
N G
J
KEYED NOTES
MISCELLANEOUS
A. INSTALL 1/2" LIP CURB THROUGH SIDEWALK
ENTRANCE OPENING. REFER TO DETAIL 4 ON
SHEET C.5 FOR CURB DETAILS.
B. MATCH EXISTING TRANSVERSE JOINTS
C. INSTALL STRUCTURAL CAP AT TUNNEL.
REFER TO DETAIL 3 ON SHEET C.7.
D. INSTALL STRUCTURAL CAP AT TUNNEL. REFER
TO DETAIL 4 ON SHEET C.7.
E. INSTALL STRUCTURE CAP AT TUNNEL. REFER TO
DETAILS 3 AND 5 ON SHEET C.7
F. REFER TO NOTES ON SHEET C.7 FOR SEALING
CORE HOLES FOR FLOWABLE MORTAR
PLACEMENT.
LEGEND
7" PCC PAVEMENT
4" PCC PAVEMENT SIDEWALK
SEEDING - SUDAS TYPE 1 SEED MIX
12" FILTER SOCK
0 10
FEET
6'
44.5'
19'
16'
.4
.3
9"
.5
15.5'
14.5'
63.4'
6.9'
16.3'
1C
1A 1B
1A
1A
1A
B
B
C
C
A A
'R T
'C
'C
'R T
'RT'
'C'
8.0'
'RT'
'L
.0
'BT-5'
12.0'
3.4'
1A
GRADING PLAN NOTES
1. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL ON
ALL AREAS NECESSARY FOR OVER EXCAVATION FOR
THE REMOVAL OF THE TUNNEL. RE-SPREAD TO
MINIMUM 6" DEPTH TO FINISH GRADE.
2. CONTRACTOR TO FURNISH 6" OF CLEAN TOPSOIL FOR
TUNNEL FOOTPRINT REMOVAL.
3. NO SPOTS GRADE ELEVATION TO BE GIVEN FOR THE
PROJECT. CONTRACTOR TO MATCH EXISTING GRADES
FOR SIDEWALK & ROADWAY PAVEMENT REPLACEMENT,
AND FOR BACKFILLING OF TUNNEL REMOVAL.
EROSION CONTROL AND SWPPP NOTES
1. EROSION CONTROL: SEED ALL DISTURBED LIMITS
AFTER ROUGH GRADING HAS BEEN COMPLETED.
PLACE FILTER SOCK AND MAINTAIN PROBLEM AREAS
AFTER GROUND COVER HAS BEEN ESTABLISHED.
COMPLY WITH EROSION CONTROL LAW.
2. SUDAS TYPE 1 SEED MIX WITH BONDED FIBER MATRIX
(BFM) AS MULCHING AGENT SHALL BE USED.
3. CONTRACTOR TO INSTALL FILTER SOCKS AT INLETS PER
SUDAS AT THE LOCATIONS INDICATED.
4. REMOVE TEMPORARY EROSION CONTROL MEASURES
ONCE FINAL STABILIZATION IS REACHED.
'RT'
'L
.0
'C'
8.0'
'C'
8.0'
'C'
8.0'
'L
.0
'C'
8.0'
'C'
8.0'
'L
.0
'C'
8.0'
'C'
8.0'
'L
.0
'C'
8.0'
'C'
8.0'
'L
.0
'L
.0
'C' OR 'RT'
'L
.0
'C'
8.0'
'C'
8.0'
'R T
'1B
'RT'
'L
.0
'C'
8.0'
'C'
8.0'
'L
.0
'C'
9.5'
'C'
9.5'
'L
.3
'C'
9.5'
'C'
9.5'
'E
'E'
'C
'C
'C
'C
'BT-5'
12.0'
'BT-5'
12.0'
'BT-5'
12.0'
'BT-5'
12.0'
'L-1'
8.9'
'L-1'
8.8'
'L-1' 'L-1'
'L
'R T
'C O
R R
T
'L-1'
'L
9"
9"
1D
1E
SUGGESTED CONSTRUCTION SEQUENCING:
1. INSTALL TRAFFIC CONTROL (BY OWNER) AND TEMPORARY CONSTRUCTION
FENCE (BY CONTRACTOR).
2. INSTALL TUNNEL CAP INSIDE SECURITY FENCE.
3. INSTALL TUNNEL CAP OUTSIDE SECURITY FENCE.
4. INSTALL TUNNEL CAP AT MAINTENANCE FACILITY BUILDING
5. REMOVE TUNNEL AND BACKFILLING.
6. COMPLETE ROAD & SIDEWALK PAVING
7. INJECT FLOWABLE MORTAR INSIDE SECURITY FENCE.
8. COMPLETE SITE CLEANUP AND SURFACE RESTORATION.
9. REMOVAL OF TRAFFIC CONTROL.
5'
5'
1F~ ~
NO SCALEC.5
1 TYPICAL PCC PAVING SECTION (A-A)
SECTION A-A
PATROL ROADWAY
NO SCALEC.5
2 TYPICAL PCC PAVING SECTION (B-B)
SECTION B-B
PATROL ROADWAY
NO SCALEC.5
3 TYPICAL PCC PAVING SECTION (C-C)
SECTION C-C
PATROL ROADWAY
NO SCALEC.5
6 TYPICAL TUNNEL BACKFILL SECTION
16.0'2' 2'
FOR ADDITIONAL INFORMATION.
6" INTEGRAL CURB. REFER TO DETAIL 4
VARIES
7" PCC
AND WITHIN +4% OF OPTIMUM MOISTURE.
COMPACT TO 95% STANDARD PROCTOR DENSITY
SUBGRADE PREPARATION SCARIFY 12" AND
2% 2%
21.0'2' 2'
4 FOR ADDITIONAL INFORMATION.
6" INTEGRAL CURB. REFER TO DETAIL
VARIES
2%
AND WITHIN +4% OF OPTIMUM MOISTURE.
COMPACT TO 95% STANDARD PROCTOR DENSITY
SUBGRADE PREPARATION SCARIFY 12" AND
7" PCC
2%
VARIES
10.5'2'
VARIES
INFORMATION.
DETAIL 4 FOR ADDITIONAL
6" INTEGRAL CURB. REFER TO
2%
OPTIMUM MOISTURE.
PROCTOR DENSITY AND WITHIN +4% OF
AND COMPACT TO 95% STANDARD
SUBGRADE PREPARATION SCARIFY 12"
7" PCC
BT-5 JOINT EXISTING 7" PCC
NO SCALEC.5
4 PV-102 CURB DETAILS
FORM
GRADE
ELEV.
per plans Slope as
6"
R 3"
'' (max.)
Back of Curb
Line
Level
Gutterline
R 3" per plans Slope as
6" STANDARD CURB
AT SIDEWALK
DROP CURB
FOR CONSTRUCTION LIMITS.
TOP SOIL. REFER TO SHEET C.4
STRIP, SALVAGE, AND SPREAD
FOR CONSTRUCTION LIMITS.
TOP SOIL. REFER TO SHEET C.4
STRIP, SALVAGE, AND SPREAD
FOR CONSTRUCTION LIMITS.
TOP SOIL. REFER TO SHEET C.4
STRIP, SALVAGE, AND SPREAD
TO SHEET C.3 FOR LOCATIONS
REMOVE EXISTING PAVEMENT, REFER
EXISTING GROUND
FOR REMOVAL OF TUNNEL
OVER EXCAVATION AS NEEDED
MOISTURE AND DENSITY TESTING SHALL BE REQUIRED.
MOISTURE CONTROL WITHIN +4% OF OPTIMUM MOISTURE.
2010. COMPACAT TO 95% STANDARD PROCTOR DENSITY AND
AND EMBANKMENT CONSTRUCTION SHALL BE PER SUDAS SECTION
SECTION 2010 FOR SUITABLE EMBANKMENT MATERIALS. BACKFILLING
CONTRACTOR FURNISHED BACKFILL MATERIAL TO MEET SUDAS
L-1 JOINT MATCH EXISTING ELEVATION L-1 JOINT
TO SHEET C.4 FOR CONSTRUCTION LIMITS.
STRIP, SALVAGE, AND SPREAD TOPSOIL. REFER
TOPSOIL FOR TUNNEL FOOTPRINT REMOVAL
CONTRACTOR FURNISH 6" DEPTH OF CLEAN
NO SCALEC.5
5 PCC SIDEWALK TYPICAL SECTION
6" AND COMPACT
SUBGRADE PREPARATION SCARIFY
DISTURBED AREAS
RESTORE LAWN AND SEED
DISTURBED AREAS
RESTORE LAWN AND SEED
SLOPE
1.8% MAXIMUM
CROSS SLOPE 4"
js u n d q u is t
V
P ro je c ts
\2
\1
.0
.0
\C A
D D
\C D
C
-D
E T
A
IL
S .d g n
/2
/2
:2
:3
A
M
O R
D B
W F u ll
W e ig h tP
D F
.p lt c fg
C
S n y d e r\
B e n tl e y
\C o n fi g u ra ti o n
S e ts
\S A
A
C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \S
A A
S ta n d a rd s \P e n
T a b le s \d a te
.t b l C
S h e e t]
Sheet
Project No:
P ro je c t
N o
T e c h n ic ia n
E n g in e e r
M A
R K
R E
V
IS
IO
N
C h e c k e d B y
D a te
S h e e tT
R
S
D A
T E
B Y
S N
Y D
E R
A
S S
O C
IA
T
E S
IN
C
C.5
126.0792
D O
C I
C
IW
R O
A D
R E
P A
IR
A
N D
T U
N N
E L
L I
N F
IL
L
D E
T A
IL
S
S
W S
N Y
D E
R B
L V
D
A N
K E
N Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
IO
W
C H
E L
L V
IL
L
E
D A
S
.0
.0
.5
/2
J P
G T
N J
J
EXISTING TUNNEL
Sheet he et
F
IL
E
L
X(A S
N O
T E
D
B Y
D A
T E
R E
V
IS
IO
N
M A
R K
S c a le
C h e ck e d B y:
E n g in e e r:
T e ch n ic ia n
D a te
F ie ld
B k:
P g
Project No:
SN
YD
ER
A
SS
O
CI
AT
ES
, I
NC
SNYDER
& ASSOCIATES
0 1/2" 1"
BAR IS ONE INCH ON
FULL SIZE DRAWINGS
IF NOT ONE INCH
ADJUST SCALE ACCORDINGLY
P ro je c t
N o
D A
S
.0
S
W S
N Y
D E
R B
L V
D A
N K
E N
Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
V P ro je c ts
\2 \1
.0
.0 \C
A D
D \R e v it \1
.0
.0
S
(2 rv t
/2
/2
:0
:3
P
M N
O T
E S
D O
C I C
IW
R
O A
D R
E P
A
IR
A N
D T
U N
N E
L I N
F
IL
L
N O
T E
S
126.0792
B F
K
C M
H
C G
G M
IT
C
H E
L L V
IL
L E
I
O W
A
/2
/2
C .6
C.6
.0
GENERAL
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS PRIOR TO
COMMENCING CONSTRUCTION.
2. ALL OF THE WORK TO BE DONE UNDER THIS CONTRACT SHALL BE DONE
IN ACCORDANCE WITH THE REQUIREMENTS OF THE DRAWINGS, THE
GENERAL REQUIREMENTS OF DIVISION ONE, THE GENERAL CONDITIONS,
THE SPECIFICATIONS, AND ANY ADDENDA THERETO.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ACQUAINT
THEMSELVES AND ALL SUPERVISORY PERSONNEL WITH THE ABOVE-NAMED
DRAWINGS AND DOCUMENTS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SITE OF
THE PROPOSED WORK TO SATISFY THEMSELVES AS TO THE EXISTING
CONDITIONS RELATIVE TO THE CONTRACT.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TEMPORARY
SHORING/BRACING OF WALLS, SLABS, COLUMNS, ETC., AS REQUIRED BY
ALL FEDERAL, STATE AND LOCAL AGENCIES HAVING JURISDICTION,
UNTIL ALL PERMANENT FRAMING IS INSTALLED.
6. ALL CONSTRUCTION SHALL CONFORM TO INTERNATIONAL BUILDING
CODE 2024 UNLESS NOTED OTHERWISE.
7. DIMENSIONS MARKED +/- REQUIRE VERIFICATION BY THE CONTRACTOR.
8. IN ANY CASE OF CONFLICT BETWEEN THE NOTES, DETAILS AND
SPECIFICATIONS, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
CONTRACTOR SHALL MAKE NO DEVIATION FROM DESIGN DRAWINGS WITHOUT
WRITTEN APPROVAL OF THE ENGINEER.
9. PROTECTIVE FENCE TO BE INSTALLED BY CONTRACTOR DURING WORK
PREVENTING ENTRANCE TO EXCAVATED AREA. PROTECTIVE FENCE TO BE
USED AND MAINTAINED THROUGHOUT CONSTRUCTION.
CONCRETE
1. CONCRETE TO BE IN ACCORDANCE WITH "SPECIFICATIONS FOR
STRUCTURAL CONCRETE FOR BUILDINGS (ACI 301 CURRENT EDITION)".
2. REINFORCING STEEL TO BE BENT AND PLACED IN ACCORDANCE WITH
"MANUAL OF STD. PRACTICE FOR DETAILING CONCRETE STRUCTURES
(ACI 315 CURRENT EDITION)".
3. ALL CONCRETE SHALL BE 4000 PSI AT 28 DAYS.
4. COARSE AGGREGATE FOR SLABS AND EXPOSED WALLS TO BE
CRUSHED LIMESTONE.
5. MAXIMUM AGGREGATE SIZE TO BE 1" - U.N.O.
6. ALL AGGREGATE IN ACCORDANCE WITH ASTM C33. LIMIT SHALE,
CHERT, COAL AND IRON OXIDE.
7. 4000 PSI CONCRETE TO HAVE A MIN. 6 SACKS CEMENT/MAX. 5 GAL. OF
WATER/SACK.
8. WATER REDUCER REQUIRED FOR ALL WALLS AND SLABS.
9. CONCRETE WATER-CEMENT RATIO INDICATED FOR DESIGN MIXES TO
HAVE CEMENT CONTENT ADJUSTED TO PROVIDE A WORKABLE MIX.
10. USE OF CALCIUM CHLORIDES PROHIBITED.
11. ALL REINFORCING STEEL TO BE ASTM A615 - GRADE 60.
12. CLEAR DISTANCE FROM FACE OF CONCRETE TO NEAR REINFORCING
BAR TO BE:
3" CAST AGAINST EARTH
2" SLABS ON GRADE (DISTANCE FROM TOP OF SLAB TO NEAR BAR)
2" STRUCTURAL SLABS
13. ALL REINFORCING STEEL SHALL BE SECURELY WIRED IN PLACE
BEFORE CONCRETE IS PLACED.
14. MAXIMUM SPACING OF BAR SUPPORTS TO BE 3'-0" O.C. EACH WAY.
15. PROVIDE CLASS B TENSION LAP SPLICES FOR CONTINUOUS BARS UNLESS
OTHERWISE SHOWN.
16. ALL REINFORCING BARS SHALL BE LAPPED AS SPECIFICALLY DETAILED
ON THE STRUCTURAL DRAWINGS. WHERE NOT SPECIFICALLY
INDICATED ON THE DRAWINGS, ALL REINFORCING BARS SHALL BE
LAPPED AS FOLLOWS: LAP WALL/BEAM TOP HORIZONTAL
REINFORCEMENT AT CENTER OF SPAN. LAP WALL/BEAM BOTTOM
HORIZONTAL REINFORCEMENT AT SUPPORT. TERMINATE CONTINUOUS
BARS AT DISCONTINUOUS ENDS WITH STANDARD HOOKS.
17. NEW WATERSTOPS TO BE BENTONITE SELF ADHERING STRIPS 1"X3/4"
18. CONCRETE ANCHORS SHALL BE HILTI HIT-HY 200 OR APPROVED
EQUAL. THREADED RODS SHALL BE HILTI HAS-E STANDARD RODS OR
GRADE 36 THREADED RODS UNLESS NOTED OTHERWISE.
DRILLED-IN-DOWELS AND ANCHOR BOLTS
1. HOLES FOR DOWELS SHALL BE DRILLED INTO THE EXISTING CONCRETE
AT THE LOCATIONS AND OF THE SIZE SHOWN ON THE PLANS. EMBED
DRILLED-IN-DOWELS 15 BAR OR ANCHOR BOLT DIAMETERS MINIMUM,
UNLESS NOTED OTHERWISE. AFTER HOLES ARE DRILLED, THEY SHALL BE
BLOWN CLEAN WITH OIL-FREE COMPRESSED AIR BEFORE THE EPOXY
RESIN IS PLACED IN THE HOLE. THE HOLE SHALL BE FILLED WITH EPOXY
RESIN TO A LEVEL SUCH THAT AFTER THE BAR IS INSERTED, THE EPOXY
WILL RISE TO THE SURFACE OF THE HOLE. IN OVERHEAD APPLICATIONS,
WORK AND SECURE ENOUGH EPOXY RESIN INTO THE HOLE SUCH THAT
WHEN THE DOWEL IS INSERTED, THE EPOXY RESIN COMPLETELY FILLS
THE VOID AROUND THE DOWEL. SECURE THE EPOXY RESIN IN PLACE FOR
CURING BY PLUGGING THE HOLE AROUND THE SHANK OF THE DOWEL.
REINFORCING STEEL DOWELS OR ANCHOR BOLTS OF THE SIZE SHOWN ON
THE PLANS SHALL BE INSERTED INTO THE HOLE IMMEDIATELY AFTER
THE EPOXY RESIN IS PLACED. THE EPOXY RESIN SHALL BE PERMITTED TO
SET BEFORE NEW CONCRETE IS PLACED AROUND THE ANCHOR.
DEMOLITION AND SHORING
1. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO
ENSURE THAT PARTS OF THE STRUCTURE TO BE PRESERVED ARE
NOT DAMAGED BY THE APPLICATION OF EXCESSIVE LOADS OR BY
ANY OTHER MEANS, AND THE CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR ANY DAMAGE CAUSED.
2. ENSURE SAFE PASSAGE OF PERSONS AROUND AREA OF DEMOLITION
AND CONSTRUCTION. CONDUCT OPERATIONS TO PREVENT INJURY
TO ADJACENT BUILDINGS, STRUCTURES, EQUIPMENT AND OTHER
FACILITIES AND PERSONS.
3. EXISTING STRUCTURE SHALL BE TEMPORARILY SHORED AS REQUIRED
TO PERFORM CONSTRUCTION SHOWN HEREIN. MEMBERS SHALL BE
REMOVED IN SUCH A MANNER AS NOT TO DAMAGE EXISTING STRUCTURE.
4. ALL REMOVALS OF EXISTING SHALL BE INITIATED WITH A
NEAT, 3/4" MIN. DEEP STRAIGHT.
5. PROTECT EXISTING REINFORCING STEEL IN PLACE. EXERCISE EXTREME
CARE TO AVOID DAMAGING EXISTING REINFORCEMENT.
6. EXACT LOCATION OF EXISTING REINFORCEMENT IS TO BE DETERMINED
BY THE CONTRACTOR USING A REBAR LOCATOR OR SIMILAR METHOD.
7. LOCATE HOLES FOR BOLTS TO AVOID EXISTING REINFORCEMENT.
8. CONTRACTOR RESPONSIBLE TO REPAIR DAMAGED EXISTING
REINFORCEMENT TO THE SATISFACTION OF THE ENGINEER/OWNER.
CONTRACTOR RESPONSIBLE FOR ALL COSTS AND DELAYS ASSOCIATED
WITH THE REPAIR.
9. IN THE EVENT OF CONFLICTS, NOTIFY ENGINEER PRIOR TO FIELD
MODIFICATIONS OF DETAILS, CONNECTIONS, OR DIMENSIONS SHOWN
ON THE CONTRACT DRAWINGS.
SPECIAL INSPECTION
1. SPECIAL INSPECTION IN ACCORDANCE WITH SECTION 1704 OF THE 2024
INTERNATIONAL BUILDING CODE, AND ICBO MODEL PROGRAM FOR
SPECIAL INSPECTION.
2. THE OWNER WILL EMPLOY AN APPROVED AGENCY TO PERFORM THE
SPECIAL INSPECTION SERVICES.
3. SPECIAL INSPECTION WILL BE PERFORMED IN ACCORDANCE WITH AND IN
ADDITION TO THE INSPECTION AND TESTING REQUIRED BY THE
DRAWINGS AND SPECIFICATIONS.
4. THE FOLLOWING ITEMS ARE INCLUDED IN THE SPECIAL INSPECTION:
CONCRETE: AIR-ENTRAINMENT
SLUMP
COMPRESSIVE STRENGTH TESTING
REINFORCING PLACEMENT
SOIL: PAVEMENT SUBGRADE AND FILL COMPACTION.
FLOWABLE FILL
1. MATERIALS SHALL CONFORM TO APPLICABLE REQUIREMENTS OF:
ASTM D6103 – FLOWABLE CONTROLLED LOW STRENGTH MATERIAL (CLSM).
ACI 229R – CONTROLLED LOW-STRENGTH MATERIALS.
2. FLOWABLE FILL SHALL CONSIST OF A CEMENTITIOUS SLURRY DESIGNED TO BE
SELF-LEVELING AND SELF-CONSOLIDATING, ELIMINATING THE NEED FOR
MECHANICAL COMPACTION.
3. 28 DAY COMPRESSIVE STRENGTH OF 50 TO 150 PSI
4. FURNISH AND PLACE CONTROLLED LOW STRENGTH MATERIAL (CLSM), ALSO
KNOWN AS FLOWABLE FILL, CONTROLLED DENSITY FILL (CDF), LEAN MIX BACKFILL,
OR UNSHRINKABLE FILL, AT LOCATIONS INDICATED ON THE PLANS.
5. PLACE MATERIAL CONTINUOUSLY TO PREVENT COLD JOINTS WHENEVER
PRACTICAL.
6. CONTRACTOR SHALL SUBMIT MIX DESIGN FOR REVIEW PRIOR TO PLACEMENT.
+/- 6'-0"
VARIOUS SIZE AND
LOCATIONS OF PIPING AND
APPARATUSES (FIELD VERIFY)
REMOVE ALL EXISTING
UTILITIES WITHIN REMOVAL
SECTION
TUNNEL REMOVAL NOTES:
1. THE CONTRACTOR SHALL DETERMINE THE MOST APPROPRIATE
METHOD FOR REMOVAL OF EXISTING UTILITIES.
A. THE INTENDED DESIGN APPROACH IS TO SAW-CUT AND
REMOVE THE CAP OF THE EXISTING TUNNEL AS REQUIRED FOR
UTILITIES REMOVAL, FOLLOWED BY REMOVAL OF ALL UTILITIES
WITHIN THE TUNNEL.
2. REMOVE THE EXISTING TUNNEL STRUCTURE IN ITS ENTIRETY
WITHIN THE REMOVAL LIMITS. (LIMITS OF REMOVAL ON C.3)
+/- 6'-0"
+/- 6'-0"
MIN. LAP = 1' - 8"
M
IN
L
A P
DRILL AND EPOXY #4 AT 6"
O.C. W/ 4" EMBED
TUNNEL CAP / FILL WITH FLOWABLE MORTAR NOTES:
1. THE CONTRACTOR SHALL REMOVE THE TUNNEL OR TUNNEL
LID THAT IS TO BE REMOVED AS REQUIRED TO GAIN ACCESS TO
THE PORTION OF THE TUNNEL THAT WILL REMAIN. (LIMITS OF
INFILL ON C.3)
2. THE CONTRACTOR SHALL REMOVE ALL UTILITIES FROM
EXISTING TUNNEL.
3. CAP THE EXISTING TUNNEL AS INDICATED IN THE PLANS.
4. CORE HOLES AT 10-FOOT INTERVALS ON CENTER WITHIN THE
FENCE LIMITS TO FACILITATE PLACEMENT AND VENTING OF
FLOWABLE MORTAR WITHIN THE TUNNEL TO REMAIN.
5. FILL THE TUNNEL USING A STEPPED PROCESS, BEGINNING AT
THE FIRST ACCESS HOLE AND PROGRESSING SEQUENTIALLY
BACK TOWARD THE BUILDING AND THEN TOWARD THE FENCE.
6. UPON COMPLETION, VERIFY THAT THE FLOWABLE MORTAR
HAS FILLED THE TUNNEL COMPLETELY AND HAS REACHED THE
ELEVATION OF THE BOTTOM OF THE SIDEWALK. POUR NEW
SIDEWALK PATCHING (8" THICK) NEW SIDEWALK 4000 PSI
CONCRETE NOT FLOWABLE MORTAR.
C.7
DRILL AND EPOXY #4 AT
6" O.C. W/ 4" EMBED W/
90 DEG. HOOK
DRILL AND EPOXY #4 AT
6" O.C. W/ 4" EMBED
DRILL AND EPOXY #4 AT
6" O.C. W/ 4" EMBED
9"
DRILL AND EPOXY #4 AT 6"
O.C. W/ 4" EMBED
REMOVE REQUIRED CONCRETE TO
INSTALL INSIDE FENCE CAP AND
OUTSIDE FENCE CAPS EXISTING TUNNEL
TO REMAIN
3 1/4" CLR.
DRILL AND EPOXY #4 AT
6" O.C. W/ 4" EMBED W/
90 DEG. HOOK
FLOWABLE MORTER
9"
DRILL AND EPOXY #4 AT 6"
O.C. W/ 4" EMBED
FLOWABLE MORTER
EXISTING TUNNEL
TO REMAIN
3 1/4" CLR.
+/- 6'-0"
MIN. LAP = 1' - 8"
DRILL AND EPOXY #4 AT 6"
O.C.E.W. W/ 4" EMBED
C.7
M
IN
L
A P
Sheet
S he et
F
IL
E
L
X(A S
N O
T E
D
B Y
D A
T E
R E
V
IS
IO
N
M A
R K
S c a le
C h e ck e d B y:
E n g in e e r:
T e ch n ic ia n
D a te
F ie ld
B k:
P g
Project No:
SN
YD
ER
A
SS
O
CI
AT
ES
, I
NC
SNYDER
& ASSOCIATES
0 1/2" 1"
BAR IS ONE INCH ON
FULL SIZE DRAWINGS
IF NOT ONE INCH
ADJUST SCALE ACCORDINGLY
P ro je c t
N o
D A
S
.0
S
W S
N Y
D E
R B
L V
D A
N K
E N
Y
IA
-9
-2
W
W W
.S N
Y D
E R
-A S
S O
C
IA
T E
S .C
O M
V P ro je c ts
\2 \1
.0
.0 \C
A D
D \R e v it \1
.0
.0
S
(2 rv t
/2
/2
:0
:3
P
M D
E T
A
IL
S
D O
C I C
IW
R
O A
D R
E P
A
IR
A N
D T
U N
N E
L I N
F
IL
L
D E
T A
IL
S
126.0792
B F
K
C M
H
C G
G M
IT
C
H E
L L V
IL
L E
I
O W
A
/2
/2
C .7
C.7
.0
3/4" = 1'-0"
1 TYPICAL TUNNEL SECTION 3/4" = 1'-0"
3 TUNNEL CAP OUTSIDE FENCE
3/4" = 1'-0"
2 TUNNEL REMOVAL
3/4" = 1'-0"
5 SECTION
3/4" = 1'-0"
6 SECTION
3/4" = 1'-0"
4 TUNNEL CAP INSIDE FENCE
(WEST OUTSIDE FENCE CAP SHOWN, EAST OUTSIDE FENCE CAP SIMILAR)
| CD_1260792_C1-TITLE |
| CD_1260792_C2-NOTES |
| CD_1260792_C3-DEMO |
| CD_1260792_C4-SITE |
| CD_1260792_C5-DETAILS |
File details come from the government source that posted it. Updated .