RFB950200-01 MPCF Hot & Cold Water Main - Drawings.pdf

PDF 4 MB Posted

Attached to
MPCF Hot & Cold Water Main Replacement
Solicitation number
RFB950200-01
Issued by
Harrison County, Iowa

About this file

Document Summary: Construction Drawings for MPCF Hot & Cold Water Main Replacement

This file consists of the complete construction document set prepared by MODUS Engineering for the Iowa Department of Administrative Services' project to replace domestic water mains at the Mt. Pleasant Correctional Facility located at 1200 E Washington Street, Mt. Pleasant, Iowa 52641. The project involves comprehensive demolition and replacement of hot water, cold water, and hot water recirculation piping systems serving the main building, powerhouse, connecting tunnels, and east and west wings of the correctional facility. The new construction includes installation of welded stainless steel piping for domestic hot water and recirculation mains, grooved stainless steel piping for cold water mains, threaded stainless steel branch piping with isolation ball valves, a new Bell & Gossett EcoCIRC XL 65-130 ECM recirculation pump, fiberglass insulation with service jackets, and associated electrical work. The drawings document both a base bid option and Alternate 1 utilizing PEX piping for cold water mains instead of stainless steel. Construction is scheduled to begin on April 17, 2026, and conclude by August 25, 2026, with final completion by October 28, 2026. A pre-bid conference is available on February 12, 2026, at 9:00 am at the facility, and sealed bids are due electronically through IMPACS by 3:00 pm on February 25, 2026, with opening at 4:00 pm the same day.

The drawing set comprises 32 sheets organized by area and function, including site plans, plumbing demolition plans for the powerhouse, tunnels, and building wings, plumbing installation plans with two alternate configurations, detailed schedules for the recirculation pump and conductor sizing, and electrical demolition and new work plans. Work must maintain facility domestic water services throughout construction except during specific connection points, coordinated with facility staff a minimum of 72 hours in advance. The facility operates three separate continuously live cold water entrances requiring careful valve coordination during phased demolition and installation. Special attention is required for compliance with the 2024 Uniform Plumbing Code, 2023 National Electric Code, NESHAP and OSHA regulations, and documented asbestos and lead-containing paint hazards identified during a December 2025 survey. All work requires security escort coordination, keyed access to tunnels, and adherence to strict material transport protocols through the correctional facility's secure yard.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARTNER IN CHARGE

ROGER LESHER

RLESHER@MODUS-ENG.COM

PROJECT MANAGER

KEVIN PANCZYK

KPANCZYK@MODUS-ENG.COM

MECHANICAL ENGINEER

DYLAN MUCKEY

DMUCKEY@MODUS-ENG.COM

ELECTRICAL ENGINEER

JOSH NIELSEN

JNIELSEN@MODUS-ENG.COM

J

J

ELECTRICAL SYMBOLS LIST

WIRING DEVICES

NOTE: NOT ALL SYMBOLS SHOWN MAY BE REQUIRED FOR THIS PROJECT

MISCELLANEOUS

SWITCH-LEG IN CONDUIT

EMPTY CONDUIT

ABOVE FINISHED FLOORAFF

POINT OF NEW CONNECTION

WEATHERPROOFWP

UNDER GROUND CONDUITUC

EC

CONDUIT

EQUIPMENT WIRING

WEATHERPROOF DISCONNECTING MEANS

MS

FUSED DISCONNECTING MEANS

MOTOR STARTER - REFER TO SPECIFICATIONS 26 28 16, AUTOMATIC CONTROLLERS

DISCONNECTING MEANS

WP

DISTRIBUTION

DEVICE ON WIREMOLDWM

F

WG WIRE GUARD

VARIABLE FREQUENCY DRIVE W/INTEGRAL DISCONNECT

GFI

WP

GFI

ABOVE FINISH GRADEAFG

FIRE STOP[FS]

EZ PASS-THROUGH

H

F

T

EXISTING - TO BE REMOVED

EXISTING - TO BE RELOCATED

EXISTING - TO REMAIN

DUPLEX WALL RECEPTACLE

DUPLEX WALL RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED

DUPLEX GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE

DUPLEX WEATHERPROOF GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE WITH COVER

QUADRUPLEX RECEPTACLE

QUADRUPLEX RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED

DUPLEX CEILING RECEPTACLE

JUNCTION BOX

WIREMOLD/PLUGMOLD W/ENTRANCE FITTING AS SPECIFIED AND

RECEPTACLES & DEVICES AS INDICATED

ADA PUSH BUTTON (BY OTHERS)

SURFACE-MOUNT PANEL

FLUSH-MOUNT PANEL

C/T CABINET

METER

208V WALL RECEPTACLE, VERIFY POWER NEEDS

HAND DRYER (BY OTHERS)

AUTOMATIC FAUCET/VALVE

DUPLEX TAMPER-RESISTANT RECEPTACLE

VFD

ER

EXR

EX

U DUPLEX RECEPTACLE WITH USB CHARGER PORT

TRANSFORMER

H DUPLEX RECEPTACLE INSTALLED HORIZONTALLY

M

SWITCHES - LINE VOLTAGE (120/277V)

S

K

SINGLE POLE KEYED SWITCHS

K3

3-WAY KEYED SWITCHS

SINGLE POLE

S 3-WAY SWITCH

S 4-WAY SWITCH

(REFER TO LIGHTING SEQUENCE OF OPERATION FOR ADDITIONAL INFORMATION)

P

PILOT LIGHT SWITCHS

M

MOMENTARY LIGHT SWITCHS

D DIMMING SWITCH

CEILING MOUNT OCCUPANCY SENSOR

OCCUPANCY SENSOR WALL SWITCH

S

S

EMERGENCY PUSH BUTTON (GENERATORS/BOILERS)EPO

S MOTOR RATED SWITCH

MS

208V WALL RECEPTACLE ON BACKUP POWER

DUPLEX RECEPTACLE ON BACKUP POWER

DUPLEX WALL RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED ON BACKUP POWER

QUADRUPLEX RECEPTACLE ON BACKUP POWER

QUADRUPLEX RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED ON BACKUP POWER

SIMPLEX WALL RECEPTACLE, VERIFY POWER NEEDS

SIMPLEX WALL RECEPTACLE, ON BACKUP POWER

DEMOLISH TO THIS POINT AND PREPARE FOR NEW CONNECTION

DEMOLISH TO THIS POINT AND CAPC

MECHANICAL SYMBOLS LIST

NOTE: NOT ALL SYMBOLS SHOWN MAY BE REQUIRED FOR THIS PROJECT

EX

FS

THERMOMETER

TEMPERATURE WELL

HOSE BIBB

GLOBE BALANCING VALVE

TRIPLE DUTY VALVE

SPR

3WAY CONTROL VALVE

CALIBRATED BALANCE VALVE

2WAY CONTROL VALVE

CHECK VALVE

BALL VALVE

GLOBE VALVE

BUTTERFLY VALVE

AIR VENT

STRAINER W/DRAIN VALVE

PRESSURE GAUGE

EXPANSION JOINT

V

FLEXIBLE PIPE CONNECTOR

STRAINER

FLOAT & THERMOSTATIC TRAP

THERMOSTATIC TRAP

PIPE CAP

BACKFLOW PREVENTERBFP

PIPE RISER

PIPE DROP

UNION

HB

DSPR

SPRINKLER LINE

DRY TYPE SPRINKLER LINE

DRY SPRINKLER HEAD

WET SPRINKLER HEAD

PEDESTAL FIRE DEPARTMENT CONNECTION

SIDE MOUNT SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION

FLOW SWITCH

TS SPRINKLER LINE TAMPER SWITCH

EXISTING LINE TO REMAIN

EXISTING LINE TO BE REMOVED (ON DEMOLITION PLANS)

POINT OF NEW CONNECTION

ER

EXR

EXISTING TO REMAIN

EXISTING TO BE REMOVED

EXISTING TO BE RELOCATED

T F

PLUMBING

PIPING SPECIALTIES

FIRE EXTINGUISHING SYSTEM

MISCELLANEOUS

P/T PORT

HWR

PC

HWS

LPS

MPR

LPR

MPS

HPR

HPS

DOMESTIC COLD WATER LINE - CW

DOMESTIC HOT WATER LINE - HW

WW

PD

LP

V

ST

AW

SCW

SHW

TW

DOMESTIC HOT WATER CIRCULATING LINE - HWC

TEMPERED WATER LINE

SOFT COLD WATER LINE

SOFT HOT WATER LINE

SANITARY SEWER LINE

ACID WASTE LINE

STORM SEWER LINE

OFD STORM SEWER OVERFLOW LINE

PLUMBING VENT LINE

AV ACID PLUMBING VENT LINE

CD CONDENSATE DRAIN LINE

G NATURAL GAS LINE

LIQUEFIED PETROLEUM GAS LINE

RL

RS

REFRIGERANT LIQUID LINE

REFRIGERANT SUCTION LINE

HG REFRIGERANT HOT GAS BYPASS LINE

PUMPED DISCHARGE LINE

WELL WATER LINE

CLEANOUT IN FLOORCO

CO CLEANOUT AT OR ABOVE CEILING

CLEANOUT IN WALLCO

SHOWERHEAD

FLOOR DRAIN

ROOF DRAIN

HYDRONIC PIPING

HIGH PRESSURE STEAM SUPPLY LINE (51-125 PSIG)

HIGH PRESSURE CONDENSATE RETURN LINE

MEDIUM PRESSURE STEAM SUPPLY LINE (16-50 PSIG)

MEDIUM PRESSURE CONDENSATE RETURN LINE

LOW PRESSURE STEAM SUPPLY LINE (0-15 PSIG)

LOW PRESSURE CONDENSATE RETURN LINE

PUMPED CONDENSATE RETURN LINE

HEATING HOT WATER SUPPLY LINE

HEATING HOT WATER RETURN LINE

SS

LUBRICATED PLUG VALVE

WALL HYDRANTWH

CURB STOP

SPRINKLER POST INDICATOR VALVE

PIV

GATE VALVE

FDC

GREASE SANITARY SEWER LINE GSS

PLUMBING FIXTURE (SINK) ON ASSOCIATED LEVEL

PLUMBING FIXTURE (SINK) ON LEVEL ABOVES

S-2

AUTOMATIC FLOW LIMITING VALVE

VENTURI FLOW MEASURING STATION

PRESSURE REDUCING VALVE

VENTURI FLOW BALANCING STATION

SIGHT FLOW INDICATOR

DEMOLISH TO THIS POINT AND PREPARE FOR NEW CONNECTION

DEMOLISH TO THIS POINT AND CAPC

FDC

FLEX PIPE DOMESTIC COLD WATER LINE - CW

FLEX PIPE DOMESTIC HOT WATER LINE - HW

FLEX PIPE DOMESTIC HOT WATER CIRCULATING LINE - HWC

Roger T. Lesher

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. My license renewal date is December 31, 2027.

Date

Drawings:See sheet index

Specification Div. 22, 26

Pages or sheets covered by this seal:

SPECIFIC APPLICABLE CODES

THIS IS NOT MEANT TO BE AN EXHAUSTIVE LIST, ADDITIONAL CODES MAY APPLY.

• STATE PLUMBING CODE - 2024 UNIFORM PLUMBING CODE WITH STATE AMENDMENTS.

• STATE ELECTRICAL CODE - 2023 NATIONAL ELECTRIC CODE WITH STATE AMENDMENTS.

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

COVER SHEET

ME000

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

SHEET INDEX

SHEET

NUMBER SHEET NAME

ME000 COVER SHEET

ME001 SITE PLAN

PD100.0 POWERHOUSE PLUMBING DEMOLITION PLANS

PD100.1 TUNNEL PLUMBING DEMOLITION PLAN - AT POWERHOUSE

PD100.2 TUNNEL PLUMBING DEMOLITION PLAN - CENTRAL

PD100.3 TUNNEL PLUMBING DEMOLITION PLAN - AT MAIN BUILDING

PD101.1 WEST WING PLUMBING DEMOLITION PLAN

PD101.2 EAST WING PLUMBING DEMOLITION PLAN

P100.0 POWERHOUSE PLUMBING PLANS

P100.0A POWERHOUSE PLUMBING PLANS - ALTERNATE 1

P100.1 TUNNEL PLUMBING PLAN - AT POWERHOUSE

P100.1A TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1

P100.2 TUNNEL PLUMBING PLAN - CENTRAL

P100.2A TUNNEL PLUMBING PLAN - CENTRAL - ALTERNATE 1

P100.3 TUNNEL PLUMBING PLAN - AT MAIN BUILDING

P100.3A TUNNEL PLUMBING PLAN - AT MAIN BUILDING - ALTERNATE 1

P101.1 WEST WING PLUMBING PLAN

P101.1A WEST WING PLUMBING PLAN - ALTERNATE 1

P101.2 EAST WING PLUMBING PLAN

P101.2A EAST WING PLUMBING PLAN - ALTERNATE 1

P501 PLUMBING DETAILS AND SCHEDULES

ED101.0 PRISON FACILITY ELECTRICAL DEMOLITION PLANS

E100.0 POWERHOUSE ELECTRICAL PLANS

IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES:

MOUNT PLEASANT CORRECTIONAL FACILITY

HOT AND COLD WATER MAIN REPLACEMENT

DAS PROJECT #9502.00

REVISION SCHEDULE

DESCRIPTION DATE NO.

01/29/2026

S01

S02

S03

SECURE YARD

SECURE YARD

EAST WING

WEST WING

SOUTH CORE NORTH CORE

PRISON FACILITY

UTILITY TUNNEL

BELOW GRADE

POWERHOUSE

SECURITY FENCE (TYP.)

GENERAL NOTES:

A. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

B. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

SITE PLAN

ME001

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1" = 30'-0"

SITE PLAN

REFERENCED NOTES

S01 ESCORT FROM OWNER'S STAFF REQUIRED FOR ALL WORK WITHIN FENCED

AREA ABOVE GRADE. WORK WITHIN THE TUNNEL BEYOND THIS POINT

REQUIRES KEYED ACCESS. COORDINATE WITH FACILITY STAFF AND

CONSTRUCTION MANAGER TO ALLOW DAILY ACCESS DURING TUNNEL

OPERATIONS AND ANY OPERATIONS OUTSIDE OF FACILITY STAFF HOURS

(6AM TO 4PM).

S02 TRANSPORT OF MATERIALS THROUGH PRISON YARD SHALL BE COMPLETED

USING VEHICLE FROM OWNER'S FLEET TO PREVENT LENGTHY VEHICLE

SEARCHES UNLESS OTHERWISE APPROVED BY FACILITY.

S03 ALL WORK WITHIN CONFINES OF BUILDING REQUIRES AN ESCORT FROM

OWNER'S STAFF AND CHECK-IN OF TOOLS AND PERSONNEL THROUGH

BUILDING SECURITY.

REVISION SCHEDULE

UP

UP

DEMOLITION GENERAL NOTES:

A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS

AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL

CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED

DEMOLITION IN THE BID.

G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER

PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.

H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL

DEMOLITION REQUIREMENTS.

I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING

ALL PLUMBING EQUIPMENT TO BE REMOVED.

J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING

REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.

CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.

K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH

EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED

ON PLANS.

BOILER ROOM

OFFICE

PUMP ROOM

ER CP

ER 1" HWC

PD06

EX 3" HW

E X

C W

ER 1" HWC

EX WATER SOFTENER

EX WATER SOFTENER

EX WATER HEATER

EX BRINE TANK

EX BRINE TANK

E100.0PD100.0

PD14

POWER

PLANT

PUMP ROOM

BOILER ROOM

E R

H W

C E R

H

W

PD07

E X

H

W

E X

C W

PD100.1

PD100.2PD100.0

PD13

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

POWERHOUSE

PLUMBING DEMOLITION

PLANS

PD100.0

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/4" = 1'-0"

POWERHOUSE BOILER ROOM PLUMBING DEMOLITION PLAN

KEY PLAN

PUMP ROOM

BOILER ROOM

1/4" = 1'-0"

POWERHOUSE PUMP ROOM PLUMBING DEMOLITION PLAN

REFERENCED NOTES

PD06 REMOVE EXISTING HOT WATER RECIRCULATION PUMP AND ALL

ASSOCIATED PIPING AND ACCESSORIES DOWNSTREAM INCLUDING VALVE

AT CONNECTION TO COLD WATER PIPING SERVING WATER HEATER.

COORDINATE WITH ELECTRICAL CONTRACTOR FOR DISCONNECTING

POWER. DEMOLITION SHALL NOT TAKE PLACE UNTIL ALL NEW PIPING ON

PROJECT HAS BEEN INSTALLED AND IS IN OPERATION.

PD07 REMOVE HOT WATER PIPING BACK TO AND INCLUDING EXISTING BALL

VALVE AT THIS LOCATION. PREPARE UPSTREAM PIPING FOR CONNECTION

SHOWN ON NEW WORK PLAN.

PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER

RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW

WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.

PD14 REMOVE ALL EXISTING DOMESTIC HOT WATER RECIRCULATION MAIN

PIPING IN THIS AREA TO BE REPLACED IN NEW WORK. REFER TO

SPECIFICATION 22 0050 FOR PHASING INTENT.

DEMOLITION GENERAL NOTES:

A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS

AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL

CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED

DEMOLITION IN THE BID.

G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER

PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.

H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL

DEMOLITION REQUIREMENTS.

I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING

ALL PLUMBING EQUIPMENT TO BE REMOVED.

J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING

REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.

CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.

K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH

EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED

ON PLANS.

POWER

PLANT

PD100.2

PD100.0

PD04

PD04

E R

H

W

ER 1" HWC

PD02

E X

C W

E X

C W

ER 1" HWC

ER 3" HW

P100.1A

PD13

PD13

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

TUNNEL PLUMBING

DEMOLITION PLAN - AT

POWERHOUSE

PD100.1

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/8" = 1'-0"

TUNNEL PLUMBING DEMOLITION PLAN - AT POWERHOUSE

KEY PLAN

POWERHOUSE TUNNEL

REFERENCED NOTES

PD02 PIPING NORTH OF THIS DOORWAY ROUTED WITHIN 7' TALL TUNNEL.

STORAGE OF NEW AND DEMOLISHED PIPING MAY TAKE PLACE WITHIN

TUNNEL AND ADJACENT POWER HOUSE EQUIPMENT ROOM TO THE SOUTH

BUT SHALL BE COORDINATED WITH OWNER AND CONSTRUCTION MANAGER

TO NOT HINDER MAINTENANCE ACTIVITES.

PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.

ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME

5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING

PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE

EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.

PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER

RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW

WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS

AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL

CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED

DEMOLITION IN THE BID.

G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER

PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.

H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL

DEMOLITION REQUIREMENTS.

I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING

ALL PLUMBING EQUIPMENT TO BE REMOVED.

J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING

REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.

CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.

K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH

EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED

ON PLANS.

O L D

K

IT

C H

E N

T U

N N

E L

M A

IN

B U

IL

D

IN

G

A B O

V E

A

IR

E S

H A F T O

P E N

T O

A B O

V E

D O

U B L E F

E N

C E A

B O

V E

D R

IV

E W

A Y A

B O

V E

D R

IV

E W

A Y A

B O

V E

T U

N N

E L W

A L L A

N D

D O

O R

F L O

O R S

L O

P E I N

C R E A S

S

O

U T H

O F T

H

IS

P O

IN

T

P D

.3

P D

.1 PD04 PD04 PD03

FLOOR SLOPE FLOOR SLOPE

ER 1" HWC

EX 4" CW

ER 3" HW

ER 1" HWC

EX 4" CW

ER 3" HW

PD01

PRV

GATE VALVE (TYP.)EX 4" CW

P100.2A

PD13

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

TUNNEL PLUMBING

DEMOLITION PLAN -

CENTRAL

PD100.2

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/8" = 1'-0"

TUNNEL PLUMBING DEMOLITION PLAN - CENTER

KEY PLAN

CENTRAL TUNNEL

REFERENCED NOTES

PD01 SECURITY GATE AT THIS LOCATION. SECURITY ESCORT FOR ALL WORK

NORTH OF THIS POINT IS REQUIRED.

PD03 EXISTING VERTICAL BRANCH WITH GATE VALVE AND HOSE CONNECTION

SHALL BE REMOVED AND REPLACED IN NEW WORK WITH A NEW BALL VALVE

AND MULTIPLE-TURN VALVED HOSE CONNECTION.

PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.

ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME

5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING

PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE

EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.

PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER

RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW

WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS

AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL

CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED

DEMOLITION IN THE BID.

G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER

PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.

H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL

DEMOLITION REQUIREMENTS.

I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING

ALL PLUMBING EQUIPMENT TO BE REMOVED.

J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING

REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.

CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.

K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH

EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED

ON PLANS.

SIDE TUNNEL TO THE WEST

S

ID

E T

U N

N

A

IR

W A Y

S

ID

E T

U N

N

A

IR

W A Y

MECH

E030

MECH

2" CW TO 18/20 BUILDINGS VIA TUNNEL

P D

.1

P D

.2

PD100.2

PD04

PD04

PD04

ER CP

ER CP

E X

C W

E X

/2

H

W

ER 3" HW ER 3" HW

E R

H

W

ER 1" HWC

ER 1" HWC

ER 3" HW

ER 1" HWC

ER 3/4" HW

EX 1 1/2" HW

EX 1" HW PD05

PD05

PD05

PD04

PD13

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

TUNNEL PLUMBING

DEMOLITION PLAN - AT

MAIN BUILDING

PD100.3

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/8" = 1'-0"

TUNNEL PLUMBING DEMOLITION PLAN - AT MAIN BUILDING

KEY PLAN

BUILDING TUNNEL

REFERENCED NOTES

PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.

ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME

5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING

PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE

EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.

PD05 EXISTING 1" MAIN DRAIN SHALL BE REMOVED AND REPLACED WITH NEW

ISOLATION BALL VALVE AND 3/4" HOSE CONNECTION AS SHOWN IN NEW

WORK.

PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER

RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW

WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

57 58

ER 3" HWC

ER 3" HW

ER 3/4" HWC

ER 4" HWC

ER 3" HW

ER 1" HWC

ER 4" HWC

ER 3" HW

ER 1" HWC

ER 3" HWC

ER 3" HW

ER 1" HWC

ER CP

ER CP

PD04

PD04PD04

PD04

PD04

PD04

PD04

PD04

E R

H W

C

PD09

CORR

W021

CANTEEN

W023

STAIR #2

W024

STORAGE

W027

CANTEEN STORAGE

W026

ELEV. NO 2

STAIR #3

MECH

VOC. ED.

W014

CORR

W016

SHOP

W020

MECH/ELECT.

W017

STAIR #1

W018

VOC. ED.

W013

STORAGE

W012

OFFICE

W011

VOC. ED.

W006

STORAGE

W009

TOILET

W007

CORR.

W010

VOC. ED.

W005

BARBER SHOP

W002

STAIR #15

W001

UNEXCAVATED

STORAGE

STORAGE

W022

EX 2" HW (BOOSTED) EX 2" HW (BOOSTED) EX 2" HW (BOOSTED)

EX WH

ER 1 1/2" HW

ER 3" CW

ER 1" HWER 2" CWER 3/4" CW

ER 3/4" HW

ER 1 1/2" CW

ER 1" HW

ER 1/2" HWC

ER 1/2" HWC

ER 1" HW

ER 3/4" HWC

PD04

PD12

PD12

PD12

PD12 PD12 PD12

PD12

PD11 PD04

PD11

P D

.3

PD10

PD15

DEMOLITION GENERAL NOTES:

A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS

AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL

CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED

DEMOLITION IN THE BID.

G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER

PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.

H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL

DEMOLITION REQUIREMENTS.

I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING

ALL PLUMBING EQUIPMENT TO BE REMOVED.

J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING

REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.

CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.

K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH

EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED

ON PLANS.

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

WEST WING PLUMBING

DEMOLITION PLAN

PD101.1

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/8" = 1'-0"

WEST WING PLUMBING DEMOLITION PLAN

KEY PLAN

WEST

REFERENCED NOTES

PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.

ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME

5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING

PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE

EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.

PD09 REMOVE EXISTING 4" WATER SERVICE ENTRANCE PIPING FROM MAIN IN

THE BUILDING TO JUST UPSTREAM OF THE MOST UPSTREAM ISOLATION

VALVE IN THE SERVICE ENTRANCE LINE. REFER TO NEW WORK PLANS FOR

REPLACEMENT PIPING.

PD10 APPROXIMATE NORTH BRANCH PIPING DEMOLITION SCOPE AS INDICATED.

REMOVE BRANCH PIPING IN THIS LOCATION ONLY AS NEEDED TO MAKE

CONNECTIONS SHOWN IN NEW WORK.

PD11 REMOVE EXISTING HOT WATER RECIRCULATION PUMP, ASSOCIATED PIPING,

POWER, AND CONTROLS.

PD12 PATCH EXISTING BLOCK WALL WHERE EXISTING PIPING IS REMOVED.

PD15 REMOVE ALL EXISTING DOMESTIC COLD WATER, HOT WATER, AND HOT

WATER RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN

NEW WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.

33 34 35 36 37 38 39 40 41 42

ER CP

ER 3" HW

ER 1" HWC

ER 4" CW

ER 3" HW

ER 1" HWC

ER 4" CW

ER 3" HW

ER 1" HWC

ER 4" CW

ER 3" HW

ER 1" HWC

ER 4" CW

PD08

STORAGE

E027

STORAGE

E028

STORAGE

E029

MECH

E030

ELEV NO. 4

STAIR #9

CORRIDOR

E019

STAIR #10

E026

MECHANICAL/ELECTRICAL

E022

CONFERENCE

E021

ELEVATOR #5

E STAIR #11

E020

TOILET

E018

STORAGE

E016

STORAGE

E016

VOC. ED.

E013

VOC. ED.

E011

TOILET

E009

TOILET

E008

STORAGE

E007

VOC. ED.

E005

TOILET

E006

STORAGE

E004

CORR.

E010

VOC. ED.

E002

STAIR #12

E001

UNEXCAVATED

E000

STORAGE

E023

MECHANICAL/ELECTRICAL

E022

CORR.

E024

PD04

PD04 PD04 PD04

PD04 PD04 PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04

E R

C W

ER CP

ER 3" CW

ER 1" HWC

EX 1/2" HWC

EX 3/4" CW

EX 2" CW

EX 1" HW

EX 1/2" HWC

EX 1" HWC

EX 3/4" HW

EX 2" CW

EX 3/4" HW

EX 2" CW

EX 1" HW

EX 3/4" CW

EX 3/4" CW

EX 3/4" HW

EX 3/4" HW

EX 1" CW

PD12

PD11

PD04

PD12

PD12

PD11

PD12

PD12

PD12

P D

.3

PD15

DEMOLITION GENERAL NOTES:

A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS

AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL

CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED

DEMOLITION IN THE BID.

G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE

DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER

PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.

H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL

DEMOLITION REQUIREMENTS.

I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING

ALL PLUMBING EQUIPMENT TO BE REMOVED.

J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING

REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.

CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.

K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH

EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED

ON PLANS.

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

EAST WING PLUMBING

DEMOLITION PLAN

PD101.2

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/8" = 1'-0"

EAST WING PLUMBING DEMOLITION PLAN

KEY PLAN

EAST

REFERENCED NOTES

PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.

ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME

5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING

PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE

EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.

PD08 REMOVE EXISTING 4" WATER SERVICE ENTRANCE PIPING FROM MAIN IN

THE BUILDING TO JUST UPSTREAM OF THE MOST UPSTREAM ISOLATION

VALVE IN THE SERVICE ENTRANCE LINE. PRESSURE REDUCING STATION

SHALL BE REMOVED. REFER TO NEW WORK PLANS FOR REPLACEMENT

PIPING.

PD11 REMOVE EXISTING HOT WATER RECIRCULATION PUMP, ASSOCIATED PIPING,

POWER, AND CONTROLS.

PD12 PATCH EXISTING BLOCK WALL WHERE EXISTING PIPING IS REMOVED.

PD15 REMOVE ALL EXISTING DOMESTIC COLD WATER, HOT WATER, AND HOT

WATER RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN

NEW WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.

UP

GENERAL NOTES:

A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES

THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE

PROPER FLOW RATE ALL BALANCING VALVES AND AT

RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS

PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE

HOT WATER MAINS.

D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.

H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY

PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.

I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND

ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE

SPACE.

J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING

CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE

SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY

OFFSETS AS REQUIRED.

K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON

ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN

ACCESSIBLE LOCATIONS.

L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF

DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED

OTHERWISE.

BOILER ROOM

OFFICE

PUMP ROOM

CP-1

H W

C

EX WATER SOFTENER

EX WATER SOFTENER

EX WATER HEATER

EX BRINE TANK

EX BRINE TANK

EX 3" HW

E X

H

W E X

H

W

E X

C W

P26

P27

P28

E100.0P100.0

P32

POWER

PLANT

PUMP ROOM

BOILER ROOM

H W

H W

C

H W

C

H W

C

E X

C W

E X

C W

E X

C W

P13 P28

P100.1

E100.0P100.0

P31

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

POWERHOUSE

PLUMBING PLANS

P100.0

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

KEY PLAN

PUMP ROOM

BOILER ROOM

1/4" = 1'-0"

POWERHOUSE BOILER ROOM PLUMBING PLAN

1/4" = 1'-0"

POWERHOUSE PUMP ROOM PLUMBING PLAN

REFERENCED NOTES

P13 CONNECT NEW HOT WATER PIPING UPSTREAM OF EXISTING FLANGE, BALL

VALVE, AND UNION ASSEMBLY AND CAP WATER TIGHT AT EXISTING FLANGE.

P26 PROVIDE NEW CIRCULATION PUMP MOUNTED TO WALL NORTH OF EXISTING

PUMP TO BE REMOVED. INSTALL NEW PUMP PER INLINE PUMP DETAIL.

COORDINATE ELECTRICAL REQUIREMENTS AND PHASING WITH ELECTRICAL

CONTRACTOR.

P27 CONNECT NEW HOT WATER RECIRCULATION PIPING INTO EXISTING CW

PIPING AT SAME LOCATION AS EXISTING RECIRCULATION TIE-IN POINT.

PROVIDE NEW METALIC ISOLATION BALL VALVE AT NEW CONNECTION TO

REPLACE EXISTING PVC VALVE.

P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION

VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL

(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE

INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS

PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL

OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING

PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE

FACILITY OPERATIONS AND MINIMIZE DOWNTIME.

P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION

MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER

TO SPECIFICATION 22 0050 FOR PHASING INTENT.

P32 INSTALL NEW DOMESTIC HOT WATER RECIRCULATION MAIN PIPING IN THIS

AREA TO REPLACE EXISTING SYSTEM PIPING. REFER TO SPECIFICATION 22

0050 FOR PHASING INTENT.

UP

GENERAL NOTES:

A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES

THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE

PROPER FLOW RATE ALL BALANCING VALVES AND AT

RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS

PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE

HOT WATER MAINS.

D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.

H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY

PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.

I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND

ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE

SPACE.

J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING

CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE

SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY

OFFSETS AS REQUIRED.

K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON

ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN

ACCESSIBLE LOCATIONS.

L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF

DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED

OTHERWISE.

BOILER ROOM

OFFICE

PUMP ROOM

CP-1

EX WATER SOFTENER

EX WATER SOFTENER

EX WATER HEATER

EX BRINE TANK

EX BRINE TANK

EX 3" HW

E X

H

W E X

H

W

E X

C W

P26

H W

C

P27 P28

P32

E100.0P100.0A

POWER

PLANT

PUMP ROOM

BOILER ROOM

H W

E X

C W

E X

C W

E X

C W

P13 P28

P100.1A

H W

C

3" HWC

H W

C

H W

P31

E100.0P100.0A

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

POWERHOUSE

PLUMBING PLANS -

ALTERNATE 1

P100.0A

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

KEY PLAN

PUMP ROOM

BOILER ROOM

1/4" = 1'-0"

POWERHOUSE BOILER ROOM PLUMBING PLAN - ALTERNATE 1

1/4" = 1'-0"

POWERHOUSE PUMP ROOM PLUMBING PLAN - ALTERNATE 1

REFERENCED NOTES

P13 CONNECT NEW HOT WATER PIPING UPSTREAM OF EXISTING FLANGE, BALL

VALVE, AND UNION ASSEMBLY AND CAP WATER TIGHT AT EXISTING FLANGE.

P26 PROVIDE NEW CIRCULATION PUMP MOUNTED TO WALL NORTH OF EXISTING

PUMP TO BE REMOVED. INSTALL NEW PUMP PER INLINE PUMP DETAIL.

COORDINATE ELECTRICAL REQUIREMENTS AND PHASING WITH ELECTRICAL

CONTRACTOR.

P27 CONNECT NEW HOT WATER RECIRCULATION PIPING INTO EXISTING CW

PIPING AT SAME LOCATION AS EXISTING RECIRCULATION TIE-IN POINT.

PROVIDE NEW METALIC ISOLATION BALL VALVE AT NEW CONNECTION TO

REPLACE EXISTING PVC VALVE.

P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION

VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL

(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE

INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS

PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL

OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING

PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE

FACILITY OPERATIONS AND MINIMIZE DOWNTIME.

P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION

MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER

TO SPECIFICATION 22 0050 FOR PHASING INTENT.

P32 INSTALL NEW DOMESTIC HOT WATER RECIRCULATION MAIN PIPING IN THIS

AREA TO REPLACE EXISTING SYSTEM PIPING. REFER TO SPECIFICATION 22

0050 FOR PHASING INTENT.

GENERAL NOTES:

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES

THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE

PROPER FLOW RATE ALL BALANCING VALVES AND AT

RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS

PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE

HOT WATER MAINS.

D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.

H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY

PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.

I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND

ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE

SPACE.

J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING

CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE

SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY

OFFSETS AS REQUIRED.

K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON

ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN

ACCESSIBLE LOCATIONS.

L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF

DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED

OTHERWISE.

POWER

PLANT

P100.2

P100.1

P100.0

H W

E X

C W

EX HB

P09

F L O

O R S

L O

P E

EX 2" HW

EX 1" HWC

EX 1" HWC

F L O

O R S

L O

P E

P08 P25

P28

2" HWC

EX 4" CW

3" HW

H W

C

P31

EX

EX

EX CW

EX

EX

EX

EX

EX

EX

2" HWC

3" HW

NEW PIPING SHALL BE

MOUNTED WITH

BOTTOM OF PIPE NO

LOWER THAN 2' AFF.

MIN. 3" BETWEEN PIPE

INSULATION AND WALL AND

BETWEEN PIPE INSULATION ON

THE (2) MAINS TO ALLOW

SPACE FOR MAINTENANCE

ACTIVITIES AND FUTURE

CONNECTIONS.

MIN. 12" TO ALLOW SPACE FOR MAINTENANCE

ACTIVITIES AND FUTURE CONNECTIONS

P28

7'-0"

PROVIDE ANVIL

WALL MOUNTED

WELDED STEEL

BRACKET WITH

GALVANIZED

COATING OR

ENGINEER PRE-

APPROVED EQUAL.

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

TUNNEL PLUMBING

PLAN - AT POWERHOUSE

P100.1

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/4" = 1'-0"

TUNNEL PLUMBING PLAN - AT POWERHOUSE

KEY PLAN

POWERHOUSE TUNNEL

REFERENCED NOTES

P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT

EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL

BRANCH AND VALVE SIZING.

P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.

P25 ADJUST BALANCING VALVE TO ACHIEVE A FLOW RATE OF 4 GPM.

P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION

VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL

(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE

INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS

PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL

OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING

PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE

FACILITY OPERATIONS AND MINIMIZE DOWNTIME.

P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION

MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER

TO SPECIFICATION 22 0050 FOR PHASING INTENT.

1" = 1'-0"

TUNNEL SECTION 1

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES

THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE

PROPER FLOW RATE ALL BALANCING VALVES AND AT

RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS

PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE

HOT WATER MAINS.

D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO

FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND

FACILITY STAFF FOR SPACE REQUIRED.

G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.

H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY

PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.

I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND

ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE

SPACE.

J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING

CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE

SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY

OFFSETS AS REQUIRED.

K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON

ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN

ACCESSIBLE LOCATIONS.

L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF

DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED

OTHERWISE.

POWER

PLANT

P100.2A

P100.0A

H W

E X

C W

EX HB

P09

F L O

O R S

L O

P E

EX 2" HW

EX 1" HWC

EX 1" HWC

F L O

O R S

L O

P E

P28

EX 4" CW

3" HW

P100.1A

P25 P08

H W

C

P31

EX

EX

EX CW

EX

EX

EX

EX

EX

EX

3" HWC

3" HW

NEW PIPING SHALL BE

MOUNTED WITH

BOTTOM OF PIPE NO

LOWER THAN 2' AFF.

MIN. 3" BETWEEN PIPE

INSULATION AND WALL AND

BETWEEN PIPE INSULATION ON

THE (2) MAINS TO ALLOW

SPACE FOR MAINTENANCE

ACTIVITIES AND FUTURE

CONNECTIONS.

MIN. 12" TO ALLOW SPACE FOR MAINTENANCE

ACTIVITIES AND FUTURE CONNECTIONS

P28

7'-0"

PROVIDE ANVIL

WALL MOUNTED

WELDED STEEL

BRACKET WITH

GALVANIZED

COATING OR

ENGINEER PRE-

APPROVED EQUAL.

NOTE:

VERIFY BUILDING DIMENSIONS FOR ROUGH-IN

SHEET:

SHEET NAME:

SHEET SET:

DATE:

PROJECT NUMBER:

CONSULTANTS:

TUNNEL PLUMBING

PLAN - AT POWERHOUSE

- ALTERNATE 1

P100.1A

M O

U N

T P

L E A S A N

T C

O R R E C T

IO

N A L F

A C

IL

IT

Y H

O T A

N D

C O

L D

W A T E R

M A

IN

R E P L A C E M

E N

T E

W a sh in g to n S t, M t P le a sa n t, I A

100% CONSTRUCTION

DOCUMENTS

2026.01.29

25-182

25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT

IO

W

A D

E P A R

T M

E N

T O

F A

D M

IN

IS

T R A T

IV

E S

E R V

IC

E S P

R O

JE

C T

.0

1/4" = 1'-0"

TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1

KEY PLAN

POWERHOUSE TUNNEL

REFERENCED NOTES

P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT

EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL

BRANCH AND VALVE SIZING.

P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.

P25 ADJUST BALANCING VALVE TO ACHIEVE A FLOW RATE OF 4 GPM.

P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION

VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL

(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE

INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS

PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL

OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING

PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE

FACILITY OPERATIONS AND MINIMIZE DOWNTIME.

P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION

MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER

TO SPECIFICATION 22 0050 FOR PHASING INTENT.

1" = 1'-0"

TUNNEL SECTION 1 - ALTERNATE 1

BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF

THE PROJECT EXCEPT DURING THE COMPLETION OF NEW

CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING

SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE

MINIMIZED AND COORDINATED WITH THE OWNER AND

CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE

DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING

INTENT.

B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE

CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL

NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,

AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE

SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.

C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES

THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE

PROPER FLOW RATE ALL BALANCING VALVES AND AT

RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS

PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE

HOT WATER MAINS.

D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION

CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND

OTHER OWNER REQUIREMENTS AND PROVISIONS.

E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL

TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.

F. FACILITY STAFF WILL RELOCATE…