File Summary
This is a construction document set (100% Construction Documents dated January 29, 2026) prepared by Modus Engineering for the Iowa Department of Administrative Services (DAS) detailing the replacement of domestic hot and cold water mains at the Mount Pleasant Correctional Facility (MPCF) located at 1200 E Washington Street, Mt. Pleasant, Iowa 52641. The project, identified as DAS Project #9502.00 and RFB950200-01, encompasses comprehensive plumbing and electrical work including the demolition and replacement of existing domestic cold water (CW), hot water (HW), and hot water recirculation (HWC) piping systems throughout the facility's powerhouse, tunnel infrastructure, and east and west wing buildings. The scope includes removal of existing water softeners, water heaters, brine tanks, and recirculation pumps; installation of new stainless steel piping with isolation ball valves on all branch connections; provision of a new ECM recirculation pump (Bell & Gossett EcoCIRC XL 65-130) rated at 26 GPM and 40 feet of total head; and associated electrical work. The facility operates as a continuous-occupancy correctional institution, requiring all domestic water services to be maintained throughout construction except during specific new connection phases, with all coordination occurring at least 72 hours in advance and work limited to 6 AM to 4 PM facility staff hours or requiring special arrangement.
The construction documents include standard 2024 Uniform Plumbing Code and 2023 National Electric Code compliance requirements and are sealed by licensed Iowa Professional Engineer Roger T. Lesher (renewal date December 31, 2027). The drawings encompass multiple plan sheets covering demolition phasing, new work installation, piping details, schedules, electrical requirements, and both base scope and Alternate 1 options (with Alternate 1 specifying PEX piping instead of stainless steel). Project planning notes indicate facility staff will handle item relocation, the contractor must verify existing conditions through field observation, security escort requirements apply for work within fenced and building areas, and material transport must utilize the facility's vehicle fleet to prevent extended security searches. All new piping installation, flushing, and disinfection must be completed before connections to existing systems or demolition of existing infrastructure, with balancing contractor required to perform two passes to ensure proper flow rates and temperature maintenance throughout the recirculation system.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARTNER IN CHARGE
ROGER LESHER
RLESHER@MODUS-ENG.COM
PROJECT MANAGER
KEVIN PANCZYK
KPANCZYK@MODUS-ENG.COM
MECHANICAL ENGINEER
DYLAN MUCKEY
DMUCKEY@MODUS-ENG.COM
ELECTRICAL ENGINEER
JOSH NIELSEN
JNIELSEN@MODUS-ENG.COM
J
J
ELECTRICAL SYMBOLS LIST
WIRING DEVICES
NOTE: NOT ALL SYMBOLS SHOWN MAY BE REQUIRED FOR THIS PROJECT
MISCELLANEOUS
SWITCH-LEG IN CONDUIT
EMPTY CONDUIT
ABOVE FINISHED FLOORAFF
POINT OF NEW CONNECTION
WEATHERPROOFWP
UNDER GROUND CONDUITUC
EC
CONDUIT
EQUIPMENT WIRING
WEATHERPROOF DISCONNECTING MEANS
MS
FUSED DISCONNECTING MEANS
MOTOR STARTER - REFER TO SPECIFICATIONS 26 28 16, AUTOMATIC CONTROLLERS
DISCONNECTING MEANS
WP
DISTRIBUTION
DEVICE ON WIREMOLDWM
F
WG WIRE GUARD
VARIABLE FREQUENCY DRIVE W/INTEGRAL DISCONNECT
GFI
WP
GFI
ABOVE FINISH GRADEAFG
FIRE STOP[FS]
EZ PASS-THROUGH
H
F
T
EXISTING - TO BE REMOVED
EXISTING - TO BE RELOCATED
EXISTING - TO REMAIN
DUPLEX WALL RECEPTACLE
DUPLEX WALL RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED
DUPLEX GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE
DUPLEX WEATHERPROOF GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE WITH COVER
QUADRUPLEX RECEPTACLE
QUADRUPLEX RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED
DUPLEX CEILING RECEPTACLE
JUNCTION BOX
WIREMOLD/PLUGMOLD W/ENTRANCE FITTING AS SPECIFIED AND
RECEPTACLES & DEVICES AS INDICATED
ADA PUSH BUTTON (BY OTHERS)
SURFACE-MOUNT PANEL
FLUSH-MOUNT PANEL
C/T CABINET
METER
208V WALL RECEPTACLE, VERIFY POWER NEEDS
HAND DRYER (BY OTHERS)
AUTOMATIC FAUCET/VALVE
DUPLEX TAMPER-RESISTANT RECEPTACLE
VFD
ER
EXR
EX
U DUPLEX RECEPTACLE WITH USB CHARGER PORT
TRANSFORMER
H DUPLEX RECEPTACLE INSTALLED HORIZONTALLY
M
SWITCHES - LINE VOLTAGE (120/277V)
S
K
SINGLE POLE KEYED SWITCHS
K3
3-WAY KEYED SWITCHS
SINGLE POLE
S 3-WAY SWITCH
S 4-WAY SWITCH
(REFER TO LIGHTING SEQUENCE OF OPERATION FOR ADDITIONAL INFORMATION)
P
PILOT LIGHT SWITCHS
M
MOMENTARY LIGHT SWITCHS
D DIMMING SWITCH
CEILING MOUNT OCCUPANCY SENSOR
OCCUPANCY SENSOR WALL SWITCH
S
S
EMERGENCY PUSH BUTTON (GENERATORS/BOILERS)EPO
S MOTOR RATED SWITCH
MS
208V WALL RECEPTACLE ON BACKUP POWER
DUPLEX RECEPTACLE ON BACKUP POWER
DUPLEX WALL RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED ON BACKUP POWER
QUADRUPLEX RECEPTACLE ON BACKUP POWER
QUADRUPLEX RECEPTACLE ABOVE COUNTER BACKSPLASH OR AS INDICATED ON BACKUP POWER
SIMPLEX WALL RECEPTACLE, VERIFY POWER NEEDS
SIMPLEX WALL RECEPTACLE, ON BACKUP POWER
DEMOLISH TO THIS POINT AND PREPARE FOR NEW CONNECTION
DEMOLISH TO THIS POINT AND CAPC
MECHANICAL SYMBOLS LIST
NOTE: NOT ALL SYMBOLS SHOWN MAY BE REQUIRED FOR THIS PROJECT
EX
FS
THERMOMETER
TEMPERATURE WELL
HOSE BIBB
GLOBE BALANCING VALVE
TRIPLE DUTY VALVE
SPR
3WAY CONTROL VALVE
CALIBRATED BALANCE VALVE
2WAY CONTROL VALVE
CHECK VALVE
BALL VALVE
GLOBE VALVE
BUTTERFLY VALVE
AIR VENT
STRAINER W/DRAIN VALVE
PRESSURE GAUGE
EXPANSION JOINT
V
FLEXIBLE PIPE CONNECTOR
STRAINER
FLOAT & THERMOSTATIC TRAP
THERMOSTATIC TRAP
PIPE CAP
BACKFLOW PREVENTERBFP
PIPE RISER
PIPE DROP
UNION
HB
DSPR
SPRINKLER LINE
DRY TYPE SPRINKLER LINE
DRY SPRINKLER HEAD
WET SPRINKLER HEAD
PEDESTAL FIRE DEPARTMENT CONNECTION
SIDE MOUNT SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION
FLOW SWITCH
TS SPRINKLER LINE TAMPER SWITCH
EXISTING LINE TO REMAIN
EXISTING LINE TO BE REMOVED (ON DEMOLITION PLANS)
POINT OF NEW CONNECTION
ER
EXR
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO BE RELOCATED
T F
PLUMBING
PIPING SPECIALTIES
FIRE EXTINGUISHING SYSTEM
MISCELLANEOUS
P/T PORT
HWR
PC
HWS
LPS
MPR
LPR
MPS
HPR
HPS
DOMESTIC COLD WATER LINE - CW
DOMESTIC HOT WATER LINE - HW
WW
PD
LP
V
ST
AW
SCW
SHW
TW
DOMESTIC HOT WATER CIRCULATING LINE - HWC
TEMPERED WATER LINE
SOFT COLD WATER LINE
SOFT HOT WATER LINE
SANITARY SEWER LINE
ACID WASTE LINE
STORM SEWER LINE
OFD STORM SEWER OVERFLOW LINE
PLUMBING VENT LINE
AV ACID PLUMBING VENT LINE
CD CONDENSATE DRAIN LINE
G NATURAL GAS LINE
LIQUEFIED PETROLEUM GAS LINE
RL
RS
REFRIGERANT LIQUID LINE
REFRIGERANT SUCTION LINE
HG REFRIGERANT HOT GAS BYPASS LINE
PUMPED DISCHARGE LINE
WELL WATER LINE
CLEANOUT IN FLOORCO
CO CLEANOUT AT OR ABOVE CEILING
CLEANOUT IN WALLCO
SHOWERHEAD
FLOOR DRAIN
ROOF DRAIN
HYDRONIC PIPING
HIGH PRESSURE STEAM SUPPLY LINE (51-125 PSIG)
HIGH PRESSURE CONDENSATE RETURN LINE
MEDIUM PRESSURE STEAM SUPPLY LINE (16-50 PSIG)
MEDIUM PRESSURE CONDENSATE RETURN LINE
LOW PRESSURE STEAM SUPPLY LINE (0-15 PSIG)
LOW PRESSURE CONDENSATE RETURN LINE
PUMPED CONDENSATE RETURN LINE
HEATING HOT WATER SUPPLY LINE
HEATING HOT WATER RETURN LINE
SS
LUBRICATED PLUG VALVE
WALL HYDRANTWH
CURB STOP
SPRINKLER POST INDICATOR VALVE
PIV
GATE VALVE
FDC
GREASE SANITARY SEWER LINE GSS
PLUMBING FIXTURE (SINK) ON ASSOCIATED LEVEL
PLUMBING FIXTURE (SINK) ON LEVEL ABOVES
S-2
AUTOMATIC FLOW LIMITING VALVE
VENTURI FLOW MEASURING STATION
PRESSURE REDUCING VALVE
VENTURI FLOW BALANCING STATION
SIGHT FLOW INDICATOR
DEMOLISH TO THIS POINT AND PREPARE FOR NEW CONNECTION
DEMOLISH TO THIS POINT AND CAPC
FDC
FLEX PIPE DOMESTIC COLD WATER LINE - CW
FLEX PIPE DOMESTIC HOT WATER LINE - HW
FLEX PIPE DOMESTIC HOT WATER CIRCULATING LINE - HWC
Roger T. Lesher
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. My license renewal date is December 31, 2027.
Date
Drawings:See sheet index
Specification Div. 22, 26
Pages or sheets covered by this seal:
SPECIFIC APPLICABLE CODES
THIS IS NOT MEANT TO BE AN EXHAUSTIVE LIST, ADDITIONAL CODES MAY APPLY.
• STATE PLUMBING CODE - 2024 UNIFORM PLUMBING CODE WITH STATE AMENDMENTS.
• STATE ELECTRICAL CODE - 2023 NATIONAL ELECTRIC CODE WITH STATE AMENDMENTS.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
COVER SHEET
ME000
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
SHEET INDEX
SHEET
NUMBER SHEET NAME
ME000 COVER SHEET
ME001 SITE PLAN
PD100.0 POWERHOUSE PLUMBING DEMOLITION PLANS
PD100.1 TUNNEL PLUMBING DEMOLITION PLAN - AT POWERHOUSE
PD100.2 TUNNEL PLUMBING DEMOLITION PLAN - CENTRAL
PD100.3 TUNNEL PLUMBING DEMOLITION PLAN - AT MAIN BUILDING
PD101.1 WEST WING PLUMBING DEMOLITION PLAN
PD101.2 EAST WING PLUMBING DEMOLITION PLAN
P100.0 POWERHOUSE PLUMBING PLANS
P100.0A POWERHOUSE PLUMBING PLANS - ALTERNATE 1
P100.1 TUNNEL PLUMBING PLAN - AT POWERHOUSE
P100.1A TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1
P100.2 TUNNEL PLUMBING PLAN - CENTRAL
P100.2A TUNNEL PLUMBING PLAN - CENTRAL - ALTERNATE 1
P100.3 TUNNEL PLUMBING PLAN - AT MAIN BUILDING
P100.3A TUNNEL PLUMBING PLAN - AT MAIN BUILDING - ALTERNATE 1
P101.1 WEST WING PLUMBING PLAN
P101.1A WEST WING PLUMBING PLAN - ALTERNATE 1
P101.2 EAST WING PLUMBING PLAN
P101.2A EAST WING PLUMBING PLAN - ALTERNATE 1
P501 PLUMBING DETAILS AND SCHEDULES
ED101.0 PRISON FACILITY ELECTRICAL DEMOLITION PLANS
E100.0 POWERHOUSE ELECTRICAL PLANS
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES:
MOUNT PLEASANT CORRECTIONAL FACILITY
HOT AND COLD WATER MAIN REPLACEMENT
DAS PROJECT #9502.00
REVISION SCHEDULE
DESCRIPTION DATE NO.
01/29/2026
S01
S02
S03
SECURE YARD
SECURE YARD
EAST WING
WEST WING
SOUTH CORE NORTH CORE
PRISON FACILITY
UTILITY TUNNEL
BELOW GRADE
POWERHOUSE
SECURITY FENCE (TYP.)
GENERAL NOTES:
A. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
B. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
SITE PLAN
ME001
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1" = 30'-0"
SITE PLAN
REFERENCED NOTES
S01 ESCORT FROM OWNER'S STAFF REQUIRED FOR ALL WORK WITHIN FENCED
AREA ABOVE GRADE. WORK WITHIN THE TUNNEL BEYOND THIS POINT
REQUIRES KEYED ACCESS. COORDINATE WITH FACILITY STAFF AND
CONSTRUCTION MANAGER TO ALLOW DAILY ACCESS DURING TUNNEL
OPERATIONS AND ANY OPERATIONS OUTSIDE OF FACILITY STAFF HOURS
(6AM TO 4PM).
S02 TRANSPORT OF MATERIALS THROUGH PRISON YARD SHALL BE COMPLETED
USING VEHICLE FROM OWNER'S FLEET TO PREVENT LENGTHY VEHICLE
SEARCHES UNLESS OTHERWISE APPROVED BY FACILITY.
S03 ALL WORK WITHIN CONFINES OF BUILDING REQUIRES AN ESCORT FROM
OWNER'S STAFF AND CHECK-IN OF TOOLS AND PERSONNEL THROUGH
BUILDING SECURITY.
REVISION SCHEDULE
UP
UP
DEMOLITION GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
BOILER ROOM
OFFICE
PUMP ROOM
ER CP
ER 1" HWC
PD06
EX 3" HW
E X
C W
ER 1" HWC
EX WATER SOFTENER
EX WATER SOFTENER
EX WATER HEATER
EX BRINE TANK
EX BRINE TANK
E100.0PD100.0
PD14
POWER
PLANT
PUMP ROOM
BOILER ROOM
E R
H W
C E R
H
W
PD07
E X
H
W
E X
C W
PD100.1
PD100.2PD100.0
PD13
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
POWERHOUSE
PLUMBING DEMOLITION
PLANS
PD100.0
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/4" = 1'-0"
POWERHOUSE BOILER ROOM PLUMBING DEMOLITION PLAN
KEY PLAN
PUMP ROOM
BOILER ROOM
1/4" = 1'-0"
POWERHOUSE PUMP ROOM PLUMBING DEMOLITION PLAN
REFERENCED NOTES
PD06 REMOVE EXISTING HOT WATER RECIRCULATION PUMP AND ALL
ASSOCIATED PIPING AND ACCESSORIES DOWNSTREAM INCLUDING VALVE
AT CONNECTION TO COLD WATER PIPING SERVING WATER HEATER.
COORDINATE WITH ELECTRICAL CONTRACTOR FOR DISCONNECTING
POWER. DEMOLITION SHALL NOT TAKE PLACE UNTIL ALL NEW PIPING ON
PROJECT HAS BEEN INSTALLED AND IS IN OPERATION.
PD07 REMOVE HOT WATER PIPING BACK TO AND INCLUDING EXISTING BALL
VALVE AT THIS LOCATION. PREPARE UPSTREAM PIPING FOR CONNECTION
SHOWN ON NEW WORK PLAN.
PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER
RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW
WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
PD14 REMOVE ALL EXISTING DOMESTIC HOT WATER RECIRCULATION MAIN
PIPING IN THIS AREA TO BE REPLACED IN NEW WORK. REFER TO
SPECIFICATION 22 0050 FOR PHASING INTENT.
DEMOLITION GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
POWER
PLANT
PD100.2
PD100.0
PD04
PD04
E R
H
W
ER 1" HWC
PD02
E X
C W
E X
C W
ER 1" HWC
ER 3" HW
P100.1A
PD13
PD13
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING
DEMOLITION PLAN - AT
POWERHOUSE
PD100.1
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
TUNNEL PLUMBING DEMOLITION PLAN - AT POWERHOUSE
KEY PLAN
POWERHOUSE TUNNEL
REFERENCED NOTES
PD02 PIPING NORTH OF THIS DOORWAY ROUTED WITHIN 7' TALL TUNNEL.
STORAGE OF NEW AND DEMOLISHED PIPING MAY TAKE PLACE WITHIN
TUNNEL AND ADJACENT POWER HOUSE EQUIPMENT ROOM TO THE SOUTH
BUT SHALL BE COORDINATED WITH OWNER AND CONSTRUCTION MANAGER
TO NOT HINDER MAINTENANCE ACTIVITES.
PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.
ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME
5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING
PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE
EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.
PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER
RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW
WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
O L D
K
IT
C H
E N
T U
N N
E L
M A
IN
B U
IL
D
IN
G
A B O
V E
A
IR
E S
H A F T O
P E N
T O
A B O
V E
D O
U B L E F
E N
C E A
B O
V E
D R
IV
E W
A Y A
B O
V E
D R
IV
E W
A Y A
B O
V E
T U
N N
E L W
A L L A
N D
D O
O R
F L O
O R S
L O
P E I N
C R E A S
S
O
U T H
O F T
H
IS
P O
IN
T
P D
.3
P D
.1 PD04 PD04 PD03
FLOOR SLOPE FLOOR SLOPE
ER 1" HWC
EX 4" CW
ER 3" HW
ER 1" HWC
EX 4" CW
ER 3" HW
PD01
PRV
GATE VALVE (TYP.)EX 4" CW
P100.2A
PD13
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING
DEMOLITION PLAN -
CENTRAL
PD100.2
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
TUNNEL PLUMBING DEMOLITION PLAN - CENTER
KEY PLAN
CENTRAL TUNNEL
REFERENCED NOTES
PD01 SECURITY GATE AT THIS LOCATION. SECURITY ESCORT FOR ALL WORK
NORTH OF THIS POINT IS REQUIRED.
PD03 EXISTING VERTICAL BRANCH WITH GATE VALVE AND HOSE CONNECTION
SHALL BE REMOVED AND REPLACED IN NEW WORK WITH A NEW BALL VALVE
AND MULTIPLE-TURN VALVED HOSE CONNECTION.
PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.
ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME
5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING
PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE
EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.
PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER
RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW
WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
SIDE TUNNEL TO THE WEST
S
ID
E T
U N
N
A
IR
W A Y
S
ID
E T
U N
N
A
IR
W A Y
MECH
E030
MECH
2" CW TO 18/20 BUILDINGS VIA TUNNEL
P D
.1
P D
.2
PD100.2
PD04
PD04
PD04
ER CP
ER CP
E X
C W
E X
/2
H
W
ER 3" HW ER 3" HW
E R
H
W
ER 1" HWC
ER 1" HWC
ER 3" HW
ER 1" HWC
ER 3/4" HW
EX 1 1/2" HW
EX 1" HW PD05
PD05
PD05
PD04
PD13
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING
DEMOLITION PLAN - AT
MAIN BUILDING
PD100.3
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
TUNNEL PLUMBING DEMOLITION PLAN - AT MAIN BUILDING
KEY PLAN
BUILDING TUNNEL
REFERENCED NOTES
PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.
ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME
5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING
PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE
EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.
PD05 EXISTING 1" MAIN DRAIN SHALL BE REMOVED AND REPLACED WITH NEW
ISOLATION BALL VALVE AND 3/4" HOSE CONNECTION AS SHOWN IN NEW
WORK.
PD13 REMOVE ALL EXISTING DOMESTIC HOT WATER AND HOT WATER
RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN NEW
WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
57 58
ER 3" HWC
ER 3" HW
ER 3/4" HWC
ER 4" HWC
ER 3" HW
ER 1" HWC
ER 4" HWC
ER 3" HW
ER 1" HWC
ER 3" HWC
ER 3" HW
ER 1" HWC
ER CP
ER CP
PD04
PD04PD04
PD04
PD04
PD04
PD04
PD04
E R
H W
C
PD09
CORR
W021
CANTEEN
W023
STAIR #2
W024
STORAGE
W027
CANTEEN STORAGE
W026
ELEV. NO 2
STAIR #3
MECH
VOC. ED.
W014
CORR
W016
SHOP
W020
MECH/ELECT.
W017
STAIR #1
W018
VOC. ED.
W013
STORAGE
W012
OFFICE
W011
VOC. ED.
W006
STORAGE
W009
TOILET
W007
CORR.
W010
VOC. ED.
W005
BARBER SHOP
W002
STAIR #15
W001
UNEXCAVATED
STORAGE
STORAGE
W022
EX 2" HW (BOOSTED) EX 2" HW (BOOSTED) EX 2" HW (BOOSTED)
EX WH
ER 1 1/2" HW
ER 3" CW
ER 1" HWER 2" CWER 3/4" CW
ER 3/4" HW
ER 1 1/2" CW
ER 1" HW
ER 1/2" HWC
ER 1/2" HWC
ER 1" HW
ER 3/4" HWC
PD04
PD12
PD12
PD12
PD12 PD12 PD12
PD12
PD11 PD04
PD11
P D
.3
PD10
PD15
DEMOLITION GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
WEST WING PLUMBING
DEMOLITION PLAN
PD101.1
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
WEST WING PLUMBING DEMOLITION PLAN
KEY PLAN
WEST
REFERENCED NOTES
PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.
ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME
5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING
PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE
EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.
PD09 REMOVE EXISTING 4" WATER SERVICE ENTRANCE PIPING FROM MAIN IN
THE BUILDING TO JUST UPSTREAM OF THE MOST UPSTREAM ISOLATION
VALVE IN THE SERVICE ENTRANCE LINE. REFER TO NEW WORK PLANS FOR
REPLACEMENT PIPING.
PD10 APPROXIMATE NORTH BRANCH PIPING DEMOLITION SCOPE AS INDICATED.
REMOVE BRANCH PIPING IN THIS LOCATION ONLY AS NEEDED TO MAKE
CONNECTIONS SHOWN IN NEW WORK.
PD11 REMOVE EXISTING HOT WATER RECIRCULATION PUMP, ASSOCIATED PIPING,
POWER, AND CONTROLS.
PD12 PATCH EXISTING BLOCK WALL WHERE EXISTING PIPING IS REMOVED.
PD15 REMOVE ALL EXISTING DOMESTIC COLD WATER, HOT WATER, AND HOT
WATER RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN
NEW WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
33 34 35 36 37 38 39 40 41 42
ER CP
ER 3" HW
ER 1" HWC
ER 4" CW
ER 3" HW
ER 1" HWC
ER 4" CW
ER 3" HW
ER 1" HWC
ER 4" CW
ER 3" HW
ER 1" HWC
ER 4" CW
PD08
STORAGE
E027
STORAGE
E028
STORAGE
E029
MECH
E030
ELEV NO. 4
STAIR #9
CORRIDOR
E019
STAIR #10
E026
MECHANICAL/ELECTRICAL
E022
CONFERENCE
E021
ELEVATOR #5
E STAIR #11
E020
TOILET
E018
STORAGE
E016
STORAGE
E016
VOC. ED.
E013
VOC. ED.
E011
TOILET
E009
TOILET
E008
STORAGE
E007
VOC. ED.
E005
TOILET
E006
STORAGE
E004
CORR.
E010
VOC. ED.
E002
STAIR #12
E001
UNEXCAVATED
E000
STORAGE
E023
MECHANICAL/ELECTRICAL
E022
CORR.
E024
PD04
PD04 PD04 PD04
PD04 PD04 PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
E R
C W
ER CP
ER 3" CW
ER 1" HWC
EX 1/2" HWC
EX 3/4" CW
EX 2" CW
EX 1" HW
EX 1/2" HWC
EX 1" HWC
EX 3/4" HW
EX 2" CW
EX 3/4" HW
EX 2" CW
EX 1" HW
EX 3/4" CW
EX 3/4" CW
EX 3/4" HW
EX 3/4" HW
EX 1" CW
PD12
PD11
PD04
PD12
PD12
PD11
PD12
PD12
PD12
P D
.3
PD15
DEMOLITION GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
EAST WING PLUMBING
DEMOLITION PLAN
PD101.2
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
EAST WING PLUMBING DEMOLITION PLAN
KEY PLAN
EAST
REFERENCED NOTES
PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.
ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME
5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING
PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE
EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.
PD08 REMOVE EXISTING 4" WATER SERVICE ENTRANCE PIPING FROM MAIN IN
THE BUILDING TO JUST UPSTREAM OF THE MOST UPSTREAM ISOLATION
VALVE IN THE SERVICE ENTRANCE LINE. PRESSURE REDUCING STATION
SHALL BE REMOVED. REFER TO NEW WORK PLANS FOR REPLACEMENT
PIPING.
PD11 REMOVE EXISTING HOT WATER RECIRCULATION PUMP, ASSOCIATED PIPING,
POWER, AND CONTROLS.
PD12 PATCH EXISTING BLOCK WALL WHERE EXISTING PIPING IS REMOVED.
PD15 REMOVE ALL EXISTING DOMESTIC COLD WATER, HOT WATER, AND HOT
WATER RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN
NEW WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
UP
GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
BOILER ROOM
OFFICE
PUMP ROOM
CP-1
H W
C
EX WATER SOFTENER
EX WATER SOFTENER
EX WATER HEATER
EX BRINE TANK
EX BRINE TANK
EX 3" HW
E X
H
W E X
H
W
E X
C W
P26
P27
P28
E100.0P100.0
P32
POWER
PLANT
PUMP ROOM
BOILER ROOM
H W
H W
C
H W
C
H W
C
E X
C W
E X
C W
E X
C W
P13 P28
P100.1
E100.0P100.0
P31
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
POWERHOUSE
PLUMBING PLANS
P100.0
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
KEY PLAN
PUMP ROOM
BOILER ROOM
1/4" = 1'-0"
POWERHOUSE BOILER ROOM PLUMBING PLAN
1/4" = 1'-0"
POWERHOUSE PUMP ROOM PLUMBING PLAN
REFERENCED NOTES
P13 CONNECT NEW HOT WATER PIPING UPSTREAM OF EXISTING FLANGE, BALL
VALVE, AND UNION ASSEMBLY AND CAP WATER TIGHT AT EXISTING FLANGE.
P26 PROVIDE NEW CIRCULATION PUMP MOUNTED TO WALL NORTH OF EXISTING
PUMP TO BE REMOVED. INSTALL NEW PUMP PER INLINE PUMP DETAIL.
COORDINATE ELECTRICAL REQUIREMENTS AND PHASING WITH ELECTRICAL
CONTRACTOR.
P27 CONNECT NEW HOT WATER RECIRCULATION PIPING INTO EXISTING CW
PIPING AT SAME LOCATION AS EXISTING RECIRCULATION TIE-IN POINT.
PROVIDE NEW METALIC ISOLATION BALL VALVE AT NEW CONNECTION TO
REPLACE EXISTING PVC VALVE.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
P32 INSTALL NEW DOMESTIC HOT WATER RECIRCULATION MAIN PIPING IN THIS
AREA TO REPLACE EXISTING SYSTEM PIPING. REFER TO SPECIFICATION 22
0050 FOR PHASING INTENT.
UP
GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
BOILER ROOM
OFFICE
PUMP ROOM
CP-1
EX WATER SOFTENER
EX WATER SOFTENER
EX WATER HEATER
EX BRINE TANK
EX BRINE TANK
EX 3" HW
E X
H
W E X
H
W
E X
C W
P26
H W
C
P27 P28
P32
E100.0P100.0A
POWER
PLANT
PUMP ROOM
BOILER ROOM
H W
E X
C W
E X
C W
E X
C W
P13 P28
P100.1A
H W
C
3" HWC
H W
C
H W
P31
E100.0P100.0A
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
POWERHOUSE
PLUMBING PLANS -
ALTERNATE 1
P100.0A
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
KEY PLAN
PUMP ROOM
BOILER ROOM
1/4" = 1'-0"
POWERHOUSE BOILER ROOM PLUMBING PLAN - ALTERNATE 1
1/4" = 1'-0"
POWERHOUSE PUMP ROOM PLUMBING PLAN - ALTERNATE 1
REFERENCED NOTES
P13 CONNECT NEW HOT WATER PIPING UPSTREAM OF EXISTING FLANGE, BALL
VALVE, AND UNION ASSEMBLY AND CAP WATER TIGHT AT EXISTING FLANGE.
P26 PROVIDE NEW CIRCULATION PUMP MOUNTED TO WALL NORTH OF EXISTING
PUMP TO BE REMOVED. INSTALL NEW PUMP PER INLINE PUMP DETAIL.
COORDINATE ELECTRICAL REQUIREMENTS AND PHASING WITH ELECTRICAL
CONTRACTOR.
P27 CONNECT NEW HOT WATER RECIRCULATION PIPING INTO EXISTING CW
PIPING AT SAME LOCATION AS EXISTING RECIRCULATION TIE-IN POINT.
PROVIDE NEW METALIC ISOLATION BALL VALVE AT NEW CONNECTION TO
REPLACE EXISTING PVC VALVE.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
P32 INSTALL NEW DOMESTIC HOT WATER RECIRCULATION MAIN PIPING IN THIS
AREA TO REPLACE EXISTING SYSTEM PIPING. REFER TO SPECIFICATION 22
0050 FOR PHASING INTENT.
GENERAL NOTES:
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
POWER
PLANT
P100.2
P100.1
P100.0
H W
E X
C W
EX HB
P09
F L O
O R S
L O
P E
EX 2" HW
EX 1" HWC
EX 1" HWC
F L O
O R S
L O
P E
P08 P25
P28
2" HWC
EX 4" CW
3" HW
H W
C
P31
EX
EX
EX CW
EX
EX
EX
EX
EX
EX
2" HWC
3" HW
NEW PIPING SHALL BE
MOUNTED WITH
BOTTOM OF PIPE NO
LOWER THAN 2' AFF.
MIN. 3" BETWEEN PIPE
INSULATION AND WALL AND
BETWEEN PIPE INSULATION ON
THE (2) MAINS TO ALLOW
SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE
CONNECTIONS.
MIN. 12" TO ALLOW SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE CONNECTIONS
P28
7'-0"
PROVIDE ANVIL
WALL MOUNTED
WELDED STEEL
BRACKET WITH
GALVANIZED
COATING OR
ENGINEER PRE-
APPROVED EQUAL.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING
PLAN - AT POWERHOUSE
P100.1
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/4" = 1'-0"
TUNNEL PLUMBING PLAN - AT POWERHOUSE
KEY PLAN
POWERHOUSE TUNNEL
REFERENCED NOTES
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P25 ADJUST BALANCING VALVE TO ACHIEVE A FLOW RATE OF 4 GPM.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
1" = 1'-0"
TUNNEL SECTION 1
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
POWER
PLANT
P100.2A
P100.0A
H W
E X
C W
EX HB
P09
F L O
O R S
L O
P E
EX 2" HW
EX 1" HWC
EX 1" HWC
F L O
O R S
L O
P E
P28
EX 4" CW
3" HW
P100.1A
P25 P08
H W
C
P31
EX
EX
EX CW
EX
EX
EX
EX
EX
EX
3" HWC
3" HW
NEW PIPING SHALL BE
MOUNTED WITH
BOTTOM OF PIPE NO
LOWER THAN 2' AFF.
MIN. 3" BETWEEN PIPE
INSULATION AND WALL AND
BETWEEN PIPE INSULATION ON
THE (2) MAINS TO ALLOW
SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE
CONNECTIONS.
MIN. 12" TO ALLOW SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE CONNECTIONS
P28
7'-0"
PROVIDE ANVIL
WALL MOUNTED
WELDED STEEL
BRACKET WITH
GALVANIZED
COATING OR
ENGINEER PRE-
APPROVED EQUAL.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING
PLAN - AT POWERHOUSE
- ALTERNATE 1
P100.1A
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.29
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/4" = 1'-0"
TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1
KEY PLAN
POWERHOUSE TUNNEL
REFERENCED NOTES
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P25 ADJUST BALANCING VALVE TO ACHIEVE A FLOW RATE OF 4 GPM.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
1" = 1'-0"
TUNNEL SECTION 1 - ALTERNATE 1
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .