RFB950200-01 MPCF Hot & Cold Water Main - Addendum No. 1.pdf
PDF 12 MB Posted
- Attached to
- MPCF Hot & Cold Water Main Replacement
- Solicitation number
- RFB950200-01
- Issued by
- Harrison County, Iowa
About this file
Addendum No. 1 to Request for Bids 950200-01: MPCF Hot & Cold Water Main Replacement
This addendum, issued by the Iowa Department of Administrative Services on February 20, 2026, modifies the bidding documents for the Mt. Pleasant Correctional Facility hot and cold water main replacement project. The project involves replacement of domestic water mains throughout the facility, including work in the main building, powerhouse, connecting tunnels, and east and west wings. The addendum provides revisions to specifications and construction drawings related to pipe hangers and supports, plumbing demolition plans, tunnel plumbing plans, east wing plumbing plans, plumbing details and schedules, electrical demolition plans, and powerhouse electrical plans. Key revisions include clarifications on existing concrete thrust block locations with required piping offsets, new wall penetration requirements for block walls, piping routing around existing electrical junction boxes and sanitary sewer risers, switchgear clearance requirements, and a new tunnel north section floor support detail for north-south oriented piping. The addendum references supplemental drawings for additional details and revisions to multiple referenced notes (P34, P35, P36, P37, P38, and P39) that clarify scope intent and provide specific installation requirements. Bids are due February 25, 2026, at 3:00 pm, with the pre-bid conference having been held on February 12, 2026.
The addendum incorporates revisions to Specification Section 22 0529 (Hangers and Supports for Plumbing and Equipment) and includes detailed requirements for pipe support systems, hanger rod sizing based on pipe diameter, PEX-A support requirements with specific spacing intervals, and sleeves for pipes penetrating walls and floors. The specifications require stainless steel hangers and supports in the tunnel environment and establish fixed point requirements for hot water piping systems based on straight run length, with no fixed points required for runs under 63 feet, one fixed point for 64-128 feet, and additional fixed points for longer runs spaced no more than 64 feet apart. Material specifications include manufacturers such as Anvil International and Tolco/Cooper B-Line for pipe hangers and supports, with fire-rated sleeve assemblies required for pipes penetrating fire-rated walls and floors. The contract includes a base bid for welded stainless steel piping for hot water and recirculation mains with grooved stainless steel for cold water mains, and Alternate 1 provides an option for PEX-A piping with elastomeric foam insulation. Construction is anticipated from April 2026 through August 2026, with a 30-day closeout period in September 2026.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 for RFB 950200-01
Project Name: MPCF Water Main Replacement
RFB #: 950200-01
DAS Project #: 9502.00
Date: 2/20/2026
Bid Due: February 25th, 2026 at 3:00 pm
Addendum No. 1 Items:
1. See MODUS Engineering Addendum #1
a. Revision to Specification Section 22 0529 – Hanger and Supports for Plumbing and Equipment
b. Revision to PD101.2 East Wing Plumbing Demolition Plan
c. Revision to P100.1 – Tunnel Plumbing Plan – at Powerhouse
d. Revision to P100.1A – Tunnel Plumbing Plan – at Powerhouse – Alternate 1
e. Revision to P100.2 – Tunnel Plumbing Plan – Central
f. Revision to P100.2A – Tunnel Plumbing plan – Central – Alternate 1
g. Revision to P100.3 – Tunnel Plumbing Plan – At Main Building
h. Revision to P100.3A – Tunnel Plumbing Plan – At Main Building – Alternate 1
i. Revision to P101.2 East Wing Plumbing Plan
j. Revision to P101.2A – East Wing Plumbing Plan – Alternate 1
k. Revision to P501 Plumbing Details and Schedules
l. Revision to ED101.0 Prison Facility Electrical Demolition Plans
m. Revision to E100.0 Powerhouse Electrical Plans
2. See attached Meeting Minutes & Sign-in Sheet from February 12th Pre-Bid Meeting.
END OF ADDENDUM
Addendum #1
Note
Mount Pleasant Correctional Facility
Project: Hot and Cold Water Main Replacement Project Number: 25-182 Date: February 19, 2026
This addendum has been issued to modify and/or interpret the bidding documents, including the drawings and specifications. Unless otherwise instructed, the information contained on the addendum shall take precedence over anything contrary on the original bidding documents and shall be hereinafter considered as a part of the bidding documents.
Specifications
Section 22 0529 – Hanger and Supports for Plumbing and Equipment
1. REVISE entire specification section.
Plans
PD101.2 - EAST WING PLUMBING DEMOLITION PLAN
• VIEW 1 - EAST WING PLUMBING DEMOLITION PLAN
1. CLARIFY room layout and location of existing switchgear in MECHANICAL/ELECTRICAL E022.
2. REVISE demolition scope in MECHANICAL/ELECTRICAL E022. Refer to supplemental drawings for additional details.
P100.1 - TUNNEL PLUMBING PLAN - AT POWERHOUSE
• REFERENCED NOTES
1. ADD Referenced Note P34 to read: OFFSET PIPING AROUND EXISTING CONCRETE THRUST BLOCK IN THIS AREA. TO MAINTAIN EXISTING WALKWAY, PIPING SHALL NOT EXTEND WEST BEYOND WEST FACE
OF THRUST BLOCK.
• VIEW 1 - TUNNEL PLUMBING PLAN - AT POWERHOUSE
1. CLARIFY location of existing concrete thrust block. Refer to supplemental drawings for location.
2. ADD required offsets to accommodate existing concrete thrust block. Refer to supplemental drawings for additional details.
3. ADD Referenced Note P34. Refer to supplemental drawings for location.
• VIEW 2 - TUNNEL SECTION 1
1. CLARIFY location of existing concrete thrust block. Refer to supplemental drawings for location.
2. ADD required offsets to accommodate existing concrete thrust block. Refer to supplemental drawings for additional details.
3. ADD Referenced Note P34. Refer to supplemental drawings for location.
4. REVISE text note to read: MIN. 12" TO ALLOW SPACE FOR MAINTENANCE ACTIVITIES AND FUTURE
CONNECTIONS EXCEPT WHERE OFFSETS ARE SHOWN AROUND OBSTACLES.
R E
E N I
G
NELANO
I S
S E
F O
R P
E H
SE
L.
RE
G O
R
16314
D
ES
NECI
L
O W A
I
T
R
Roger T. Lesher
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. My license renewal date is December 31, 2027.
Date
Drawings:See sheet index
Specification Div. 21,22,23,26,27,28
Pages or sheets covered by this seal:
22, 26
02/19/2026
P100.1A - TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1
1. ADD Referenced Note P34 to read: OFFSET PIPING AROUND EXISTING CONCRETE THRUST BLOCK IN
THIS AREA. TO MAINTAIN EXISTING WALKWAY, PIPING SHALL NOT EXTEND WEST BEYOND WEST FACE
OF THRUST BLOCK.
• VIEW 1 - TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1
1. CLARIFY location of existing concrete thrust block. Refer to supplemental drawings for location.
2. ADD required offsets to accommodate existing concrete thrust block. Refer to supplemental drawings for additional details.
3. ADD Referenced Note P34. Refer to supplemental drawings for location.
• VIEW 2 - TUNNEL SECTION 1 - ALTERNATE 1
1. CLARIFY location of existing concrete thrust block. Refer to supplemental drawings for location.
2. ADD required offsets to accommodate existing concrete thrust block. Refer to supplemental drawings for additional details.
3. ADD Referenced Note P34. Refer to supplemental drawings for location.
4. REVISE text note to read: MIN. 12" TO ALLOW SPACE FOR MAINTENANCE ACTIVITIES AND FUTURE
P100.2 - TUNNEL PLUMBING PLAN - CENTRAL
1. ADD Referenced Note 35 to read: PROVIDE NEW PENETRATIONS IN EXISTING BLOCK WALL IN THIS
LOCATION. OFFSET PIPING TO STACK VERTICALLY AS REQUIRED.
• VIEW 1 - TUNNEL PLUMBING PLAN - CENTRAL
1. ADD required offsets to accommodate penetrations in existing block wall. Refer to supplemental drawings for additional details.
2. ADD Referenced Note P35. Refer to supplemental drawings for location.
• VIEW 2 - TUNNEL SECTION 2
1. ADD required offsets to accommodate penetrations in existing block wall. Refer to supplemental drawings for additional details.
2. ADD Referenced Note P35. Refer to supplemental drawings for location.
3. REVISE text note to read: MIN. 12" TO ALLOW SPACE FOR MAINTENANCE ACTIVITIES AND FUTURE
P100.2A - TUNNEL PLUMBING PLAN - CENTRAL - ALTERNATE 1
1. ADD Referenced Note 35 to read: PROVIDE NEW PENETRATIONS IN EXISTING BLOCK WALL IN THIS
LOCATION. OFFSET PIPING TO STACK VERTICALLY AS REQUIRED.
• VIEW 1 - TUNNEL PLUMBING PLAN - CENTRAL - ALTERNATE 1
1. ADD required offsets to accommodate penetrations in existing block wall. Refer to supplemental drawings for additional details.
2. ADD Referenced Note P35. Refer to supplemental drawings for location.
• VIEW 2 - TUNNEL SECTION 2 - ALTERNATE 1
1. ADD required offsets to accommodate penetrations in existing block wall. Refer to supplemental drawings for additional details.
2. ADD Referenced Note P35. Refer to supplemental drawings for location.
3. REVISE text note to read: MIN. 12" TO ALLOW SPACE FOR MAINTENANCE ACTIVITIES AND FUTURE
P100.3 - TUNNEL PLUMBING PLAN - AT MAIN BUILDING
1. REVISE Referenced Note P16 to read: OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY
TO MAINTAIN ACCESS AND CLEARANCE FOR ELECTRICAL JUNCTION BOXES AND MAXIMIZE
ACCESSIBILITY FROM SIDE TUNNEL STAIRWAY. PIPING SHOULD STAY AS CLOSE TO EAST WALL AND
TUNNEL CEILING AS POSSIBLE.
2. REVISE Referenced Note P17 to read: COORDINATE NEW HOT WATER AND HOT WATER
RECIRCULATION MAIN ROUTING WITH EXISTING PIPING AND ELECTRICAL JUNCTION BOXES IN THIS AREA AND OFFSET AS NECESSARY TO ROUTE AS TIGHT TO TUNNEL CEILING AND SOUTH WALL OF
EAST-WEST TUNNEL OFF-SHOOTS AS POSSIBLE WHILE MAINTAINING ACCESS AND CLEARANCE FOR
EXISTING EQUIPMENT.
3. ADD Referenced Note 36 to read: OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY TO
MAINTAIN ACCESS AND CLEARANCE FOR ELECTRICAL JUNCTION BOXES. PIPING SHOULD STAY AS
CLOSE TO EAST WALL AND TUNNEL CEILING AS POSSIBLE.
4. ADD Referenced Note 37 to read: OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY TO
AVOID SANITARY SEWER RISER IN THIS LOCATION. PIPING SHOULD STAY AS CLOSE TO EAST WALL
AND TUNNEL CEILING AS POSSIBLE.
5. ADD Referenced Note 39 to read: NEW NORTH-SOUTH ORIENTED PIPING NORTH OF THIS POINT SHALL
BE SUPPORTED USING FLOOR SUPPORTS PER TUNNEL NORTH SECTION FLOOR SUPPORT DETAIL.
SUPPORTS SHALL BE SPACED PER CODE REQUIREMENTS AND COORDINATED WITH EXISTING
ELECTRICAL CONDUIT AND JUNCTION BOXES.
• VIEW 1 - TUNNEL PLUMBING PLAN - CENTRAL
1. REVISE extents of offset around kitchen tunnel stairway to accommodate existing junction boxes. Refer to supplemental drawings for additional details.
2. ADD Referenced Note P39. Refer to supplemental drawings for location.
3. ADD piping offsets to accommodate existing electrical junction boxes and sanitary sewer piping along east wall of tunnel. Refer to supplemental drawings for additional details.
4. ADD Referenced Note P36. Refer to supplemental drawings for location.
5. ADD Referenced Note P37. Refer to supplemental drawings for location.
6. CLARIFY routing intent in East-West tunnel offshoots. Refer to supplemental drawings for additional details.
P100.3A - TUNNEL PLUMBING PLAN - AT MAIN BUILDING - ALTERNATE 1
1. REVISE Referenced Note P16 to read: OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY
TO MAINTAIN ACCESS AND CLEARANCE FOR ELECTRICAL JUNCTION BOXES AND MAXIMIZE
ACCESSIBILITY FROM SIDE TUNNEL STAIRWAY. PIPING SHOULD STAY AS CLOSE TO EAST WALL AND
TUNNEL CEILING AS POSSIBLE.
2. REVISE Referenced Note P17 to read: COORDINATE NEW HOT WATER AND HOT WATER RECIRCULATION MAIN ROUTING WITH EXISTING PIPING AND ELECTRICAL JUNCTION BOXES IN THIS
AREA AND OFFSET AS NECESSARY TO ROUTE AS TIGHT TO TUNNEL CEILING AND SOUTH WALL OF
EAST-WEST TUNNEL OFF-SHOOTS AS POSSIBLE WHILE MAINTAINING ACCESS AND CLEARANCE FOR
EXISTING EQUIPMENT.
3. ADD Referenced Note 36 to read: OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY TO MAINTAIN ACCESS AND CLEARANCE FOR ELECTRICAL JUNCTION BOXES. PIPING SHOULD STAY AS
CLOSE TO EAST WALL AND TUNNEL CEILING AS POSSIBLE.
4. ADD Referenced Note 37 to read: OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY TO
AVOID SANITARY SEWER RISER IN THIS LOCATION. PIPING SHOULD STAY AS CLOSE TO EAST WALL
AND TUNNEL CEILING AS POSSIBLE.
5. ADD Referenced Note 39 to read: NEW NORTH-SOUTH ORIENTED PIPING NORTH OF THIS POINT SHALL
BE SUPPORTED USING FLOOR SUPPORTS PER TUNNEL NORTH SECTION FLOOR SUPPORT DETAIL.
SUPPORTS SHALL BE SPACED PER CODE REQUIREMENTS AND COORDINATED WITH EXISTING
ELECTRICAL CONDUIT AND JUNCTION BOXES.
• VIEW 1 - TUNNEL PLUMBING PLAN - CENTRAL - ALTERNATE 1
1. REVISE extents of offset around kitchen tunnel stairway to accommodate existing junction boxes. Refer to supplemental drawings for additional details.
2. ADD Referenced Note P39. Refer to supplemental drawings for location.
3. ADD piping offsets to accommodate existing electrical junction boxes and sanitary sewer piping along east wall of tunnel. Refer to supplemental drawings for additional details.
4. ADD Referenced Note P36. Refer to supplemental drawings for location.
5. ADD Referenced Note P37. Refer to supplemental drawings for location.
6. CLARIFY routing intent in East-West tunnel offshoots. Refer to supplemental drawings for additional details.
P101.2 - EAST WING PLUMBING PLAN
1. ADD Referenced Note 38 to read: OFFSET PIPING IN THIS LOCATION TO MAINTAIN CODE REQUIRED CLEARANCE AROUND EXISTING SWTCHGEAR AND COORDINATE WITH EXISTING BEAM ORIENTED EAST-
WEST AT APPROX. 8'0" AFF. PROVIDE 3/4" DRAIN WITH BALL VALVE AND HOSE CONNECTION ON
WEST-MOST VERTICAL OFFSET.
• VIEW 1 - EAST WING PLUMBING PLAN
1. CLARIFY piping entrance from tunnel to accommodate clarification on Sheet P100.3. Refer to supplemental drawings for additional details.
2. REMOVE main domestic hot water and cold water drains in STORAGE E027. Refer to supplemental drawings for additional details.
3. CLARIFY existing conditions and switch gear location in MECHANICAL ELECTRICAL E022. Refer to supplemental drawings for additional details.
4. ADD piping offsets to accommodate existing electrical switchgear and structural beam in MECHANICAL/ELECTRICAL E022. Refer to supplemental drawings for additional details.
5. ADD Referenced Note P38. Refer to supplemental drawings for location.
6. REVISE domestic cold water branch connection in MECHANICAL/ELECTRICAL E022. Refer to supplemental drawings for additional details.
P101.2A - EAST WING PLUMBING PLAN - ALTERNATE 1
1. ADD Referenced Note 38 to read: OFFSET PIPING IN THIS LOCATION TO MAINTAIN CODE REQUIRED
CLEARANCE AROUND EXISTING SWTCHGEAR AND COORDINATE WITH EXISTING BEAM ORIENTED EAST- WEST AT APPROX. 8'0" AFF. PROVIDE 3/4" DRAIN WITH BALL VALVE AND HOSE CONNECTION ON
WEST-MOST VERTICAL OFFSET.
• VIEW 1 - EAST WING PLUMBING PLAN - ALTERNATE 1
1. CLARIFY piping entrance from tunnel to accommodate clarification on Sheet P100.3. Refer to supplemental drawings for additional details.
2. REMOVE main domestic hot water and cold water drains in STORAGE E027. Refer to supplemental drawings for additional details.
3. CLARIFY existing conditions and switch gear location in MECHANICAL ELECTRICAL E022. Refer to supplemental drawings for additional details.
4. ADD piping offsets to accommodate existing electrical switchgear and structural beam in
MECHANICAL/ELECTRICAL E022. Refer to supplemental drawings for additional details.
5. ADD Referenced Note P38. Refer to supplemental drawings for location.
6. REVISE domestic cold water branch connection in MECHANICAL/ELECTRICAL E022. Refer to supplemental drawings for additional details.
P501 - PLUMBING DETAILS AND SCHEDULES
• VIEW 1 - TUNNEL NORTH SECTION PIPE FLOOR SUPPORT DETAIL
1. ADD detail in its entirety. Refer to supplemental drawings for additional details.
ED101.0 - PRISON FACILITY ELECTRICAL DEMOLITION PLANS
1. REVISE Referenced Note ED02 to read: REMOVE EXISTING WIRING, CONDUIT, AND ELECTRICAL
ACCESSORIES STRICTLY SERVING EXISTING PUMP BACK TO PANEL. IF CIRCUIT IS FOUND TO SERVE
OTHER EXISTING EQUIPMENT, REMOVAL EXTENTS SHALL BE BACK TO JUNCTION BOX SERVING
EXISTING EQUIPMENT TO REMAIN. CIRCUIT DIRECTORY SHALL BE UPDATED WITH CONNECTED
EQUIPMENT OR LABELED AS SPARE PER FINAL PROJECT CONDITIONS.
2. REVISE Referenced Note ED03 to read: REMOVE EXISTING WIRING, CONDUIT, AND ELECTRICAL
ACCESSORIES SERVING EXISTING PUMP BACK TO SWITCH HOUSING MOUNTED TO CEILING. REMOVE
SWITCH DEVICE, CAP EXISTING WIRING WITHIN REMAINING HOUSING, AND PROVIDE BLANK COVER
PLATE WITH LABEL TO DENOTE CIRCUIT AND PANEL THAT FEED WIRING.
3. REVISE Referenced Note ED04 to read: REMOVE EXISTING WIRING, CONDUIT, AND ELECTRICAL ACCESSORIES SERVING EXISTING PUMP BACK TO JUNCTION BOX SERVING EXISTING EQUIPMENT TO
REMAIN. CIRCUIT DIRECTORY SHALL BE UPDATED WITH CONNECTED EQUIPMENT OR LABELED AS
SPARE PER FINAL PROJECT CONDITIONS.
• WEST WING ELECTRICAL DEMOLITION PLAN
1. REVISE Referenced Note in MECH/ELECT. W017 to be ED02 Refer to supplemental drawings for location.
2. CLARIFY scope intent within MECH/ELECT. W017. Refer to supplemental drawings for additional details.
3. REVISE Referenced Note in MECH 119 to be ED03. Refer to supplemental drawings for location.
4. CLARIFY scope intent within MECH 119. Refer to supplemental drawings for additional details.
• EAST WING ELECTRICAL DEMOLITION PLAN
1. REVISE Referenced Note in MECH E030 to be ED04. Refer to supplemental drawings for location.
2. CLARIFY scope intent within MECH E030. Refer to supplemental drawings for additional details.
3. CLARIFY location of EX EAST WING EM PANEL serving existing condensate pump. Refer to supplemental drawings for location.
4. REVISE Referenced Note in CONFERENCE E021 to be ED02. Refer to supplemental drawings for location.
5. CLARIFY scope intent within CONFERENCE E021 and MECHANICAL/ELECTRICAL E022. Refer to supplemental drawings for additional details.
E100.0 POWERHOUSE ELECTRICAL PLANS
1. REVISE Referenced Note E01 to read: CONNECT NEW ECM RECIRCULATION PUMP WITH INTEGRAL MOTOR STARTER TO EXISTING CIRCUIT SERVING REMOVED PUMP. PROVIDE NEW DISCONNECT AND
COORDINATE WITH OWNER, NEW PUMP LOCATION, AND EXISTING CONDITIONS FOR FINAL
DISCONNECT LOCATION.
2. REVISE Referenced Note ED01 to read: REMOVE WIRING, CONDUIT, AND ELECTRICAL ACCESSORIES, INCLUDING LOCAL DISCONNECT SERVING EXISTING PUMP BACK AS NECESSARY TO MAKE
CONNECTIONS SHOWN IN NEW WORK.
• VIEW 1 BOILER ROOM ELECTRICAL DEMOLITION PLANS
1. REVISE view name to be: BOILER ROOM ELECTRICAL PLAN.
2. CLARIFY location of EX EM PANEL 1 serving existing pump to be removed. Refer to supplemental drawings for location.
3. CLARIFY existing panel EX P1 does not exist.
4. CLARIFY location of existing disconnect serving existing pump to be removed. Refer to supplemental drawings for location.
5. REVISE Referenced Note at pump to be ED01. Refer to supplemental drawings for location.
• VIEW 2 BOILER ROOM ELECTRICAL PLAN
1. REVISE view name to be: BOILER ROOM ELECTRICAL DEMOLITION PLAN.
2. CLARIFY location of EX EM PANEL 1 serving existing pump to be removed. Refer to supplemental drawings for location.
3. CLARIFY existing panel EX P1 does not exist.
4. CLARIFY existing pump circuit details to be: 208V-3P/15A EX EM PANEL 1-7,9,11.
Vendor Approval
No Vendor approvals are included in this addendum.
Attachments
Section 23 0529 – Hanger and Supports for Plumbing and Equipment… (8.5 x 11); PD101.2 - EAST WING PLUMBING
DEMOLITION PLAN.pdf; P100.1 - TUNNEL PLUMBING PLAN - AT POWERHOUSE.pdf; P100.1A - TUNNEL PLUMBING PLAN -
AT POWERHOUSE - ALTERNATE 1.pdf; P100.2 - TUNNEL PLUMBING PLAN - CENTRAL.pdf; P100.2A - TUNNEL PLUMBING
PLAN - CENTRAL - ALTERNATE 1.pdf; P100.3 - TUNNEL PLUMBING PLAN - AT MAIN BUILDING.pdf; P100.3A - TUNNEL
PLUMBING PLAN - AT MAIN BUILDING - ALTERNATE 1.pdf; P101.2 - EAST WING PLUMBING PLAN.pdf; P101.2A - EAST
WING PLUMBING PLAN - ALTERNATE 1.pdf; P501 - PLUMBING DETAILS AND SCHEDULES.pdf; ED101.0 - PRISON FACILITY
ELECTRICAL DEMOLITION PLANS.pdf; E100.0 POWERHOUSE ELECTRICAL PLANS.pdf
Total Pages…23
Project 9502.00 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT (ADDENDUM #1) 22 0529 - 1
SECTION 22 0529
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT (ADDENDUM #1)
PPART 1 GENERAL
1.01 SECTION INCLUDES
A. Pipe hangers and supports B. Accessories C. Sleeves
1.02 RELATED SECTIONS
A. Specification Section 22 0548 - Vibration and Seismic Controls for Plumbing Piping and
Equipment B. Specification Section 22 1116 - Domestic Water Piping
1.03 REFERENCES
A. ASME B31.9 - Building Services Piping B. ASTM F708 - Design and Installation of Rigid Pipe Hangers C. MSS SP58 - Pipe Hangers and Supports - Materials, Design and Manufacturer D. MSS SP69 - Pipe Hangers and Supports - Selection and Application E. MSS SP89 - Pipe Hangers and Supports - Fabrication and Installation Practices
1.04 SUBMITTALS
A. All submitted documents shall be:
1. Digital (scanned documents are not acceptable)
2. Current, within last 5 years
3. Complete and in sufficient detail to allow ready determination of compliance with contract documents
4. Have options clearly indicated as applicable to each submittal
B. Construction submittal
1. Provide (1) submittal including all products listed in this specification section.
Provide the following for each product.
a. Product Data
b. Design Data, indicating load capacity of hangers
1.05 REGULATORY REQUIREMENTS
A. Conform to applicable code for support of piping.
PART 2 PRODUCTS
2.01 PIPE HANGERS AND SUPPORTS
A. Manufacturers:
1. Anvil International
2. Tolco/Cooper B-Line
3. Engineer pre-approved equal.
B. Plumbing Piping - Water:
1. Conform to ASME B31.9; ASTM F708.
2. Hangers for Pipe Sizes 1/2 Inch to 1-1/2 Inches: Carbon steel adjustable swivel, split ring. Anvil International Figure 104.
3. Hangers for Cold Pipe Sizes 2 Inch and Over: Carbon steel, adjustable, clevis.
4. Hangers for Hot Pipe Sizes 2 Inch to 4 Inch: Carbon steel, adjustable, clevis.
EQUIPMENT (ADDENDUM #1) 22 0529 - 2
5. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.
6. Wall Support for Pipe Sizes to 3 Inches: Welded steel bracket with galvanized coating.
7. Wall Support for Pipe Sizes 4 Inches Over: Welded steel bracket and wrought steel clamp.
8. Vertical Support: Steel riser clamp.
9. Floor Support for Cold Pipe: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
10. Floor Support for Hot Pipe Sizes to 4 Inches: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.
11. Provide stainless steel hangers and supports in tunnel.
C. PEX-A Support Requirements:
1. Support PEX piping per requirements of the 2024 Uniform plumbing code, the manufacturer's recommendations, and these specifications.
2. Provide PEX-A pipe support channel and strapping every 3 feet for all main piping
2" and above.
3. Provide split ring clamps spaced per PEX-A hanger schedule on piping mains conveying fluids above ambient temperature.
4. Provide fixed points per detail on drawings and spaced per PEX-A hanger schedule on piping mains conveying fluids above ambient temperature.
2.02 ACCESSORIES
A. Hanger Rods: Mild steel threaded both ends, threaded one end or continuous threaded.
2.03 SLEEVES
A. Sleeves for pipes through wall below grade shall be Schedule 40, two pipe diameters larger than pipe. Seal with Linkseal.
B. Sleeves for pipes through non-fire rated beams, walls, footings, and potentially wet floors shall be Schedule 40 steel pipe or 18 gauge galvanized steel.
C. Sleeves for pipes through fire rated and fire resistive floors and walls, and fire proofing to be a fire rated sleeve assembly including seals, UL listed.
D. Stuffing and Firestopping Insulation: Fiberglass type, non-combustible per UL tested assembly type.
E. Sealant Manufacturers:
1. Dow Corning Silicone RTV Foam.
2. 3-M Fire Barrier Caulk and Putty.
3. Thomas & Betts Flame Safe Fire Stop System.
4. Engineer approved equal.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install in accordance with manufacturer's instructions.
3.02 PIPE HANGERS AND SUPPORTS
A. Support horizontal piping as scheduled.
B. Install hangers to provide minimum 1/2 inch space between finished covering and adjacent work.
C. Place hangers within 12 inch of each horizontal elbow.
EQUIPMENT (ADDENDUM #1) 22 0529 - 3
D. Use hangers with 1-1/2 inch minimum vertical adjustment.
E. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers.
F. Support riser piping independently of connected horizontal piping.
G. Design hangers for pipe movement without disengagement of supported pipe.
3.03 SLEEVES
A. Set sleeves in position in formwork. Provide reinforcing around sleeves.
B. Size sleeves large enough to allow for movement due to expansion and contraction.
Provide for continuous insulation wrapping.
C. Provide sleeves where piping penetrates floor, ceiling or wall. Close off space between pipe and adjacent work with fire stopping insulation and caulk.
D. Provide close fitting metal collar or escutcheon covers at both sides of penetration.
Install chrome plated steel escutcheons at finished surfaces and within cabinets.
3.04 SCHEDULES
METALLIC PIPING HANGER ROD DIAMETER SCHEDULE
HANGER ROD PIPE SIZE
(INCHES)
ROD DIAMETER
(INCHES)
1/2 to 2 3/8
2-1/2 to 3 1/2 4 to 6 5/8
PEX-A HANGER SCHEDULE
STANDARD HANGER PIPE
SIZE (INCHES)
MAX. HANGER SPACING
(FEET)
ROD DIAMETER
(INCHES)
1/2-1 2.67 (32 INCHES) 3/8
1-1/4-4 4 1/2
PEX-A CONVEYING FLUIDS ABOVE AMBIENT TEMMPERATURE
SPLIT RING CLAMP PIZE
SIZE
(INCHES)
MAX CLAMP SPACING
(FEET)
ROD DIAMETER
(INCHES)
2 AND ABOVE 30 1/2
LENGTH OF STRAIGHT RUN NUMBER OF FIXED
POINTS FIXED POINT LOCATION(S)
0-63 FEET 0 N/A
64-128 FEET 1
CLOSEST SUPPORT WITH
CLAMPS TO
CENTERCLOSEST
129-192 FEET 2 NO MORE THAN 64 FEET
APART
193+ FEET
3 (+1 FOR EVERY
ADDITIONAL 64 FEET OF
STRAIGHT RUN)
NO MORE THAN 64 FEET
APART
EQUIPMENT (ADDENDUM #1) 22 0529 - 4
END OF SECTION
33 34 35 36 37 38 39 40 41 42
ER CP
ER 3" HW
ER 1" HWC
ER 4" CW
ER 3" HW
ER 1" HWC
ER 4" CW
ER 3" HW
ER 1" HWC
ER 4" CW
ER 3" HW
ER 1" HWC
ER 4" CW
PD08
STORAGE
E027
STORAGE
E028
STORAGE
E029
MECH
E030
ELEV NO. 4
STAIR #9
CORRIDOR
E019
STAIR #10
E026
MECHANICAL/ELECTRICAL
E022
CONFERENCE
E021
ELEVATOR #5
E STAIR #11
E020
TOILET
E018
STORAGE
E016
STORAGE
E016
VOC. ED.
E013
VOC. ED.
E011
TOILET
E009
TOILET
E008
STORAGE
E007
VOC. ED.
E005
TOILET
E006
STORAGE
E004
CORR.
E010
VOC. ED.
E002
STAIR #12
E001
UNEXCAVATED
E000
STORAGE
E023
CORR.
E024
PD04
PD04 PD04 PD04
PD04 PD04 PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
E R
C W
ER CP
ER 3" CW
ER 1" HWC
EX 1/2" HWC
EX 3/4" CW
EX 2" CW
EX 1" HW
EX 1/2" HWC
EX 1" HWC
EX 3/4" HW
EX 2" CW
EX 3/4" HW
EX 2" CW
EX 1" HW
EX 3/4" CW
EX 3/4" CW
EX 3/4" HW
EX 3/4" HW
EX 1" CW
PD12
PD11
PD04
PD12
PD12
PD11
PD12
PD12
PD12
P D
.3
PD15
EX SG
ADD
ADD
DEMOLITION GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
D. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
E. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
F. DEMOLITION DRAWINGS ARE BASED ON EXISTING AVAILABLE DRAWINGS
AND CASUAL FIELD OBSERVATION. MECHANICAL AND ELECTRICAL
CONTRACTORS SHALL FIELD VERIFY THE SITE AND INCLUDE ALL REQUIRED
DEMOLITION IN THE BID.
G. ALL REQUIRED DEMOLITION IS NOT INDICATED. IT IS THE INTENT OF THESE
DOCUMENTS THAT ALL DOMESTIC HOT, COLD, AND RECIRCULATION WATER
PIPING AND ACCESSORIES (NOT TO BE REUSED OR EXTENDED) BE REMOVED.
H. REFER TO SPECIFICATIONS AND OTHER SHEETS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
I. REMOVE ALL ELECTRICAL CONNECTIONS, WIRING, AND CONDUIT SERVING
ALL PLUMBING EQUIPMENT TO BE REMOVED.
J. EXISTING PLUMBING SYSTEMS LOCATED IN WALLS AND CHASES NOT BEING
REMOVED OR REUSED FOR NEW SYSTEMS MAY BE ABANDONED IN PLACE.
CAP AT MAINS OR IN A CONCEALED LOCATION IF REQUIRED.
K. CONTRACTOR SHALL PATCH ALL PENETRATIONS ABANDONED TO MATCH
EXISTING CONSTRUCTION REGARDLESS OF EACH INSTANCE BEING INCLUDED
ON PLANS.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
EAST WING PLUMBING
DEMOLITION PLAN
PD101.2
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.27
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
EAST WING PLUMBING DEMOLITION PLAN
KEY PLAN
EAST
REFERENCED NOTES
PD04 REMOVE PORTIONS OF BRANCH LINES FROM THE MAINS AS SHOWN.
ASSOCIATED ISOLATION VALVES, IF PRESENT, SHALL BE REMOVED. ASSUME
5 LINEAL FEET OF PIPING DEMOLITION PER BRANCH LINE FOR BIDDING
PURPOSES. REFER TO NEW WORK PLANS FOR NEW CONNECTIONS TO THE
EXISTING TO REMAIN PORTIONS OF THE BRANCH LINES.
PD08 REMOVE EXISTING 4" WATER SERVICE ENTRANCE PIPING FROM MAIN IN
THE BUILDING TO JUST UPSTREAM OF THE MOST UPSTREAM ISOLATION
VALVE IN THE SERVICE ENTRANCE LINE. PRESSURE REDUCING STATION
SHALL BE REMOVED. REFER TO NEW WORK PLANS FOR REPLACEMENT
PIPING.
PD11 REMOVE EXISTING HOT WATER RECIRCULATION PUMP, ASSOCIATED PIPING,
POWER, AND CONTROLS.
PD12 PATCH EXISTING BLOCK WALL WHERE EXISTING PIPING IS REMOVED.
PD15 REMOVE ALL EXISTING DOMESTIC COLD WATER, HOT WATER, AND HOT
WATER RECIRCULATION MAIN PIPING IN THIS AREA TO BE REPLACED IN
NEW WORK. REFER TO SPECIFICATION 22 0050 FOR PHASING INTENT.
REVISION SCHEDULE
DESCRIPTION DATE NO.
ADDENDUM 1 2026.02.19 1
GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
POWER
PLANT
P100.2
P100.1
P100.0
H W
E X
C W
EX HB
P09
F L O
O R S
L O
P E
EX 2" HW
EX 1" HWC
EX 1" HWC
F L O
O R S
L O
P E
P08 P25
P28
2" HWC
EX 4" CW
3" HW
H W
C
P31
P34
ADD
EX
EX
EX CW
EX
EX
EX
EX
EX
EX
2" HWC
3" HW
NEW PIPING SHALL BE
MOUNTED WITH
BOTTOM OF PIPE NO
LOWER THAN 2' AFF.
MIN. 3" BETWEEN PIPE
INSULATION AND WALL AND
BETWEEN PIPE INSULATION ON
THE (2) MAINS TO ALLOW
SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE
CONNECTIONS.
MIN. 12" TO ALLOW SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE CONNECTIONS
EXCEPT WHERE OFFSETS ARE SHOWN AROUND
OBSTACLES.
P28
7'-0"
PROVIDE ANVIL
WALL MOUNTED
WELDED STEEL
BRACKET WITH
GALVANIZED
COATING OR
ENGINEER PRE-
APPROVED EQUAL.
P34
ADD
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING PLAN
- AT POWERHOUSE
P100.1
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.27
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/4" = 1'-0"
TUNNEL PLUMBING PLAN - AT POWERHOUSE
KEY PLAN
POWERHOUSE TUNNEL
REFERENCED NOTES
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P25 ADJUST BALANCING VALVE TO ACHIEVE A FLOW RATE OF 4 GPM.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
P34 OFFSET PIPING AROUND EXISTING CONCRETE THRUST BLOCK IN THIS AREA.
TO MAINTAIN EXISTING WALKWAY, PIPING SHALL NOT EXTEND WEST
BEYOND WEST FACE OF THRUST BLOCK.
1" = 1'-0"
TUNNEL SECTION 1
ADD
REVISION SCHEDULE
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
POWER
PLANT
P100.2A
P100.0A
H W
E X
C W
EX HB
P09
F L O
O R S
L O
P E
EX 2" HW
EX 1" HWC
EX 1" HWC
F L O
O R S
L O
P E
P28
EX 4" CW
3" HW
P100.1A
P25 P08
H W
C
P31
P34
ADD
EX
EX
EX CW
EX
EX
EX
EX
EX
EX
3" HWC
3" HW
NEW PIPING SHALL BE
MOUNTED WITH
BOTTOM OF PIPE NO
LOWER THAN 2' AFF.
MIN. 3" BETWEEN PIPE
INSULATION AND WALL AND
BETWEEN PIPE INSULATION ON
THE (2) MAINS TO ALLOW
SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE
CONNECTIONS.
MIN. 12" TO ALLOW SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE CONNECTIONS
EXCEPT WHERE OFFSETS ARE SHOWN AROUND
OBSTACLES.
P28
7'-0"
PROVIDE ANVIL
WALL MOUNTED
WELDED STEEL
BRACKET WITH
GALVANIZED
COATING OR
ENGINEER PRE-
APPROVED EQUAL.
ADD
P34
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING PLAN
- AT POWERHOUSE -
ALTERNATE 1
P100.1A
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.27
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/4" = 1'-0"
TUNNEL PLUMBING PLAN - AT POWERHOUSE - ALTERNATE 1
KEY PLAN
POWERHOUSE TUNNEL
REFERENCED NOTES
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P25 ADJUST BALANCING VALVE TO ACHIEVE A FLOW RATE OF 4 GPM.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
P34 OFFSET PIPING AROUND EXISTING CONCRETE THRUST BLOCK IN THIS AREA.
TO MAINTAIN EXISTING WALKWAY, PIPING SHALL NOT EXTEND WEST
BEYOND WEST FACE OF THRUST BLOCK.
1" = 1'-0"
TUNNEL SECTION 1 - ALTERNATE 1
ADD
REVISION SCHEDULE
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
O L D
K
IT
C H
N
T U
N N
E L
M A
IN
B U
IL
D
IN
G
A B O
V E
A
IR
E S
H A F T O
P E N
T O
A B O
V E
D O
U B L E F
E N
C E A
B O
V E
D R
IV
E W
A Y A
B O
V E
D R
IV
E W
A Y A
B O
V E
T U
N N
E L W
A L L A
N D
D O
O R
F L O
O R S
L O
P E I N
C R E A S
S
O
U T H
O F T
H
IS
P O
IN
T
P .3
P .1
EX 4" CW
P08
2" UP
P08
EX 1-1/2" HW
EX 1 1/2" SERVING OLD KITCHEN
EX 4" CW
3" HW
P09
P08
FLOOR SLOPE FLOOR SLOPEP01
P09
EX PRV
TO EX 6" WATER ENTRANCE
P28
P18 2" HWC
3" HW
P18 P31
ADD
P35
TUNNEL FLOOR
3' - 0"
EX
EX
EX
EX
EX
EX
EX CW
EX
2" HWC
3" HW
MIN. 12" TO ALLOW SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE CONNECTIONS
EXCEPT WHERE OFFSETS ARE SHOWN AROUND
OBSTACLES.
EX
P28
NEW PIPING SHALL BE
MOUNTED WITH
BOTTOM OF PIPE NO
LOWER THAN 2' AFF.
MIN. 3" BETWEEN PIPE
INSULATION AND WALL AND
BETWEEN PIPE INSULATION ON
THE (2) MAINS TO ALLOW
SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE
CONNECTIONS.
7'-0"
PROVIDE ANVIL
WALL MOUNTED
WELDED STEEL
BRACKET WITH
GALVANIZED
COATING OR
ENGINEER PRE-
APPROVED EQUAL.
4'-0"
2'-6"
ADD
P35
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING PLAN
- CENTRAL
P100.2
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.27
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
TUNNEL PLUMBING PLAN - CENTER
KEY PLAN
CENTRAL TUNNEL
REFERENCED NOTES
P01 SECURITY GATE AT THIS LOCATION. SECURITY ESCORT FOR ALL WORK
NORTH OF THIS POINT IS REQUIRED.
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P18 PROVIDE NEW VERTICALLY ORIENTED FLEXIBLE EXPANSION LOOP ON HOT
WATER AND HOT WATER RECIRCULATION PIPING IN THIS AREA WITH
BOTTOM OF LOOP BELOW PIPE. INSTALL EXPANSION LOOP PER
SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS AND
RECOMMENDATIONS.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
P35 PROVIDE NEW PENETRATIONS IN EXISTING BLOCK WALL IN THIS LOCATION.
OFFSET PIPING TO STACK VERTICALLY AS REQUIRED.
1" = 1'-0"
TUNNEL SECTION 2
ADD
REVISION SCHEDULE
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
O
D
K
IT
C H
N
U
N N
E L
M A
IN
B U
IL
D
IN
G
A B O
V E
A
IR
E S
H A F T O
P E N
T O
A B O
V E
D O
U B L E F
E N
C E A
B O
V E
D R
IV
E W
A Y A
B O
V E
D R
IV
E W
A Y A
B O
V E
T U
N N
E L W
A L L A
N D
D O
O R
F L O
O R S
L O
P E I N
C R E A S
O
U T H
O F T
H
IS
P O
IN
T
P .3
A
P .1
A
EX 4" CW
P08
2" UP
P08
EX 1-1/2" HW
EX 1 1/2" SERVING OLD KITCHEN
EX 4" CW
P09
P08
FLOOR SLOPE FLOOR SLOPEP01
P09
EX PRV
TO EX 6" WATER ENTRANCE
P28
3" HWC
P18P18
3" HW
3" HWC
3" HW
3" HWC
3" HW
P31 P35
ADD
TUNNEL FLOOR
3' - 0"
EX
EX
EX
EX
EX
EX
EX CW
EX
3" HWC
3" HW
MIN. 12" TO ALLOW SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE CONNECTIONS
EXCEPT WHERE OFFSETS ARE SHOWN AROUND
OBSTACLES.
EX
P28
NEW PIPING SHALL BE
MOUNTED WITH
BOTTOM OF PIPE NO
LOWER THAN 2' AFF.
MIN. 3" BETWEEN PIPE
INSULATION AND WALL AND
BETWEEN PIPE INSULATION ON
THE (2) MAINS TO ALLOW
SPACE FOR MAINTENANCE
ACTIVITIES AND FUTURE
CONNECTIONS.
7'-0"
PROVIDE ANVIL
WALL MOUNTED
WELDED STEEL
BRACKET WITH
GALVANIZED
COATING OR
ENGINEER PRE-
APPROVED EQUAL.
4'-0"
2'-6"
ADD
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING PLAN
- CENTRAL - ALTERNATE
P100.2A
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.27
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
TUNNEL PLUMBING PLAN - CENTER - ALTERNATE 1
KEY PLAN
CENTRAL TUNNEL
REFERENCED NOTES
P01 SECURITY GATE AT THIS LOCATION. SECURITY ESCORT FOR ALL WORK
NORTH OF THIS POINT IS REQUIRED.
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P18 PROVIDE NEW VERTICALLY ORIENTED FLEXIBLE EXPANSION LOOP ON HOT
WATER AND HOT WATER RECIRCULATION PIPING IN THIS AREA WITH
BOTTOM OF LOOP BELOW PIPE. INSTALL EXPANSION LOOP PER
SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS AND
RECOMMENDATIONS.
P28 NEW PIPING FROM NEW CONNECTION IN POWERHOUSE TO ISOLATION
VALVES SERVING EAST AND WEST WING MAIN PIPING WITHIN TUNNEL
(INCLUDING ALL BRANCH TAKE-OFFS WITHIN TUNNEL) SHALL BE
INSTALLED, CAPPED, FLUSHED, AND DISINFECTED PER SPECIFICATIONS
PRIOR TO ANY CONNECTIONS TO EXISITNG PIPING SYSTEMS OR REMOVAL
OF ANY EXISTING PIPING. COORDINATE FINAL CONNECTIONS TO EXISTING
PIPING WITH FACILITY AND CONSTRUCTION MANAGER TO ACCOMODATE
FACILITY OPERATIONS AND MINIMIZE DOWNTIME.
P31 INSTALL NEW DOMESTIC HOT WATER AND HOT WATER RECIRCULATION
MAIN PIPING IN THIS AREA TO REPLACE EXISTING SYSTEM PIPING. REFER
TO SPECIFICATION 22 0050 FOR PHASING INTENT.
P35 PROVIDE NEW PENETRATIONS IN EXISTING BLOCK WALL IN THIS LOCATION.
OFFSET PIPING TO STACK VERTICALLY AS REQUIRED.
1" = 1'-0"
TUNNEL SECTION 2 - ALTERNATE 1
ADD
REVISION SCHEDULE
SIDE TUNNEL TO THE WEST
ID
E T
U N
N
A
IR
W A Y
S
ID
E T
U N
N
A
IR
W A Y
2" CW TO 18/20 BUILDINGS VIA TUNNEL
P .1
P .2
P100.2
H W
H W
C
3" HW
2" HWC
EX 1" SERVING 10 CELL
P08
P08
EX 1 1/2"
P08
EX TO NORTH CORE
EX DRAIN
2 1/2" HW
EX 4" CW EX 4" CW
2" HWC
H W
H W
C
P07
P07
P15
EX 3/4" HW
P08
P16
P17
P09
P09
E X
C W
E X
C W
E X
C W
P25
EX 3" HW
EX 1" HWC
TO KITCHEN
P28
P28
P28
P18
P31
P16
ADD
P36
P37
ADD
3" HW
ADD
P39
GENERAL NOTES:
A. FACILITY DOMESTIC WATER SERVICES (CW, HW, AND HWC) SHALL
BE MAINTAINED AT ALL FIXTURES THROUGHOUT THE DURATION OF
THE PROJECT EXCEPT DURING THE COMPLETION OF NEW
CONNECTIONS TO EXISTING PIPING. INSTALLATION OF NEW PIPING
SHALL BE PHASED ACCORDINGLY, AND ALL DOWNTIME SHALL BE
MINIMIZED AND COORDINATED WITH THE OWNER AND
CONSTRUCTION MANAGER 72 HOURS BEFORE THE WORK IS TO BE
DONE. REFER TO SPECIFICATION 22 0050 FOR DETAILED PHASING
INTENT.
B. BUILDING DOMESTIC COLD WATER SYSTEM INCLUDES (3) SEPARATE
CONTINUOUSLY LIVE ENTRANCES: (1) 6" ON WEST SIDE OF TUNNEL
NORTH OF POWER HOUSE, (1) 4" ON NORTH WALL OF WEST WING,
AND (1) 4" ON SOUTH WALL OF EAST WING. COORDINATE VALVE
SETTINGS TO PROPERLY ISOLATE PIPING DURING CONSTRUCTION.
C. BALANCING CONTRACTOR SHALL COMPLETE (2) BALANCING PASSES
THROUGH FULL HOT WATER RECIRCULATION SYSTEM TO ENSURE
PROPER FLOW RATE ALL BALANCING VALVES AND AT
RECIRCULATION PUMP AND TO ENSURE THAT THE SYSTEM IS
PROPERLY MAINTAINING THE TEMPERATURE OF THE WATER IN THE
HOT WATER MAINS.
D. REFER TO FRONT END SPECIFICATIONS FOR ADDITIONAL INFORMATION
CONCERNING SITE ACCESS, STORAGE OF MATERIALS AND TOOLS, AND
OTHER OWNER REQUIREMENTS AND PROVISIONS.
E. ALL ACCESS AND SITE TRANSPORTATION COORDINATION SHALL
TAKE PLACE NO LESS THAN 72 HOURS IN ADVANCE.
F. FACILITY STAFF WILL RELOCATE ITEMS WITHIN AFFECTED ROOMS TO
FACILITATE WORK. COORDINATE WITH CONSTRUCTION MANAGER AND
FACILITY STAFF FOR SPACE REQUIRED.
G. VERIFY ALL SITE CONDITIONS PRIOR TO START OF WORK.
H. INSTALLATION PLANS ARE SCHEMATIC IN NATURE. CONTRACTOR TO VERIFY
PLACEMENT OF NEW EQUIPMENT PRIOR TO INSTALLATION.
I. MAINTAIN SERVICE CLEARANCE AROUND ALL MECHANICAL EQUIPMENT AND
ABOVE ELECTRICAL EQUIPMENT. DO NOT ROUTE PIPING IN CLEARANCE
SPACE.
J. COORDINATE PIPING LAYOUT AND ELEVATIONS WITH EXISTING
CONDITIONS, BUILDING STRUCTURE, LOCAL PLUMBING CODE AND THE
SPECIFICATIONS TO ALLOW FOR PROPER CLEARANCES. MAKE NECESSARY
OFFSETS AS REQUIRED.
K. PROVIDE ISOLATION BALL VALVES ON BRANCH PIPING TAPS FROM MAIN ON
ALL COLD AND HOT WATER PIPES. ENSURE VALVES ARE INSTALLED IN
ACCESSIBLE LOCATIONS.
L. ALL VALVES AND OTHER PIPING ACCESSORIES REMOVED AS PART OF
DEMOLITION SCOPE SHALL BE REPLACED IN NEW WORK UNLESS NOTED
OTHERWISE.
NOTE:
VERIFY BUILDING DIMENSIONS FOR ROUGH-IN
SHEET:
SHEET NAME:
SHEET SET:
DATE:
PROJECT NUMBER:
CONSULTANTS:
TUNNEL PLUMBING PLAN
- AT MAIN BUILDING
P100.3
M O
U N
T P
L E A S A N
T C
O R R E C T
IO
N A L F
A C
IL
IT
Y H
O T A
N D
C O
L D
W A T E R
M A
IN
R E P L A C E M
E N
T E
W a sh in g to n S t, M t P le a sa n t, I A
100% CONSTRUCTION
DOCUMENTS
2026.01.27
25-182
25-182 - MOUNT PLEASANT CORRECTIONAL FACILITY HOT AND COLD WATER MAIN REPLACEMENT
IO
W
A D
E P A R
T M
E N
T O
F A
D M
IN
IS
T R A T
IV
E S
E R V
IC
E S P
R O
JE
C T
.0
1/8" = 1'-0"
TUNNEL PLUMBING PLAN - AT MAIN BUILDING
KEY PLAN
BUILDING TUNNEL
REFERENCED NOTES
P07 PROVIDE NEW WALL PENATRATIONS FOR ALL NEW DOMESTIC COLD WATER,
HOT WATER, AND RECIRCULATION WATER. SLEEVE PIPING THROUGH NEW
WALL PENETRATION AND PROVIDE FIRE CAULKING MATCHING UL LISTED
DETAIL FOR GIVEN WALL CONSTRUCTION. FOR BIDDING PURPOSES, ALL
WALLS CAN BE CONSIDERED TO BE 8" MASONRY BLOCK.
P08 PROVIDE NEW BRANCH PIPING AND ISOLATION BALL VALVE TO RECONNECT
EXISTING BRANCH. REFER TO EACH INSTANCE ON PLANS FOR INDIVIDUAL
BRANCH AND VALVE SIZING.
P09 PROVIDE NEW 1" DRAIN WITH BALL VALVE AND 3/4" HOSE CONNECTION.
P15 PROVIDE SHORT VERTICAL BRANCH WITH NEW BALL VALVE AND
MULTIPLE-TURN VALVED HOSE CONNECTION TO MATCH BRANCH TO BE
REMOVED.
P16 OFFSET PIPING HORIZONTALLY AND VERTICALLY AS NECESSARY TO
MAINTAIN ACCESS AND CLEARANCE FOR ELECTRICAL JUNCTION BOXES AND
MAXIMIZE ACCESSIBILITY FROM SIDE TUNNEL STAIRWAY. PIPING SHOULD
STAY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .