RFB948800-01 - Drawings (Reduced Size).pdf

PDF 27 MB Posted

Attached to
DOC 4JD CBC New Central Office Building
Solicitation number
RFB948800-01
Issued by
Polk County, Iowa

About this file

This file is a set of 100% Construction Documents for a new office building project for the Iowa Department of Administrative Services (DAS), Department of Corrections (DOC), 4th District, located at 818 S. 10th Street, Council Bluffs, Iowa. The project encompasses a two-story, 14,136 gross square foot office building with a finished floor elevation of 984.75 feet. The building includes approximately 153 occupants distributed across business office spaces, assembly areas (training room and breakroom), and utility spaces. Construction is classified as Type V-B (sprinkled) under the 2024 International Building Code, with applicable compliance to the 2024 International Fire Code, 2023 National Electric Code, 2024 International Mechanical Code, and 2024 International Plumbing Code. The facility features two emergency stairwells, one passenger elevator, and multiple office configurations with associated restroom facilities including eight single-use restrooms to meet ADA accessibility requirements.

The construction documents specify comprehensive site work including pavement removal and replacement (757 square yards of 6-inch and 7-inch Portland cement concrete), utility infrastructure consisting of a 6-inch water service line (272 linear feet), 4-inch sanitary sewer connection (15 linear feet), and new storm sewer system with 6-inch high-density polyethylene and 15-inch reinforced concrete pipe totaling approximately 170 linear feet. The site requires grading adjustments with 180 cubic yards of cut material and 226 cubic yards of topsoil respread. Parking accommodates 33 total spaces (16 proposed plus 17 existing), including two ADA-accessible spaces. The documents include erosion control and stormwater pollution prevention plan details, utility coordination requirements, and landscaping specifications. Professional engineers and architects involved include SVPA Architects Inc., KPFF Structural Consultant, Snyder & Associates (Civil), Alvine (M/E/P/T), and Samuels Group (Construction Manager). The documents were prepared as of April 21, 2026, at 100% completion for construction bidding.

View the file

Other files

File Type Posted
RFB948800-01 - Project Manual (Vol 1).pdf PDF
RFB948800-01 - Notice to Bidders.pdf PDF
RFB948800-01 - Addendum 2 Rev. 1.pdf PDF
RFB948800-01 - Addendum 1.pdf PDF
RFB948800-01 - Addendum 3.pdf PDF
RFB948800-01 - Project Manual (Vol 2).pdf PDF
RFB948800-01 - Bid Form.pdf PDF
RFB948800-01 - Addendum 2.pdf PDF
1386243-event.pdf PDF
Bidding Documents.html HTML file
Drawings and Project Manual.html HTML file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .