The file's text, extracted by GovTribe without its formatting.
Summary
| Period | Description | Estimated Quantity | U/M | Unit |
| Price | Total | | | | |
| 01 | Period 01 (DD MMM 2024 - DD MMM 2029) | 1 | EA | $ - 0 |
| Contract Total: | | | | $ - 0 |
| Base Year | | | | | |
| Sub Sch | Line No. | Item | Estimated Quantity | U/M | Unit |
| Price | Total | | | | | |
| A - RADIO FIRE ALARM EQUIPMENT | | | | | |
| A | A01 | Fire Reporting System Servers - Central Receiving Station Communicator, Win 10, Rackmount | 2 | EA | 0 |
| A | A02 | Client Workstation - Client Alarm and Dispatch Station Communicator, WIN10, Tower | 3 | EA | 0 |
| A | A03 | Fire Reporting System - Fire Client | 5 | EA | 0 |
| A | A04 | Radio Fire Alarm Transceiver (BT-XF) | 118 | EA | 0 |
| A | A05 | Fire Zone Card (BT-XF) | 118 | EA | 0 |
| A | A06 | Zone Expansion Backplane (BT-XF) | 118 | EA | 0 |
| A | A07 | Radio Fire Alarm Antenna - Omnidirectional | 118 | EA | 0 |
| A | A08 | Radio Fire Alarm Antenna Cabling | 8850 | LF | 0 |
| A | A09 | Outdoor Pull Station, Solar Powered | 2 | EA | 0 |
| A | A10 | Radio Frequency Modem | 5 | EA | 0 |
| A | A11 | Fiber-Optic Backbone | 19000 | LF | 0 |
| A | A12 | Fiber-Optic Terminiation | 9 | EA | 0 |
| A | A13 | Fiber-Optic Networking Equipment | 3 | EA | 0 |
| B - DEMOLITION | | | | | |
| B | B01 | Remove & Dispose of Wired Master Box | 118 | EA | 0 |
| B | B02 | Removal & Dispose of primary receiving station digitizer and decoder | 1 | EA | 0 |
| C - ENABLING CONSTRUCTION | | | | | |
| C | C01 | 120V Branch Circuit for Transceiver | 118 | EA | 0 |
| C | C02 | 120V Branch Circuit Wiring | 8850 | LF | |
| C | C03 | Patch and Repair | 118 | EA | 0 |
| C | C04 | Sealing of Penetrations | 354 | EA | 0 |
| C | C05 | Primary Reporting Station Code Improvements | 104 | LF | 0 |
| C | C06 | FFE (Table and Chair) | 4 | EA | 0 |
| D - SUPPORT | | | | | |
| D | D01 | Fire Watch | 118 | EA | 0 |
| D | D02 | As-built drawings | 118 | EA | 0 |
| D | D03 | Inspections | 118 | EA | 0 |
| SUBTOTAL | | | $ - 0 |
| Contract Markups | | | |
| Overhead % | 0.00% | $0.00 | |
| Profit % | 0.00% | $0.00 | |
| Bond % | 0.00% | $0.00 | |
| Project (Task Order) Total: | | | $ - 0 |
&"Arial,Bold"&14Sitework and Paving IDIQ &"Arial,Bold"&14FY2015 Contract (5 Year Ordering Period) Period 01 - 15 Sep 15 - 30 Sep 16 (Contractor)
&"Arial,Regular"&12&A &"Arial,Regular"&12&P of &N
Descriptions
| CONTRACT ITEM DESCRIPTIONS | | | | | | |
| Sub Sch | Line No. | Item | Unit | Specification Section | Drawing Reference | Description |
| A - RADIO FIRE ALARM EQUIPMENT | | | | | | |
| A | A01 | Fire Reporting System Servers - Central Receiving Station Communicator, Win 10, Rackmount | EA | 28 31 33.00 10 | | This includes the components required at the primary receiving stations, such as monitors, computers, printer, UPS, etc. |
| A02 | Client Workstation - Client Alarm and Dispatch Station Communicator, WIN10, Tower | EA | 28 31 33.00 10 | | This includes the components required at the client workstation locations to allow for remote monitoring and control of the reporting network. |
| A | A03 | Fire Reporting System - Fire Client | EA | 28 31 33.00 10 | | Client is required at client workstations and receiving stations |
| A | A04 | Radio Fire Alarm Transceiver (BT-XF) | EA | 28 31 33.00 10 | | 1 transceiver per building, locations and quantities to be finalized. |
| A05 | Fire Zone Card (BT-XF) | EA | 28 31 33.00 10 | | Provides four zone inputs and eight relay outputs at transceiver. |
| A06 | Zone Expansion Backplane (BT-XF) | EA | 28 31 33.00 10 | | Supports zone card. |
| A | A07 | Radio Fire Alarm Antenna - Omnidirectional | EA | 28 31 33.00 10 | | 1 Antenna per building, some buildings share reporting points |
| A | A08 | Radio Fire Alarm Antenna Cabling | LF | 28 31 33.00 10 | | Assumed average of 75' per building, contractor to determine amount of cabling required at site visit. |
| A | A09 | Outdoor Pull Station, Solar Powered | EA | 28 31 33.00 10 | | Located in Residential portion of Base, intended to replace existing outdoor masterboxes. |
| A | A10 | Radio Frequency Modem | EA | 28 31 33.00 10 | | Required at the primary and secondary receiving stations. |
| A | A11 | Fiber-Optic Backbone | LF | 33 82 00 | | Required physical connection between primary and secondary receiving stations, 2 pair, single mode. |
| A | A12 | Fiber-Optic Terminiation | EA | 33 82 00 | | Termination for fiber-optic backbone, only fused connections allowable. |
| A | A13 | Fiber-Optic Networking Equipment | EA | 33 82 00 | | Additonal hardware required for switching and transfer of physical connection in primary and secondary receiving stations. |
| B - DEMOLITION | | | | | |
| B | B01 | Remove & Dispose of Wired Master Box | EA | | Removal of existing reporting equipment only to occur after new FA system is operational and approved for use. |
| B | B02 | Removal & Dispose of primary receiving station digitizer and decoder | EA | 1 | Removal of existing reporting equipment only to occur after new FA system is operational and approved for use. |
| C - ENABLING CONSTRUCTION | | | | | | |
| C | C01 | 120V Branch Circuit for Transceiver | EA | | | Addition of circuit breaker and required scope in nearest electrical panel, on emergency power, to |
| C | C02 | 120V Branch Circuit Wiring | LF | | | Assumed average of 75' per building, contractor to determine amount of cabling required at site visit. |
| C | C03 | Patch and Repair | EA | Various | | Base buildings are of varying construction types, generic specifications to capture known substrates and finishes have been provided. A case-by-case determination of applicablilty will be required to associate spec section based on building construction and scope location. |
| C | C04 | Sealing of Penetrations | EA | Various | | Base buildings are of varying construction types, generic specifications to capture known substrates and finishes have been provided. A case-by-case determination of applicablilty will be required to associate spec section based on building construction and scope location. Assumption is average of three penetrations per building, size of penetrations will be the same for each. Contractor to determine amount of penetrations required at site visit. |
| C | C05 | Primary Reporting Station Code Improvements | LF | Various | A-101 | Diagramiatic sketch of anticipated extent of scope provided. Existing Primary Receiving station does not meet code requirements. Existing partitions will need to be upgraded to meet fire resistance rating requirements, including penetration and void sealing. Existing wall replacement should not be required. UoM is in linear foot of wall. Majority of work is above ceiling. Scope quanity covers both recieveing station, and adjacent room where servers may be located. |
| C | C06 | FFE (Table and Chair) | EA | SOW | | Appropriatly sized tables and rolling office chairs as required to locate equipment and worksations in primary and secondary receiving stations. 48" wide workstation |
| D - SUPPORT | | | | | |
| D | D01 | Fire Watch | EA | SOW 2.16.2 | Anticipated fire-watch while FACP in buildings may be brought down. |
| D | D02 | As-built drawings | EA | 01 78 00 | Anticipated documenation of new antenna and transceiver improvements. |
| D | D03 | Inspections | EA | | Inspections as required for completion and approval of work. |
| D | D04 | Design Services | UM | Division 01 | Professional design services per task order to facilitate install and construction of the work and ensure compliance with UFC and industry codes. |
&"Arial,Bold"&14Sitework and Paving IDIQ &"Arial,Bold"&14FY2015 Contract (5 Year Ordering Period) Period 01 - 15 Sep 15 - 30 Sep 16
&"Arial,Regular"&12&A &"Arial,Regular"&12&P of &N