Representative Task Order 1 (Campaign and ELV).pdf

PDF 217 KB Posted

Attached to
Wallops Range Contract (WRC)-Draft RFP-Industry Day-Q&A Federal contract opportunity
Solicitation number
80GSFC23R0009-DRFP
Issued by
National Aeronautics and Space Administration Goddard Space Center

View the file

Other files for this federal contract opportunity

Other files attached to Wallops Range Contract (WRC)-Draft RFP-Industry Day-Q&A, newest first.
File Type Posted
WRC DRFP Q_A 219-252 Final.pdf PDF
WRC DRFP Q_A Continued 9-14-23r.pdf PDF
WRC DRFP Questions.pdf PDF
WRC Industry Day Transcript.pdf PDF
Wallops Range Contract (WRC) Industry Day slides.pdf PDF
WRC Industry Day Sign In Sheet.pdf PDF
WRC Industry Day Meeting Recording (Q_A) pt 2.mp4 MP4 file
WRC Industry Day Meeting Recording (Q_A) pt 1.mp4 MP4 file
WRC Industry Day Meeting Recording (Briefing).mp4 MP4 file
WRC Industry Day Meeting Recording-Afternoon.mp4 MP4 file
WRC Industry Day Transcript 2.pdf PDF
Map.pdf PDF
Exhibit C - Past Performance Questionaire.pdf PDF
Exhibit B - WRC Exh RTO Cost.pdf PDF
ELV Requirements.pdf PDF
Sounding Rocket 36-360 Requirements.pdf PDF
Sounding Rocket 46-031 Requirements.pdf PDF
Attachment O - GFP.pdf PDF
IAM AW and KBR - ROC II - Fully Executed CBA - 2022.PDF PDF
CBA-2023-224 Rothe Enterprises Inc..pdf PDF
CBA-2023-222 KBR.pdf PDF
Attachment S - OCI-Plan-Data-Requirements.pdf PDF
Attachment R - DEIA Plan.pdf PDF
Attachment Q - DEIA Plan.pdf PDF
Attachment M - IT Security Applicable Documents List.pdf PDF
Attachment L - Contract Historical Data.pdf PDF
Attachment J - DD254 - WRC.pdf PDF
Rothe 2022-2025 CBA Final.pdf PDF
IAM AW and Saalex- ROC II - CBA -Final (signed).pdf PDF
533 Attach Core and IDIQ--Both Onsite and Offsite.pdf PDF
Attachment I - Quality Assurance Plan.pdf PDF
CBA-2023-223 Saalex Solutions Inc..pdf PDF
Exhibit A - Cost Plus FF Hybrid CORE.pdf PDF
ROC II Contract Historical Data - 2.pdf PDF
Enclosure 4 - IT Security Management Plan Template.pdf PDF
Attachment D - Safety and Health Plan.pdf PDF
Attachment C - IAGP.pdf PDF
Attachment B - Direct Labor Rates Indirect Rates and Fee.pdf PDF
WRC - Draft SOW 12-12-22 - Final.pdf PDF
ROC II Contract Historical Data - 1.pdf PDF
Enclosure 3 - Government WRC QASP.pdf PDF
Enclosure 1 - Phase-in SOW 28MAR.pdf PDF
Attachment P - Requirements Statements List.pdf PDF
Attachment N - Contractor Proposed Enhancements.pdf PDF
Attachment K - OCI Avoidance Plan.pdf PDF
Attachment H - WD 2015-4327 Rev-22.pdf PDF
Attachment F - IT Security Management Plan.pdf PDF
Attachment E - Small Business Subcontracting Plan.pdf PDF
WRC DRFP - 80GSFC23R0009.pdf PDF
WRC - DRFP - Cover Letter signed.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 2 Representative Task Order 1

Concurrent Mission: Sounding Rocket Campaign and Expendable Launch Vehicle (ELV)

Background:

In recent years, WFF has demonstrated a unique ability to support diverse missions that are geographically separated but nearly concurrent. An example of this type of mission set is a sounding rocket campaign at Poker Flat Research Range (PFRR) in Fairbanks, Alaska, consisting of multiple rockets launched almost simultaneously, and an ELV mission launched at WFF.

The NASA Range and Mission Management Office (RMMO) has been tasked with range services and support in multiple areas for both missions. For the sounding rocket Campaign, hardware is designed, fabricated, and tested at WFF then shipped to PFRR for final integration, assembly, and launch. RMMO is only responsible for range services in support of the pre-launch testing and launch operations.

For the ELV mission, the payload and launch vehicle are assembled, integrated, tested, and fueled at WFF facilities by the vehicle owner but with some ground and facilities operations support by RMMO, and then launched from the WFF Range with downrange support sites at Bermuda.

Scope:

For the ELV mission, RMMO has been tasked as the range instrumentation, operations, and service provider. RMMO will support processing and integration facilities utilized by the ELV mission, as well as ordnance storage, fueling facilities, and various operational control centers. The ELV mission will be conducted at WFF. The mission consists of an ELV rocket carrying a Cygnus spacecraft loaded with cargo to resupply the International Space Station (ISS). RMMO will have to utilize both on- range and off-range assets to meet the operational support requirements. On-range at WFF, the full spectrum of range support will be required, including pre-launch maintenance and sustainment, pre-mission testing, launch operations, and post-launch data processing and deliverables in the following areas: See attached Range Requirements Document from an ELV mission.

1. Radar services and operations (including tracking and surveillance)

2. Telemetry services and operations

3. Command Destruct services and operations

4. Communications and timing services and operations

5. Meteorological services and operations

6. Surveillance services and operations

7. Data handling services and operations (processing and displays)

8. Optical services and operations (photo and video)

RMMO will also setup a downrange site in Bermuda. In Bermuda, range support will be required including pre-mission testing, launch operations, and post-launch data processing and deliverables in the following areas:

1. Radar services and operations

2. Telemetry services and operations

3. Command Destruct services and operations

For the Campaign mission, RMMO has been tasked as the range instrumentation, operations, and service provider. The campaign will be conducted at PFRR in Alaska and consists of two individual sounding rockets (46.031 Terrier Malemute & 36.360 Black Brant) containing payloads to study the aurora. Each rocket will launch 30 seconds apart. See attached Range requirements document.

The WFF Range is required to provide the full spectrum of range support, including pre-mission testing, launch operations, and post-launch data processing and deliverables in the following areas:

1. Surveillance radar services and operations

2. Telemetry services and operations

3. Voice and data communications, timing, and command uplink command services and operations

4. Data handling services and operations (processing and displays)

5. Optical services and operations (photo and video)

6. Meteorological Operations (launch balloon sondes, monitor instrumentation, provide weather forecasts)

For purposes of this RTO, assume that this tasking is received in March of Year 2025, that the ELV launch is scheduled for November (the actual day is still shown as “TBD”) of Year 2025 and that the ELV launch window is linked tightly to the ISS operational schedule but is a ten-day window with a specific 5-minute window on each day of the window. The Contractor is aware that launch dates for ISS Resupply missions have historically varied from initial schedule. The sounding rocket campaign mission window opens in November 10 of Year 2025 and, driven by a desire for heliophysics phenomena such as aurora effects, will have a launch window every night until all missions in the series are launched/completed. Optimum science conditions vary annually but are usually expected to begin around the November 10 date and, on average, start to diminish at the end of November, though some years have seen launch windows extend into mid-December. The support of both the ELV and the sounding rocket campaign concurrently is required.

Task Parameters:

The following Range instrumentation will be provided by NASA (both mobile and fixed):

1. Telemetry systems

2. Timing systems

3. RF monitoring and communications systems

4. Voice and data communication systems

5. Command systems

6. Radar systems (precision tracking, surveillance, meteorological)

7. Data processing and display systems

8. Meteorological systems

9. Optical systems (photo and video)

10. Power systems

For additional details on Range instrumentation, see the Wallops Range Users Handbook (RUH).

NASA will provide all institutional facilities for this effort at no cost to the contractor.

RMMO will provide a Project Manager for the Campaign mission and a Project Manager for the ELV mission.

Period of Performance

March 01 – December 31, 2025

Travel Travel to Poker Flat Research Range (PFRR) in Fairbanks, AK for Sounding Rocket campaign.

Travel to Bermuda for ELV mission

Applicable Documents RMMO will provide the following documents at task initiation:

1. Operational Requirements Document

2. Ground Safety Requirements Document

3. Flight Safety Requirements Document

Performance Metrics IAW Wallops Range Contract (WRC) SOW

Task Deliverables For this RTO, provide the following:

• A description of the approach that the KTR will use to meet the requirements of the overall task and how that approach will help ensure a successful set of missions in multiple locations.

• Cost Proposal for this scope of work as detailed above.

Special Requirements N/A

File details come from the government source that posted it. Updated .