RFP#
Proposing Entity:
EXHIBIT 1
PRIME OFFEROR
CORE REQUIREMENTS
SUMMARY OF ESTIMATED COST PLUS FIXED FEE
Base Option 1 Option 2 Option 3 Option 4 GRAND Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL
TOTAL PRIME PLUS SIGNIFICANT SUBCONTRACTOR
DIRECT LABOR HOURS
TOTAL ESTIMATED COST
MAXIMUM AVAILABLE FIXED FEE
TOTAL COST PLUS FIXED FEE
This exhibit contains Source Selection Information. See FAR 3.104.
Elements of Cost
EXHIBIT 2
PRIME OFFEROR
CORE REQUIREMENTS
SUMMARY OF ESTIMATED COST PLUS FIXED FEE
Work Breakdown Structure (WBS) Level 2 - Core Requirements
Base Option 1 Option 2 Option 3 Option 4
Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 GRAND TOTAL
Prime Regular Direct Labor (DL) Hours:
Prime Onsite DL Hours Prime Offsite DL Hours Total Prime Regular Direct Labor Hours
Prime Overtime Premium (OT) DL Hours:
Prime Onsite OT DL Hours Prime Offsite OT DL Hours Total Prime Overtime Premium Direct Labor Hours
Significant Subcontractor Regular Direct Labor (DL) Hours*:
(List total hours separately by company) Significant Subcontractor Onsite DL Hours Significant Subcontractor Offsite DL Hours Total Significant Subcontractor Regular Direct Labor Hours
Significant Subcontractor Overtime Premium (OT) DL Hours*:
(List total hours separately by company) Significant Subcontractor Onsite OT DL Hours Significant Subcontractor Offsite OT DL Hours Total Significant Subcontractor Overtime Premium Direct Labor Hours
Non-Significant Subcontractor Regular Direct Labor (DL) Hours*:
(List total hours separately by company) Non-Significant Subcontractor Onsite DL Hours Non-Significant Subcontractor Offsite DL Hours Total Non-Significant Subcontractor Regular Direct Labor Hours
Non-Significant Subcontractor Overtime Premium (OT) DL Hours*:
(List total hours separately by company) Non-Significant Subcontractor Onsite OT DL Hours Non-Significant Subcontractor Offsite OT DL Hours Total Non-Significant Subcontractor Overtime Premium Direct Labor Hours
Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Hours:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Hours
Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Hours*:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite Overtime (OT) DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Offsite Overtime (OT) DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Hours*:
Total Prime and Subcontractors (Significant and Non-Significant) Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Hours (Reg & OT)
Prime Regular Direct Labor (DL) Costs:
Prime Onsite DL Costs Prime Offsite DL Costs Total Prime Regular Direct Labor Costs
Prime Overtime Premium (OT) DL Costs:
Prime Onsite OT DL Costs Prime Offsite OT DL Costs Total Prime Overtime Premium Direct Labor Costs
Significant Subcontractor Direct Labor (DL) Costs*:
(List total hours separately by company) Significant Subcontractor Onsite DL Costs Significant Subcontractor Offsite DL Costs Total Significant Subcontractor Direct Labor Costs
Significant Subcontractor Overtime Premium (OT) DL Costs*:
(List total hours separately by company) Significant Subcontractor Onsite OT DL Costs Significant Subcontractor Offsite OT DL Costs Total Significant Subcontractor Overtime Premium (OT) Direct Labor Costs
Non-Significant Subcontractor Direct Labor (DL) Costs*:
(List total hours separately by company) Non-Significant Subcontractor Onsite DL Costs Non-Significant Subcontractor Offsite DL Costs Total Non-Significant Subcontractor Direct Labor Costs
Non-Significant Subcontractor Overtime Premium (OT) DL Costs*:
(List total hours separately by company) Non-Significant Subcontractor Onsite OT DL Costs Non-Significant Subcontractor Offsite OT DL Costs Total Non-Significant Subcontractor Overtime Premium Direct Labor Costs
Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Costs:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Regular Direct Labor Costs
Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Costs:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite OT DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Offsite OT DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Costs:
OVERHEAD:
Onsite Offsite
TOTAL OVERHEAD COSTS
Other Direct Costs (ODC):
Significant Subcontracts (list separately by company)** Other Subcontracts Material $1,334,320.01 $1,394,364.41 $1,457,110.81 $1,522,680.80 $1,591,201.43 $7,299,677.46 Travel $1,001,140.37 $1,046,191.69 $1,093,270.31 $1,142,467.48 $1,193,878.51 $5,476,948.36 Other (Specify) $1,274,592.20 $1,331,948.85 $1,391,886.55 $1,454,521.44 $1,519,974.91 $6,972,923.94
TOTAL ODC COSTS:
Subtotal Cost
G&A
TOTAL ESTIMATED COST
FIXED FEE PERCENTAGE
FIXED FEE AMOUNT
TOTAL COST PLUS FIXED FEE
*Significant Subcontractor (>20% of proposed Core estimated value (Base and all Option Periods)) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Costs and Fees/Profits Offerors may adjust elements of cost to be consistent with your current accounting system.
EXHIBIT 2A
PRIME OFFEROR
CORE REQUIREMENTS
ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)
WBS Level 3 - CORE Program Management
Base Option 1 Option 2 Option 3 Option 4 Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 GRAND TOTAL
Prime Regular Direct Labor (DL) Hours:
Prime Onsite DL Hours Prime Offsite DL Hours Total Prime Regular Direct Labor Hours
Prime Overtime Premium (OT) DL Hours:
Prime Onsite OT DL Hours Prime Offsite OT DL Hours Total Prime Overtime Premium Direct Labor Hours
Significant Subcontractor Regular Direct Labor (DL) Hours*:
(List total hours separately by company) Significant Subcontractor Onsite DL Hours Significant Subcontractor Offsite DL Hours Total Significant Subcontractor Regular Direct Labor Hours
Significant Subcontractor Overtime Premium (OT) DL Hours*:
(List total hours separately by company) Significant Subcontractor Onsite OT DL Hours Significant Subcontractor Offsite OT DL Hours Total Significant Subcontractor Overtime Premium Direct Labor Hours
Non-Significant Subcontractor Regular Direct Labor (DL) Hours*:
(List total hours separately by company) Non-Significant Subcontractor Onsite DL Hours Non-Significant Subcontractor Offsite DL Hours Total Non-Significant Subcontractor Regular Direct Labor Hours
Non-Significant Subcontractor Overtime Premium (OT) DL Hours*:
(List total hours separately by company) Non-Significant Subcontractor Onsite OT DL Hours Non-Significant Subcontractor Offsite OT DL Hours Total Non-Significant Subcontractor Overtime Premium Direct Labor Hours
Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Hours:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Hours
Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Hours*:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite Overtime (OT) DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Offsite Overtime (OT) DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Hours*:
Total Prime and Subcontractors (Significant and Non-Significant) Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Hours (Reg & OT)
Prime Regular Direct Labor (DL) Costs:
Prime Onsite DL Costs Prime Offsite DL Costs Total Prime Regular Direct Labor Costs
Prime Overtime Premium (OT) DL Costs:
Prime Onsite OT DL Costs Prime Offsite OT DL Costs Total Prime Overtime Premium Direct Labor Costs
Significant Subcontractor Direct Labor (DL) Costs*:
(List total hours separately by company) Significant Subcontractor Onsite DL Costs Significant Subcontractor Offsite DL Costs Total Significant Subcontractor Direct Labor Costs
Significant Subcontractor Overtime Premium (OT) DL Costs*:
(List total hours separately by company) Significant Subcontractor Onsite OT DL Costs Significant Subcontractor Offsite OT DL Costs Total Significant Subcontractor Overtime Premium (OT) Direct Labor Costs
Non-Significant Subcontractor Direct Labor (DL) Costs*:
(List total hours separately by company) Non-Significant Subcontractor Onsite DL Costs Non-Significant Subcontractor Offsite DL Costs Total Non-Significant Subcontractor Direct Labor Costs
Non-Significant Subcontractor Overtime Premium (OT) DL Costs*:
(List total hours separately by company) Non-Significant Subcontractor Onsite OT DL Costs Non-Significant Subcontractor Offsite OT DL Costs Total Non-Significant Subcontractor Overtime Premium Direct Labor Costs
Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Costs:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Regular Direct Labor Costs
Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Costs:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite OT DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Offsite OT DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Costs:
OVERHEAD:
Onsite Offsite
TOTAL OVERHEAD COSTS
Other Direct Costs (ODC):
Significant Subcontracts (list separately by company)** Other Subcontracts Material $444,773.34 $464,788.14 $485,703.60 $507,560.27 $530,400.48 $2,433,225.82 Travel $333,713.46 $348,730.56 $364,423.44 $380,822.49 $397,959.50 $1,825,649.45 Other (Specify) $424,864.07 $443,982.95 $463,962.18 $484,840.48 $506,658.30 $2,324,307.98
TOTAL ODC COSTS:
Subtotal Cost
G&A
TOTAL ESTIMATED COST
FIXED FEE PERCENTAGE
FIXED FEE AMOUNT
TOTAL COST PLUS FIXED FEE
*Significant Subcontractor (>20% of proposed Core estimated value (Base and all Option Periods)) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Costs and Fees/Profits
EXHIBIT 2B
PRIME OFFEROR
CORE REQUIREMENTS
ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)
WBS Level 3 - CORE Range Management and Sustainment
Base Option 1 Option 2 Option 3 Option 4 Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 GRAND TOTAL
Prime Regular Direct Labor (DL) Hours:
Prime Onsite DL Hours Prime Offsite DL Hours Total Prime Regular Direct Labor Hours
Prime Overtime Premium (OT) DL Hours:
Prime Onsite OT DL Hours Prime Offsite OT DL Hours Total Prime Overtime Premium Direct Labor Hours
Significant Subcontractor Regular Direct Labor (DL) Hours*:
(List total hours separately by company) Significant Subcontractor Onsite DL Hours Significant Subcontractor Offsite DL Hours Total Significant Subcontractor Regular Direct Labor Hours
Significant Subcontractor Overtime Premium (OT) DL Hours*:
(List total hours separately by company) Significant Subcontractor Onsite OT DL Hours Significant Subcontractor Offsite OT DL Hours Total Significant Subcontractor Overtime Premium Direct Labor Hours
Non-Significant Subcontractor Regular Direct Labor (DL) Hours*:
(List total hours separately by company) Non-Significant Subcontractor Onsite DL Hours Non-Significant Subcontractor Offsite DL Hours Total Non-Significant Subcontractor Regular Direct Labor Hours
Non-Significant Subcontractor Overtime Premium (OT) DL Hours*:
(List total hours separately by company) Non-Significant Subcontractor Onsite OT DL Hours Non-Significant Subcontractor Offsite OT DL Hours Total Non-Significant Subcontractor Overtime Premium Direct Labor Hours
Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Hours:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Hours
Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Hours*:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite Overtime (OT) DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Offsite Overtime (OT) DL Hours Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Hours*:
Total Prime and Subcontractors (Significant and Non-Significant) Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Hours (Reg & OT) Total Prime and Subcontractors (Significant and Non-Significant) Hours (Reg & OT)
Prime Regular Direct Labor (DL) Costs:
Prime Onsite DL Costs Prime Offsite DL Costs Total Prime Regular Direct Labor Costs
Prime Overtime Premium (OT) DL Costs:
Prime Onsite OT DL Costs Prime Offsite OT DL Costs Total Prime Overtime Premium Direct Labor Costs
Significant Subcontractor Direct Labor (DL) Costs*:
(List total hours separately by company) Significant Subcontractor Onsite DL Costs Significant Subcontractor Offsite DL Costs Total Significant Subcontractor Direct Labor Costs
Significant Subcontractor Overtime Premium (OT) DL Costs*:
(List total hours separately by company) Significant Subcontractor Onsite OT DL Costs Significant Subcontractor Offsite OT DL Costs Total Significant Subcontractor Overtime Premium (OT) Direct Labor Costs
Non-Significant Subcontractor Direct Labor (DL) Costs*:
(List total hours separately by company) Non-Significant Subcontractor Onsite DL Costs Non-Significant Subcontractor Offsite DL Costs Total Non-Significant Subcontractor Direct Labor Costs
Non-Significant Subcontractor Overtime Premium (OT) DL Costs*:
(List total hours separately by company) Non-Significant Subcontractor Onsite OT DL Costs Non-Significant Subcontractor Offsite OT DL Costs Total Non-Significant Subcontractor Overtime Premium Direct Labor Costs
Total Prime and Subcontractors (Significant and Non-Significant) Direct Labor Costs:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Offsite DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Regular Direct Labor Costs
Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Costs:
Total Prime and Subcontractors (Significant and Non-Significant) Onsite OT DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Offsite OT DL Costs Total Prime and Subcontractors (Significant and Non-Significant) Overtime Premium (OT) DL Costs:
OVERHEAD:
Onsite Offsite
TOTAL OVERHEAD COSTS
Other Direct Costs (ODC):
Significant Subcontracts (list separately by company)** Other Subcontracts Material $889,546.67 $929,576.27 $971,407.21 $1,015,120.53 $1,060,800.95 $4,866,451.64 Travel $667,426.91 $697,461.12 $728,846.88 $761,644.98 $795,919.01 $3,651,298.91 Other (Specify) $849,728.13 $887,965.90 $927,924.36 $969,680.96 $1,013,316.60 $4,648,615.96
TOTAL ODC COSTS:
Subtotal Cost
G&A
TOTAL ESTIMATED COST
FIXED FEE PERCENTAGE
FIXED FEE AMOUNT
TOTAL COST PLUS FIXED FEE
*Significant Subcontractor (>20% of proposed Core estimated value (Base and all Option Periods)) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Costs and Fees/Profits
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2DL
CORE REQUIREMENTS
DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL
Work Breakdown Structure (WBS) Level 2 - Core Requirements
Base Option 1 Option 2 Option 3 Option 4 Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5
REGULAR DIRECT LABOR (DL) HOURS:
Onsite DL Hours:
(List by Individual DL Category)
Subtotal Onsite DL Hours
Offsite DL Hours:
(List by Individual DL Category)
Subtotal Offsite DL Hours
TOTAL REGULAR DIRECT LABOR HOURS
OVERTIME PREMIUM (OT) DIRECT LABOR HOURS:
Onsite OT DL Hours:
(List by Individual OT DL Category)
Subtotal Onsite OT DL Hours
Offsite OT DL Hours:
(List by Individual DL Category)
Subtotal Offsite OT DL Hours
TOTAL OVERTIME PREMIUM DIRECT LABOR HOURS
REGULAR DIRECT LABOR HOURLY RATES:
(List by Individual DL Category)
DIRECT LABOR COSTS:
Onsite DL Costs:
(List by Individual DL Category)
Subtotal Onsite DLCosts
Offsite DL Costs:
(List by Individual DL Category)
Subtotal Offsite DL Costs
TOTAL REGULAR DIRECT LABOR COSTS
OVERTIME PREMIUM DIRECT LABOR HOURLY RATES:
(List by Individual DL Category)
OVERTIME PREMIUM DIRECT LABOR COSTS:
Onsite OT DL Costs:
(List by Individual DL Category)
Subtotal Onsite OT DLCosts
Offsite OT DL Costs:
(List by Individual DL Category)
Subtotal Offsite OT DL Costs
TOTAL OVERTIME PREMIUM DIRECT LABOR COSTS
TOTAL REGULAR AND OVERTIME PREMIUM DIRECT LABOR COSTS
This exhibit contains Source Selection Information. See FAR 3.104.
Elements of Cost Labor Type (E or NE)
GRAND
TOTAL
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2ADL
CORE REQUIREMENTS
DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL
WBS Level 3 - CORE Program Management
Base Option 1 Option 2 Option 3 Option 4 Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5
REGULAR DIRECT LABOR (DL) HOURS:
Onsite DL Hours:
(List by Individual DL Category)
Subtotal Onsite DL Hours
Offsite DL Hours:
(List by Individual DL Category)
Subtotal Offsite DL Hours
TOTAL REGULAR DIRECT LABOR HOURS
OVERTIME PREMIUM (OT) DIRECT LABOR HOURS:
Onsite OT DL Hours:
(List by Individual OT DL Category)
Subtotal Onsite OT DL Hours
Offsite OT DL Hours:
(List by Individual DL Category)
Subtotal Offsite OT DL Hours
TOTAL OVERTIME PREMIUM DIRECT LABOR HOURS
REGULAR DIRECT LABOR HOURLY RATES:
(List by Individual DL Category)
DIRECT LABOR COSTS:
Onsite DL Costs:
(List by Individual DL Category)
Subtotal Onsite DLCosts
Offsite DL Costs:
(List by Individual DL Category)
Subtotal Offsite DL Costs
TOTAL REGULAR DIRECT LABOR COSTS
OVERTIME PREMIUM DIRECT LABOR HOURLY RATES:
(List by Individual DL Category)
OVERTIME PREMIUM DIRECT LABOR COSTS:
Onsite OT DL Costs:
(List by Individual DL Category)
Subtotal Onsite OT DLCosts
Offsite OT DL Costs:
(List by Individual DL Category)
Subtotal Offsite OT DL Costs
TOTAL OVERTIME PREMIUM DIRECT LABOR COSTS
TOTAL REGULAR AND OVERTIME PREMIUM DIRECT LABOR COSTS
This exhibit contains Source Selection Information. See FAR 3.104.
Elements of Cost Labor Type (E or NE)
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2BDL
CORE REQUIREMENTS
DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL
WBS Level 2 - Range Management and Sustainment
Base Option 1 Option 2 Option 3 Option 4 Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5
REGULAR DIRECT LABOR (DL) HOURS:
Onsite DL Hours:
(List by Individual DL Category)
Subtotal Onsite DL Hours
Offsite DL Hours:
(List by Individual DL Category)
Subtotal Offsite DL Hours
TOTAL REGULAR DIRECT LABOR HOURS
OVERTIME PREMIUM (OT) DIRECT LABOR HOURS:
Onsite OT DL Hours:
(List by Individual OT DL Category)
Subtotal Onsite OT DL Hours
Offsite OT DL Hours:
(List by Individual DL Category)
Subtotal Offsite OT DL Hours
TOTAL OVERTIME PREMIUM DIRECT LABOR HOURS
REGULAR DIRECT LABOR HOURLY RATES:
(List by Individual DL Category)
DIRECT LABOR COSTS:
Onsite DL Costs:
(List by Individual DL Category)
Subtotal Onsite DLCosts
Offsite DL Costs:
(List by Individual DL Category)
Subtotal Offsite DL Costs
TOTAL REGULAR DIRECT LABOR COSTS
OVERTIME PREMIUM DIRECT LABOR HOURLY RATES:
(List by Individual DL Category)
OVERTIME PREMIUM DIRECT LABOR COSTS:
Onsite OT DL Costs:
(List by Individual DL Category)
Subtotal Onsite OT DLCosts
Offsite OT DL Costs:
(List by Individual DL Category)
Subtotal Offsite OT DL Costs
TOTAL OVERTIME PREMIUM DIRECT LABOR COSTS
TOTAL REGULAR AND OVERTIME PREMIUM DIRECT LABOR COSTS
This exhibit contains Source Selection Information. See FAR 3.104.
Elements of Cost Labor Type (E or NE)
EXHIBIT 2C
SIGNIFICANT SUBCONTRACTOR
CORE REQUIREMENTS
ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)
Work Breakdown Structure (WBS) Level 2 - Core Requirements
Base Period Option 1 Option 2 Option 3 Option 4 GRAND Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL
Direct Labor (DL) Hours:
Onsite DL Hours Offsite DL Hours Regular Direct Labor Hours
Overtime Premium (OT) DL Hours:
Onsite OT DL Hours Offsite OT DL Hours Total Overtime Premium Direct Labor Hours
Total Direct and Overtime Premium Labor Hours (DL & OT):
Total Onsite DL & OT Hours Total Offsite DL & OT Hours Total Direct and Overtime Premium Labor Hours (DL & OT)
Direct Labor (DL) Costs:
Onsite DL Costs Offsite DL Costs Total Direct Labor Costs
Overtime Premium (OT) DL Costs:
Onsite OT DL Costs Offsite OT DL Costs Total Overtime Premium Direct Labor Costs
Direct and Overtime Premium Labor (DL & OT) Costs:
Total Onsite OT & DL Costs Total Offsite OT & DL Costs Total Direct and Overtime Premium Labor (DL & OT) Costs:
OVERHEAD:
Onsite Offsite
TOTAL OVERHEAD COSTS
Other Direct Costs (ODC):
Other Subcontracts Materials Travel Other (Specify)
TOTAL ODC COSTS:
Subtotal Cost
G&A
TOTAL ESTIMATED COST
FIXED FEE PERCENTAGE
FIXED FEE AMOUNT
TOTAL COST PLUS FIXED FEE
Offerors may adjust elements of cost to be consistent with your current accounting system.
EXHIBIT 2D
SIGNIFICANT SUBCONTRACTOR
CORE REQUIREMENTS
ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)
Work Breakdown Structure (WBS) Level 3 - Program Management
Base Period Option 1 Option 2 Option 3 Option 4 GRAND Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL
Direct Labor (DL) Hours:
Onsite DL Hours Offsite DL Hours Regular Direct Labor Hours
Overtime Premium (OT) DL Hours:
Onsite OT DL Hours Offsite OT DL Hours Total Overtime Premium Direct Labor Hours
Total Direct and Overtime Premium Labor Hours (DL & OT):
Total Onsite DL & OT Hours Total Offsite DL & OT Hours Total Direct and Overtime Premium Labor Hours (DL & OT)
Direct Labor (DL) Costs:
Onsite DL Costs Offsite DL Costs Total Direct Labor Costs
Overtime Premium (OT) DL Costs:
Onsite OT DL Costs Offsite OT DL Costs Total Overtime Premium Direct Labor Costs
Direct and Overtime Premium Labor (DL & OT) Costs:
Total Onsite OT & DL Costs Total Offsite OT & DL Costs Total Direct and Overtime Premium Labor (DL & OT) Costs:
OVERHEAD:
Onsite Offsite
TOTAL OVERHEAD COSTS
Other Direct Costs (ODC):
Other Subcontracts Materials Travel Other (Specify)
TOTAL ODC COSTS:
Subtotal Cost
G&A
TOTAL ESTIMATED COST
FIXED FEE PERCENTAGE
FIXED FEE AMOUNT
TOTAL COST PLUS FIXED FEE
Offerors may adjust elements of cost to be consistent with your current accounting system.
EXHIBIT 2E
SIGNIFICANT SUBCONTRACTOR
CORE REQUIREMENTS
ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)
Work Breakdown Structure (WBS) Level 3 - Range Management and Sustainment
Base Period Option 1 Option 2 Option 3 Option 4 GRAND Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL
Direct Labor (DL) Hours:
Onsite DL Hours Offsite DL Hours Regular Direct Labor Hours
Overtime Premium (OT) DL Hours:
Onsite OT DL Hours Offsite OT DL Hours Total Overtime Premium Direct Labor Hours
Total Direct and Overtime Premium Labor Hours (DL & OT):
Total Onsite DL & OT Hours Total Offsite DL & OT Hours Total Direct and Overtime Premium Labor Hours (DL & OT)
Direct Labor (DL) Costs:
Onsite DL Costs Offsite DL Costs Total Direct Labor Costs
Overtime Premium (OT) DL Costs:
Onsite OT DL Costs Offsite OT DL Costs Total Overtime Premium Direct Labor Costs
Direct and Overtime Premium Labor (DL & OT) Costs:
Total Onsite OT & DL Costs Total Offsite OT & DL Costs Total Direct and Overtime Premium Labor (DL & OT) Costs:
OVERHEAD:
Onsite Offsite
TOTAL OVERHEAD COSTS
Other Direct Costs (ODC):
Other Subcontracts Materials Travel Other (Specify)
TOTAL ODC COSTS:
Subtotal Cost
G&A
TOTAL ESTIMATED COST
FIXED FEE PERCENTAGE
FIXED FEE AMOUNT
TOTAL COST PLUS FIXED FEE
Offerors may adjust elements of cost to be consistent with your current accounting system.
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 3
SUMMARY OF INDIRECT RATES
Overhead Onsite Overhead Offsite Manufacturing G&A Expense Other (Identify)** Rate Rate Overhead Rate Rate Rate
Contract Year 1 - Base Period *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 1 Composite
Contract Year 2 -Option 1 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 2 Composite
Contract Year 3 - Option 2 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 3 Composite
Contract Year 4 - Option 3 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 4 Composite
Contract Year 5 - Option 4 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 5 Composite
BASE OF APPLICATION - INDIRECT RATE APPLIED
AGAINST (Specific Base)****
*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates **If Multiple "Other" Indirect Rates - Add additional columns and specify each individually ***Explanation of Base of Application
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 4
SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)
Specify ODC** Specify ODC** Specify ODC** Specify ODC** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount***
Contract Year 1 - Base Period *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 1 Composite
Contract Year 2 - Option 1 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 2 Composite
Contract Year 3 - Option 2 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 3 Composite
Contract Year 4 - Option 3 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 4 Composite
Contract Year 5 - Option 4 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________
Contract Year 5 Composite
BASE OF APPLICATION - INDIRECT RATE APPLIED
AGAINST (Specific Base)****
*Explain Basis of Allocation of Contractor FY Rates to Obtain Government Fiscal Year Composite Rates **Type/Name of Recurring ODCs or CERs (i.e. Computer Usage, Program Management, Administrative Support, Depreciation, etc.)
***Specify ODC as either a Percentage (%), Rate, and/or Dollar amount ($) ****Explanation of Base of Application
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 5A
OVERHEAD EXPENSE POOL (Composition of Burden Pool)
Overhead or Service Center Pool = _______________ (Specify Type of Overhead Burden, e.g. Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc. - See Section L - Cost Volume Instructions)
OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.
Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Cost Elements within Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year the Overhead Burden Pool Prior Yr 3** Prior Yr 2** Prior Yr 1** _________ _________ _________ _________ _________
Total Overhead Pool Expenses Base of Distribution (identify) Dollars:
Existing Base Forecasted Base* Contractor FY Rate (%)
Conversion of Contractor FY Overhead Rate to Contract Year (CY) Rate CY 1 CY 2 CY 3 CY 4 CY 5 Proposed Overhead Bid Rate by CY
If more than one Overhead Pool is proposed, submit a separate Exhibit for each Pool.
*Provide details of the forecasted base.
**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 5B
GENERAL AND ADMINISTRATIVE (G&A) EXPENSE POOL (Composition of Burden Pool)
OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.
Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Prior Yr 3** Prior Yr 2** Prior Yr 1** _________ _________ _________ _________ _________
Labor:
Labor Related Cost:
B&P
IR&D
Corporate Allocations:
Other (Specify):
Total G&A Pool Expenses Base of Distribution (identify) Dollars:
Existing Base Forecasted Base* Contractor FY Rate (%)
Conversion of Contractor FY G&A Rate to Contract Year (CY) Rate CY 1 CY 2 CY 3 CY 4 CY 5 Proposed G&A Bid Rate by CY
If more than one G&A Pool is proposed, submit a separate Exhibit for each Pool.
*Provide details of the forecasted base.
**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.
Cost Elements Within the G&A Expense Pool
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 6
CORE REQUIREMENTS
OTHER SUBCONTRACTS
CONTRACT
YEAR WBS(s) SUBCONTRACTOR DESCRIPTION OF EFFORT TYPE OF
CONTRACT
PRIME
PROPOSED
SUB HOURS
PRIME
PROPOSED
SUB PRICE
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 7
CORE REQUIREMENTS
TRAVEL COSTS
CONTRACT YEAR WBS ORGIN/DESTINATION PURPOSE # OF TRIPS # OF PEOPLE # OF DAYS AIRFARE
RATE
AIRFARE
AMOUNT
PER DIEM
RATE
PER DIEM
AMOUNT
CAR
RENTAL
RATE
CAR
RENTAL
AMOUNT
TOTAL
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 8
CORE REQUIREMENTS
OTHER DIRECT COSTS
CY WBS VENDOR DESCRIPTION QUANTITY
REQUIRED UNIT PRICE TOTAL PRICE
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 9
PHASE-IN PLAN PRICE
Proposed Costs
DIRECT LABOR HOURS (Derived from Exhibit 10A )
DIRECT LABOR COST (Derived from Exhibit 10A )
OVERHEAD
OTHER DIRECT COSTS:
Relocation Training Subcontracts Travel Other (detail)
TOTAL ODCS
SUBTOTAL COSTS
G&A
TOTAL COSTS
PROFIT
TOTAL FIRM FIXED PRICE
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 9A
DIRECT LABOR PHASE-IN COSTS
Contract Direct Labor Categories Hours Proposed Rates Proposed Costs
TOTAL PHASE-IN DIRECT LABOR
COSTS
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 10
CORE REQUIREMENTS
SOURCE OF PERSONNEL CHART - CONTRACT WIDE (CORE + IDIQ)
(FIRST CONTRACT YEAR ONLY)
Total Number of Staff Labor Category/Position Title
Labor Category
Code*
Personnel Available Within Company
Personnel to be Obtained from
Incumbent Outside Hired Staff
TOTAL
*Code each Labor Cateogry: S=SALARIED; H=HOURLY; U=UNION; E=EXEMPT; NE=NON-EXEMPT DOL/WD DETERMINATION;
I=INCUMBENT; SU=SUBCONTRACTOR
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 11
PRODUCTIVE WORK YEAR CALCULATION
Base Option 1 Option 2 Option 3 Option 4 Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5
Total Possible Hours in Year Less:
Vacation in Hours
Holidays in Hours
Sick Leave in Hours
Miscellaneous in Hours (specifically identify)
This exhibit contains Source Selection Information. See FAR 3.104.
PRODUCTIVE WORK YEAR in Hours (Hours Actually Worked)
[ ] Prime Offeror OR [ ] Significant Subcontractor OR [ ] Non-Significant Subcontractor
EXHIBIT 12A
FRINGE BENEFITS (FB)
(Total Compensation Plan)
Exempt Employees Company Or Division Name:
Employer Location(s):
Effective:
Insurance Plans Health Life Dental Disability Other (List)
Sick Leave
Employee Savings
Severance Pay
Vacation
Holidays
Other (List)
Total Cost of FB
This exhibit contains Source Selection Information. See FAR 3.104.
NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.
RemarksBenefit Item Percentage AND Cost Per Hour of
Employee Contribution Percentage AND Cost Per Hour of
Company Contribution Total Cost of FB per Hour
[ ] Prime Offeror OR [ ] Significant Subcontractor OR [ ] Non-Significant Subcontractor
EXHIBIT 12A
FRINGE BENEFITS (FB)
(Total Compensation Plan)
Non-Exempt Employees Company Or Division Name:
Employer Location(s):
Effective:
Insurance Plans Health Life Dental Disability Other (List)
Sick Leave
Employee Savings
Severance Pay
Vacation
Holidays
Other (List)
Total Cost of FB
This exhibit contains Source Selection Information. See FAR 3.104.
NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.
Total Cost of FB per Hour RemarksBenefit Item
Percentage AND Cost Per Hour of Employee Contribution
Percentage AND Cost Per Hour of Company Contribution
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 13A
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
BASE CONTRACT PERIOD ONLY
(Core Requirements Plus IDIQ Maximum Ordering Value)
Dollar Amount* Percentage Dollar Amount* Percentage
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
Other Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING
(SMALL & LARGE BUSINESS CONCERNS)
*Dollar Amount should be the same
This exhibit contains Source Selection Information. See FAR 3.104.
SMALL BUSINESS CATEGORY
PROPOSED BASE PERIOD CONTRACT GOALS
(Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED BASE PERIOD CONTRACT GOALS
BASED ON TOTAL PLANNED SUBCONTRACTS OF
$TBP
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 13B
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
OPTION PERIODS ONLY
(Core Requirements Plus IDIQ Maximum Ordering Value)
Dollar Amount* Percentage Dollar Amount* Percentage Dollar Amount** Percentage Dollar Amount** Percentage Dollar Amount** Percentage Dollar Amount** Percentage
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
Other Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING
(SMALL & LARGE BUSINESS CONCERNS)
* Dollar Amount should be the same ** Dollar Amount should be the same
This exhibit contains Source Selection Information. See FAR 3.104.
SMALL BUSINESS CATEGORY
PROPOSED OPTION 1 GOALS (Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED OPTION 1 GOALS
BASED ON OPTION 1 PLANNED
SUBCONTRACTS OF $TBP
PROPOSED OPTION 3 GOALS (Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED OPTION 3 GOALS
BASED ON OPTION 3 PLANNED
SUBCONTRACTS OF $TBP
PROPOSED OPTION 2 GOALS (Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED OPTION 2 GOALS
BASED ON OPTION 2 PLANNED
SUBCONTRACTS OF $TBP
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 13C
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
BASE CONTRACT PERIOD PLUS FOUR OPTION PERIODS
(Core Requirements Plus IDIQ Maximum Ordering Value)
Dollar Amount* Percentage Dollar Amount* Percentage
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
Other Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING
(SMALL & LARGE BUSINESS CONCERNS)
*Dollar Amount should be the same
This exhibit contains Source Selection Information. See FAR 3.104.
SMALL BUSINESS CATEGORY
PROPOSED BASE PLUS 4 OPTION PERIODS
CONTRACT GOALS
BASED ON TOTAL PLANNED SUBCONTRACTS OF
$TBP
PROPOSED BASE PLUS 4 OPTION PERIODS
CONTRACT GOALS
(Core Proposed Value plus IDIQ Max)
$TBP
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 14A
Cognizant Defense Contract Audit Agency (DCAA) Office Information
DCAA Online Info http://www.dcaa.mil
Company Name: DCAA FAO:
POC: POC:
Phone Number: Phone Number:
FAX Number: FAX Number:
E-Mail Address: E-Mail Address:
Street: Street:
P.O.Box: P.O.Box:
City: City:
State: State:
Zip Code: Zip Code:
Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.
DCAA Field Audit Office (FAO):Submitting Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 14B
Cognizant Defense Contract Management Agency (DCMA) Office Information
DCMA Online Info http://www.dcma.mil
Company Name: DCMA Office
POC: POC:
Phone Number: Phone Number:
FAX Number: FAX Number:
E-Mail Address: E-Mail Address:
Street: Street:
P.O.Box: P.O.Box:
City: City:
State: State:
Zip Code: Zip Code:
Disclosures: Date Status Contractor Estimating System Review (CESR) Contractor Purchasing System Review (CPSR) Contractor Billing System Review Contractor Accounting System Review Contractor Disclosure Statement Accuracy Contractor Executive Compensation Review Contractor Property Management System Forward Pricing Rate Agreements Earned Value Management System (EVMS) Level of CAS applicability Determination of Cost Accounting Standards (CAS) applicability
Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.