Report_Limited Lead Paint Survey_PR-1.pdf

PDF 2 MB Posted

Attached to
Signs and Safety Repairs Project in PR-1, PR-2, and PR-3
Solicitation number
693C73-21-B-000006
Issued by

About this file

This solicitation is seeking sealed bids from certified Small Business Concerns for a Signs and Safety Repairs Project in PR-1, PR-2, and PR-3 highways located in Puerto Rico. The project consists of repairing signs and guardrails damaged by Hurricanes Irma and Maria, including traffic sign assemblies, new guardrails, end-terminals, bridge transition upgrades, new transition modules, traffic signs and guardrails demolition and removal, temporary traffic control, and other miscellaneous work. The project will be split into multiple work schedules/contract options, with the total cost expected to exceed $10,000,000. Schedule C will not be awarded until Categorical Exclusion receives final approval. Bids are due on a date to be specified in Solicitation Number 693C73-21-B-000006. The soliciting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Results of the Bid Opening - PR ST ER PRMNT RPR (6).pdf PDF
Amended Plan Sheets_Standard Drawings_Amendment 2.pdf PDF
Amendment 0002.pdf PDF
Bid Schedule_Amendment 2.pdf PDF
Plan Sheet Changes Summary_Amendment 2.pdf PDF
B Pages Changes Summary_Amendment 2.pdf PDF
Amendment 0001 - PR ST ER PRMNT RPR(6).pdf PDF
Report_Abestos Containing Mat Survey_PR-3.pdf PDF
NEPA_OGPE_PR-1.pdf PDF
NEPA_PR-3_Part1 (Pages 1 - 115).pdf PDF
Plans_Sch A_PR-2 Unit 1.pdf PDF
Plans_Sch B_PR-3 Unit 1.pdf PDF
NEPA_PR-1_Archeological Monitoring.pdf PDF
PRHTAs Standard Drawings_RPR(6).pdf PDF
Plans_Sch B_PR-3 Unit 2.pdf PDF
NEPA_PR-3_Part3 (Pages 231 - 346).pdf PDF
Report_Lead Based Paint Survey_PR-3.pdf PDF
Report_Lead-Abestos_PR-2.pdf PDF
Plans_Sch A_PR-2 Unit 4.pdf PDF
NEPA_PR-1.pdf PDF
Certification _No Presence of Asbesto_PR3.pdf PDF
Plans_Sch B_PR-3 Unit 3.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Plans_Sch C_PR-1.pdf PDF
Plans_Sch A_PR-2 Unit 2.pdf PDF
NEPA_PR-2.pdf PDF
Letter_Procedure to Deliver Salvageable Materials.pdf PDF
IFB Solicitation - PR ST ER PRMNT RPR (6).pdf PDF
Report_Abestos Containing Material Survey_PR-1.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Plans_Sch A_PR-2 Unit 3.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
NEPA_PR-3_Part2 (Pages 116 - 230).pdf PDF
VETS-4212 Form.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared for: Barret Hale and Alamo July 28, 2019

Prepared By: Altol Environmental Services

Hygiene Division

Lead- Asbestos Consultant

P O Box 359

Mercedita, PR 00715

PR-1 Ponce-San Juan PR

Limited Lead Based Paint Survey

Altol Environmental Services Inc.

Environmental Survey for LBP Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019 Prepared For Barrett, Hale & Alamo

TABLE OF CONTENTS

Page

I. Summary 2-3

1.0 Introduction 4

2.0 Lead Based Paint Testing Methodology 4-5

3.0 Testing Procedure 5-6

4.0 Results 7

Conclusions 8

5.0 Appendix

Appendix I. General View Pictures of Inspected Structures. 8

Appendix II. XRF Data 14

Appendix III. Photos of Positives Components 18

Appendix IV. Credentials 19

Appendix V. Schematic Plan 21

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

I. Summary

An environmental survey for Lead Based Painted (LBP) Components was conducted by

Altol Environmental Services Inc. in order of Barrett Hale & Alamo on Jun 27, 2019 for

Highway PR-1 (Km 0.00 to Km 128.00) of Roadside Barriers (Specific Locations). The structures are located from Km 0.00 to Km 128.00, San Juan to Ponce, Puerto Rico. The purposed of this inspection was to identify LBP coating in the roadside barriers affected by the Hurricane Maria to be scheduled for removal and replace. The inspection was performed following applicable portions of the Housing Urban Development Guidelines. The scope of the survey included detection of LBP components that were present in the specific locations where they were tested.

The structures (Road Barriers) were tested. The inspection consisted in the determination for

LBP at The Head Start Center. The survey, performed with an XRF instrument manufactured by Thermo Scientific, was conducted using 100% of testing.

Positive components were found painted with LBP during this inspection. See

Table 1-1 for Summary of Positive Components.

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

TABLE 1-1 SUMMARY OF POSITIVE COMPONENTS

Location Component Measure

PR 1 Km 117.9 to 117.8- Northbound Metal Barrier 20 ft2

PR 1 Km 108.4 to 108.3- Northbound Metal Barrier 60 ft2

PR 1 Km 52.4 to Km 52.5- Southbound Metal Barrier 30 ft2

Note: All measurements should be confirmed by contractor.

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

1. Introduction

An environmental survey for Lead Based Painted (LBP) Components was conducted by

Altol Environmental Services, Inc for Barrett Hale & Alamo. The scope of the survey included LBP testing of components for Metal at Highway PR-1 (Km 0.00 to Km 128.00), which are scheduled to be removed and install (Roadside Barriers). The structures are located from San Juan to Ponce, Puerto Rico. The survey was performed using the single-family testing protocol outlined by HUD in 1997.

The LBP investigation was conducted by Margarita Irizarry, EQB certified LBP inspector

No. 3248-1218-LI-006. The credentials of Altol Environmental Services, Inc. and of LBP inspector are attached in Appendix IV.

2.0 Lead Based Paint Testing Methodology

The lead based paint testing protocol officially available at this time was published by

HUD initially in 1990, revised in 1991 and finalized in 1995 (see above HUD reference). A revised modification of Chapter 7 was published in 1997. In accordance to the new protocol, almost all surfaces present in the dwelling units has to be tested. The above guidelines were used to perform lead based-paint testing for this project.

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

The hazard level of lead in paint has been determined by the Department of Housing &

Urban Development (HUD) to be 1.0 mg/cm2, as measured by XRF or Atomic Absorption

Spectroscopy (AAS), or 0.5% by weight (or 5000 ppm) as measured by AAS, or Inductive

Coupled Plasma (ICP). The same level was adopted by EPA regulations published in 1992, under Title X.

The main steps involving a multi-family inspection:

1. Select the painted area to be tested

2. Classify XRF and paint chips results

3. Collect and analyze paint chip samples, for inconclusive results

4. Classify paint chips results

5. Review and evaluate the data

6. Report findings

3.0 Testing Procedure

For this survey the painted component testing was performed with a Thermo Scientific Niton X

Ray fluorescence instrument (serial number 85563) the instrument operates in two modes;

standard mode and time corrected mode (Lead in Paint K+L variable reading time mode). The standard mode is a method selected for the NIST reference reading to ensure

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019 that the instrument is working according to the manufacturers Performance Characteristic Sheet

(PCS). The selected mode for sampling of components was done in time corrected mode (Lead in Paint variable reading time mode); which allows reference to the abatement level set at 1.0 mg/cm². The results are reported at 95% confidence level and the quality of the testing verified according to the manufacturers recommendations.

NOTE:

If the results of the surface analyzed by the XRF Spectrum Analyzer is less than 1.0 mg/cm² it’s considered negative.

If the results of the surface analyzed by the XRF Spectrum Analyzer is equal or greater than 1.0 mg/cm² it’s considered positive.

In case of inconclusive result, Paint Chip (sample of the paint) will analyzed at laboratory and reported by weight % or ppm.

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Component sampling was conducted using a clockwise path for all functional spaces including exterior sides of selection as per the following figure:

4.0 Results

Seventy-six (76) XRF readings were taken. Positive LBP components were found at the moment of this inspection. The results of the tested components are shown in Appendix II.

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

5.0 Conclusions

LBP survey was conducted for Barrett Hale & Alamo. The scope of the survey included

LBP testing of components of Metal at Highway PR-1, which is scheduled to be renovated.

The structure is located from San Juan to Ponce (Km 0.00 to Km 128.00), Puerto Rico.

Positive components were found during the inspection.

This report should be kept by the owner and all future owners for the life of the building.

The LBP survey relates to surfaces accessible and not covered by rigid barriers. Should any hidden surfaces or components be present, they must be assumed to be painted with LBP or with positive value.

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Appendix I. General View of Inspected Structure

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Appendix II. XRF Data

Customer Name: Project Name:

Contact: Total Samples: 76

Phone / Fax/Email: Bldg/Structure:

Collected By: Margarita Irizarry Inspector No. 3248-1218-LI-006 Floor:

Date: XRF Serial No.

Project Description:

Reading # Structure Room Sustrate Color Component & Location

XRF

Reading

Paint

Condition Measurement

1 Calibration 1.2

2 Calibration 1.0

3 Calibration 1.0

PR 1 Km 123.6 to 123.5 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 123.3 to 123.1 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 117.9 to 117.8 Northbound Metal Yellow Roadside Barrier 1.3 Fair 20 ft^2

PR 1 Km 108.5 to 108.4 Northbound Metal Yellow Roadside Barrier 0.10 Fair

PR 1 Km 108.4 to 108.3 Northbound Metal Yellow Roadside Barrier 2.0 Fair 60 ft^2

PR 1 Km 107.4 to 107.3 Northbound Metal Yellow Roadside Barrier 0.02 Fair

PR 1 Km 94.2 to 93.2 (Km 93.3) Northbound Metal Yellow Roadside Barrier 0.7 Fair

PR 1 Km 94.2 to 93.2 (Km 93.2) Northbound Metal Yellow Roadside Barrier 0.5 Fair

PR 1 Km 81.5 to 81.3 (Km 81.41) Northbound Metal Yellow Roadside Barrier 0.5 Fair

PR 1 Km 81.5 to 81.3 (Km 81.33) Northbound Metal Yellow Roadside Barrier 0.23 Fair

ALTOL ENVIRONMENTAL SERVICES, INC. Page_____of______

PO BOX 359 MERCEDITA, PR 00715-0359

XRF Form for Lead Base Paint Inspection

Barrett Hale & Alamo Removal and Installation of Roadside Barriers Affected by Hurricane Maria

27-Jun-19 85563

Environmental Survey for Lead Base Paint, Highway PR 1 (Km 0.0 to Km 128.0) San Juan to Ponce (Both Direction)

Herminio Alamo Job Number: ENJ-3782

Highway PR 1 (Km 0.00 to Km 128.0) San Juan to Ponce (Both Direction)

Substrate: Concrete (C), Ceramic (Ce), Metal (M), Brich (B), Wood (W), Plaster (P). Color: White (W) Brown (Br), Cream (Cr), Blue (Bl), Yellow (Y), Green (Gr), Gray (Gy), Pink (P)

Phone / Fax/Email: Bldg/Structure:

Collected By: Margarita Irizarry Inspector No. 3248-1218-LI-006 Floor:

Date: XRF Serial No.

Project Description:

Reading # Structure Room Sustrate Color Component & Location

XRF

Reading

Paint

Condition Measurement

ALTOL ENVIRONMENTAL SERVICES, INC. Page_____of______

PO BOX 359 MERCEDITA, PR 00715-0359

XRF Form for Lead Base Paint Inspection

Barrett Hale & Alamo Removal and Installation of Roadside Barriers Affected by Hurricane Maria

27-Jun-19 85563

Environmental Survey for Lead Base Paint, Highway PR 1 (Km 0.0 to Km 128.0) San Juan to Ponce (Both Direction)

Herminio Alamo Job Number: ENJ-3782

Highway PR 1 (Km 0.00 to Km 128.0) San Juan to Ponce (Both Direction)

PR 1 Km 76.8 to 76.6 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 72.0 to 71.9 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 44.1 to Km 44.0 Northbound Metal Yellow Roadside Barrier 0.36 Fair

PR 1 Km 43.4 to Km 43.3 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 43.3 to Km 43.2 Northbound Metal Yellow Roadside Barrier 0.07 Fair

PR 1 Km 43.2 to Km 43.1 Northbound Metal Yellow Roadside Barrier 0.03 Fair

PR 1 Km 42.7 to Km 42.5 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 41.7 to Km 41.6 (Km 41.695) Northbound Metal Yellow Roadside Barrier 0.0 Fair

PR 1 Km 41.7 to Km 41.6 (Km 41.67) Northbound Metal Yellow Roadside Barrier 0.04 Fair

PR 1 Km 41.7 to Km 41.6 (Km 41.65) Northbound Metal Yellow Roadside Barrier 0.0 Fair

PR 1 Km 41.6 to Km 41.48 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 41.475 to Km 41.4 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 41.4 to Km 41.3 Northbound Metal Yellow Roadside Barrier 0.10 Fair

Substrate: Concrete (C), Ceramic (Ce), Metal (M), Brich (B), Wood (W), Plaster (P). Color: White (W) Brown (Br), Cream (Cr), Blue (Bl), Yellow (Y), Green (Gr), Gray (Gy), Phone / Fax/Email: Bldg/Structure:

Collected By: Margarita Irizarry Inspector No. 3248-1218-LI-006 Floor:

Date: XRF Serial No.

Project Description:

Reading # Structure Room Sustrate Color Component & Location

XRF

Reading

Paint

Condition Measurement

ALTOL ENVIRONMENTAL SERVICES, INC. Page_____of______

PO BOX 359 MERCEDITA, PR 00715-0359

XRF Form for Lead Base Paint Inspection

Barrett Hale & Alamo Removal and Installation of Roadside Barriers Affected by Hurricane Maria

27-Jun-19 85563

Environmental Survey for Lead Base Paint, Highway PR 1 (Km 0.0 to Km 128.0) San Juan to Ponce (Both Direction)

Herminio Alamo Job Number: ENJ-3782

Highway PR 1 (Km 0.00 to Km 128.0) San Juan to Ponce (Both Direction)

PR 1 Km 41.1 to Km 41.0 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 40.7 to Km 40.5 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 40.5 to Km 40.4 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 38.6 to Km 38.5 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 19.2 to Km 19.0 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 18.6 to Km 18.4 Northbound Metal Yellow Roadside Barrier 0.03 Fair

PR 1 Km 18.1 to Km 18.0 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 7.2 to Km 7.08 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 7.04 to Km 6.9 Northbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 17.3 to Km 17.6 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR Km 38.6 to Km 38.12 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR Km 41.9 to Km 41.2 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 45.10 to Km 45.12 Southbound Metal Yellow Roadside Barrier 0.15 Fair

Substrate: Concrete (C), Ceramic (Ce), Metal (M), Brich (B), Wood (W), Plaster (P). Color: White (W) Brown (Br), Cream (Cr), Blue (Bl), Yellow (Y), Green (Gr), Gray (Gy), Phone / Fax/Email: Bldg/Structure:

Collected By: Margarita Irizarry Inspector No. 3248-1218-LI-006 Floor:

Date: XRF Serial No.

Project Description:

Reading # Structure Room Sustrate Color Component & Location

XRF

Reading

Paint

Condition Measurement

ALTOL ENVIRONMENTAL SERVICES, INC. Page_____of______

PO BOX 359 MERCEDITA, PR 00715-0359

XRF Form for Lead Base Paint Inspection

Barrett Hale & Alamo Removal and Installation of Roadside Barriers Affected by Hurricane Maria

27-Jun-19 85563

Environmental Survey for Lead Base Paint, Highway PR 1 (Km 0.0 to Km 128.0) San Juan to Ponce (Both Direction)

Herminio Alamo Job Number: ENJ-3782

Highway PR 1 (Km 0.00 to Km 128.0) San Juan to Ponce (Both Direction)

PR 1 Km 45.4 to Km 45.5 (Km 45.4) Southbound Metal Yellow Roadside Barrier 0.15 Fair

PR 1 Km 45.4 to Km 45.5 (Km 45.4) Southbound Metal Yellow Roadside Barrier 0.01 Fair

PR 1 Km 45.7 to Km 45.82 Southbound Metal Yellow Roadside Barrier 0.01 Fair

PR 1 Km 45.5 to Km 45.82 Southbound Metal Red Roadside Barrier 0.05 Fair

PR 1 Km 45.5 to Km 45.82 Southbound Metal Yellow Roadside Barrier 0.01 Fair

PR 1 Km 45.5 to Km 45.82 Southbound Metal Yellow Roadside Barrier 0.14 Fair

PR 1 Km 46.0 to Km 46.12 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 46.13 to Km 46.17 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 46.2 to Km 46.3 Southbound Metal Yellow Roadside Barrier 0.06 Fair

PR 1 Km 47.8 to Km 47.9 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 49.3 to Km 49.4 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 52.4 to Km 52.5 Southbound Metal Yellow Roadside Barrier 1.20 Fair 30 ft^2

PR 1 Km 59.2 to Km 59.3 Southbound Metal

No

Paint Roadside Barrier 0.0 -

Substrate: Concrete (C), Ceramic (Ce), Metal (M), Brich (B), Wood (W), Plaster (P). Color: White (W) Brown (Br), Cream (Cr), Blue (Bl), Yellow (Y), Green (Gr), Gray (Gy), Phone / Fax/Email: Bldg/Structure:

Collected By: Margarita Irizarry Inspector No. 3248-1218-LI-006 Floor:

Date: XRF Serial No.

Project Description:

Reading # Structure Room Sustrate Color Component & Location

XRF

Reading

Paint

Condition Measurement

ALTOL ENVIRONMENTAL SERVICES, INC. Page_____of______

PO BOX 359 MERCEDITA, PR 00715-0359

XRF Form for Lead Base Paint Inspection

Barrett Hale & Alamo Removal and Installation of Roadside Barriers Affected by Hurricane Maria

27-Jun-19 85563

Environmental Survey for Lead Base Paint, Highway PR 1 (Km 0.0 to Km 128.0) San Juan to Ponce (Both Direction)

Herminio Alamo Job Number: ENJ-3782

Highway PR 1 (Km 0.00 to Km 128.0) San Juan to Ponce (Both Direction)

PR 1 Km 62.0 to Km 62.1 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 62.9 to Km 63.1 Southbound Metal Yellow Roadside Barrier 0.08 Fair

PR 1 Km 63.7 to Km 63.8 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 63.8 to Km 63.9 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 63.9 to Km 64.0 Southbound Metal Yellow Roadside Barrier 0.4 Fair

PR 1 Km 65.1 to Km 65.2 Southbound Metal Yellow Roadside Barrier 0.03 Fair

PR 1 Km 65.6 to Km 65.8 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 65.8 to Km 65.9 Southbound Metal Yellow Roadside Barrier 0.08 Fair

PR 1 Km 67.2 to Km 65.3 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 70.6 to Km 70.7 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 77.2 to Km 77.3 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 78.8 to Km 78.9 Southbound Metal Yellow Roadside Barrier 0.03 Fair

PR 1 Km 107.3 to Km 107.4 Southbound Metal Yellow Roadside Barrier 0.08 Fair

Substrate: Concrete (C), Ceramic (Ce), Metal (M), Brich (B), Wood (W), Plaster (P). Color: White (W) Brown (Br), Cream (Cr), Blue (Bl), Yellow (Y), Green (Gr), Gray (Gy), Phone / Fax/Email: Bldg/Structure:

Collected By: Margarita Irizarry Inspector No. 3248-1218-LI-006 Floor:

Date: XRF Serial No.

Project Description:

Reading # Structure Room Sustrate Color Component & Location

XRF

Reading

Paint

Condition Measurement

ALTOL ENVIRONMENTAL SERVICES, INC. Page_____of______

PO BOX 359 MERCEDITA, PR 00715-0359

XRF Form for Lead Base Paint Inspection

Barrett Hale & Alamo Removal and Installation of Roadside Barriers Affected by Hurricane Maria

27-Jun-19 85563

Environmental Survey for Lead Base Paint, Highway PR 1 (Km 0.0 to Km 128.0) San Juan to Ponce (Both Direction)

Herminio Alamo Job Number: ENJ-3782

Highway PR 1 (Km 0.00 to Km 128.0) San Juan to Ponce (Both Direction)

PR 1 Km 111.2 to Km 111.3 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 111.3 to Km 111.6 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 111.6 to Km 111.75 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 111.75 to Km 111.82 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 111.82 to Km 111.87 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 111.88 to Km 111.94 Southbound Metal

No

Paint Roadside Barrier 0.0 -

PR 1 Km 120.9 to Km 121.0 Southbound Metal Yellow Roadside Barrier 0.04 Fair

74 Calibration 0.9

75 Calibration 1.0

76 Calibration 1.0

Substrate: Concrete (C), Ceramic (Ce), Metal (M), Brich (B), Wood (W), Plaster (P). Color: White (W) Brown (Br), Cream (Cr), Blue (Bl), Yellow (Y), Green (Gr), Gray (Gy), Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Appendix III. Photos of Positive Components

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Km 117.9 PR-1

Km 108.3 PR-1

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Km 52.4 to 52.5, PR-1

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Appendix IV. Credentials

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Appendix V.

Schematic Site Location of Lead Base Paint Components

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

Highway PR-1, (Km 0.00 to Km 128.00) San Juan to Ponce, PR Jun 27, 2019

File details come from the government source that posted it. Updated .