This federal contract opportunity solicitation seeks sealed bids for signs and safety repairs on multiple highways in Puerto Rico. The project consists of repairing damaged signs, guardrails, and other safety structures on PR-1, PR-2, and PR-3, with the total cost expected to exceed $10 million. Bids are due by the date specified in the solicitation and must be submitted to the specified location. The work includes replacing and upgrading traffic signs, guardrails, end terminals, and bridge transitions, as well as sign and guardrail removal and temporary traffic control. The project will be split into multiple schedules, with Schedule C not awarded until receiving final NEPA approval. Only certified small businesses may submit bids in response to this solicitation issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT-4
FROM KM 195.55 TO KM 230.30
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
GENERAL
MAINTENANCE OF TRAFFIC
Sheet Number Sheet Title
Drawing Title
ROADSIDE SAFETY PLAN
TRAFFIC SIGNING PLAN
Sheet Number Sheet Title Drawing Title
AutoCAD SHX Text
USER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
SEQUENCE:
AutoCAD SHX Text
JVP
AutoCAD SHX Text 12/04/2018
AutoCAD SHX Text
17217-1D\GR-01.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
INDEX OF DRAWINGS
AutoCAD SHX Text
GR
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GR-00
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
AutoCAD SHX Text
GR-01
AutoCAD SHX Text
INDEX OF DRAWINGS
AutoCAD SHX Text
AutoCAD SHX Text
GR-02
AutoCAD SHX Text
GENERAL NOTES & LEGEND
AutoCAD SHX Text
AutoCAD SHX Text
GR-03
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
AutoCAD SHX Text
GR-04
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
AutoCAD SHX Text
GR-05
AutoCAD SHX Text
TYPICAL SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text
GR-06
AutoCAD SHX Text
TYPICAL SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text
MOT-01
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC GENERAL NOTES AND CONSTRUCTION SCHEDULE
AutoCAD SHX Text
AutoCAD SHX Text
MOT-02
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC TYPICAL APPLICATIONS DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
MOT-03
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC TYPICAL APPLICATIONS DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
MOT-04
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC TYPICAL APPLICATIONS DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
MOT-05
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC TYPICAL APPLICATIONS DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
MOT-06
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC SIGN DATA TABLE
AutoCAD SHX Text
AutoCAD SHX Text
RSD-01
AutoCAD SHX Text
ROADSIDE SAFETY PLAN
AutoCAD SHX Text
AutoCAD SHX Text
RSD-02
AutoCAD SHX Text
ROADSIDE SAFETY PLAN
AutoCAD SHX Text
AutoCAD SHX Text
RSD-03
AutoCAD SHX Text
ROADSIDE SAFETY TABLE
AutoCAD SHX Text
AutoCAD SHX Text
TS-01
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 195.55 TO KM. 197.7
AutoCAD SHX Text
AutoCAD SHX Text
TS-02
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 197.7 TO KM. 200.9
AutoCAD SHX Text
AutoCAD SHX Text
TS-03
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 200.9 TO KM. 204.2
AutoCAD SHX Text
AutoCAD SHX Text
TS-04
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 204.2 TO KM. 207.6
AutoCAD SHX Text
AutoCAD SHX Text
TS-05
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 207.6 TO KM. 211.0
AutoCAD SHX Text
AutoCAD SHX Text
TS-06
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 211.0 TO KM. 214.3
AutoCAD SHX Text
AutoCAD SHX Text
TS-07
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 214.3 TO KM. 217.5
AutoCAD SHX Text
AutoCAD SHX Text
TS-08
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 217.5 TO KM. 220.8
AutoCAD SHX Text
AutoCAD SHX Text
TS-09
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 220.8 TO KM. 224.0
AutoCAD SHX Text
AutoCAD SHX Text
TS-10
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 224.0 TO KM. 227.2
AutoCAD SHX Text
AutoCAD SHX Text
TS-11
AutoCAD SHX Text
TRAFFIC SIGNING FROM KM. 227.2 TO KM. 230.3
AutoCAD SHX Text
AutoCAD SHX Text
TS-12
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-13
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-14
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-15
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-16
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-17
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-18
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
TS-19
AutoCAD SHX Text
GUIDE SIGN DETAILS & TABLE OF KILOMETER AND HECTOMETER POST MARKERS
AutoCAD SHX Text
AutoCAD SHX Text
TS-20
AutoCAD SHX Text
GUIDE SIGNS DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
TS-21
AutoCAD SHX Text
GUIDE SIGN DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
TS-22
AutoCAD SHX Text
GUIDE SIGNS DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
TS-23
AutoCAD SHX Text
ROUTE MARKERS SIGN DESIGN
C M
A A
E
LL
C
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
AutoCAD SHX Text
TELEPHONE POLE
AutoCAD SHX Text
AND GUY WIRE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
DIRT ROAD
AutoCAD SHX Text
PROP. SIGN IDENT.
AutoCAD SHX Text
ELECTRICAL OR
AutoCAD SHX Text
MATCH TO EXISTING
AutoCAD SHX Text
TRAFFIC DETECTOR
AutoCAD SHX Text
SIGNS, GROUND, MTD
AutoCAD SHX Text
BLDG TO DEMOLISH
AutoCAD SHX Text
PALM TREES
AutoCAD SHX Text
LUMINARY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UPPER - CODE
AutoCAD SHX Text
LOWER - LOCATION
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
DEM.
AutoCAD SHX Text T.O.S.
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text T.O.S.
AutoCAD SHX Text
RIP RAP PAVING
AutoCAD SHX Text
EDGE OF WOODS
AutoCAD SHX Text
RIP RAP
AutoCAD SHX Text
FOUNDATION
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
ROCK
AutoCAD SHX Text
HEDGE
AutoCAD SHX Text
TREES
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
LAKE OR POND
AutoCAD SHX Text
WATER COURSE
AutoCAD SHX Text
SWAMP
AutoCAD SHX Text
PAVED DITCH
AutoCAD SHX Text
DITCH
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
HEADWALLS
AutoCAD SHX Text
PIPES
AutoCAD SHX Text
INLETS
AutoCAD SHX Text
OR
AutoCAD SHX Text
OR
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY IF REQ.
AutoCAD SHX Text
IDENTIFY IF REQ.
AutoCAD SHX Text
IDENTIFY IF REQ.
AutoCAD SHX Text
IDENTIFY IF REQ.
AutoCAD SHX Text
IDENTIFY TYPE, ETC.
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text W
AutoCAD SHX Text
IDENTIFY AS
AutoCAD SHX Text
IDENTIFY SIZE
AutoCAD SHX Text
TYPE & FLOW
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
AS PER TYPE
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY IF REQ.
AutoCAD SHX Text
PER SIZE
AutoCAD SHX Text
OR
AutoCAD SHX Text
OR
AutoCAD SHX Text
BARRICADE
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
ACCESS CONTROL
AutoCAD SHX Text
CONC. PARAPETS
AutoCAD SHX Text ROW LINE & MON.(a)
AutoCAD SHX Text PROPERTY LINE (a)
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
TOP OF CUT
AutoCAD SHX Text T.O.C.
AutoCAD SHX Text
CONTOUR LINES
AutoCAD SHX Text
HORIZONTAL P.I.
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
CURB
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
NORTH ARROW
AutoCAD SHX Text
NORTH ARROW
AutoCAD SHX Text
SW
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY TYPE
AutoCAD SHX Text
IDENTIFY TYPE
AutoCAD SHX Text
IDENTIFY LIMITS
AutoCAD SHX Text
IDENTIFY IF C.O.A.
AutoCAD SHX Text P
AutoCAD SHX Text T.O.C.
AutoCAD SHX Text L
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
IDENTIFY ROAD
AutoCAD SHX Text
MAGNETIC
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY TYPE
AutoCAD SHX Text
IDENTIFY TYPE
AutoCAD SHX Text
SW
AutoCAD SHX Text
MEAN HIGH WATER
AutoCAD SHX Text M.H.W.
AutoCAD SHX Text
MEAN SEA LEVEL
AutoCAD SHX Text
MON.
AutoCAD SHX Text
MIN.
AutoCAD SHX Text M.S.L.
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
POWER
AutoCAD SHX Text
RIGHT
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
STATION
AutoCAD SHX Text
WATER FAUCET BOX
AutoCAD SHX Text
PROPOSED GRADE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
RETAINING
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
REINFORCED CONCRETE PIPE
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
RADIUS OF CURVATURE
AutoCAD SHX Text
POINT OF VERTICAL INTERSECTION
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
SPIRAL TO CURVE
AutoCAD SHX Text
SPIRAL TO TANGENT
AutoCAD SHX Text
SQUARE METER
AutoCAD SHX Text
STORM SEWER
AutoCAD SHX Text
STRUCTURE
AutoCAD SHX Text
SUBGRADE
AutoCAD SHX Text
TANGENT DISTANCE OF CURVE
AutoCAD SHX Text
TANGENT TO SPIRAL
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
TELEPHONE POLE
AutoCAD SHX Text
TOP ELEVATION
AutoCAD SHX Text
TOP OF GRATE
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
VERTICAL CURVE
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
SURVEY LINE
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WIRE MESH FENCE
AutoCAD SHX Text
WROUGHT IRON
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
EXTERNAL DISTANCE
AutoCAD SHX Text
EXTREME HIGH WATER
AutoCAD SHX Text
GALVANIZED IRON
AutoCAD SHX Text
FEDERAL AID PRIMARY
AutoCAD SHX Text
FEDERAL AID SECONDARY
AutoCAD SHX Text
HIGH WATER LEVEL
AutoCAD SHX Text
INVERT ELEVATION
AutoCAD SHX Text
LENGTH OF CURVE
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAV.
AutoCAD SHX Text
HWL
AutoCAD SHX Text
HYD.
AutoCAD SHX Text
HOR.
AutoCAD SHX Text J.B.
AutoCAD SHX Text
INV.
AutoCAD SHX Text
GRD.
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
MH.
AutoCAD SHX Text M.L.
AutoCAD SHX Text M.B.
AutoCAD SHX Text L.P.
AutoCAD SHX Text L.
AutoCAD SHX Text
LT.
AutoCAD SHX Text I.E.
AutoCAD SHX Text
HW
AutoCAD SHX Text
LEFT
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
MAIN BOX
AutoCAD SHX Text
MAIN LINE
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
HEADWALL
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
INVERT
AutoCAD SHX Text
GROUND
AutoCAD SHX Text E.G.
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
F. TO F.
AutoCAD SHX Text E.H.W.
AutoCAD SHX Text
EXT.
AutoCAD SHX Text
EXP.
AutoCAD SHX Text F.L.
AutoCAD SHX Text F.A.S.
AutoCAD SHX Text F.A.P.
AutoCAD SHX Text F.A.
AutoCAD SHX Text G.V.
AutoCAD SHX Text
FWD.
AutoCAD SHX Text G.I.
AutoCAD SHX Text G.
AutoCAD SHX Text F.
AutoCAD SHX Text E.
AutoCAD SHX Text
FILL
AutoCAD SHX Text
FLOW LANE
AutoCAD SHX Text
GAS
AutoCAD SHX Text
GAS VALVE
AutoCAD SHX Text
FORWARD
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
FACE TO FACE
AutoCAD SHX Text
EXTERNAL
AutoCAD SHX Text
FEDERAL AID
AutoCAD SHX Text W.I.
AutoCAD SHX Text W/F
AutoCAD SHX Text W.V.
AutoCAD SHX Text W.W.
AutoCAD SHX Text
W.MTR.
AutoCAD SHX Text W.M.F.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
UG.
AutoCAD SHX Text
VERT.
AutoCAD SHX Text W.M.
AutoCAD SHX Text
BITUMINOUS CONCRETE
AutoCAD SHX Text
CENTER TO CENTER
AutoCAD SHX Text
CONTROL OF ACCESS
AutoCAD SHX Text
CORRUGATED METAL
AutoCAD SHX Text
CORRUGATED METAL PIPE
AutoCAD SHX Text
BITUMINOUS COATED CORRUGATED METAL PIPE
AutoCAD SHX Text
CURVE TO SPIRAL
AutoCAD SHX Text
CU.M.
AutoCAD SHX Text C.M.P.
AutoCAD SHX Text C.M.
AutoCAD SHX Text
DIA.
AutoCAD SHX Text
DEG.
AutoCAD SHX Text C.S.
AutoCAD SHX Text
CULV.
AutoCAD SHX Text
E. TO E.
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
DWY.
AutoCAD SHX Text
DWG.
AutoCAD SHX Text
DIM.
AutoCAD SHX Text
EXC.
AutoCAD SHX Text
EST.
AutoCAD SHX Text
ENGR.
AutoCAD SHX Text C.
AutoCAD SHX Text
DIMENSION
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
END TO END
AutoCAD SHX Text
EXCAVATION
AutoCAD SHX Text
ESTIMATE
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
CUBIC METER
AutoCAD SHX Text
CUT
AutoCAD SHX Text
DEGREE
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text B.C.C.M.P.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text B.M.
AutoCAD SHX Text B. & S.
AutoCAD SHX Text C.L.
AutoCAD SHX Text C.B.
AutoCAD SHX Text C.I.P.
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
COM.
AutoCAD SHX Text
COL.
AutoCAD SHX Text
CTD.
AutoCAD SHX Text
C. TO C.
AutoCAD SHX Text
COORD.
AutoCAD SHX Text C.O.A.
AutoCAD SHX Text C.I.
AutoCAD SHX Text
CENTER LINE
AutoCAD SHX Text
COLUMN
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
COATED
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
COORDINATES
AutoCAD SHX Text
BENCH MARK
AutoCAD SHX Text
BELL & SPIGOT
AutoCAD SHX Text
CAST IRON PIPE
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
CAST IRON
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
TEL.
AutoCAD SHX Text T.E.
AutoCAD SHX Text T.P.
AutoCAD SHX Text T.G.
AutoCAD SHX Text
SG.
AutoCAD SHX Text S.L.
AutoCAD SHX Text T.S.
AutoCAD SHX Text T.
AutoCAD SHX Text
SQ.M.
AutoCAD SHX Text S.S.
AutoCAD SHX Text
STR.
AutoCAD SHX Text
STA.
AutoCAD SHX Text
SW.
AutoCAD SHX Text S.C.
AutoCAD SHX Text
SHDR.
AutoCAD SHX Text S.T.
AutoCAD SHX Text
SAN. S.
AutoCAD SHX Text
RD.
AutoCAD SHX Text
RDWAY.
AutoCAD SHX Text S.M.H.
AutoCAD SHX Text R.C.P.
AutoCAD SHX Text
RT.
AutoCAD SHX Text
RET.
AutoCAD SHX Text R.O.W.
AutoCAD SHX Text P.V.I.
AutoCAD SHX Text P.G.
AutoCAD SHX Text
RR.
AutoCAD SHX Text R.
AutoCAD SHX Text
PWR.
AutoCAD SHX Text P.L.
AutoCAD SHX Text P.P.
AutoCAD SHX Text
PROP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UL E G E N D :
AutoCAD SHX Text S Y M B O L
AutoCAD SHX Text P R O P O S E D
AutoCAD SHX Text
SPOT ELEVATION
AutoCAD SHX Text
SURVEY MONUMENT
AutoCAD SHX Text F E A T U R E
AutoCAD SHX Text
CENTER LINE
AutoCAD SHX Text
BENCH MARK
AutoCAD SHX Text
AT SPOT ELEV.
AutoCAD SHX Text
DECIMAL POINT
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text R E M A R K S
AutoCAD SHX Text
IDENTIFY
AutoCAD SHX Text E X I S T I N G
AutoCAD SHX Text BM No.3
AutoCAD SHX Text
ON CENTERS
AutoCAD SHX Text
POINT OF COMPOUND CURVATURE
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
OUTSIDE TO OUTSIDE
AutoCAD SHX Text
OUTSIDE DIAMETER
AutoCAD SHX Text
POINT OF INTERSECTION
AutoCAD SHX Text
POINT OF TANGENCY
AutoCAD SHX Text
PORTLAND CEMENT CONCRETE
AutoCAD SHX Text
POINT OF REVERSE CURVE
AutoCAD SHX Text
POINT OF CURVATURE
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
AGG.
AutoCAD SHX Text
ABUT.
AutoCAD SHX Text B.L.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASB.
AutoCAD SHX Text B.V.
AutoCAD SHX Text B.W.F.
AutoCAD SHX Text
BK.
AutoCAD SHX Text
AH.
AutoCAD SHX Text
AL.
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
BACK
AutoCAD SHX Text
ASBESTOS
AutoCAD SHX Text
BASE LINE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
AGGREGATE
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
%%UABBREVIATIONS:
AutoCAD SHX Text
O. TO O.
AutoCAD SHX Text P.I.
AutoCAD SHX Text P.R.C.
AutoCAD SHX Text P.C.C.
AutoCAD SHX Text P.T.
AutoCAD SHX Text
PCC.
AutoCAD SHX Text P.C.
AutoCAD SHX Text
PVMT.
AutoCAD SHX Text O.C.
AutoCAD SHX Text O.D.
AutoCAD SHX Text
4 - NORTH ARROW INDICATION POINTS TO TRUE NORTH.
AutoCAD SHX Text
3 - COORDINATE SYSTEM IS REFERRED TO THE STATE PLANE COORDINATE SYSTEM FOR
AutoCAD SHX Text
2 - ALL ELEVATIONS ARE REFERRED TO MEAN SEA LEVEL AND GIVEN IN METERS.
AutoCAD SHX Text 1 - METRIC SYSTEM HAS BEEN USED THROUGHOUT THE PROJECT UNLESS OTHERWISE SPECIFIED.
AutoCAD SHX Text
7 - FOR STANDARD MODELS DRAWINGS, REFER TO THE STANDARD DRAWINGS BOOK ADOPTED
AutoCAD SHX Text
BY THE PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY.
AutoCAD SHX Text
OTHER THAT MIGHT BE IN THE AREA PRIOR TO THE COMMENCEMENT OF ANY WORK IN
AutoCAD SHX Text
WITH THE OWNERS OF SUCH UTILITIES FOR THE EXACT LOCATION OF THE SAME OR ANY
AutoCAD SHX Text
CARE NOT TO CAUSE ANY DAMAGE TO THESE UTILITIES AND SHALL COORDINATE
AutoCAD SHX Text
OBTAINED FROM THE RESPECTIVE OWNERS, THE CONTRACTOR SHALL EXERCISE UPMOST
AutoCAD SHX Text
ALTHOUGH THOSE UTILITIES WERE SHOWN ON THE PLANS USING THE INFORMATION
AutoCAD SHX Text
PUERTO RICO AQUEDUCT AND SEWER AUTHORITY AND CABLE TV .
AutoCAD SHX Text
ENTITIES: P.R. TELEPHONE CO., PUERTO RICO ELECTRIC & POWER AUTHORITY, THE
AutoCAD SHX Text
CONSTRUCTION AREA OF THIS PROJECT, WHICH ARE THE PROPERTY OF THE FOLLOWING
AutoCAD SHX Text
6 - ATTENTION IS CALLED TO ALL BIDDERS THAT THERE ARE UTILITIES INSTALLED IN THE
AutoCAD SHX Text 5 - NEW CONSTRUCTION SHALL MEET HORIZONTAL AND VERTICAL ALIGNMENTS OF EXISTING FACILITIES.
AutoCAD SHX Text
THE VICINITY OF THESE UTILITIES.
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
PUERTO RICO AND THE US VIRGIN ISLANDS NAD-83, EPOCH 2010, ADJUSTMENT 2011,
AutoCAD SHX Text 9 - ALL EXISTING PIPES AND DRAINAGE STRUCTURES TO REMAIN, SHALL BE CLEANED AND IF
AutoCAD SHX Text
NECESSARY, BE ADJUSTED TO THE NEW PROPOSED ELEVATIONS. THE COST FOR THIS WORK
AutoCAD SHX Text SHALL BE A SUBSIDIARY OBLIGATION FOR THE INSTALLATION OF NEW PIPES, SPEC. No. 603.
AutoCAD SHX Text
8 - EXISTING PAVEMENT AREAS THAT COULD BE AFFECTED DURING THE CONSTRUCTION
AutoCAD SHX Text
SHALL BE REPAIRED. THIS WORK SHALL BE A SUBSIDIARY OBLIGATION UNDER SPEC.
AutoCAD SHX Text
401 AND ITS PAY ITEMS.
AutoCAD SHX Text OF SOIL EROSION AND SEDIMENTATION DEVELOPED FOR THE CONSTRUCTION OF THE PROJECT".
AutoCAD SHX Text
APPROVAL BY THE ENVIRONMENTAL QUALITY BOARD (EQB) HIS PLAN FOR THE CONTROL
AutoCAD SHX Text 11 - THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING, SUBMITTING TO AND OBTAINING THE
AutoCAD SHX Text
PERMIT IN ACCORDANCE WITH THE ENVIRONMENTAL QUALITY BOARD REGULATIONS.
AutoCAD SHX Text
10 - THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN THE CONSOLIDATED GENERAL
AutoCAD SHX Text (134
AutoCAD SHX Text 25)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
USER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
SEQUENCE:
AutoCAD SHX Text
JRUIZ
AutoCAD SHX Text 10/14/2019
AutoCAD SHX Text
17217-1D\GR-02.DWG
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
LAMBERT PROJECTION.
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
GENERAL NOTES & LEGEND
AutoCAD SHX Text
GR
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
AutoCAD SHX Text
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
CODES
AutoCAD SHX Text
GUANICA
AutoCAD SHX Text
PEÑUELAS
AutoCAD SHX Text
GUAYANILLA
AutoCAD SHX Text
YAUCO
AutoCAD SHX Text
PONCE
AutoCAD SHX Text
ISABELA
AutoCAD SHX Text
MOCA
AutoCAD SHX Text
AÑASCO
AutoCAD SHX Text
SAN GERMAN
AutoCAD SHX Text
AGUADILLA
AutoCAD SHX Text
HORMIGUEROS
AutoCAD SHX Text
MAYAGUEZ
AutoCAD SHX Text
AGUADA
AutoCAD SHX Text
SABANA GRANDE
AutoCAD SHX Text
MANATI
AutoCAD SHX Text
DORADO
AutoCAD SHX Text
QUEBRADILLAS
AutoCAD SHX Text
CAMUY
AutoCAD SHX Text
HATILLO
AutoCAD SHX Text
ARECIBO
AutoCAD SHX Text
BARCELONETA
AutoCAD SHX Text
VEGA BAJA
AutoCAD SHX Text
VEGA ALTA
AutoCAD SHX Text
BAYAMON
AutoCAD SHX Text
GUAYNABO
AutoCAD SHX Text
SAN JUAN
AutoCAD SHX Text
TOA BAJA
AutoCAD SHX Text V
AutoCAD SHX Text Y
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text Z
AutoCAD SHX Text N
AutoCAD SHX Text Ñ
AutoCAD SHX Text Q
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text U
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text D
%%UMUNICIPAL CODE FOR SIGN LOCATION.
L
IN
D
E
P
U
M
A
C
O
M
P
L
E
J
O
D
E
P
O
R
T
I
V
O
P
A
R
Q
U
E
C
A
S
T
I
L
L
O
D
E
N
I
Ñ
O
C
O
S
T
A
B
H
I
A
H
O
T
C
O
N
V
E
N
T
I
O
N
T
E
R
A
C
A
D
E
M
IA
B
A
U
T
IS
T
A
D
E
Y
A
U
C
O
R
E
S
T
A
U
R
A
N
T
E
LA G
UARDARRAYA
LA
C
A
R
R
E
TA
U
N
IV
E
R
S
ID
A
D
D
E
L
E
S
T
E
Y
A
U
C
O
P
L
A
Z
A
I
I
Y
A
U
C
O
P
L
A
Z
A
I
E
S
T
A
D
IO
D
E
Y
A
U
C
O
Y
A
U
C
O
G
U
A
Y
A
N
IL
L A
G
U
Á
N
IC
A
G
U
Á
N
I
C
A
Y
A
U
C
O
Y
A
U
C
O
Y
A
U
C
O
Y
A
U
C
O
G
U
A
Y
A
N
IL
L
A
G
U
A
Y
A
N
I
L
L
A
G
U
A
Y
A
N
I
L
L
A
G
U
A
Y
A
N
I
L
L
A
Y
A
U
C
O
Y
A
U
C
O
G
U
Á
N
I
C
A
T
S
T
S
T
S
T
S
T S
T
S
T
S
T
S
C
E
M
E
N
T
E
R
I
O
C
R
I
S
R
S
U
C
I
T
A
D
O
H
O
T
E
L
H
O
L
I
D
Y
N
U
Q
U
E
C
E
N
T
R
O
P
E
N
IT
E
N
C
IA
R
IO
L
A
S
C
U
C
H
A
R
A
S
E
C
O
M
A
X
X
C
H
U
R
C
H
'SC
H
IC
K
E
N
G
U
L
F
E
S
C
U
E
L
A
S
E
G
U
N
D
I
D
A
D
P
A
R
R
O
Q
U
I
A
S
A
G
R
A
R
A
Z
O
N
L
IN
D
E
P
U
M
A
E
S
T
A
N
C
IA
S
D
E
V
IS
T
A
B
A
H
IA
P
O
N
C
E
P
E
Ñ
U
E
L
A
S
G
U
A
Y
A
N
I
L
L
A
G
U
A
Y
A
N
I
L
L
A
G
U
A
Y
A
N
I
L
L
A
P
E
Ñ
U
E
L
A
S
P
E
Ñ
U
E
L
A
S
P
E
Ñ
U
E
L
A
S
P
E
Ñ
U
E
L
A
S
P
O
N
C
E
P
O
N
C
E
P
E
Ñ
U
E
L
A
S
P
E
Ñ
U
E
L
A
S
P
O
N
C
E
G
U
A
Y
A
N
I
L
L
A
P
E
Ñ
U
E
L
A
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
C M
A A
E
LL
C
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
GR
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
AutoCAD SHX Text 1:15,000
AutoCAD SHX Text
AutoCAD SHX Text
USER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
SEQUENCE:
AutoCAD SHX Text
FRIVERA
AutoCAD SHX Text 12/06/2018
AutoCAD SHX Text
17217-1D\GR-03.DWG
L
G
U
A
L
D
A
D
C
A
R
I
B
B
E
A
N
U
N
I
V
E
R
S
I
T
Y
P
I
T
U
S
A
L
U
M
B
P
O
L
L
O
T
R
O
P
I
C
A
L
A
C
U
R
A
P
L
A
Z
A
N
U
E
V
M
N
D
O
G
R
A
I
N
G
E
R
I
N
D
U
S
T
R
I
S
P
P
L
Y
F
U
R
I
E
L
T
O
Y
O
T
A
C
A
L
N
Q
U
I
S
T
A
C
O
O
P
S
E
G
U
R
O
S
H
O
N
D
A
M
U
L
T
I
P
L
E
S c
N
A
L
D
S
K
F
C
W
E
N
D
Y
S
C
H
U
R
C
H
S
C
H
I
C
K
E
N
H
Y
U
N
D
A
I
U
P
R
P
O
N
C
E
C
.F
.S
.E
A
V
E
C
O
N
T
R
E
R
A
S
P
L
A
Z
A
D
E
L
C
A
R
IB
E
R
E
S
ID
E
N
C
IA
L
R
A
F
A
E
L
L
O
P
E
Z
N
U
S
S
A
C
A
L
T
A
R
E
S
W
A
L
G
R
E
E
N
S
F
O
R
D
S
O
C
IA
L
S
E
C
U
R
IT
YA
D
M
C
H
U
R
C
H
'S
C
H
IC
K
E
N
F
IN
A
C
H
IN
A
C
A
L
M
A
S
H
O
S
P
IT
A
L
D
A
M
A
S
V
A
L
L
E
R
E
A
L
S
H
O
P
P
IN
G
C
E
N
T
E
R
B
U
R
G
E
R
K
IN
G
P
IZ
Z
A
H
U
T
A
V
E
M
U
Ñ
Z
V
E
R
A
C
A
L
R
Q
U
E
S
A
G
U
A
R
D
IA
N
A
C
IO
N
A
L
K
IA
M
IT
S
U
B
IS
H
I
P
O
N
D
E
R
O
S
A
A
D
V
A
N
C
EA
U
T
O
P
A
R
T
S
C
A
L
V
I R
G
I L
A
G
G
I
G
L
ID
D
E
N
A
U
T
O
Z
O
N
E
P
E
P
B
O
Y
S
O
F
F
IC
E
M
A
X
C
A
L
F
A
N
Z
A
L
E
Z
P
O
N
C
E
M
A
L
L
P
O
P
E
Y
E
S
P
U
M
A
T
A
C
O
B
E
L
L
B
O
N
A
N
Z
A
S
A
M
'S
C
LU
B
M c
D
O
N
A
L
D
'S
C
V
S
P
H
A
R
M
A
C
Y
C
A
L
N
Y
A
L
IS
S
P
U
M
A
H
N
O
S
. S
A
N
T
IA
G
O
C
A
S
H
C
A
R
R
Y
T
R
IA
N
G
L
E
C
H
R
Y
S
L
E
R
W
A
L
G
R
E
E
N
S
A
V
E
M
A
R
U
C
A
P
O
N
C
E
T
O
W
N
C
E
N
T
E
R
K
F
C
K
R
IS
P
Y
K
R
E
M
E
B
U
R
G
E
R
K
IN
G
P
E
T
S
M
A
R
T
R
O
C
H
E
U
N
IV
E
R
S
A
L
IN
S
U
R
A
N
C
E
E
L
M
E
S
O
N
B
U
R
G
E
R
K
IN
G
C
E
S
C
O
A
A
A
H
O
S
P
IT
A
L
S
A
N
L
U
C
A
S
C
E
M
E
N
T
E
R
IO
C
R
IS
T
O
R
E
S
U
C
IT
A
D
O
H
O
T
E
L
H
O
L
ID
A
Y
I
N
N
E
L
T
U
Q
U
E
C
E
N
T
P
N
I
T
E
N
C
I
A
R
I
O
L
C
H
A
R
A
S
H
A
R
D
W
A
R
E
P
O
N
C
E
P
E
Ñ
U
E
L
A
S
P
O
N
C
E
P
O
N
C
E
P
O
N
C
E
P
O
N
C
E
P
O
N
C
E
P
O
N
C
E
P
O
N
C
E
P
E
Ñ
U
E
L
A
S
P
O
N
C
E
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
C M
A A
E
LL
C
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
GR
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
AutoCAD SHX Text 1:15,000
AutoCAD SHX Text
AutoCAD SHX Text
USER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
SEQUENCE:
AutoCAD SHX Text
FRIVERA
AutoCAD SHX Text 12/06/2018
AutoCAD SHX Text
17217-1D\GR-04.DWG
L PR-2
TYPICAL SECTION
FROM KM. 195.51 TO KM. 195.60
SCALE: 1:100
EXISTING ROADWAY
VARIES
0.96
EXISTING ROADWAY
VARIES
EXISTING
EXISTING
FROM KM. 195.75 TO KM. 195.78
FROM KM. 196.10 TO KM. 196.15
FROM KM. 198.53 TO KM. 198.61
FROM KM. 199.00 TO KM. 199.29
FROM KM. 200.90 TO KM. 200.92
FROM KM. 203.98 TO KM. 204.01
FROM KM. 214.51 TO KM. 214.56
FROM KM. 216.40 TO KM. 216.78
FROM KM. 220.44 TO KM. 220.50
FROM KM. 221.40 TO KM. 221.75
FROM KM. 223.13 TO KM. 223.19
EXISTING ROADWAY
VARIES EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
C
L PR-2
FROM KM. 195.60 TO KM. 195.75
0.60
VARIES BERM
EXISTING EXISTING
SCALE: 1:100
MEDIAN
VARIES
FROM KM. 195.78 TO KM. 198.10
FROM KM. 198.15 TO KM. 198.53
FROM KM. 198.61 TO KM. 199.00
FROM KM. 199.29 TO KM. 200.90
FROM KM. 200.92 TO KM. 203.98
FROM KM. 204.01 TO KM. 204.35
FROM KM. 204.40 TO KM. 209.08
FROM KM. 209.09 TO KM. 212.72
FROM KM. 215.00 TO KM. 216.02
FROM KM. 216.78 TO KM. 217.58
FROM KM. 218.18 TO KM. 219.88
EXISTING R.O.W. MIN. 27.00M(VARIABLE)
TYPICAL SECTION
FROM KM. 209.08 TO KM. 209.09
SCALE: 1:100
L PR-2
EXISTING ROADWAY
VARIES
0.425
EXISTING ROADWAY
VARIES
C
EXISTING
EXISTING
0.425
FROM KM. 212.72 TO KM. 212.84
FROM KM. 213.10 TO KM. 213.15
FROM KM. 224.75 TO KM. 224.77
FROM KM. 204.35 TO KM. 204.40
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
FROM KM. 213.15 TO KM. 214.51
0.60
VARIES BERM
EXISTING
EXISTING
SCALE: 1:100
MEDIAN
VARIES
L PR-2
C
FROM KM. 214.56 TO KM. 215.00
FROM KM. 216.02 TO KM. 216.40
FROM KM. 219.88 TO KM. 220.44
FROM KM. 220.50 TO KM. 221.40
FROM KM. 221.75 TO KM. 221.90
EXISTING R.O.W. MIN. 26.00M(VARIABLE)
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
C
L PR-2
FROM KM. 217.58 TO KM. 218.18
VARIES BERM
EXISTING EXISTING
SCALE: 1:100
MEDIAN
VARIES
EXISTING R.O.W. MIN. 47.00M(VARIABLE)
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
FROM KM. 221.90 TO KM. 222.3
EXISTING
EXISTING
SCALE: 1:100
MEDIAN
VARIES
L PR-2
C
EXISTING R.O.W. MIN. 49.00M(VARIABLE)
EXISTING ROADWAY
VARIES
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
FROM KM. 221.90 TO KM. 222.3
EXISTING
EXISTING
SCALE: 1:100
MEDIAN
VARIES
L PR-2
C
EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING R.O.W. MIN. 33.00M(VARIABLE)
C
L PR-2
EXISTING
MEDIAN
EXISTING ROADWAY
VARIES
TYPICAL SECTION
FROM KM. 222.30 TO KM. 222.59
SCALE: 1:100
EXISTING EXISTING
C
L MARGINAL
EXISTING ROADWAY
VARIES
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
EXISTING
SHOULDER
EXISTING R.O.W. MIN. 50.00M(VARIABLE)
EXISTING
SHOULDER
0.60
BERM
C
L PR-2
EXISTING
MEDIAN
EXISTING ROADWAY
VARIES
TYPICAL SECTION
FROM KM. 222.30 TO KM. 222.70
SCALE: 1:100
EXISTING EXISTING
C
L MARGINAL
EXISTING ROADWAY
VARIES
EXISTING ROADWAY
VARIES
FROM KM. 223.60 TO KM. 224.16
FROM KM. 224.22 TO KM. 224.48
EXISTING
SHOULDER
EXISTING R.O.W. MIN. 50.00M(VARIABLE)
C M
A A
E
LL
C
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
USER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
SEQUENCE:
AutoCAD SHX Text
FRIVERA
AutoCAD SHX Text 05/21/2019
AutoCAD SHX Text
17217-1D\GR-05.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
TYPICAL SECTIONS
AutoCAD SHX Text
GR
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
EXISTING
SHOULDER
0.60
BERM
VARIES
C
L PR-2
EXISTING
MEDIAN
EXISTING ROADWAY
VARIES
TYPICAL SECTION
FROM KM. 222.70 TO KM. 223.13
SCALE: 1:100
EXISTING EXISTING
C
L MARGINAL
EXISTING ROADWAY
VARIES
EXISTING ROADWAY
VARIES
FROM KM. 223.19 TO KM. 223.60
EXISTING
SHOULDER
EXISTING R.O.W. MIN. 50.00M(VARIABLE)
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
C
L PR-2
FROM KM. 224.48 TO KM. 224.75
0.60
VARIES BERM
EXISTING EXISTING
SCALE: 1:100
MEDIAN
VARIES
EXISTING R.O.W. MIN. 50.00M(VARIABLE)
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
C
L PR-2
FROM KM. 224.77 TO KM. 225.50
0.60
VARIES BERM
EXISTING EXISTING
SCALE: 1:100
MEDIAN
VARIES
FROM KM. 225.53 TO KM. 225.50
FROM KM. 225.53 TO KM. 226.38
EXISTING R.O.W. MIN. 50.00M(VARIABLE)
TYPICAL SECTION
FROM KM. 225.50 TO KM. 225.53
SCALE: 1:100
L PR-2
EXISTING ROADWAY
VARIES
0.425
EXISTING ROADWAY
VARIES
C
EXISTING
EXISTING
0.425
EXISTING
SHOULDER
EXISTING
SHOULDER
0.425
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
C
L PR-2
FROM KM. 226.38 TO KM. 227.73
EXISTING
EXISTING
SCALE: 1:100
MEDIAN
VARIES
BERM
VARIES
C
L MARGINAL
EXISTING ROADWAY
VARIES
BERM
VARIES
C
L MARGINAL
EXISTING ROADWAY
VARIES
EXISTING R.O.W. MIN. 60.00M(VARIABLE)
0.60 0.60
C
L PR-2
TYPICAL SECTION
FROM KM. 227.73 TO KM. 227.77
SCALE: 1:100
EXISTING ROADWAY
VARIES
VARIES
EXISTING ROADWAY
VARIES
EXISTING
EXISTING
FROM KM. 228.99 TO KM. 229.10
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
TYPICAL SECTION
C
L PR-2
FROM KM. 227.77 TO KM. 228.54
EXISTING EXISTING
MEDIAN
VARIES
BERM
VARIES
C
L MARGINAL
EXISTING ROADWAY
VARIES
EXISTING R.O.W. MIN. 60.00M(VARIABLE)
EXISTING EXISTING
L PR-2
C
MEDIAN
VARIES
SIDEWALK
EXISTING ROADWAY
VARIES
EXISTING ROADWAY
VARIES
TYPICAL SECTION
SCALE: 1:100
FROM KM. 228.54 TO KM. 228.99
SIDEWALK
EXISTING R.O.W. MIN. 60.00M(VARIABLE)
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
0.60
VARIESBERM
EXISTING ROADWAY
VARIES
EXISTING
SHOULDER
C
L PR-2
0.60
VARIES BERM
EXISTING
EXISTING
MEDIAN
VARIES
TYPICAL SECTION
FROM KM. 229.09 TO KM. 229.18
SCALE: 1:100
EXISTING R.O.W. MIN. 49.00M(VARIABLE)
C M
A A
E
LL
C
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
USER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
SEQUENCE:
AutoCAD SHX Text
FRIVERA
AutoCAD SHX Text 05/14/2019
AutoCAD SHX Text
17217-1D\GR-06.DWG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
TYPICAL SECTIONS
AutoCAD SHX Text
GR
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
GENERAL NOTES:
1. NO WORK OTHER THAN MOBILIZATION, TRAFFIC CONTROL, AND PROJECT FIELD OFFICE, SHALL BE PERFORMED UNTIL THE PROGRESS SCHEDULE IS
APPROVED BY THE PROJECT ENGINEER.
2. ALL TEMPORARY CONTROL DEVICES SHALL COMPLY WITH THE SUPPLEMENTAL SPECIFICATION NUMBER 638 - "MAINTENANCE AND PROTECTION OF
TRAFFIC" OF THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2005 EDITION.
3. EQUIPMENT, MATERIALS AND OTHER DEVICES USED FOR CONSTRUCTION SHALL BE REMOVED FROM THE ROADWAY AFTER WORK HOURS AND SHALL BE
STAGED AT A MINIMUM OF 10 METERS FROM THE TRAVEL WAY.
4. THE DRUM SPACING SHALL BE 5 METERS.
5. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER THE INSTALLATION OF TEMPORARY CONTROL DEVICES FOR EACH STAGES AT LEAST
FOURTEEN (14) CALENDAR DAYS IN ADVANCE FOR THE RELEASE OF PUBLIC NOTICE. THE CONTRACTOR SHALL NOT COMMENCE ANY OF THE
CONSTRUCTION PHASES WITHOUT A PUBLIC NOTICE IS ISSUED OR WITHOUT DIRECT CONSENT FROM THE PROJECT ENGINEER.
6. THE CONSTRUCTION SIGNS INSTALLATION SHOULD BE IN ACCORDANCE TO THE TEMPORARY TRAFFIC SIGNS MOUNTING DETAILS, SHEET NO. MPT-23 OF
THE PRHTA STANDARD DRAWINGS, REV. JUNE 2012.
7. THE USE, LOCATION AND MESSAGES OF THE PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) SHALL BE ONLY AS DIRECTED BY THE PROJECT ENGINEER.
8. THE CONTRACTOR SHALL FURNISH TEMPORARY CONTROL DEVICES THAT MEET THE NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM REPORT
(NCHRP) CURRENT CRITERIA FOR THE APPLICABLE CRASH WORTHINESS STANDARD.
9. ALL EXISTING SIGNS AND TRAFFIC CONTROL SIGNS DETERMINED BY THE PROJECT ENGINEER TO BE UNNECESSARY OR CONTRADICTORY TO THE
APPLICABLE CONSTRUCTION SIGNS AND OPERATION, SHALL BE IMMEDIATELY COVERED IN ITS ENTIRETY WITH NON ABRASIVE MATERIAL AND SHALL BE
INSPECTED DURING DAY AND NIGHT TIME TO ENSURE THAT THE SIGN IS NOT READABLE. THIS WORK IS A SUBSIDIARY OBLIGATION UNDER THE VARIOUS
PAY ITEMS INCLUDED IN THE CONTRACT.
10. DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL TAKE ALL THE NECESSARY PRECAUTIONS AND MEASURES TO AVOID FALLING DEBRIS, TOOLS, EQUIPMENT OR ANY OTHER MATERIALS INTERFERENCE OR IMPACT TO THE MOTORING PUBLIC IN THE ROADWAY. ALL THE MATERIALS, LABOR
EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING THIS REQUIREMENT IS A SUBSIDIARY OBLIGATION UNDER THE VARIOUS PAY ITEMS INCLUDED IN
THE CONTRACT.
11. THE CONTRACTOR SHALL MAINTAIN ACCESS AT ALL TIMES TO ADJACENT PROPERTIES DURING CONSTRUCTION. THIS WORK WILL REQUIRE COORDINATION
WITH BUSINESSES AND PRIVATE OWNERS. ALL THE MATERIALS, LABOR, EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING THIS REQUIREMENT IS A
SUBSIDIARY OBLIGATION UNDER THE VARIOUS PAY ITEMS INCLUDED IN THE CONTRACT.
12. NO EXCAVATION AND / OR PAVEMENT DROP OFF SHALL REMAIN OPEN WITHIN THE TRAVELED WAY WHEN THE CONTRACTOR OR ITS PERSONNEL IS NOT
WORKING AND PHYSICALLY PRESENT AT THE WORK SITE.
15. IN CASE THAT THE WORKS AFFECT THE EXISTING LUMINARIES, THE CONTRACTOR SHALL PROVIDE ADEQUATE ILLUMINATION IN THE AFFECTED AREA. THE
GLARE OF THE TEMPORARY ILLUMINATION SHOULD NOT AFFECT THE DRIVER'S VISIBILITY. LIGHTING SHALL BE PROVIDED FOR NIGHTTIME OPERATIONS.
SEE SPECIAL PROVISION 938 "LIGHTING FOR NIGHTTIME CONSTRUCTION".
16. IT IS OF THE UTMOST IMPORTANCE THAT ALL EXISTING STORM DRAINAGE SYSTEMS BE KEPT FUNCTIONING AT ALL TIMES AND PROVIDE MEANS TO
PREVENT CLOGGING OF THESE SYSTEMS DURING CONSTRUCTION. THIS APPLIES ON ALL CONSTRUCTION STAGES.
17. IN ALL CONSTRUCTION OPERATIONS UNDER THIS CONTRACT, ALL PRECAUTIONS SHALL BE EXERCISED IN ORDER THAT THE MOVEMENT OF EQUIPMENT
AND CONSTRUCTION WORK SHALL BE PERFORMED IN SUCH A WAY AS TO AVOID UNNECESSARY INCONVENIENCES TO TRAFFIC.
18. REPAIR OF DAMAGE TO EXISTING PAVEMENTS CAUSED BY CONSTRUCTION OPERATION OR EQUIPMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
19. PROVISIONAL SIGNING AND TRAFFIC CONTROL SHALL BE AS PROVIDED IN PART 6 "TEMPORARY TRAFFIC CONTROL" OF THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (M.U.T.C.D.), 2009 EDITION.
20. ALL TRAFFIC CONTROL DEVICES SHALL BE CLEANED, REPAINTED OR REPLACED AS NECESSARY TO PROVIDE ADEQUATE VISIBILITY AND LEGIBILITY AT ALL
TIMES. NO DIRECT PAYMENT WILL BE MADE TO THE CONTRACT FOR THESE WORK.
21. THE CONTRACTOR SHALL VERIFY THE LOCATION OF THE EXISTING UTILITIES AND AVOID ANY DAMAGE DURING EXCAVATIONS AND CONSTRUCTION WORK.
IF DAMAGE OCCURS, THE CONTRACTOR MUST REPLACE AND/OR REPAIR THE SAME TO ITS ORIGINAL CONDITION AT HIS OWN EXPENSE.
22. THE CONTRACTOR IS RESPONSIBLE OF VERIFY ALL DIMENSIONS IN THE FIELD FOR THE NECESSARY REPLACEMENT AND/OR REPAIR OF THE EXISTING
SIGNS. THE MOT NEEDED TO OBTAIN THE MEASUREMENTS WILL BE SUBSIDIARY OBLIGATION OF SIGN REPAIR PAY ITEM UNDER SPEC. 613.
23. TRUCK MOUNTED ATTENUATOR USED FOR MOVABLE AND INCIDENTAL WORK OF THE MOT IMPLEMENTATION AND/OR REMOVAL, WILL BE SUBSIDIARY
OBLIGATION OF THE MOT PAY ITEM.
24. DURING THE EXCAVATION WORKS THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ROCK OR DEBRIS. THIS ACTIVITY
SHALL BE CONSIDERED SUBSIDIARY OBLIGATION OF THE CONTRACTED ITEMS.
A. BEFORE PRESENTING THE COST PROPOSAL, CONTRACTOR IS RESPONSIBLE TO VISIT AND EXAMINE CAREFULLY EACH SIGN LOCATION DUE TO
VARIABLE SITE CONDITIONS. CONDITIONS TO CONSIDER ARE ROAD SIDE STEEPS SLOPES, SUBSOIL CONDITIONS WHEN DRILLING FOR POSSIBLE
BOULDERS UNDERNEATH AND UNDERGROUND UTILITIES.
CONSTRUCTION SCHEDULE:
1. FOR THE CONSTRUCTION OPERATIONS OF THIS PROJECT, THE FOLLOWING CONSTRUCTION SCHEDULE AND SPECIAL INSTRUCTIONS
SHALL BE FOLLOWED IN ORDER TO MAINTAIN TRAFFIC FLOW WITH THE LEAST POSSIBLE INTERFERENCE FROM CONSTRUCTION WORK.
2. TYPICAL APPLICATIONS ARE SUBMITTED FOR THE TEMPORARY TRAFFIC CONTROL ACTIVITIES FOR A VARIETY OF SITUATIONS
COMMONLY ENCOUNTERED. IT IS REQUIRED FROM THE ENGINEER TO ADJUST THESE GUIDELINES TO FIELD CONDITIONS.
3. SPECIFIC SITUATIONS NOT COVERED BY THESE APPLICATIONS SHALL BE BROUGHT UP TO THE ENGINEER FOR APPROPRIATE DIRECTION
AND CLARIFICATION 10 DAYS BEFORE THE BEGINNING OF THE CONSTRUCTION WORK IN THAT AREA.
4. THE CONTRACTOR SHALL OBTAIN THE ORDER TO PROCEED PRIOR TO THE COMMENCEMENT OF ANY WORK INCLUDING THE
INSTALLATION OF THE TEMPORARY CONSTRUCTION SIGNS.
CONSTRUCTION:
1. THE LENGTH OF LANE CLOSURES WOULD BE RESTRICTED TO THE MINIMUM NECESSARY TO ACCOMPLISH THE WORK SAFELY, EFFICIENTLY AND WITHIN CONTRACTOR CAPACITY.
2. IMPLEMENT THE WORK ZONE TEMPORARY TRAFFIC CONTROL IN ACCORDANCE WITH THE MAINTENANCE OF TRAFFIC INDICATED ON THE
PLANS.
3. INSTALL PCMS TO COMPLEMENT SIGNING AS REQUIRED BY EACH ACTIVITY TYPE.
4. THE DETAILS SHOWN SHALL BE USED IN BOTH DIRECTIONS.
5. WORK ACTIVITIES SHALL NOT OCCUR DURING PEAK HOURS, THE WORK HOURS ARE DESCRIBE AS FOLLOWING:
a. ALL WORK THAT IS NOT REQUIRE LANE CLOSURE, THE WORK HOURS WILL BE PERMITTED ALL WEEK FROM 7:00 AM TO 5:00 PM
b. ALL WORK THAT REQUIRE LANE CLOSURE, THE WORK HOURS ONLY PERMITTED DURING THE DAY WILL BE FROM 10:00 AM TO 3:00 PM
IN EASTBOUND DIRECTION AND 9:00 AM TO 2:00 PM IN WESTBOUND DIRECTION.
LEGEND:
TRAFFIC DRUMS (SPACING @ 5.00 METERS EACH)
TRAFFIC SIGN LOCATION
TRAFFIC FLOW
WORK AREA
FLASHING ARROW PANEL
PCMS - PORTABLE CHANGEABLE MESSAGE SIGN
TYPE III BARRICADE
P C M S
TRUCK MOUNTED ATTENUATOR
WITH FLASHING ARROW SIGN, TEST LEVEL 3
TMA
MPH
BUFFER
SPACE* (Mts.)
< 25
*Taper length (L) and Buffer Space for a typical lane of 3.65 mts.
TAPER
LENGTH* (Mts.)
X = CODE NUMBER
TEMPORARY CONSTRUCTION SIGN IDENTIFICATION
Y = LOCATION
X
Y
CAUTION MODE
DOUBLE DIAMOND
FLAGGER
HIGHWAY
A B
120m. 120m.
PR-2
C
120m.
DISTANCE BETWEEN SIGNS
THE PROJECT WILL BE IMPLEMENTED BY THE PHASES SHOWN ON THIS TABLE. THE CONTRACTOR WILL DEVELOP A CONSTRUCTION SCHEDULE FOR THE
EVALUATION AND APPROVAL OF THE PROJECT ENGINEER CONSIDERING THE ORDER OF THE PHASES. THE CONTRACTOR CAN MODIFY THAT ORDER BY PRESENTING
RECOMMENDATIONS IN THE CONSTRUCTION SCHEDULE.
CONSTRUCTION
PHASE
CONSTRUCTION ACTIVITY TYPE DESCRIPTION
APLICABLE
TYPICAL
APPLICATION
DIAGRAM
WORKING HOURS PCMS - MESSAGE
PHASE 1
· INSTALLATION OF TEMPORARY
CONSTRUCTION SIGNS.
III (MOT-02)
7 AM TO 5 PM N/A
CARRIL
DERECHO
CERRADO
REDUZCA
VELOCIDAD
· PERMANENT TRAFFIC SIGNS
INSTALLATION.
· CONCRETE BASE CONSTRUCTION FOR
CANTILEVER STRUCTURE AND SIGN
INSTALLATION.
· GUARDRAIL REMOVAL AND INSTALLATION.
· BRIDGE TRANSITION OR TRANSITION
MODULE UPGRADE CONSTRUCTION.
CONSTRUCTION SCHEDULE TABLE
PHASE 2
I (MOT-02)
II (MOT-02)
III (MOT-02)
IV (MOT-03)
V (MOT-03)
PHASE 3
· REMOVAL OF TEMPORARY CONSTRUCTION
SIGNS.
III (MOT-02)
N/A7 AM TO 5 PM
NO LANE CLOSURE
NEEDED /
DURING DAY
7 AM TO 5 PM
LANE CLOSURE
NEEDED /
DURING DAY
9 AM TO 3 PM
VI (MOT-03)
CARRIL
IZQUIERDO
CERRADO
REDUZCA
VELOCIDAD
VII (MOT-04)
VIII (MOT-04)
IX (MOT-05)
X (MOT-05)
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
NOT TO SCALE
CARRIL
DERECHO
CERRADO
REDUZCA
VELOCIDAD
1KM
ADELANTE
I-A (MOT-02)
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC GENERAL NOTES AND CONSTRUCTION SCHEDULE
AutoCAD SHX Text
MOT
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
TYPICAL APPLICATION DIAGRAM II
LANE CLOSURE
T A
P E
R B
U F
F E
R W
O R
K
A
R E
A
T E
R M
I N
A T
I O
N
A R
M
T S
M
T S
M
T S
M
T S
M
T S
M
T S
M
T S
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
A L
L E
N G
H
S E
E
S
H E
T
M
T S
S H
O U
L D
E R
S H
O U
L D
E R
M
T S
M
T S
TYPICAL APPLICATION DIAGRAM I
SHOULDER CLOSURE FOR INTERMEDIATE TERM
WORK IN URBAN EXPRESSWAYS
M
T S
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
N
G T
H
L
S E
E
S
H E
T
S
T A
P E
R
M T
S
T A
P E
R
L
M
T S
B U
F F
E R
W O
R K
A R
E A
F L
A S
H I N
G
A R
R O
W
C
A U
T I O
N
M
O D
E
EXISTING EDGE
OF ROADWAY
EXISTING EDGE
OF ROADWAY
TRUCK-MOUNTED
S H
O U
L D
E R
WORK AREA
S H
O U
L D
E R
FLASHING ARROW ON CAUTION
MODE
TYPICAL APPLICATION III
INSIDE AND OUTSIDE SHOULDER CLOSURE MOBILE
OPERATION FOR TEMPORARY TRAFFIC SIGNS
INSTALLATION
ATTENUATOR
B U
F F
E R
S H
O U
L D
E R
S H
O U
L D
E R
M
T S
W O
K
E
A
M
T S
T A
P E
R
L
B R
I D
G E
S H
O U
L D
E R
A R
R O
W
F L A
S H
I N
G
TYPICAL APPLICATION DIAGRAM I-A
SHOULDER CLOSURE FOR
BRIDGE TRANSITION MODULE
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
A L
L E
N G
S
E
T
TEMPORARY CONCRETE
BARRIERS
BRIDGE TRANSITION OR
TRANSITION MODULE AND
BRIDGE PARAPET
RECONSTRUCTION
TEMPORARY
CRASH CUSHION
TYPE III, TL-3
M
T S
M
T S
M
T S
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
NOT TO SCALE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC TYPICAL APPLICATIONS DIAGRAMS
AutoCAD SHX Text
MOT
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
M
T S
M
T S
150 MTS
120 MTS 120 MTS
WORK AREA
MTS
M
T S
M
T S
120 MTS
150 MTS
MEDIAN MEDIAN
TYPICAL APPLICATION DIAGRAM V
LANE CLOSURE BEYOND INTERSECTION
B U
F F
E R
W O
R K
A R
E A
T A
P E
R
120 MTS
M
T S
M
T S
120 MTS
150 MTS
M
T S
M
T S
30 MTS
M E
D I A
N M
E D
I A
N
TYPICAL APPLICATION DIAGRAM VI
LANE CLOSURE IN ADVANCE OF INTERSECTION
M
T S
M
T S
150 MTS
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
N
G T
H
L
S E
E
S
H E
T
120 MTS
150 MTS
M
T S
W O
R K
A R
E A
M
T S
120 MTS
150 MTS
M
T S
M
T S
M E
D I A
N
M E
D I A
N
TYPICAL APPLICATION DIAGRAM IV
LANE CLOSURE IN ADVANCE OF INTERSECTION
M
T S
M
T S
T A
P E
R B
U F
F E
R
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
N
G T
H
L
S
E E
S H
E E
T
M
O T
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
NOT TO SCALE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
CMA# 17217-1
AutoCAD SHX Text
MAINTENANCE OF TRAFFIC TYPICAL APPLICATIONS DIAGRAMS
AutoCAD SHX Text
MOT
AutoCAD SHX Text
AutoCAD SHX Text
UNIT 4
AutoCAD SHX Text
FINAL PLAN
AutoCAD SHX Text 08/28/20
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text No.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text P.R.
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
MUNICIPALITIES
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
FED. AID HWAY
AutoCAD SHX Text
RW
AutoCAD SHX Text C
AutoCAD SHX Text PROJECT No.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text CODE No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
PR-2
AutoCAD SHX Text
AC-801578
AutoCAD SHX Text
AutoCAD SHX Text ORACLE No.
AutoCAD SHX Text
ER-9999(286)
AutoCAD SHX Text R019999578
TYPICAL APPLICATION DIAGRAM VIII
WORK IN VICINITY OF AN EXIT RAMP
FLASHING
ARROW PANEL
TYPE III BARRICADE
S
M
T S
M
T S
S H
O U
L D
E R
S H
O U
L D
E R
FLASHING
ARROW PANEL
TYPE III BARRICADE
S
S
M T
S
TYPE III BARRICADE
FLASHING
ARROW PANEL
TYPE III BARRICADE
S H
O U
L D
E R
M
T S
M
T S
M
T S
M
T S
M T
S
TYPE III BARRICADE
S H
O U
L D
E R
T A
P E
R
S H
O U
L D
E R
T A
P E
R
T A
P E
R
S
M
T S
S H
O U
L D
E R
PCMS-MESSAGES
CARRIL
DERECHO
CERRADO
1 KM
ADELANTE
REDUZCA
VEL
PCMS
M
T S
M
T S
S
T A
P E
R
L
T A
P E
R
S H
D
S H
D
L
T A
P E
R
S
T A
P E
R
T A
P E
R
L
T A
P E
R
S H
D
1/3(L) TAPER
SHOULDER
FLASHING
ARROW PANEL
OR
OR
OR
OR
M
T S
M
T S
M
T S
M
T S
PCMS
M
T S
M
T S
OR
OR
OR
OR
M
T S
M
T S
M
T S
M
T S
PCMS
M
T S
M
T S
OR
OR
OR
OR
M
T S
M
T S
M
T S
M
T S
PCMS
M
T S
M
T S
OR
OR
OR
OR
W O
R K
A R
E A
W O
R K
A R
E A
W O
R K
A R
E A
T A
P E
R
S
M
T S
T A
P E
R
F O
R
T
A P
F
F E
R
L
O N
G I T
U D
I N
A L
L E
N G
S
E
T
F O
R
T
A P
F
F E
R
L
O N
G I T
U D
I N
A L
L E
N G
S
E
T
W O
R K
A R
E A
W O
R K
A R
E A
F O
R
T
A P
F
F E
R
L
O N
G I T
U D
I N
A L
L E
N G
S
E
T
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
N
G T
H
L
S E
E
S
H E
T
F O
R
T
A P
F
F E
R
L O
N G
I T
U D
I N
N
G T
H
L
S E
E
S
H E
T
F O
R
T
A P
F
F E
R
L
O N
G I T
U D
I N
A L
L E
N G
S
E
T
TYPICAL APPLICATION DIAGRAM VII
WORK IN VICINITY OF AN ENTRANCE RAMP
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
NOT TO SCALE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO
AutoCAD SHX Text
ISLANDWIDE
AutoCAD SHX Text
SIGNING AND GUARDRAILS IMPROVEMENTS PROJECTS PR-2
AutoCAD SHX Text
HURRICANE MARÍA RECOVERY EFFORTS
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
WORK
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PUERTO RICO HIGHWAY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .