Amendment 0001 - PR ST ER PRMNT RPR(6).pdf
PDF 3 MB Posted
- Solicitation number
- 693C73-21-B-000006
About this file
This solicitation seeks sealed bids for a signs and safety repairs project in Puerto Rico. The project involves repairing signs and guardrails damaged by hurricanes on multiple highways, including traffic sign assemblies, new guardrails, end terminals, bridge transition upgrades, new transition modules, sign and guardrail demolition and removal, and temporary traffic control. The work will be split into multiple schedules that may be awarded separately or together, with the total project cost expected to exceed $10 million. Bids are due by the date specified in solicitation block 13a. Interested vendors must register at beta.sam.gov to receive email notifications and bid documents. Bids must come from certified small businesses and representational certifications must be completed annually at beta.sam.gov and dol.gov/vets/vets4212. Questions should be directed to the email provided.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7321B000006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
693C73
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
SUITE E2-3-300
ATTN:ACQUISITIONS
ASHBURN VA 20147
See Block 1412/21/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/24/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project PR ST ER PRMNT RPR(6)
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to:
a) Replace the Cost Proposal Bid Schedules and Cost Proposal Summary to update quantities and the unit of measurement for various bid items, and add/remove bid items.
b) See B Pages Changes Summary_Amednment 1.pdf for details.
2) Revise the Special Contract Requirements (J Pages) as follows:
a) Section 613-3.04 to clarify detail applicability for route marker sign assemblies.
b) See SCR Chages_Amendment 1.pdf for details.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY SUITE
E2-3-300
ASHBURN VA 20147
693C73
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7321B000006/0001
3) Revise the Plan as follows:
a) Schedule C (PR-1): Replace Sheets TSP/81, TSP/82, TSP/89, TSP/92, TSP/93, TSP/94, TSP/98, TSP/101, TSP/102
b) See Amended Plan Sheets_Schedule
C_PR-3_Amendment 1.pdf and Plan Sheet Changes
Summary_Amendment 1.pdf for details.
4) Provide a summary of responses to questions/clarifications asked by potential bidders.
5) The Bid Opening date remains December 29, 2020 at 2:00 p.m. EST.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PR ST ER PRMNT RPR(6)
Signs and Safety Repairs in PR-1, PR-2, and PR-53 Solicitation: 693C73-21-B-000006
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to:
a) Replace the Cost Proposal Bid Schedules and Cost Proposal Summary to update quantities and the unit of measurement for various bid items, and add/remove bid items.
b) See B Pages Changes Summary_Amednment 1.pdf for details.
2) Revise the Special Contract Requirements (J Pages) as follows:
a) Section 613-3.04 to clarify detail applicability for route marker sign assemblies.
b) See SCR Chages_Amendment 1.pdf for details.
3) Revise the Plan as follows:
a) Schedule C (PR-1): Replace Sheets TSP/81, TSP/82, TSP/89, TSP/92, TSP/93, TSP/94, TSP/98, TSP/101, TSP/102
b) See Amended Plan Sheets_Schedule C_PR-3_Amendment 1.pdf and Plan Sheet Changes Summary_Amendment 1.pdf for details.
4) Provide a summary of responses to questions/clarifications asked by potential bidders.
5) The Bid Opening date remains December 29, 2020 at 2:00 p.m. EST.
B I D S C H E D U L E Schedule A
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-2
Item No. Quantity Unit Unit Price Amount
15001-0000 Line A0020 ALL LPSM $
15100-1000 Line A0040 ALL LPSM $
15102-0000 Line A0060 1 CTSM $
15401-0000 Line A0080 ALL LPSM $
15501-0000 Line A0100 ALL LPSM $
60600-1000 Line A0120 7,700 M $ $
60600-2000 Line A0140 500 M $ $
60600-4000 Line A0160 8,200 M $ $
60604-3000 Line A0180 12 Each $ $
60605-3000 Line A0200 1 Each $ $
61101-0000 Line A0220 1 Each $ $
61310-1000 Line A0240 8,560 SQFT $ $
61310-2000 Line A0260 9,340 SQFT $ $
61310-3000 Line A0280 1,740 SQFT $ $
61310-4000 Line A0300 2,500 SQFT $ $
61310-5000 Line A0320 1,750 SQFT $ $
61310-7000 Line A0340 1,340 SQFT $ $
61310-9000 Line A0360 145 SQFT $ $
61311-0000 Line A0380 360 SQFT $ $
Schedule Total: ________________________
Submitted by: _________________________
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code G
Traffic Sign Assembly, Code K
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Construction Schedule
W-Beam Guardrail, Single Face
Traffic Sign Assembly, Code O
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
W-Beam Guardrail, Double Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Crashworthy End Terminal, Type 1, TL-3
Field Office
Traffic Sign Assembly, Code A
430,000.00
B-1
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-2
Item No. Quantity Unit Unit Price Amount
61311-1000 Line A0400 1,710 SQFT $ $
61311-2000 Line A0420 6,200 SQFT $ $
61311-3000 Line A0440 135 SQFT $ $
61311-6000 Line A0460 1,360 SQFT $ $
61311-7000 Line A0480 875 SQFT $ $
61311-8000 Line A0500 3,540 SQFT $ $
61312-0000 Line A0520 160 SQFT $ $
61312-1000 Line A0540 180 SQFT $ $
62100-1000 Line A0560 85 Each $ $
62100-2000 Line A0580 415 Each $ $
62101-1000 Line A0600 35 Each $ $
63800-1000 Line A0620 ALL LPSM $
66100-1000 Line A0640 8 Each $ $
91001-3000 Line A0660 9 Each $ $
91001-6000 Line A0680 3 Each $ $
91102-9000 Line A0700 ALL LPSM $
91103-0000 Line A0720 ALL LPSM $
91300-5000 Line A0740 2,100 Each $ $
91300-6000 Line A0760 105 Each $ $
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Transiton Module to Concrete Parapet
Special Item No. 17
Special Item No. 42
Kilometer Marker
Hectometer Marker
Object Markers
Traffic Sign Assembly, Code S
Traffic Sign Assembly, Code W
Traffic Sign Assembly, Code X
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
Traffic Sign Assembly, Code P
Traffic Sign Assembly, Code R
Traffic Sign Assembly, Code Y
Traffic Sign Assembly, Code BB
Traffic Sign Assembly, Code CC
B-2
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-2
Item No. Quantity Unit Unit Price Amount
91300-7000 Line A0780 26 Each $ $
93101-1000 Line A0800 610 M $ $
93101-3000 Line A0820 7 SQM $ $
93501-0000 Line A0840 20 Each $ $
Removal of Existing Traffic Signs (Overhead)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Removal and Disposal of Lead Based Paint (Painted Concrete Structure)
Locate Utility, Test Pit
B-3
Schedule B
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-3
Item No. Quantity Unit Unit Price Amount
15001-0000 Line B0020 ALL LPSM $
15100-1000 Line B0040 ALL LPSM $
15102-0000 Line B0060 1 CTSM $
15401-0000 Line B0080 ALL LPSM $
15501-0000 Line B0100 ALL LPSM $
60600-1000 Line B0120 18,520 M $ $
60600-2000 Line B0140 180 M $ $
60600-4000 Line B0160 18,700 M $ $
60604-3000 Line B0180 41 Each $ $
60604-3100 Line B0200 11 Each $ $
61101-0000 Line B0220 1 Each $ $
61310-1000 Line B0240 5,200 SQFT $ $
61310-2000 Line B0260 4,600 SQFT $ $
61310-3000 Line B0280 2,600 SQFT $ $
61310-4000 Line B0300 2,405 SQFT $ $
61310-5000 Line B0320 800 SQFT $ $
61311-2000 Line B0340 1,050 SQFT $ $
61311-7000 Line B0360 290 SQFT $ $
61311-8000 Line B0380 770 SQFT $ $
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Construction Schedule
W-Beam Guardrail, Single Face
Traffic Sign Assembly, Code Y
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
W-Beam Guardrail, Double Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Thrie-Beam Transition, Type II
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code R
Traffic Sign Assembly, Code X
Schedule Total: ________________________
Submitted by: _________________________
442,000.00
B-4
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-3
Item No. Quantity Unit Unit Price Amount
61312-2000 Line B0400 3,600 SQFT $ $
61312-3000 Line B0420 910 SQFT $ $
62100-1000 Line B0440 140 Each $ $
62100-2000 Line B0460 710 Each $ $
62101-1000 Line B0480 108 Each $ $
63800-1000 Line B0500 ALL LPSM $
66100-1000 Line B0520 6 Each $ $
91001-3000 Line B0540 42 Each $ $
91001-5000 Line B0560 1 Each $ $
91001-5100 Line B0580 9 Each $ $
91300-5000 Line B0600 2,208 Each $ $
91300-6000 Line B0620 627 Each $ $
91300-7000 Line B0640 88 Each $ $
93101-1000 Line B0660 1,380 M $ $
93101-2000 Line B0680 165 SQM $ $
93501-0000 Line B0700 20 Each $ $
Removal of Existing Traffic Signs (Breakaway)
Removal of Existing Traffic Signs (Overhead)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Traffic Sign Assembly, Code GG
Traffic Sign Assembly, Code HH
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
New Transition Module (More than 45mph)
New Transition Module (Less than 45mph)
Removal of Existing Traffic Signs (Ground Mounted)
Kilometer Marker
Hectometer Marker
Object Markers
Removal and Disposal of Lead Based Paint (Painted Concrete Barrier)
B-5
B - 8
BID SUMMARY
Project PR ST ER PRMNT RPR(6)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-4) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-6) = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
Maximum Time Allowed for the Contract if all schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 1210 calendar days.
If Schedules A, B, and C are not awarded at the same time, Maximum Time Allowed for completion of each award configuration is as follows:
If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 1060 calendar days.
If the Government awards the contract as Schedules A + C, the performance period to complete all contract work will be 870 calendar days.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 870 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 1060 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 550 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-2
Item No. Quantity Unit Unit Price Amount
15001-0000 Line A0020 ALL LPSM $
15100-1000 Line A0040 ALL LPSM $
15102-0000 Line A0060 1 CTSM $
15401-0000 Line A0080 ALL LPSM $
15501-0000 Line A0100 ALL LPSM $
60600-1000 Line A0120 7,700 M $ $
60600-2000 Line A0140 500 M $ $
60600-4000 Line A0160 8,200 M $ $
60604-3000 Line A0180 12 Each $ $
60605-3000 Line A0200 1 Each $ $
61101-0000 Line A0220 1 Each $ $
61310-1000 Line A0240 8,560 SQFT $ $
61310-2000 Line A0260 9,340 SQFT $ $
61310-3000 Line A0280 1,740 SQFT $ $
61310-4000 Line A0300 2,500 SQFT $ $
61310-5000 Line A0320 1,750 SQFT $ $
61310-7000 Line A0340 1,340 SQFT $ $
61310-9000 Line A0360 145 SQFT $ $
61311-0000 Line A0380 360 SQFT $ $
Schedule Total: ________________________
Submitted by: _________________________
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code G
Traffic Sign Assembly, Code K
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Construction Schedule
W-Beam Guardrail, Single Face
Traffic Sign Assembly, Code O
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
W-Beam Guardrail, Double Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Crashworthy End Terminal, Type 1, TL-3
Field Office
Traffic Sign Assembly, Code A
430,000.00
B-1 Amendment No. 1
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-2
Item No. Quantity Unit Unit Price Amount
61311-1000 Line A0400 1,710 SQFT $ $
61311-2000 Line A0420 6,200 SQFT $ $
61311-3000 Line A0440 135 SQFT $ $
61311-6000 Line A0460 1,360 SQFT $ $
61311-7000 Line A0480 875 SQFT $ $
61311-8000 Line A0500 3,540 SQFT $ $
61312-0000 Line A0520 160 SQFT $ $
61312-1000 Line A0540 180 SQFT $ $
62100-1000 Line A0560 85 Each $ $
62100-2000 Line A0580 415 Each $ $
62101-1000 Line A0600 35 Each $ $
63800-1000 Line A0620 ALL LPSM $
66100-1000 Line A0640 8 Each $ $
91001-3000 Line A0660 9 Each $ $
91001-6000 Line A0680 3 Each $ $
91102-9000 Line A0700 ALL LPSM $
91103-0000 Line A0720 ALL LPSM $
91300-5000 Line A0740 2,100 Each $ $
91300-6000 Line A0760 105 Each $ $
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Transiton Module to Concrete Parapet
Special Item No. 17
Special Item No. 42
Kilometer Marker
Hectometer Marker
Object Markers
Traffic Sign Assembly, Code S
Traffic Sign Assembly, Code W
Traffic Sign Assembly, Code X
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
Traffic Sign Assembly, Code P
Traffic Sign Assembly, Code R
Traffic Sign Assembly, Code Y
Traffic Sign Assembly, Code BB
Traffic Sign Assembly, Code CC
B-2 Amendment No. 1
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-2
Item No. Quantity Unit Unit Price Amount
91300-7000 Line A0780 26 Each $ $
93101-1000 Line A0800 610 M $ $
93101-3000 Line A0820 7 SQM $ $
93501-0000 Line A0840 20 Each $ $
Removal of Existing Traffic Signs (Overhead)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Removal and Disposal of Lead Based Paint (Painted Concrete Structure)
B-3 Amendment No. 1
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-3
Item No. Quantity Unit Unit Price Amount
15001-0000 Line B0020 ALL LPSM $
15100-1000 Line B0040 ALL LPSM $
15102-0000 Line B0060 1 CTSM $
15401-0000 Line B0080 ALL LPSM $
15501-0000 Line B0100 ALL LPSM $
60600-1000 Line B0120 18,520 M $ $
60600-2000 Line B0140 180 M $ $
60600-4000 Line B0160 18,700 M $ $
60604-3000 Line B0180 41 Each $ $
60604-3100 Line B0200 11 Each $ $
61101-0000 Line B0220 1 Each $ $
61310-1000 Line B0240 5,200 SQFT $ $
61310-2000 Line B0260 4,600 SQFT $ $
61310-3000 Line B0280 2,600 SQFT $ $
61310-4000 Line B0300 2,405 SQFT $ $
61310-5000 Line B0320 800 SQFT $ $
61311-2000 Line B0340 1,050 SQFT $ $
61311-7000 Line B0360 290 SQFT $ $
61311-8000 Line B0380 770 SQFT $ $
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Construction Schedule
W-Beam Guardrail, Single Face
Traffic Sign Assembly, Code Y
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
W-Beam Guardrail, Double Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Thrie-Beam Transition, Type II
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code R
Traffic Sign Assembly, Code X
Schedule Total: ________________________
Submitted by: _________________________
442,000.00
B-4 Amendment No. 1
Project No: PR ST ER PRMNT RPR(6)
Name: Sign and Safety Repairs on PR-3
Item No. Quantity Unit Unit Price Amount
61312-2000 Line B0400 3,600 SQFT $ $
61312-3000 Line B0420 910 SQFT $ $
62100-1000 Line B0440 140 Each $ $
62100-2000 Line B0460 710 Each $ $
62101-1000 Line B0480 108 Each $ $
63800-1000 Line B0500 ALL LPSM $
66100-1000 Line B0520 6 Each $ $
91001-3000 Line B0540 42 Each $ $
91001-5000 Line B0560 1 Each $ $
91001-5100 Line B0580 9 Each $ $
91300-5000 Line B0600 2,208 Each $ $
91300-6000 Line B0620 627 Each $ $
91300-7000 Line B0640 88 Each $ $
93101-1000 Line B0660 1,380 M $ $
93101-2000 Line B0680 165 SQM $ $
93501-0000 Line B0700 20 Each $ $
Removal of Existing Traffic Signs (Breakaway)
Removal of Existing Traffic Signs (Overhead)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Traffic Sign Assembly, Code GG
Traffic Sign Assembly, Code HH
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
New Transition Module (More than 45mph)
New Transition Module (Less than 45mph)
Removal of Existing Traffic Signs (Ground Mounted)
Kilometer Marker
Hectometer Marker
Object Markers
Removal and Disposal of Lead Based Paint (Painted Concrete Barrier)
Locate Utility, Test Pit
B-5 Amendment No. 1
Schedule C
Project No: PR ST ER PRMNT RPR(6)
Item No. Quantity Unit Unit Price Amount
15001-0000 Line C0020 ALL LPSM $
15100-1000 Line C0040 ALL LPSM $
15102-0000 Line C0060 1 CTSM $
15401-0000 Line C0080 ALL LPSM $
15401-1000 Line C0100 ALL LPSM $
15501-0000 Line C0120 ALL LPSM $
60600-1000 Line C0140 4,800 M $ $
60600-4000 Line C0160 4,800 M $ $
60600-5000 Line C0180 12 Each $ $
60604-3100 Line C0200 8 Each $ $
61101-0000 Line C0220 1 Each $ $
61310-1000 Line C0240 3,620 SQFT $ $
61310-2000 Line C0260 1,875 SQFT $ $
61310-3000 Line C0280 1,260 SQFT $ $
61310-4000 Line C0300 $ $
61310-5000 Line C0320 610 SQFT $ $
61310-6000 Line C0340 95 SQFT $ $
61310-7000 Line C0360 $ $
61310-8000 Line C0380 $ $
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Construction Schedule
Traffic Sign Assembly, Code H
110 SQFT
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
New Crashworthy End Terminal Type II, TL-2
Thrie-Beam Transition, Type II
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code F
Traffic Sign Assembly, Code G
44 SQFT
Submitted by: __________________________
Name: Sign and Safety Repairs on PR-1 Schedule Total: _________________________
145,000.00
B-6
1,060 SQFT
Schedule C
Project No: PR ST ER PRMNT RPR(6)
Item No. Quantity Unit Unit Price Amount
Name: Sign and Safety Repairs on PR-1
61311-0000 Line C0400 $ $
61311-2000 Line C0420 770 SQFT $ $
61311-7000 Line C0440 $ $
61312-2000 Line C0460 912 SQFT $ $
61312-3000 Line C0480 641 SQFT $ $
62100-1000 Line C0500 115 Each $ $
62100-2000 Line C0520 560 Each $ $
62101-1000 Line C0540 178 Each $ $
63800-1000 Line C0560 ALL LPSM $
66100-1000 Line C0580 2 Each $ $
91001-3000 Line C0600 8 Each $ $
91300-5000 Line C0620 950 Each $ $
91300-6000 Line C0640 10 Each $ $
91300-7000 Line C0660 9 Each $ $
93101-1000 Line C0680 33 M $ $
93101-2000 Line C0700 11 SQM $ $
93501-0000 Line C0720 20 Each $ $
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Removal of Existing Traffic Signs (Overhead)
Traffic Sign Assembly, Code O
Traffic Sign Assembly, Code R
Kilometer Marker
Hectometer Marker
Object Markers
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
Traffic Sign Assembly, Code X
380 SQFT
Traffic Sign Assembly, Code GG
Traffic Sign Assembly, Code HH
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Removal and Disposal of Lead Based Paint (Painted Concrete Barrier)
Locate Utility, Test Pit
B-7
185 SQFT
B - 8
BID SUMMARY
Project PR ST ER PRMNT RPR(6)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-4) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-6) = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
Maximum Time Allowed for the Contract if all schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 1210 calendar days.
If Schedules A, B, and C are not awarded at the same time, Maximum Time Allowed for completion of each award configuration is as follows:
If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 1060 calendar days.
If the Government awards the contract as Schedules A + C, the performance period to complete all contract work will be 870 calendar days.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 870 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 1060 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 550 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
B Pages Changes Summary Page 1 of 1
B Pages changes
1. Delete the Cost Proposal Bid Schedules and Cost Proposal Summary, pages B-1 through B- 8, and substitute the amended Cost Proposal Bid Schedules and Cost Proposal Summary, pages B-1 through B-8.
a) Revised bid quantities for the following Schedule C pay items:
1. Pay item 61310-3000 Traffic Sign Assembly, Code C
2. Pay item 61310-5000 Traffic Sign Assembly, Code D
3. Pay item 61310-7000 Traffic Sign Assembly, Code G
4. Pay item 61310-8000 Traffic Sign Assembly, Code H
5. Pay item 61311-0000 Traffic Sign Assembly, Code O
6. Pay item 61311-7000 Traffic Sign Assembly, Code X
7. Pay item 61312-2000 Traffic Sign Assembly, Code GG
8. Pay item 61312-3000 Traffic Sign Assembly, Code HH
9. Pay item 62101-1000 Object Markers
10. Pay item 93101-1000 Removal and Disposal of Lead Based Paint (Painted Guardrail)
11. Pay item 93101-2000 Removal and Disposal of Lead Based Paint (Painted Concrete
Barrier)
SCR changes 1 of 1
Special Contract Requirement (J Pages) changes
1. Add the following to Subsection 613-3.04 of the SCR, page J-147:
(h) Details for “Typical Route Marker Assembly (including Toll ways) for Three or more 36” X 36” Route Markers With or Without Auxiliary Plates” shall also apply for 36” X 24” route markers.
(i) Details for “Typical Route Marker Assembly (including Toll ways) for 48” X 48” Route Marker With or Without Auxiliary Plates” shall also apply for 48” X 36” route markers.
BARRETTHALE ALAMO
ESTACIONE
NO
ESTACIONE
NO
ESTACIONE
NO
REDUCTOR
VELOCIDAD
ADELANTE
INT
NORTE
OESTE
VELOCIDAD
MAXIMA
ESCUELA
6AM-7PM
INT
TERMINA
ZONA
ESCOLAR
SUR
INT
INT
NORTE
SU
R 1
N O R
TE 1
SUR
N O R
TE 1
SUR
INT
SUR
NORTE
INT
INT
INT
NORTE
SUR
INT
SUR
NORTE
SUR
INT
SURNORTE
INT
SUR
OESTE
SURNORTE
OESTE NORTE
OESTE
SUR
SUR
OESTE
HACIA
SU
R N O R
TE
N O R
TE
SU
R
SU
R 1
N O R
TE 1
N O R
TE 1
SU
R 1
N O R
TE
1SU
R
SUR
NORTE
N O R
TE
SU
R
SUR
1 1
NORTE
NORTESUR
OESTE
SU
R
N O R
TE
52H
AC
IA
SUR
NORTE
SUR
NORTE
1 594
NORTE
1 572
SUR
1 572
OESTE
Plan Sheet changes 1 of 1
Plan Sheet changes
Schedule C (PR-1)
1. Delete Plan Sheets TSP/81, TSP/82, TSP/89, TSP/92, TSP/93, TSP/94, TSP/98, TSP/101, TSP/102, and substitute the amended Plan Sheets TSP/81, TSP/82, TSP/89, TSP/92, TSP/93, TSP/94, TSP/98, TSP/101, TSP/102.
a) Sheet TS-81 updated to revise the Total Item quantity of Sign Code Number 1.
b) Sheet TS-82 updated to revise the Total Item quantity of Sign Code Number 12.
c) Sheet TS-89 updated to revise the Total Item quantity of Sign Code Number 167.
d) Sheet TS-92 updated to revise the Total Item quantity of Sign Code Numbers 238 and 239.
e) Sheet TS-93 updated to revise the Total Item quantity of Sign Code Number 239.
f) Sheet TS-94 updated to revise the Pay Item Code and the dimensions of the signs of
Sign Code Number 265.
g) Sheet TS-98 updated to revise the Pay Item Code of Sign Code Number 364.
h) Sheet TS-101 updated to revise the Pay Item Code of Sign Code Number 417.
i) Sheet TS-102 updated to revise the Pay Item Codes of Sign Code Numbers 437, 438, 440, 441, and 443.
Questions/Clarifications
Questions/Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 9 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were asked at the Pre-Bid Meeting submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. Will there be a Pre-Bid meeting for this solicitation?
Response: There will not be a Pre-Bid Meeting for this solicitation.
2. On Schedule C (PR-1) page TSP-81 code 1 indicates in the item total column that the number of signs is 181 but the locations add up to 224. What is the correct quantity?
Response: The plans and bid quantities have been revised as needed. Refer to the amended plan sheets and B-pages for additional information.
3. On Schedule C (PR-1) page TSP-82 code 12 indicates in the total item column that the number of signs is 14 but the locations add up to 15. What is the correct quantity?
4. On Schedule C (PR-1) page TSP-84 code 60 indicates OVERHEAD STRUCTURE TYPE 1- C. Do you require a new structure or it is an existing?
Response: The sign is marked as a pay item code X and therefore, it requires a new structure.
5. On Schedule C (PR-1) page TSP-89 code 167 indicates in the item total column that the number of signs is 6 but the locations add up to 7. What is the correct quantity?
6. On Schedule C (PR-1) page TSP-89 code 187 indicates in the item total column that the number of signs is 6 but the locations add up to 7. What is the correct quantity?
Response: This question seems to be referring to sign code 167, which is located in the referenced plan sheet and has the described issue. Refer to question 5 for additional information.
7. On Schedule C (PR-1) page TSP-94 code 265 combines a 48 "X 36" label with a 36 "X 36".
Normally in PRHTA projects the rules of how to quote this type of signs is defined in the "Instructions to Bidders for Traffic Signs”. But this document is not included in the bid documents. This creates a doubt if the mounting is STS type or GMTS type. If the answer is GMTS, we recommend separating pay items that are STS type and pay items that are GMTS type because of the disproportion in unit cost.
Response: The dimensions and pay item code for sign code 265 have been adjusted and now falls under pay item code D. The special contract requirements have been modified to further clarify the types of mounting to be used. Refer to the amended plan sheets, B-pages and Special Contract Requirements for additional information.
8. In Pay Code E GMTS type signs are being combined with STS type, these two types have very different construction costs. We recommend it should be separated.
Response: It is understood that both types of structures are included in this pay item code and will remain this way.
9. On Schedule C (PR-1) page TSP-98, code 364 indicates that your "PAY ITEM CODE" is "A", it should be "C" according to the already established pattern.
10. On Schedule C (PR-1) pages TSP-101 & 102 the code 417, 437, 438, 440 & 441 indicates that your "PAY ITEM CODE" is "C", it should be "D" according to the established pattern.
11. On Schedule C (PR-1) page TSP-102 the code 443 indicates that your "PAY ITEM CODE" is "C", it should be "A" according to the pattern already established.
12. On Schedule C (PR-1), Sign Code "O" indicates in the Bid Schedule the amount of 60 SQFT but in the plans the amount is doubled.
Response: The bid quantities have been revised as needed. Refer to the amended plan sheets and B-pages for additional information.
13. On Schedule C (PR-1), the quantities in the codes "GG" and "HH" do not coincide with the one in the plans.
Response: The quantities have been adjusted in the bid schedule. Refer to the amended plan sheets and B-pages for additional information.
14. Due to the magnitude of the project and uncertainty of actual quantities. Please consider moving the Bid due date?
Response: The bid opening date remains Tuesday December 29, 2020 at 2:00 p.m. EST.
Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. Contractors are required to coordinate with the CO any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21. The scheduled quantities may be increased, decreased, or deleted. Bids are to take into consideration the quantities and units of measure included in the bid schedule.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Solicitation: 693C73-21-B-000006 |
| Amended Plan Sheets_Schedule C_PR-3_Amendment 1.pdf |
| Sheets and Views |
| 285 SIGN DATA TABLES |
| 286 SIGN DATA TABLES |
| 293 SIGN DATA TABLES |
| 296 SIGN DATA TABLES |
| 297 SIGN DATA TABLES |
| 298 SIGN DATA TABLES |
| 302 SIGN DATA TABLES |
| 305 SIGN DATA TABLES |
| 306 SIGN DATA TABLES |