This solicitation is for a signs and safety repairs project in Puerto Rico. The project consists of repairing signs and guardrails damaged by hurricanes on multiple highways in Puerto Rico. The work includes traffic sign assemblies, new guardrails, end-terminals, bridge transition upgrades, new transition modules, traffic signs and guardrails demolition and removal, temporary traffic control, and other miscellaneous work. The project will be split into multiple schedules with the total cost expected to be over $10 million. Sealed bids from certified Small Business Concerns only will be accepted, with the bid due date and location to be specified in the solicitation. The solicitation is issued by the Department of Transportation Federal Highway Administration for repairs located in multiple municipalities in Puerto Rico.

View the file

Other files

File Type Posted
Results of the Bid Opening - PR ST ER PRMNT RPR (6).pdf PDF
Amended Plan Sheets_Standard Drawings_Amendment 2.pdf PDF
Amendment 0002.pdf PDF
Bid Schedule_Amendment 2.pdf PDF
Plan Sheet Changes Summary_Amendment 2.pdf PDF
B Pages Changes Summary_Amendment 2.pdf PDF
Amendment 0001 - PR ST ER PRMNT RPR(6).pdf PDF
Report_Abestos Containing Mat Survey_PR-3.pdf PDF
NEPA_OGPE_PR-1.pdf PDF
NEPA_PR-3_Part1 (Pages 1 - 115).pdf PDF
Plans_Sch A_PR-2 Unit 1.pdf PDF
Plans_Sch B_PR-3 Unit 1.pdf PDF
NEPA_PR-1_Archeological Monitoring.pdf PDF
PRHTAs Standard Drawings_RPR(6).pdf PDF
Plans_Sch B_PR-3 Unit 2.pdf PDF
NEPA_PR-3_Part3 (Pages 231 - 346).pdf PDF
Report_Lead Based Paint Survey_PR-3.pdf PDF
Report_Lead-Abestos_PR-2.pdf PDF
Plans_Sch A_PR-2 Unit 4.pdf PDF
NEPA_PR-1.pdf PDF
Certification _No Presence of Asbesto_PR3.pdf PDF
Plans_Sch B_PR-3 Unit 3.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Plans_Sch C_PR-1.pdf PDF
Plans_Sch A_PR-2 Unit 2.pdf PDF
NEPA_PR-2.pdf PDF
IFB Solicitation - PR ST ER PRMNT RPR (6).pdf PDF
Report_Abestos Containing Material Survey_PR-1.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Report_Limited Lead Paint Survey_PR-1.pdf PDF
Plans_Sch A_PR-2 Unit 3.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
NEPA_PR-3_Part2 (Pages 116 - 230).pdf PDF
VETS-4212 Form.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P á g i n a 1 | 2

3 de junio de 2020

Daniel Camacho, PE

Construction Operations Engineer

Eastern Federal Lands Highway Division

Federal Highway Administration

Javier E. Domínguez Pérez, PE

Senior Project Manager

CSA Group

RE: Recibo Por Parte del DTOP de Material a Removerse – Varios Proyectos ER de Rotulación y Barreras o “Guardrail”

La Directoria de Obras Públicas, brazo operacional del DTOP, recibirá el material en referencia luego de una coordinación efectiva entre el contratista y el Director Regional correspondiente.

El material para recibir deberá estar en buenas condiciones y no contener pintura con plomo u otros contaminantes conocidos.

Definimos buenas condiciones en términos de que el material sea reusable y funcional. No se aceptarán barreras, postes o cualquier dispositivo impactado o defleccionado.

Luego de coordinado con el Director Regional correspondiente el material deberá ser entregado en la Oficina Regional correspondiente o propiedad gubernamental designado por el Director.

Para efectos contractuales podría establecerse la distancia máxima como aquella desde el proyecto hasta la Oficina Regional o almacén principal correspondiente. Cualquier alternativa provista por el Director será menor a esta distancia o en acuerdo entre las partes sin costo para el DTOP.

La coordinación para la entrega de los materiales deberá realizarse con al menos dos días de anticipación. El personal para la descarga del material en el lugar designado deberá ser provista por el contratista.

P á g i n a 2 | 2

El Gerente de Proyecto proporcionará al Director Regional un listado detallado (descripción y cantidad) del material reusable y otro del material no reusable. El Director Regional Certificará entonces aquel material no reusable y recibirá aquel que tenga alguna utilidad para el Gobierno de Puerto Rico.

La disposición adecuada, del material que DTOP certifique que no es funcional o de utilidad para ser reusado será responsabilidad del contratista.

El contratista deberá hacer un esfuerzo genuino para que la remoción de los materiales propiedad del Estado no sea destruidos o mutilados durante los trabajos. Esto incluye, aunque no se limitan a conservar todos los componentes de las alineaciones de berreras en buen estado y con sus correspondientes tornillos, tuercas, arandelas, terminales postes etc.

Ing. Emilio Garay Vega; PE, RPA

Director Ejecutivo