This solicitation is for landslide repair projects on various roadways in Ciales, Corozal, and Orocovis, Puerto Rico. The work includes embankment reconstruction, reinforced soil slope systems, gabion walls, drainage systems, retaining walls, pavement work, guardrails, signage, and traffic control. The project will be split into multiple schedules, with an estimated total cost between $10-20 million. Schedule B cannot be executed until utility endorsements are received for one set of roadways, and Schedule C cannot be executed until endorsements are received for another set. Sealed bids from certified small businesses are due on or around April 14, 2023 at a location specified in the solicitation. Annual representations and certifications must be completed online. Questions should be sent to the specified email address. Bidders must be registered in SAM for payment. Visitor security procedures are outlined.

View the file

Other files

File Type Posted
ROBO - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0007 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0006 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0005 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0004 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR (12).pdf PDF
Report - Geo_Report_Sch C_Hwy-285.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Report - Geo-Report_Sch A_Hwy-384.pdf PDF
Report - Geo-Report_Addendum_2_Sch A_Hwy-386.pdf PDF
Categorical Exclusion Form (NEPA)_CE_Sch B_Hwy-267.pdf PDF
Report - Environmental Study_Tree Inventory_Sch A_Hwy-384.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-282_283_Sch C_Hwy-281_285.pdf PDF
Report - Geo_Report_Sch B_Hwy-271.pdf PDF
NEPA CE_Sch C_Hwy-285_SHPO Acceptable.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 5 of 6.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Categorical Exclusion Form (NEPA)_ CE_Sch A_Hwy-384_385.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-385.pdf PDF
Report - Geo_Report_Sch A_Hwy-283.pdf PDF
Report - Geo-Report_Sch A_Hwy-386.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Plan_Set_Sch A_Hwy-282_part 2 of 5.pdf PDF
Report - Environmental Study_Tree Inventory_Sch A_Hwy-386.pdf PDF
Plan_Set_Sch A and Sch C_Hwy-281_282_283_285_part 1 of 5.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 3 of 4.pdf PDF
Report - Geo-Report_Addendum_1_Sch A_Hwy-384.pdf PDF
Report - USACE_Sch A_Hwy-384.pdf PDF
Plan_Set_Sch C_Hwy-285_part 5 of 5.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 4 of 6.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-384_385.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 1 of 4.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 4 of 4.pdf PDF
Categorical Exclusion Form (NEPA)_CE_Sch C_Hwy-281.pdf PDF
NEPA CE_Sch B_Hwy-270_271_273_275_SHPO No Concurrence Letter.pdf PDF
Report - Environmental Study_Habitat_Sch A_Hwy-384.pdf PDF
Plan_Set_Sch A_Hwy-283_part 3 of 5.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 2 of 6.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-386.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-384.pdf PDF
NEPA CE_Sch B_Hwy-270_271_273_275_SHPO Concurrence Letter.pdf PDF
Report - Environmental Study_Habitat_Sch A_Hwy-386.pdf PDF
Plan_Set_Sch B_Hwy-267_270_271_273_275.pdf PDF
Report - Geo_Report_Sch B_Hwy-267.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 3 of 6.pdf PDF
NEPA CE_Sch C_Hwy-281_No SHPO Concurrence Email.pdf PDF
Categorical Exclusion Form (NEPA)_ CE_Sch B_Hwy-270_271_273_275.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LUIS O. GARCIA & ASSOCIATES

GEOTECHNICAL ENGINEERING CONSULTANTS

Partners Luis Oscar García, MSCE, CE Carlos García Echevarría, MSCE

Associate Alejandro E. Soto, MS, PG

AMELIA DISTRIBUTION CENTER, EMMA STREET NO. 26A, GUAYNABO, PR 00968-8007

TEL. (787) 792-2626 FAX (787) 782-5990

Email: cgarcia@geocim.com

GEOTECHNICAL MEMORANDUM

TO : Eng. Carlos R. Perez Bras, P.E.

cperez@uniproaep.net

Eng. Emmanuel Gonzalez, P.E.

egonzalez@gcapr.com

UNIPRO Architects & Engineers LLP

FROM : Eng. Carlos García Echevarría, P.E.

Geol. Alejandro Soto, P.G.

RE : Landslide Evaluation PR-156, Km. 6.3, Orocovis, PR

JOB NO. : 5159

DATE : January 19, 2019

This memorandum presents the results of a geotechnical investigation of a landslide that impacted State Road PR-156 at Kilometer 6.3 in the Botijas Ward of the municipality of

Orocovis. The approximate location of the project site is shown in Figure 1 – Site Location

Map. The objective of the investigation was to evaluate subsoil conditions at the site in order to provide geotechnical recommendations for the design and construction of landslide stabilization alternatives that would enable the full reopening of PR-156. The Puerto Rico Highway and

Transportation Authority (PRHTA) are the project sponsors and UNIPRO Architects-Engineers

LLC (UNIPRO) are the Project Designers. The work was performed in general accordance with

Landslide at PR-156, Km. 6.3, Orocovis, PR January 19, 2019.

our proposal dated April 26, 2018. This report provides a summary of the activities performed during the course of the investigation, a description of subsurface conditions encountered at the site, and geotechnical recommendations for the design and construction of landslide stabilization alternatives for the project.

The project site contains one (1) landslide on the inside edge of the roadway where part of the roadway was blocked with soil and rock debris which was removed with earthmoving equipment and trucks; some of this debris appears to have been pushed or dumped over the inside edge of the roadway. The landslide area visually extends approximately 50 feet along the roadway and from the edge of PR-156 to a street above that provide access to several residential structures.

The geotechnical investigation performed consisted of the drilling two (2) boring (B-1 and B-2) to 30 feet depth for a total of 60 lineal feet of drilling exploration. The location of the boring at the site was established in the field by GeoCim by visual observation from existing local references; the presence of underground and areal utilities in the area and vehicle traffic requirements on the roadway were also taken into consideration in the selection of the location of the boring. The approximate boring location is shown on Figure 2 – Boring Location Plan;

boring B-1 was located adjacent to the landslide on the inside edge of the PR-156 and boring B-2 was located adjacent to the top of the landslide on the local access roadway.

Geo Cim, Inc., our affiliate geotechnical testing services firm, performed the field and laboratory work. The borings were drilled with a CME-45 drill rig using the "Hollow Stem

Auger-Dry Sample" method of drilling and an Automatic SPT hammer. Soil samples were collected beginning at the ground surface, at 2.5-foot depth intervals to the bottom of the borings.

The samples were collected with a split-spoon sampler driven into the ground. The number of blows required to drive the split-spoon sampler into the soil was recorded in the field; the N-value of the SPT represents the number of blows required for the penetration of the last 12 inches of the sampler. The samples were placed in tightly closed plastic bottles and transported to the

GeoCim Geotechnical Testing Laboratory in Guaynabo for unconfined compression testing (in cohesive samples using a spring tester and/or pocket penetrometer), natural moisture content determinations, and visual/manual soil descriptions following standard laboratory procedures.

Two (2) Classification Test, including Sieve Analysis and Atterberg Limits, were performed on selected samples from the borings. The results of the field operations, laboratory testing, and detailed descriptions of the soils encountered are documented in the boring log included in

Appendix A. Appendix B contains a description of the GeoCim, Inc. drilling, sampling, and testing procedures. Results of the Classification test is provided in Appendix C.

GEOLOGY AND SUBSOIL CONDITIONS

According to the Geologic Map of the Barranquitas Quadrangle, Puerto Rico published by the US Geological Survey (USGS) in 1962, the project site lies within the Pre-Robles Rocks

Formation (Kpr) which is described in the geologic map as “Dominantly bluish-black to dark-greenish-gray lava and flow breccia; …massive tuffaceous conglomerate and massive tuffaceous breccia common …”. The subsurface conditions encountered at the site is in general agreement with those described in the geologic map.

The subsurface conditions encountered at the site are in general agreement with those described in the geologic map. The subsoil profile seen in boring B-1 consist of an upper Fill layer which is underlain by a Clay strata which in turn is underlain by the Thoroughly Weathered

Volcanic Rock formation. The Fill layer extends from the existing ground surface to about 2 feet depth and is described as a Gravel with some sand and little silt in a dense condition as indicated by N-values of 39 blows per foot (bpf). This layer is probably the pavement base course material which is typically known as “mogolla” and which has the same general description provided above.

Underlying the Fill layer and extending to about 13 feet depth is a Clay layer that is described as a Clay with trace silt and sand in a stiff to very stiff consistency as indicated by N-values of 8 to 16 bpf. Results of a Classification Tests performed on a sample from the Clay layer at 5 feet depth indicate that it classifies as a low plasticity Clay (CL) in accordance with the

Unified Soil Classification System with 75.6% of fines (passing the #200 sieve), and Liquid

Limit (LL) of 40% and Plasticity Index (PI) of 18%. Underlying this Clay layer and extending to the bottom of the boring at 30 feet is the Thoroughly Weathered Rock Formation which is described as Sand with little silt and gravel to a Silt with little sand in a dense conditions as indicated by N-values of 31 to 44 bpf with the N-values increasing with increasing depth.

Groundwater was not observed in the boring.

Subsurface conditions encountered at boring B-2 at the top of the hill are similar to those encountered in boring B-1 except that the Clay layer is described as a silty Clay with little silt and that the underlying Thoroughly Weathered Rock Formation is encountered in a very dense condition in the lower 5 feet with N-values of 51 to over 100 bpf with the higher N-value indicating virtual refusal to the penetration of the sampler at the bottom of the boring. Results of a Classification Tests performed on a sample from the Clay layer at 2.5 feet depth indicate that it also classifies as a low plasticity Clay (CL) in accordance with the Unified Soil Classification

System with 59.8% of fines (passing the #200 sieve), and Liquid Limit (LL) of 43% and

Plasticity Index (PI) of 21%.

A detailed description of the soils encountered is provided in the boring log in Appendix

A. Groundwater observations were made during drilling operations or within the open borehole immediately after drilling operations were completed and the augers were removed from the ground. For more accurate determination of groundwater levels or to determine groundwater level variations under different conditions (at times of heavy rain, etc.) and on a long term basis, then installation of piezometers and observation wells and their monitoring during extended periods of time would be required.

ANALYSIS, CONCLUSIONS AND RECOMMENDATIONS

This section of the report presents our analysis, conclusions and recommendations based on the results of the geotechnical investigation and site reconnaissance performed at the site. It is important to note that the main objective of these recommendations is to provide stability to the in the landslide area adjacent to the roadway.

Based on the results of the borings drilled and the site reconnaissance performed we understand that the landslide on the inside edge of the roadway in this area was triggered by the heavy rain that fell during Hurricane Maria that saturated the surface soils on the slope increasing their weight while reducing their strength; additionally, erosion of the near surface soils may have also occurred due to uncontrolled surface water runoff over the top edge of the slope causing local undercutting of the slope. A visual reconnaissance at the top (from a local access road of limited width providing access to several residential structures) and bottom (from

PR-156) of the cut slope indicate that surface cracks on the pavement at the top and bulging at the base of the cut were not observed. Although the original slope inclination in this area is not known, at this time some sections at the top edge of the slope are relatively steep showing a scar surface where the slope failed near the edge of the local access road. Also, there is a relatively low steep slope at the toe of the slope adjacent to PR-156; limited visual observations (due to the existing densely vegetated conditions within the landslide area) suggest that this slope represents slide debris that may have accumulated on the roadway during the storm but was later dumped during clearing operations in the area adjacent to the PR-156 roadway and in the middle portions of the landslide area.

The stabilization alternatives may include the following:

1. Re-construction of the slope with the construction of an engineered compacted Fill with final slopes not exceeding 2(H):1(V) that would allow re-establishment of the slope to the top of the existing cut slope. Survey information obtained by the Designer will allow evaluation of the required slope inclination. This re-grading will include excavation of any fill material dumped at the site for temporary storage of soil debris and of any soils that may have fallen from the top of the slope due to erosion or landsliding. It is estimated that about 6 to 8 feet of soil will have to be excavated adjacent to the PR-156 roadway but there is no information of the amount of excavation required farther up the slope. The required excavation must remove all the existing loose/deposited material on the slope until the natural in-situ soils are encountered, with the depth of excavation to be determined in the field by the Project Geotechnical Engineer by visual observations as the excavations proceeds. The required Fill for the re-construction of the slope shall be constructed as described in the Earthwork Recommendations section contained later in this report, including keying each fill layer into the in-situ soils to avoid creating a preferred surface of sliding.

2. Gravity retaining wall such as a Gabion or Concrete wall – this wall may be founded within 3 feet below the roadway level and at the inside edge of the roadway where a stiff

Clay layer was encountered in Boring B-1. The height of the wall shall be selected such that the existing soils adjacent to the roadway may be retained without providing any additional stability measures toward the top of the existing cut slope as these may lie outside the limits of the roadway; alternatively, an engineered compacted fill at maximum inclinations of 2(H):1(V) may be constructed from the top of the wall to the edge of the existing cut slope at the top, but in this alternative any loose/deposited material on the slope must be removed/excavated until the firm in-situ natural soils are exposed for the construction of the engineered Fill as described in Alternative 1 above.

An Allowable Soil Bearing Pressure of 4,000 pounds per square foot (psf) may be utilized at the recommended foundation level for the design of the retaining wall;

PRHTA standard drawings for these walls may be utilized.

For a detailed design, the lateral pressures acting on the retaining wall shall be determined using a triangular earth pressure diagram acting on a vertical plane passing through the heel of the wall and extending from the bottom of the wall to the proposed ground surface. This triangular earth pressure diagram shall be calculated using an

“active” lateral earth pressure coefficient, Ka, and an angle of internal friction (Ø) of 32 degrees for the backfill material to be utilized; a unit weight (γ) of 130 pounds per cubic foot (pcf) may also be used for the backfill material behind the wall. Any other surcharge loads acting on the ground surface at or near the walls must be added to the previously mentioned earth pressures to determine the final design lateral loads acting on the walls.

The above lateral earth pressure recommendations assume that any cut excavation into the existing soils for the construction of the retaining wall will be performed at an inclination not steeper that 1(H):1(V) and that the backfill material behind the wall will consist of an engineered compacted fill constructed as described under the Earthwork

Recommendations section of this report. The backfill material within 10 feet from the wall shall be placed in 4 to 6 inch thick layers and compacted with light, hand operated compaction equipment to 90% of the maximum dry density as obtained in the Modified

Proctor Test (ASTM D 1557). The backfill material beyond 10 feet from the wall shall be placed in 8 to 12 inches thick layers and each layer compacted to 95% of the maximum dry density as obtained in the Modified Proctor Test (ASTM D 1557) using conventional compaction equipment.

We have also assumed that the design of the retaining wall will include a drainage system that will provide a fast and efficient way to collect and dispose of any water that may infiltrate behind the wall in order to prevent the development of unbalanced water forces behind the wall; a typical drainage system would include a free draining crushed stone layer behind the retaining wall separated from the backfill material by a geotextile filter fabric (such as Mirafi 140N or equivalent), and a perforated drainage pipe placed at the bottom of the wall and connected to a proper drainage outlet.

Alternatively, other types of drainage composites specifically manufactured for drainage behind retaining walls may be used.

Prior to beginning construction of the retaining wall, the foundation bearing surface for the wall shall be cleaned and any soil/rock disturbed during the excavation operations (or any time thereafter) shall be removed to provide an undisturbed soil/rock bearing surface. We recommend that a Geotechnical Engineer and/or Engineering

Geologist be present at the site when the landslide area is excavated in order to observe and confirm that the proposed excavation depths reach the recommended firm bearing surface; therefore, the final bearing surface for the retaining wall shall be determined in the field based on observations of the materials exposed by the excavation.

3. Reinforced concrete retaining wall – in this alternative a reinforced concrete retaining wall may be designed following the same recommendations provided above for the

Gravity Retaining Wall, including bearing on the stiff Clay layer at a minimum depths of

3 feet and the inclusion of adequate drainage measures behind the wall. Also, the height of the wall may be limited such that an engineered compacted fill at maximum inclinations of 2(H):1(V) may be constructed from the top of the wall to the edge of the existing slope at the top. This reinforced retaining wall may be constructed with the larger portion of the footing under the existing roadway (L-shape wall footing) in order to minimize the amount of excavation into the lower portion of the existing slope.

Earthwork Recommendations

The following general earthwork recommendations are provided for construction of any fill or backfill that may be required within the project in the landslide areas.

1. Prior to commencing construction the site shall be cleared and grubbed of vegetation cover and topsoil that may exist at the ground surface and any existing asphalt/concrete pavement from the existing roadway shall be demolished and removed from the site. After the clearing, grubbing, and demolition operations of the existing facilities are completed, and after any cut excavations and removal of loose/deposited material on the slope are performed, the exposed surfaces shall then be proof-rolled with several passes of a heavy vibratory roller to detect any soft soil spot that may have to be removed and to densify any surface soil that may have been disturbed during the clearing and grubbing, and/or cut excavation operations.

2- Excavations into the existing Clay and residual sandy Clay soils near the ground surface may be performed with conventional excavating equipment including bulldozers and excavators as indicated by results of the borings.

3- Materials from required cuts at the site shall not be used as Fill at the site. Fill and/or backfill material to be used at the site shall consist of a non-expansive A-2-4 soil or better in accordance with the AASHTO (American Association of State Highway and Transportation

Officials) Soil Classification system. All fill within the site shall be placed as engineered compacted fill in 8 to 10 inch thick layers and each layer compacted to a minimum of 95% of the Maximum Dry Density as obtained in the Modified Proctor Test (ASTM D-1557); in excavations of limited extent the thickness of the fill layers placed shall be reduced to about 4 to 6 inches in order to attain the above compaction level. Fill required on sloped surfaces shall be placed in horizontal layers starting from the lower elevations and each horizontal layer shall be keyed into the in-situ soils so as to prevent the development of a preferred surface of sliding along the contact of the natural soils and the engineered compacted fill.

4- Temporary cut excavations on the in-situ soils deeper than 4 feet shall be performed with inclinations not steeper than 1(H):1(V); alternatively, the cut shall be properly braced and supported. Since bracing and support of cut excavations is a temporary construction feature, the Contractor shall design and select the most suitable support system for the excavation equipment and technique that he will use in the project.

5- We recommend that final fill slopes (if any) be constructed at inclinations not to exceed

2(H):1(V). All fill slopes shall be properly and promptly vegetated in order to prevent excessive erosion of the soils that may cause instability of the slopes.

6- The project should be provided with adequate surface drainage measures to collect and conduct runoff to adequate discharge locations and/or to the storm water system of the existing PR-156 roadway. Under no circumstance should water be allowed to accumulate anywhere within the project or to spill over the recommended retaining walls and/or slope embankments.

We request to be consulted should there be any questions on the intent and general scope of our recommendations. Likewise, we request to be informed of any changes in the scope of this project that may require our revision of these recommendations or if additional recommendations are needed.

N:\0000-project files\5159 Landslide Evaluations UNIPRO\UNIPRO Landslide Sites\Landslides B\LIST B - UNIPRO\PR-156 Km 6.3 6.4\PR-

156 Km 6.3 Landslide Report.doc

APPENDIX A

BORING LOGS

APPENDIX B

FIELD AND LABORATORY TEST PROCEDURES

GEO CIM, INC.

Appendix B

Field and Laboratory Test Procedures

I. DRILLING METHODS

A. Hollow Stem Auger Boring - Dry Sample method (ASTM-D-1452)

In the auger method, borings are advanced by turning a hydraulic powered auger into the ground in 5 feet increments or less. As the auger penetrates the cuttings rise to the surface on the spirals. The depth from which the material comes, however, cannot be accurately determined. Therefore, soil samples are not taken from the spiral augers. With the use of a hollow stem auger, a sampling apparatus may be inserted in the hollow stem to the bottom of the auger, eliminating the need for casings. The sampling procedures are described in the following paragraphs. Geo Cim, Inc. normally uses CME (Central Mining Equipment) drilling rigs which are trailer mounted and pulled with a 4 x 4 wheel drive F-350 or equivalent truck. The drilling rigs are either CME-45 or CME-55 models.

B. Wash Boring - Dry Sample Method

For inaccessible locations a portable drilling unit is used which consists of a tripod mounted motorized cathead which is used to drive casings and sampling rods to conduct this method of drilling. Borings are advanced into the ground by the wash-boring-dry sample method. The borings are normally cased through most of this length by the drop of either a 350 or 140 lbs. hammer from a height of 30 inches. The casing diameter is 2-1/2 inches. The number of blows for every foot of penetration the casing advanced is recorded and is reported in the boring logs. When driving of the casing becomes too difficult due to the hardness of the soils encountered, and the hole does not cave-in, the boring may be advances without casing by continuous washing out of the soils with the drill rods. The color and nature of the soils washed out (gravel, sand, silts or clay) is examined and recorded in order to determine the extent of each soil strata this is complemented with the sampling operations which are regularly made every five feet.

C. Core Borings (ASTM-D-2113)

Core Borings are used when necessary to penetrate into rock and obtain a continuous rock sample. The sample is obtained by means of a core barrel which is attached to the drill rods. At the end of the core barrel is a special bit studded with industrial diamonds which cuts into the rock. The drill rod, and hence the core barrel and diamond bit are rotated as downward pressure is applied. As the bit cuts into the rock, the rock core is free to move into the inner core barrel head, which is suspended on a swivel and therefore does not follow the motion of the outer core barrel with its bit. Cooling water or bentonite slurry is circulated through the drill rod and the core barrel. Penetration depends on the length of the core barrel and the quality of the rock (amount of joints or fractures). Rock discontinuities such as joints and fractures affect the length of penetration in a given core run. The runs are longer as the rock quality increases. As the core barrel is withdrawn, the core lifter, located inside the diamond bit, wedges itself around the bottom of the rock core and thus permits it to be pulled free from the underlying rock. The two most common core sizes are NWM which produces a core of 2.15 inches diameter and HWM which produces a core 3.00 inches in diameter.

II. SAMPLING IN SOILS

A. Standard Penetration Test (ASTM-D-1586)

The standard penetration tests are made with a split-spoon sampler 2.0 inches/O.D.

diameter, 1,375 inches I.D. diameter, 18 inches long. The sampler is driven into the ground by the drop of a 140 pounds hammer from a height of 30 inches. The number of blows from the three consecutive six inches of penetration of the sampler is recorded and the number of blows for the last foot of penetration is reported as the N-value. The samples are stored and sealed in glass jars for future classification tests in the laboratory.

The standard penetration test has been correlated with the consistency of fine grained soils and with the angle of internal friction or the relative density of sands. Such correlations can be used for preliminary estimates and to aid in the stratigraphic classification of the soil strata at a given site.

In the case of fine grained soils, the correlations of the SPT with the undrained shear strength of medium and stiff silts and clays of low sensitivity have been found to be fairly good; however, in the case of the soft silts and clays the SPT gives poor estimates of the undrained shear strength. Testing in undisturbed samples and vane shear tests are recommended in such cases.

B. Undisturbed Sampling

Undisturbed Samples are obtained using thin wall brass or zinc coated steel shelby tubes 2" to 3"O.D. by 24" to 30" long. The sampler is forced to penetrate the soil by static force or downward pressure and is pulled out also using static pull. The samplers are sealed in the field and shipped to the laboratory where the samples are extruded at the time of testing by pushing in the same direction that the sample penetrated the sampler. Special care is taken in packing and handling these samples to avoid disturbance.

III. LABORATORY TESTING

A. Atterberg Limits (ASTM-D-2166)

The Atterberg limits and related indices are very commonly used in soil mechanics works mainly for soil identification and classification purposes. They are also used in connection with some semi-empirical methods of design for preliminary estimates.

B. Unconfined Compression Test (ASTM-D-2166)

The best quality samples recovered in the split-spoon sampler are subjected to unconfined compression to failure. These samples cannot be regarded as “undisturbed” and the strengths obtained are lower than the “true” in-situ value due to the effect of disturbances and sensitivity of the soil. Furthermore, increased brittleness of friability of the soil structure results in strength values lower than the in-situ undrained strength.

Therefore, the unconfined strength values measured in the split-spoon samples are used only as an index property for classification and identification purposes. When more accurate values of strength are needed, undisturbed samples from thin-wall shelby tubes are used.

C. Natural Moisture Content (ASTM-D-2216)

The natural moisture content is the water content of the soil in-situ. The soil sample is obtained from the SPT sampler or shelby tubes. Approximately 40 gms. of soil are weighed and then placed in an oven for 24 hours at a temperature of 105� - 110�C. The natural moisture content, “Wn” is obtained from the difference between the weights in the natural state and after oven drying, divided by the dry weight of the sample and expressed in percentage.

IV. SOIL DESCRIPTION (ASTM-D-2488)

The description of the soils include the type (gravel, sand, silt, clay, organic), consistency (if a fine grained soil), size and roundness (if a coarse grained soil), color, and some other special characteristic which can aid in the identification and classification of the soil such as presence of rubbish, organic matter, shells and fossils, stratification and structure, cementation, mineral composition, relict structures, stains and others.

To aid in the preparation of these descriptions some simple tests are made such as those recommended by the Unified Soil Classification system for field classification (dilatancy, dry strength, shine, toughness). To approximate the consistency of fine grained soils (soft, medium, stiff, hard), a simple test is performed with the hand: a hard fine grained soil is difficult to indent with the thumbnail, stiff soils are readily indented with the thumb, medium soils can be penetrated by moderate thumb pressure and soft soils are easily penetrated with the thumb.

The description of coarse grained soils (sands and gravel) includes size (fine, medium coarse) and roundness (angular, sub-angular, sub-rounded, rounded and well-rounded).

The relative amount of coarse fractions in fine grained soils is estimated by placing a representative sample or some 50 gms. in a graduated cylinder filled with water. The mix is shaken and allowed to settle. Particles of a size larger than a fine sand are visible to the naked eye while silts and clays are not. In this manner, estimates of the relative amounts of the coarse fraction are made and reported as:

Trace 1 10% Little 10 20%

Some 20 35% Sandy, gravelly, silty or clayey 35 50%

The relative density of sands has been correlated with the results of the Standard

Penetration Test, as follows:

For Granular Soils N-Blows/ft. Relative Density

0 – 4 Very loose 4 – 10 Loose

10 – 30 Medium 30 – 50 Dense over 50 Very dense

These are very approximate correlations which vary with, among other factors, overburden pressure (Gibbs and Holtz, 1957, and Peck and Bazaraa, 1967). These correlations are meaningless in soils with a significant amount of gravel or cobbles.

The relative amounts of the fine grained soils is estimated based on the reaction of the soils to the dilatancy, shine, dry strength and toughness tests, with adjective indicating the less active fraction i.e. a sandy clay behaves more like a clay than a sand.

The consistency of cohesive soils has also been correlated to the results of the Standard Penetration Test, as shown below. The correlation, however, is greatly affected by the clay structure and factors such as sensitivity.

For Cohesive Soils

Unconfined Compressive Strength (T.S.F.)

N-Blows/Ft.

Consistency

Less than 0.25 Less than 2 Very soft

0.25 – 0.50 2 – 4 Soft

0.50 – 1.00 4 – 8 Medium

1.00 – 2.00 8 – 15 Stiff

2.00 – 4.00 15 – 30 Very stiff More than 4.00 More than 30 Hard

Once the soil samples have been tested, they are stored for three months after the date of our final report, and then destroyed, unless required in writing by the client to store them for a longer period.

APPENDIX C

CLASSIFICATION TEST REPORTS

Relative Density
Consistency