Amendment 0002 - PR ER DOT PRMNT RPR(12).pdf
PDF 7 MB Posted
- Solicitation number
- 693C73-23-B-000010
About this file
This federal solicitation seeks sealed bids from certified Small Business Concerns for a landslide repair project in Puerto Rico. Work includes embankment reconstruction, retaining walls, drainage, pavement repair and replacement of guardrails across multiple roadways. The project will be split into schedules, with the total cost expected between $10-20 million. Schedule B cannot be executed until utility endorsements are received, and Schedule C cannot be executed until additional endorsements are received. Bids are due as specified in solicitation block 13a. Firms must register in the System for Award Management for payment. The solicitation provides details on bid submissions and security procedures for attending bid openings.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7323B000010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1405/15/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/14/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project PR ER DOT PRMNT RPR(12)
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (Schedule A) to:
a) Replace the Bid Schedule to add pay items, remove pay items, and revise unit.
b) See Bid Schedule Changes Summary_Amendment 2.pdf for details.
2) Revise the Plan as follows:
a) Schedule A (AC-804579): Replace HWY-384 Sheet 42 (RD-A/1) Tree Inventory Plan, HWY-385
Sheet 78 (RD-B/1) Tree Inventory Plan, and HWY-386 Sheet 108 (RD-C/9) Tree Inventory Plan.
b) Schedule B (AC-858579): Replace HWY-275 Sheet 115 (PP-L/1) Plan and Profile sheet, Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 29
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7323B000010/0002
HWY-273 Sheet 92 (PP-K/1), Plan and Profile sheet, and HWY-267 Sheet 11 (GR-H/7), Quantity
Summary and Demolition Plan sheet.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) The Bid Opening date will be rescheduled to
May 23, 2023, at 2:00 p.m. EST.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0002
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PR ER DOT PRMNT RPR(12)
Puerto Rico Highway and Transportation Authority Landslide repairs in Ciales, Corozal, and Orocovis, Puerto Rico
Solicitation: 693C73-23-B-000010
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (Schedule A) to:
a) Replace the Bid Schedule to add pay items, remove pay items, and revise unit.
b) See Bid Schedule Changes Summary_Amendment 2.pdf for details.
2) Revise the Plan as follows:
a) Schedule A (AC-804579): Replace HWY-384 Sheet 42 (RD-A/1) Tree Inventory Plan, HWY-385 Sheet 78 (RD-B/1) Tree Inventory Plan, and HWY-386 Sheet 108 (RD-C/9) Tree Inventory Plan.
b) Schedule B (AC-858579): Replace HWY-275 Sheet 115 (PP-L/1) Plan and Profile sheet, HWY-273 Sheet 92 (PP-K/1), Plan and Profile sheet, and HWY-267 Sheet 11 (GR-H/7), Quantity Summary and Demolition Plan sheet.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) The Bid Opening date will be rescheduled to May 23, 2023, at 2:00 p.m. EST.
B Pages Changes Summary Page 1 of 1
B Pages changes
1. Delete Cost Proposal Bid Schedules and Cost Proposal Summary Pages B-1 through B-5 and substitute with the amended Cost Proposal Bid Schedules and Cost Proposal Summary, pages B-1 through B-5.
a) Revised bid quantities for the following Schedule A pay items:
1. Pay item 93400-4000 Class III (General Use)
2. Pay item 93400-6000 Class IV (General Use), Level of Permeability (2)
B I D S C H E D U L E Schedule A
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-282, HWY-283), PR-5568 (HWY-334, 335), PR-568 (HWY-336)
Item No. Quantity Unit Unit Price Amount
15000-1000 Line 0020 ALL LPSM $
15100-1000 Line 0040 ALL LPSM $
15102-0000 Line 0060 1 CTSM $ 480,000.00$
15401-0000 Line 0080 ALL LPSM $
15401-1000 Line 0100 ALL LPSM $
15501-0000 Line 0120 ALL LPSM $
20100-1000 Line 0140 ALL LPSM $
20100-2000 Line 0160 15 Each $ $
20200-1000 Line 0180 ALL LPSM $
20200-4000 Line 0200 30 m2 $ $
20200-4100 Line 0220 15 M $ $
20200-8000 Line 0240 120 m2 $ $
20300-1000 Line 0260 12,400 m3 $ $
20300-5000 Line 0280 3,200 m3 $ $
20500-1000 Line 0300 580 m3 $ $
20600-1000 Line 0320 5,400 m3 $ $
20600-2000 Line 0340 1,250 m3 $ $
20600-5000 Line 0360 ALL LPSM $
20700-1000 Line 0380 460 m3 $ $
Unclassified Excavation for Structures
Rock Excavation for Structures
Temporary Shoring and Bracing
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Contractor Testing (Biological Species Monitoring)
Construction Schedule
Foundation Fill
Unclassified Excavation
Borrow Class B
Trench Excavation, Unclassified
Clearing and Grubbing
Cutting and Removing Trees, Small (12" to 24" Diameter)
Removal of Structures and Obstructions
Removal of Structure (Concrete Gutter)
Removal of Structure (Concrete Curb)
Removal of Bituminous Concrete Pavement
B-1
Ricardo.Reyes Text Box
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-282, HWY-283), PR-5568 (HWY-334, 335), PR-568 (HWY-336)
Item No. Quantity Unit Unit Price Amount
20900-1000 Line 0400 55 m3 $ $
21000-1000 Line 0420 840 M 10.00$ 8,400.00$
21000-2000 Line 0440 190 Each 15.00$ 2,850.00$
21000-8000 Line 0460 80 M 105.00$ 8,400.00$
21100-0000 Line 0480 2,100 m3 $ $
21200-0000 Line 0500 ALL LPSM $
30100-1000 Line 0520 350 m3 $ $
30400-1000 Line 0540 110 m3 $ $
30500-2000 Line 0560 150 m3 $ $
40300-1100 Line 0580 90 m3 $ $
42100-1000 Line 0600 270 TON $ $
42100-2000 Line 0620 305 TON $ $
60200-1000 Line 0640 195,000 LBS $ $
60300-2000 Line 0660 45 M $ $
60300-4000 Line 0680 10 M $ $
60402-5000 Line 0700 1 Each $ $
60402-8000 Line 0720 2 Each $ $
60402-9300 Line 0740 1 Each $ $
60402-9400 Line 0760 2 Each $ $
Inlet Type 4A
Inlet Type 4A (Modified)
36" Reinforced Concrete Pipe Class-III
Headwall, Type B
Inlet Type 5
Lean Concrete Base
Cold Milling Bituminous Concrete Pavement
HPM Bituminous Pavement Mix Type S (75)(12)
Straw Bales
Floating Turbidity Barrier
Bridge Approach Embankment
HPM Bituminous Pavement Mix Type B (75)(34)
Reinforcing Steel
24" Reinforced Concrete Pipe Class-III
Sheathing
Silt Fence
Reconditioning of Shoulder & Ditches
Subbase Course
Aggregate Base Course
B-2
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-282, HWY-283), PR-5568 (HWY-334, 335), PR-568 (HWY-336)
Item No. Quantity Unit Unit Price Amount
60500-5000 Line 0780 115 M $ $
60500-7000 Line 0800 15 M $ $
60600-1000 Line 0820 390 M $ $
60600-4000 Line 0840 20 M $ $
60600-5000 Line 0860 3 Each $ $
60600-8000 Line 0880 20 M $ $
60600-9000 Line 0900 6 Each $ $
60700-1000 Line 0920 390 M $ $
60700-3000 Line 0940 170 M $ $
60900-1000 Line 0960 130 M $ $
60900-4000 Line 0980 10 M $ $
61000-3000 Line 1000 20 M $ $
61101-1000 Line 1020 27 mo $ $
61310-3000 Line 1040 1 Each $ $
61310-4100 Line 1060 4 Each $ $
61310-6100 Line 1080 4 Each $ $
61310-8100 Line 1100 2 Each $ $
61400-1000 Line 1120 80 m3 $ $
61500-9000 Line 1140 250 M $ $
Traffic Sign Assembly, Code 8, 9
Gabions
Soldier Pile W14x74
Concrete Gutter (Shallow)
Concrete Barrier, Type C
Field Office
Traffic Sign Assembly, Code 3
Traffic Sign Assembly, Code 4, 5
Traffic Sign Assembly, Code 6, 7
New Crashworthy End Terminal Type II, TL-2
W-beam Guardrail, Single Face, (Concrete Slab Mounted)
ThrieBeam Transition Section, Type II
Barbed Wire Fence, Type A
Chain-Link Fence, Type A
Combination Concrete Curb and Gutter, Type-F
6" Under Drain, Perforated PVC
4" Under Drain, Perforated PVC
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
B-3
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-282, HWY-283), PR-5568 (HWY-334, 335), PR-568 (HWY-336)
Item No. Quantity Unit Unit Price Amount
61700-1000 Line 1160 280 m2 $ $
61700-1300 Line 1180 25 m3 $ $
61800-2000 Line 1200 750 M $ $
61800-3000 Line 1220 40 M $ $
62100-2000 Line 1240 2 Each $ $
62100-3000 Line 1260 55 Each $ $
62200-1000 Line 1280 910 m3 $ $
62200-1100 Line 1300 1,120 m3 $ $
62200-2000 Line 1320 25 m3 $ $
62200-6100 Line 1340 25 m3 $ $
62200-7000 Line 1360 10 m3 $ $
62200-8000 Line 1380 750 m3 $ $
62200-9000 Line 1400 3,100 m3 $ $
62500-1000 Line 1420 190 m3 $ $
62700-2000 Line 1440 2,000 m2 $ $
62800-0000 Line 1460 25 m2 $ $
63500-0000 Line 1480 ALL LPSM 10,000.00$
63500-5100 Line 1500 2 Each $ $
63500-7700 Line 1520 1 Each $ $
Sodding
Removal of Existing Facilities (PREPA)
Concrete Pole, Self Support, 45 FT, H-4
PREPA Standard, K-1
Filter Blanket, Type C
Filter Blanket, Type D
Dumped Riprap, Class VII
Dumped Riprap, Class VIII
Furnishing and Placing Loamy Topsoil
Seeding, (with mulch)
Thermoplastic Pavement Marking Stripes, Yellow (0.15 mts. Width)
Hectometer Marker
Right of Way Marker
Dumped Riprap, Class 1
Dumped Riprap, Class IX
Dumped Riprap, Class II
Concrete Paved Waterway
Bed Course Material
Thermoplastic Pavement Marking Stripes, White (0.15 mts. Width)
B-4
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-282, HWY-283), PR-5568 (HWY-334, 335), PR-568 (HWY-336)
Item No. Quantity Unit Unit Price Amount
63500-7800 Line 1540 1 Each $ $
63504-2000 Line 1560 1 CTSM $ 10,000.00$
63505-1000 Line 1580 264 M $ $
63505-2000 Line 1600 64 M $ $
63600-8000 Line 1620 ALL LPSM $
63601-1100 Line 1640 95 M $ $
63602-9000 Line 1660 145 M $ $
63604-8000 Line 1680 1 CTSM $ $
63800-0000 Line 1700 ALL LPSM $
66000-0000 Line 1720 1 each $ $
66100-1000 Line 1740 6 Each $ $
90900-0000 Line 1760 350 m2 $ $
91001-7000 Line 1780 4 Each $ $
92600-1000 Line 1800 180 m2 $ $
93400-4000 Line 1820 325 m3 $ $
93400-5000 Line 1840 130 m3 $ $
93400-6000 Line 1860 800 m3 $ $
93501-0000 Line 1880 17 Each $ $
Class III (General Use)
Class V (Bridge Deck), Level of Permeability (2)
Class IV (General Use), Level of Permeability (2)
Locate Utility, Test Pit
Maintenances of Traffic
Name Plates
Project Funding Sign
Prefabricated Drainage Composite
Modified Transition Module (Cast-In-Place)
Mechanically-Stabilized Earth Walls (MSEW)
1/0 #2 AWG CU TRXLPE
1/0 #2 AWG CU 600 XITHN
Removal of Existing Facilities (PRASA)
4" PVC Pipe, SDR 35
6" Ductile Iron Pipe, Class 350
Utility Company Compensation (PRASA)
PREPA Standard, K-2
Utility Company Compensation (PREPA)
B-5
Ricardo.Reyes
Schedule B
Project No: PR ER DOT PRMNT RPR(12)
PR-155 (HWY-267) AND PR-156 (HWY-270, 271, 273, AND 275)
Item No. Quantity Unit Unit Price Amount
15000-1000 Line 0020 ALL LPSM $
15100-1000 Line 0040 ALL LPSM $
15102-0000 Line 0060 1 CTSM 310,000.00$ 310,000.00$
15401-0000 Line 0080 ALL LPSM $
15401-1000 Line 0100 ALL LPSM $
15501-0000 Line 0120 ALL LPSM $
20100-1000 Line 0140 ALL LPSM $
20100-2000 Line 0160 17 Each $ $
20100-4000 Line 0180 2 Each $ $
20200-1000 Line 0200 ALL LPSM $
20200-3000 Line 0220 120 M $ $
20200-8000 Line 0240 450 m2 $ $
20200-9000 Line 0260 1 Each $ $
20300-1000 Line 0280 2,000 m3 $ $
20300-1100 Line 0300 3,300 m3 $ $
20300-5000 Line 0320 2,100 m3 $ $
20600-5000 Line 0340 ALL LPSM $
20700-1000 Line 0360 5 m3 $ $
21000-1000 Line 0380 650 M 10.00$ 6,500.00$
Borrow Class B
Temporary Shoring and Bracing
Foundation Fill
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Contractor Testing (Biological Species Monitoring)
Construction Schedule
Silt Fence
Removal of Headwall
Unclassified Excavation
Unclassified Excavation (For Structures)
Clearing and Grubbing
Cutting and Removing Trees, Small (12" to 24" Diameter)
Cutting and Removing Trees, Large (Over 24" Diameter)
Removal of Structures and Obstructions
Removal of Concrete Barrier
Removal of Bituminous Concrete Pavement
B-6
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-155 (HWY-267) AND PR-156 (HWY-270, 271, 273, AND 275)
Item No. Quantity Unit Unit Price Amount
21000-2000 Line 0400 1,150 Each 15.00$ 17,250.00$
30100-1000 Line 0420 1,300 m3 $ $
30400-1000 Line 0440 220 m3 $ $
40300-1100 Line 0460 180 m3 $ $
42100-1000 Line 0480 750 TON $ $
42100-2000 Line 0500 650 TON $ $
60200-1000 Line 0520 400 LBS $ $
60300-5100 Line 0540 12 M $ $
60402-4000 Line 0560 1 Each $ $
60402-8000 Line 0580 1 Each $ $
60600-1000 Line 0600 230 M $ $
60600-4000 Line 0620 130 M $ $
60700-1000 Line 0640 800 M $ $
60900-1000 Line 0660 125 M $ $
60900-2000 Line 0680 40 M $ $
61000-3000 Line 0700 100 M $ $
61000-3000 Line 0720 75 M $ $
61101-1000 Line 0740 20 mo $ $
61310-1000 Line 0760 3 Each $ $
Field Office
Traffic Sign Assembly, Code 1
Concrete Curb, Type-D
Concrete Barrier, Type C (Modified)
Concrete Barrier, Type C
Headwall, Type A
Inlet Type 5
W-Beam Guardrail, Single Face
Aggregate Base Course
Cold Milling Bituminous Concrete Pavement
HPM Bituminous Pavement Mix Type S (75)(12)
Removal, Storage and Delivery of Existing Guardrail
Barbed Wire Fence, Type A
Combination Concrete Curb and Gutter, Type-F
Straw Bales
Subbase Course
HPM Bituminous Pavement Mix Type B (75)(34)
Reinforcing Steel
42" Reinforced Concrete Pipe Class-III
B-7
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-155 (HWY-267) AND PR-156 (HWY-270, 271, 273, AND 275)
Item No. Quantity Unit Unit Price Amount
61310-2000 Line 0780 3 Each $ $
61310-3100 Line 0800 10 Each $ $
61310-6000 Line 0820 10 Each $ $
61311-1100 Line 0840 3 Each $ $
61311-1300 Line 0860 2 Each $ $
61400-1000 Line 0880 900 m3 $ $
61700-1100 Line 0900 70 m2 $ $
61700-1200 Line 0920 250 m2 $ $
61800-2000 Line 0940 1,350 M $ $
61800-3000 Line 0960 1,590 M $ $
62100-1000 Line 0980 3 Each $ $
62100-3000 Line 1000 100 Each $ $
62101-1000 Line 1020 8 Each $ $
62200-1000 Line 1040 25 m3 $ $
62200-6000 Line 1060 8 m3 $ $
62500-1000 Line 1080 80 m3 $ $
62600-8100 Line 1100 60 Each $ $
62600-8200 Line 1120 100 Each $ $
62700-3000 Line 1140 2,300 m2 $ $
Planting Wedelia Trilobata
Planting Bambusa Vulgaris
Jute Mesh
Kilometer Marker
Right of Way Marker
Object Markers
Dumped Riprap, Class 1
Filter Blanket, Type B
Furnishing and Placing Loamy Topsoil
Traffic Sign Assembly, Code 13
Gabions
Concrete Paved Waterway, Type III
Concrete Paved Waterway, Type II
Thermoplastic Pavement Marking Stripes, White (0.15 mts. Width)
Thermoplastic Pavement Marking Stripes, Yellow (0.15 mts. Width)
Traffic Sign Assembly, Code 2
Traffic Sign Assembly, Code 3, 4
Traffic Sign Assembly, Code 6
Traffic Sign Assembly, Code 11
B-8
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-155 (HWY-267) AND PR-156 (HWY-270, 271, 273, AND 275)
Item No. Quantity Unit Unit Price Amount
63200-3000 Line 1160 1 Each $ $
63200-6000 Line 1180 300 m2 $ $
63500-0000 Line 1200 ALL LPSM $
63500-6000 Line 1220 100 M $ $
63500-6100 Line 1240 385 M $ $
63500-7000 Line 1260 1 Each $ $
63500-7010 Line 1280 1 Each $ $
63500-7020 Line 1300 1 Each $ $
63500-7030 Line 1320 1 Each $ $
63500-7100 Line 1340 2 Each $ $
63500-7200 Line 1360 4 Each $ $
63500-7300 Line 1380 4 Each $ $
63500-7400 Line 1400 2 Each $ $
63500-7500 Line 1420 1 Each $ $
63500-7600 Line 1440 1 Each $ $
63500-8000 Line 1460 1 Each $ $
63504-2000 Line 1480 1 CTSM 10,000.00$ 10,000.00$
63600-1000 Line 1500 135 M $ $
63600-4000 Line 1520 6 Each $ $
Utility Concrete Pole, Class H-6
Utility Company Compensation (PREPA)
4" PVC Pipe, DR 14
4" Gate Valve
CP-C5 (PREPA)
E1-2-3 (PREPA)
F1-1 (PREPA)
K-6 (PREPA)
T-2 (PREPA)
STL-10 (PREPA)
#3 ACSR Tripex (Conduit)
#3/0 AL ACSR (Conduit)
M16-2 (PREPA)
M16-3 (PREPA)
M16-4 (PREPA)
M2-1 (PREPA)
Cleaning and Repair of Manholes, Inlets and Catch Basins
Cleaning and Reshaping Existing Ditches and Channels
Removal of Existing Facilities (PREPA)
B-9
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-155 (HWY-267) AND PR-156 (HWY-270, 271, 273, AND 275)
Item No. Quantity Unit Unit Price Amount
63600-4100 Line 1540 4 Each $ $
63600-4200 Line 1560 2 Each $ $
63600-6000 Line 1580 90 M $ $
63600-6100 Line 1600 45 Each $ $
63600-7000 Line 1620 3 Each $ $
63600-8000 Line 1640 ALL LPSM $
63604-8000 Line 1660 1 CTSM 10,000.00$ 10,000.00$
63800-0000 Line 1680 ALL LPSM $
64000-6000 Line 1700 250 Each $ $
64000-7000 Line 1720 170 Each $ $
66100-1000 Line 1740 4 Each $ $
92600-1000 Line 1760 260 m2 $ $
92600-2000 Line 1780 550 m3 $ $
93400-4000 Line 1800 7 m3 $ $
93501-0000 Line 1820 15 Each $ $
Locate Utility, Test Pit
Reflective Raised Pavement Markers, Two way, Clear-Red
Reflective Raised Pavement Markers, Two way, Yellow-Yellow
Project Funding Sign
Mechanically-Stabilized Earth Walls (MSEW)
Granular Material
Class III (General Use)
10" PVC Pipe DR 14
12" PVC Pipe DR 14
Manhole Adjustment (PRASA)
Removal of Existing Facilities (PRASA)
Utility Company Compensation (PRASA)
Maintenances of Traffic
10" Gate Valve
12" Gate Valve
B-10
Ricardo.Reyes
Schedule C
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-281 AND HWY-285)
Item No. Quantity Unit Unit Price Amount
15000-1000 Line 0020 ALL LPSM $
15100-1000 Line 0040 ALL LPSM $
15102-0000 Line 0060 1 CTSM 140,000.00$ 140,000.00$
15401-0000 Line 0080 ALL LPSM $
15401-1000 Line 0100 ALL LPSM $
15501-0000 Line 0120 ALL LPSM $
20100-1000 Line 0140 ALL LPSM $
20100-2000 Line 0160 1 Each $ $
20200-1000 Line 0180 ALL LPSM $
20200-4000 Line 0200 30 m2 $ $
20200-8000 Line 0220 120 m2 $ $
20300-1000 Line 0240 250 m3 $ $
20300-4000 Line 0260 650 m3 $ $
20300-5000 Line 0280 140 m3 $ $
20500-1000 Line 0300 20 m3 $ $
20600-2000 Line 0320 1,040 m3 $ $
20600-5000 Line 0340 ALL LPSM $
21000-1000 Line 0360 150 M 10.00$ 1,500.00$
21000-2000 Line 0380 100 Each 15.00$ 1,500.00$
Rock Excavation for Structures
Temporary Shoring and Bracing
Silt Fence
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Contractor Testing (Biological Species Monitoring)
Construction Schedule
Straw Bales
Borrow Class A
Borrow Class B
Trench Excavation, Unclassified
Clearing and Grubbing
Cutting and Removing Trees, Small (12" to 24" Diameter)
Removal of Structures and Obstructions
Removal of Structure (Concrete Gutter)
Removal of Bituminous Concrete Pavement
Unclassified Excavation
B-11
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-281 AND HWY-285)
Item No. Quantity Unit Unit Price Amount
30400-1000 Line 0400 25 m3 $ $
40300-1000 Line 0420 35 m2 $ $
42100-1000 Line 0440 100 TON $ $
42100-2000 Line 0460 60 TON $ $
60300-1000 Line 0480 5 M $ $
60402-9000 Line 0500 2 each $ $
60500-5000 Line 0520 50 M $ $
60600-1000 Line 0540 120 M $ $
60600-4000 Line 0560 25 M $ $
60700-1000 Line 0580 100 M $ $
60900-1000 Line 0600 70 M $ $
60900-4000 Line 0620 45 M $ $
61101-1000 Line 0640 15 mo $ $
61500-7000 Line 0660 520 m2 $ $
61700-1000 Line 0680 140 m2 $ $
61700-1300 Line 0700 20 m3 $ $
61800-2000 Line 0720 180 M $ $
61800-3000 Line 0740 150 M $ $
62100-3000 Line 0760 10 Each $ $
Thermoplastic Pavement Marking Stripes, Yellow (0.15 mts. Width)
Right of Way Marker
Concrete Paved Waterway
Bed Course Material
Thermoplastic Pavement Marking Stripes, White (0.15 mts. Width)
Removal, Storage and Delivery of Existing Guardrail
Barbed Wire Fence, Type A
Combination Concrete Curb and Gutter, Type-F
HPM Bituminous Pavement Mix Type S (75)(12)
HPM Bituminous Pavement Mix Type B (75)(34)
18" Reinforced Concrete Pipe Class-III
Concrete Gutter (Shallow)
Field Office
Cantilever Sheet Pile (AZ17 - 700 ASTM-A572, Grade 60)
Aggregate Base Course
Cold Milling Bituminous Concrete Pavement
Inlet Type 4
6" Under Drain, Perforated PVC
W-Beam Guardrail, Single Face
B-12
Ricardo.Reyes
Project No: PR ER DOT PRMNT RPR(12)
PR-157 (HWY-281 AND HWY-285)
Item No. Quantity Unit Unit Price Amount
62200-1000 Line 0780 8 m3 $ $
62500-1000 Line 0800 30 m3 $ $
62700-2000 Line 0820 210 m2 $ $
62800-0000 Line 0840 90 m2 $ $
63200-2000 Line 0860 20 M $ $
63200-3000 Line 0880 2 Each $ $
63800-0000 Line 0900 ALL LPSM $
65000-1000 Line 0920 25 m2 $ $
66100-1000 Line 0940 2 Each $ $
92600-1000 Line 0960 180 m2 $ $
93501-0000 Line 0980 4 Each $ $
Locate Utility, Test Pit
Cleaning and Repair of Storm Sewer
Cleaning and Repair of Manholes, Inlets and Catch Basins
Maintenances of Traffic
Slope Paving
Project Funding Sign
Mechanically-Stabilized Earth Walls (MSEW)
Dumped Riprap, Class 1
Furnishing and Placing Loamy Topsoil
Seeding, (with mulch)
Sodding
B-13
Ricardo.Reyes
BID SUMMARY
Project PR ER DOT PRMNT RPR(12)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-6) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-11) = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
Maximum Time Allowed for the Contract if all schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 1180 calendar days.
If Schedules A, B, and C are NOT awarded at the same time, Maximum Time Allowed for completion of each award configuration is as follows:
If the Government awards the contract as Schedule A only, the performance period to complete all contract work will be 515 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period of the contract will be extended 400 calendar days and the performance of Schedule B work is to be simultaneous with the performance of the executed contract.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period of the contract will be extended 265 calendar days and the performance of Schedule C work is to be simultaneous with the performance of the executed contract.
B-14
Ricardo.Reyes
Plan Sheet changes 1 of 1
Plan Sheet changes
Plan_Set_Sch A_Hwy-384_385_386.pdf
1. Delete Plan Sheets 42 (RD-A/1), Tree Inventory Plan sheet, and substitute with the Amended_RD-A 01_HWY-384_Amendment 2.pdf.
a) Sheet 42 (RD-A/1) was revised to remove the monetary mitigation compensations note.
2. Delete Plan Sheets 78 (RD-B/1), Tree Inventory Plan sheet, and substitute with the Amended_RD-B 01_HWY-385_Amendment 2.pdf.
a) Sheet 78 (RD-B/1) was revised to remove the monetary mitigation compensations
3. Delete Plan Sheets 108 (RD-C/9), Tree Inventory Plan sheet, and substitute with the Amended_RD-C 09_HWY-386_Amendment 2.pdf.
a) Sheet 108 (RD-C/9) was revised to remove the monetary mitigation compensations
Plan_Set_Sch B_Hwy-267_270_271_273_275.pdf
1. Delete Plan Sheet 115 (PP-L/1), Plan and Profile sheet, and substitute with the Amended_PP-L 01_HWY-275_Amendment 2.pdf.
a) Sheet 115 (PP-L/1) was revised to update callout for Jute Mesh.
2. Delete Plan Sheet 92 (PP-K/1), Plan and Profile sheet, and substitute with the
Amended_PP-K 01_HWY-273_Amendment 2.pdf.
a) Sheet 92 (PP-K/1) was revised to update callout for Jute Mesh.
3. Delete Plan Sheet 11 (GR-H/7), Quantity Summary and Demolition Plan sheet, and substitute with the Amended_GR-H 07_HWY-267_Amendment 2.pdf.
a) Sheet 11 (GR-H/7) was revised to remove the callout for Staging Area.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WAGON
AutoCAD SHX Text
LANDSLIDE
AutoCAD SHX Text
LANDSLIDE
AutoCAD SHX Text
CONCRETE BARRIER BEGINS
AutoCAD SHX Text
CONCRETE BARRIER ENDS
AutoCAD SHX Text
EXISTING STRUCTURE
AutoCAD SHX Text
EXISTING STRUCTURE
AutoCAD SHX Text F.F.E.=611.27
AutoCAD SHX Text F.F.E.=609.938
AutoCAD SHX Text
CONCRETE BARRIER BEGINS
AutoCAD SHX Text
CONCRETE BARRIER ENDS
AutoCAD SHX Text 8" %%C
AutoCAD SHX Text 8" %%C
AutoCAD SHX Text 4" %%C
AutoCAD SHX Text 2" %%C
AutoCAD SHX Text 4" %%C
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
EXISTING FENCE
AutoCAD SHX Text
GUARDRAIL
AutoCAD SHX Text
TOP OF SLOPE
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
CONCRETE SWALE I.E.=597.32
AutoCAD SHX Text
CONCRETE SWALE I.E.=599.73
AutoCAD SHX Text I.E.=600.85
AutoCAD SHX Text
CONCRETE SWALE I.E.=600.93
AutoCAD SHX Text
CONCRETE SWALE I.E.=605.34
AutoCAD SHX Text 6" %%C
AutoCAD SHX Text
KM 30.1
AutoCAD SHX Text
CONCRETE WALL T.E.=598.52
AutoCAD SHX Text
CONCRETE WALL T.E.=589.28
AutoCAD SHX Text
TO MOROVIS
AutoCAD SHX Text
TO COAMO
AutoCAD SHX Text
CONCRETE SWALE I.E.=608.49
AutoCAD SHX Text
CONCRETE SWALE I.E.=610.23
AutoCAD SHX Text
STATE ROAD PR-155
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
219-037-077-40-000 EVARISTO MORALES FELICIANO
AutoCAD SHX Text
219-037-077-50-000 CRISPIN MALDONADO RIVERA
AutoCAD SHX Text
219-037-082-29-000 JOSE L. MALDONADO RIVERA
AutoCAD SHX Text
219-037-082-28-000 OJEL H. ORTIZ RODRIGUEZ
AutoCAD SHX Text
219-037-082-47-000 BENITA MALDONADO RIVERA
AutoCAD SHX Text
219-037-082-48-001 JORGE I BURGOS ORTIZ
AutoCAD SHX Text
PARKING AREA CONCRETE PAVEMENT
AutoCAD SHX Text
ER-HWY-367-1
AutoCAD SHX Text
ER-HWY-367-2
AutoCAD SHX Text
CURB
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text 1+20
AutoCAD SHX Text 1+40
AutoCAD SHX Text 1+60
AutoCAD SHX Text 1+80
AutoCAD SHX Text 2+00
AutoCAD SHX Text 2+20
AutoCAD SHX Text 2+40
AutoCAD SHX Text 1+00
AutoCAD SHX Text PROPOSED PROJECT ENDS ALIGNMENT AND TRANSITION TO EXISTING SECTION ENDS STA. 2+47.75 PR-155 N:244653.4530 E:203780.7909
AutoCAD SHX Text PROPOSED PROJECT BEGINS ALIGNMENT AND TRANSITION TO PROPOSED SECTION BEGINS (MATCH TO EXISTING) STA. 1+00.00 PR-155 N:244639.1029 E:203918.9832
AutoCAD SHX Text MSE RETAINING WALL AND CONCRETE BARRIER TYPE C (MODIFIED) BEGINS W-BEAM GUARDRAIL AND CONC. CURB TYPE F ENDS,TRANSITION TO CONC. BARRIER STA. 1+00.00 = = STA. 1+28.00 (PR-155), 4.80 RT.
AutoCAD SHX Text MSE RETAINING WALL AND CONCRETE BARRIER TYPE C (MODIFIED) ENDS W-BEAM GUARDRAIL BEGINS, TRANSITION TO CONCRETE BARRIER STA. 1+67.14 = = STA. 1+99.00 (PR-155), 4.80 RT.
AutoCAD SHX Text
2.40 WIDTH CLEARING AND GRUBBING OUTSIDE CONSTRUCTION AREA
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text EXISTING SANITARY SEWER MANHOLE TO REMAIN. MANHOLE ADJUSTMENT BASED ON FINISH GRADE
AutoCAD SHX Text
EXISTING SANITARY SEWER LINE TO REMAIN
AutoCAD SHX Text
EXISTING STORM SEWER LINE TO BE RELOCATED
AutoCAD SHX Text EXISTING SANITARY SEWER MANHOLE TO REMAIN. MANHOLE ADJUSTMENT BASED ON FINISH GRADE
AutoCAD SHX Text
EXISTING SANITARY SEWER LINE TO REMAIN
AutoCAD SHX Text
EXISTING STORM SEWER LINE TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text S
AutoCAD SHX Text EXISTING SANITARY SEWER MANHOLE TO REMAIN. MANHOLE ADJUSTMENT BASED ON FINISH GRADE
AutoCAD SHX Text
8" DIA. SANITARY SEWER SYSTEM TO REMAIN
AutoCAD SHX Text
FULL PAVEMENT REMOVAL
AutoCAD SHX Text
FULL PAVEMENT REMOVAL
AutoCAD SHX Text R E V I S I O N S
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MUNICIPALITY
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
FED AID H'WAY
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
AC PROJECT
AutoCAD SHX Text
CODE NO.
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text
P.R. NO.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text P.O. Box 10914, Caparra Station San Juan, P.R. 00922-0914
AutoCAD SHX Text Tel.(787) 793-3950 Fax(787) 793-8593
AutoCAD SHX Text
ARCHITECTS - ENGINEERS LLP
AutoCAD SHX Text
UNIPRO
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE = 1:200
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
WORK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
PR
AutoCAD SHX Text
AutoCAD SHX Text 858579
AutoCAD SHX Text R589999579
AutoCAD SHX Text 9999(438)
AutoCAD SHX Text
ORACLE NO.
AutoCAD SHX Text C
AutoCAD SHX Text
RW
AutoCAD SHX Text 9999(325)
AutoCAD SHX Text
AutoCAD SHX Text 14.10.2003
AutoCAD SHX Text 03_267-GR-8_DemolitionPlan.dwg
AutoCAD SHX Text
FILE NAME=
AutoCAD SHX Text
OROCOVIS PUERTO RICO
AutoCAD SHX Text
AND REPAIR RECOMMENDATIONS
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE EVALUATION
AutoCAD SHX Text
FROM STA. 1+00.00 TO STA. 2+48.00
AutoCAD SHX Text
ER-HWY-267, PR-155, KM. 30.10, 30.20
AutoCAD SHX Text
QUANTITY SUMMARY AND DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
GR-H
AutoCAD SHX Text
PR-155
AutoCAD SHX Text
OROCOVIS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
QUANTITY SUMMARY AND DEMOLITION PLAN SCALE 1:200
AutoCAD SHX Text
AREA
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ID
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING ASPHALT PAVEMENT TO BE REMOVED BY COLD MILLING
AutoCAD SHX Text
FULL DEPTH REMOVAL BITUMINOUS CON. PAVEMENT TK=0.15 M
AutoCAD SHX Text
EXISTING STRUCTURE TO ACQUIRE AND TO BE DEMOLISHED
AutoCAD SHX Text
PROPOSE ASPHALT SECTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 147.14
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CLEARING AND GRUBBING OUTSIDE CONSTRUCTION AREA
AutoCAD SHX Text 365.07
AutoCAD SHX Text
FROM
AutoCAD SHX Text
STATION
AutoCAD SHX Text
DIRECTION
AutoCAD SHX Text
TO
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
SINGLE
AutoCAD SHX Text
DOUBLE
AutoCAD SHX Text
CONCRETE BARRIER
AutoCAD SHX Text
CONCRETE BARRIER CONTAINING ASBESTOS AND/OR LEAD
AutoCAD SHX Text
GUARDRAIL
AutoCAD SHX Text
GUARDRAIL CONTAINING ASBESTOS AND/OR LEAD
AutoCAD SHX Text
0.05 M HOT PLANT MIX BITUMINOUS SURFACE COURSE, MIX S (75)(38)
AutoCAD SHX Text
0.15 M HOT PLANT MIX BITUMINOUS BASE COURSE, MIX B (75)(34)
AutoCAD SHX Text
0.15 M AGGREGATE BASE COURSE GRADING CLASS A
AutoCAD SHX Text
0.80 M SUB-BASE COURSE
AutoCAD SHX Text
CONCRETE BARRIER TYPE C WITH REFLECTIVE SHEETING PANEL
AutoCAD SHX Text
CONCRETE BARRIER TYPE C (MODIFIED) WITH REFLECTIVE SHEETING PANEL
AutoCAD SHX Text
BARBED WIRE FENCE TYPE "A"
AutoCAD SHX Text
CORRUGATED STL. BEAM GUARD RAIL SINGLE FACE WITH REFLECTIVE SHEETING PANEL
AutoCAD SHX Text
EXIST. BIT. ASPH. PAVEMENT TO BE REMOVED BY COOL MILLING TK.=0.05 M.
AutoCAD SHX Text
AREA 1
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ID
AutoCAD SHX Text
AREA 2
AutoCAD SHX Text
AREA 3
AutoCAD SHX Text
UNIT
AutoCAD SHX Text Ton.
AutoCAD SHX Text
AREA 4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Ton.
AutoCAD SHX Text Cu. Mt.
AutoCAD SHX Text Cu. Mt.
AutoCAD SHX Text
LM
AutoCAD SHX Text
AutoCAD SHX Text
LM
AutoCAD SHX Text
LM
AutoCAD SHX Text Sq. Mt.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 147.14
AutoCAD SHX Text 147.14
AutoCAD SHX Text 147.14
AutoCAD SHX Text 147.14
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SUB-TOTAL A
AutoCAD SHX Text 1048.42
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 67.14
AutoCAD SHX Text 50.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VOLUME
AutoCAD SHX Text 157.263
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOIL NAIL WALL
AutoCAD SHX Text
GRAVITY WALL TYPE GABION WALL
AutoCAD SHX Text
FULL DEPTH REMOVAL BITUMINOUS CON. PAVEMENT TK=0.15 M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHOTCRETE RETAINING WALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICALLY STABILIZED EARTH RETAINING WALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
QUANTITY SUMMARY TABLE
AutoCAD SHX Text
QUANTITY SUMMARY TABLE
AutoCAD SHX Text 1+79.93
AutoCAD SHX Text 1+35.70
AutoCAD SHX Text 2+04.41
AutoCAD SHX Text 1+58.41
AutoCAD SHX Text 21.84
AutoCAD SHX Text 24.74
AutoCAD SHX Text 1+00.30
AutoCAD SHX Text 1+39.86
AutoCAD SHX Text 38.56
AutoCAD SHX Text
PAVEMENT MARKING TO BE REMOVE
AutoCAD SHX Text
FINAL TOTAL
AutoCAD SHX Text
ADJUST
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
WIDTH
AutoCAD SHX Text
LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text 0.15
AutoCAD SHX Text
SWEL
AutoCAD SHX Text
SINGLE WHITE EDGE LINE
AutoCAD SHX Text
DOUBLE YELLOW SOLID LINE
AutoCAD SHX Text
DYSL
AutoCAD SHX Text 0.15
AutoCAD SHX Text
WHITE
AutoCAD SHX Text
YELLOW
AutoCAD SHX Text
OTHERS
AutoCAD SHX Text
TOTALS
AutoCAD SHX Text
SINGLE YELLOW SKIP LANE LINE
AutoCAD SHX Text
SYSLL
AutoCAD SHX Text 0.15
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.15
AutoCAD SHX Text
SWEL
AutoCAD SHX Text
SINGLE WHITE EDGE LINE
AutoCAD SHX Text
DOUBLE YELLOW SOLID LINE
AutoCAD SHX Text
DYSL
AutoCAD SHX Text 0.15
AutoCAD SHX Text
SINGLE YELLOW SKIP LANE LINE
AutoCAD SHX Text
SYSLL
AutoCAD SHX Text 0.15
AutoCAD SHX Text 147.75
AutoCAD SHX Text
AutoCAD SHX Text 147.75
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2.375
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LOAMY TOP SOIL & TURF ESTABLISHMENT
AutoCAD SHX Text 297.70
AutoCAD SHX Text
TO BE DEMOLISHED AND/OR TO BE REMOVED
AutoCAD SHX Text
GUARD RAIL, CONCRETE BARRIER AN RT WALL
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UIMPORTANT NOTE
AutoCAD SHX Text
1. THE CONSTRACTOR SHOULD EXECUTE THE EXCAVATION WORK WITH EXTREME CARE, THIS TO AVOID DAMAGE TO THE EXISTING UTILITIES LINE OF P.R.A.S.A.THE CONSTRACTOR SHOULD EXECUTE THE EXCAVATION WORK WITH EXTREME CARE, THIS TO AVOID DAMAGE TO THE EXISTING UTILITIES LINE OF P.R.A.S.A.
AutoCAD SHX Text Sq. Mt.
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CONCRETE BARRIER TYPE A (TO BE REMOVED)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED EXCAVATION TK=0.95 M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED EXCAVATION TK=0.80 M PAY ITEM ACCORDING TO SPEC. 203-5.04
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Cu. Mt.
AutoCAD SHX Text
Ricardo.Reyes
B-1
ELEVATIONSTA
EASTING
COORDINATES
NORTHING
DESCRIPTION
HORIZONTAL AND VERTICAL CONTROLS
PK NAIL & WASHER
PK NAIL & WASHER
ER-HWY-273-1
ER-HWY-273-2
242,080.437
242,090.324
208,143.917
208,097.091
641.419
643.573
PK NAIL & WASHER
ER-HWY-273-3
242,046.381 208,132.058
656.041
AutoCAD SHX Text PROJECT BEGINS ALIGNMENT AND TRANSITION TO PROPOSED ROAD SECTION BEGINS MATCH TO EXISTING) STA. 1+00.00 PR-156 N:242088.6730 E:208215.6900
AutoCAD SHX Text PROJECT ENDS ALIGNMENT AND TRANSITION TO EXISTING ROAD SECTION ENDS (MATCH TO EXISTING) STA. 2+44.468 (PR-156) N:242087.3945 E:208080.9307
AutoCAD SHX Text
CENTER LINE PROPOSED PROJECT
AutoCAD SHX Text 1+00
AutoCAD SHX Text 1+20
AutoCAD SHX Text 1+40
AutoCAD SHX Text 1+60
AutoCAD SHX Text 1+80
AutoCAD SHX Text 2+00
AutoCAD SHX Text 2+20
AutoCAD SHX Text 2+40
AutoCAD SHX Text
SLOPE STABILIZATION ENDS STA. 1+99.78 (PR-156), 5.75 LT.
AutoCAD SHX Text
PROPOSED SHOULDER TRANSITION BEGINS STA. 1+16.83 (PR-156), 3.35 LT.
AutoCAD SHX Text PROPOSED SLOPE STABILIZATION AND SHOULDER TRANSITION BEGINS STA. 1+21.17 (PR-156), 5.74 LT.
AutoCAD SHX Text
PROPOSED SHOULDER TRANSITION BEGINS STA. 1+16.83 (PR-156), 4.55 RT.
AutoCAD SHX Text
PROPOSED SHOULDER TRANSITION ENDS STA. 1+52.47 (PR-156), 4.55 RT.
AutoCAD SHX Text
PROPOSED SHOULDER TRANSITION ENDS STA. 1+41.60 (PR-156), 4.55 LT.
AutoCAD SHX Text
SHOULDER TRANSITION ENDS STA. 2+32.53 (PR-156), 3.35 LT.
AutoCAD SHX Text SHOULDER TRANSITION BEGINS AND CONC. PAVED WATERWAY TYPE II ENDS STA. 2+24.11 (PR-156), 4.55 LT.
AutoCAD SHX Text
SHOULDER TRANSITION BEGINS STA. 2+24.11 (PR-156), 4.55 RT.
AutoCAD SHX Text
SHOULDER TRANSITION ENDS STA. 2+32.53 (PR-156), 3.35 RT.
AutoCAD SHX Text
CONTROL POINT ER-HWY-273-1
AutoCAD SHX Text
CONTROL POINT ER-HWY-273-2
AutoCAD SHX Text
PROPOSED SLOPE STABILIZATION AREA JUTE MESH
AutoCAD SHX Text
AEXISTING CONC. WALL TO REMAIN
AutoCAD SHX Text
TRANSITION TO EXISTING BEGINS STA. 1+10.00
AutoCAD SHX Text
PROPOSED R.O.W. LIMIT
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
KM 6.3
AutoCAD SHX Text 30"%%C
AutoCAD SHX Text
TO BARRANQUITAS
AutoCAD SHX Text
TO MOROVIS
AutoCAD SHX Text
ER-HWY-273-2
AutoCAD SHX Text
ER-HWY-273-1
AutoCAD SHX Text 246-003-091-11
AutoCAD SHX Text 246-003-091-10
AutoCAD SHX Text 246-000-002-09
AutoCAD SHX Text
246-013-192-03-000 NELIDA BURGOS ORTIZ
AutoCAD SHX Text B-1
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
PRHTA RIGHT OF WAY
AutoCAD SHX Text
STATION
AutoCAD SHX Text
FINISHEG GRADE ELEV.
AutoCAD SHX Text
EXISTING GROUND ELEV.
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text R E V I S I O N S
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MUNICIPALITY
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
FED AID H'WAY
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
AC PROJECT
AutoCAD SHX Text
CODE NO.
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text
P.R. NO.
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text P.O. Box 10914, Caparra Station San Juan, P.R. 00922-0914
AutoCAD SHX Text Tel.(787) 793-3950 Fax(787) 793-8593
AutoCAD SHX Text
ARCHITECTS - ENGINEERS LLP
AutoCAD SHX Text
UNIPRO
AutoCAD SHX Text
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE = 1:200
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
WORK
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
PR
AutoCAD SHX Text
AutoCAD SHX Text 858579
AutoCAD SHX Text R589999579
AutoCAD SHX Text 9999(438)
AutoCAD SHX Text
ORACLE NO.
AutoCAD SHX Text C
AutoCAD SHX Text
RW
AutoCAD SHX Text 9999(325)
AutoCAD SHX Text
AutoCAD SHX Text 14.10.2003
AutoCAD SHX Text 09_273-PP-01.dwg
AutoCAD SHX Text
FILE NAME=
AutoCAD SHX Text
OROCOVIS PUERTO RICO
AutoCAD SHX Text
AND REPAIR RECOMMENDATIONS
AutoCAD SHX Text
LANDSLIDE AND ROAD DAMAGE EVALUATION
AutoCAD SHX Text
FROM STA. 1+00.00 TO STA. 2+44.44
AutoCAD SHX Text
ER-HWY-273, PR-156, KM. 6.30-6.40
AutoCAD SHX Text
PLAN AND PROFILE
AutoCAD SHX Text
AutoCAD SHX Text
PP-K
AutoCAD SHX Text
PR-156
AutoCAD SHX Text
OROCOVIS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION PLAN SCALE 1:200
AutoCAD SHX Text
PROFILE SCALE 1:200
AutoCAD SHX Text
1. CONCRETE BARRIER SHALL BE TYPE C WITH RETROREFLECTIVE CONCRETE BARRIER SHALL BE TYPE C WITH RETROREFLECTIVE SHEETING PANELS EVERY 3.00 MTS. 2. GUARDRAIL SHALL BE CORRUGATED STEEL BEAM GUARDRAIL (SP), GUARDRAIL SHALL BE CORRUGATED STEEL BEAM GUARDRAIL (SP), SINGLE FACE WITH RETROREFLECTIVE SHEETING PANELS EVERY 3.00 MTS. 3. THE CONTRACTOR SHALL REMOVE AL PAVEMENT MARKING INTO THE CONTRACTOR SHALL REMOVE AL PAVEMENT MARKING INTO THE CONSTRUCTION LIMIT. 4. THE PAVEMENT MARKING TO BE REMOVED IS CONTAMINATED WITH THE PAVEMENT MARKING TO BE REMOVED IS CONTAMINATED WITH LEAD BASE PAINT. 5. REMOVE OF CONTAMINATED PAVEMENT MARKING WITH REMOVE OF CONTAMINATED PAVEMENT MARKING WITH HAZARDOUS WASTE RESIDUE - REQUIRED PROPER MANAGEMENT OF HAZARDOUS RESIDUE AND A LEAD COMPLIANCE PLAN. 6. PRIOR TO BEGINNING OF THE REMOVAL OF THE CONTAMINATED PRIOR TO BEGINNING OF THE REMOVAL OF THE CONTAMINATED MATERIAL THE CONTRACTOR SHALL SUBMITTED TO THE ENGINEER THE PROPER MANAGEMENT OF HAZARDOUS RESIDUE AND A LEAD COMPLIANCE PLAN.
AutoCAD SHX Text
%%UGENERAL NOTES
AutoCAD SHX Text
1. ANY WERE IN THIS SET OF DRAWINGS, REPORT AND/OR STUDY ANY WERE IN THIS SET OF DRAWINGS, REPORT AND/OR STUDY WERE IN THIS SET OF DRAWINGS, REPORT AND/OR STUDY WERE IN THIS SET OF DRAWINGS, REPORT AND/OR STUDY IN THIS SET OF DRAWINGS, REPORT AND/OR STUDY IN THIS SET OF DRAWINGS, REPORT AND/OR STUDY THIS SET OF DRAWINGS, REPORT AND/OR STUDY THIS SET OF DRAWINGS, REPORT AND/OR STUDY SET OF DRAWINGS, REPORT AND/OR STUDY SET OF DRAWINGS, REPORT AND/OR STUDY OF DRAWINGS, REPORT AND/OR STUDY OF DRAWINGS, REPORT AND/OR STUDY DRAWINGS, REPORT AND/OR STUDY DRAWINGS, REPORT AND/OR STUDY REPORT AND/OR STUDY REPORT AND/OR STUDY AND/OR STUDY AND/OR STUDY STUDY STUDY OR SIMILAR WERE THE DESIGNER ARE INDICATING "ENGINEER, SIMILAR WERE THE DESIGNER ARE INDICATING "ENGINEER, SIMILAR WERE THE DESIGNER ARE INDICATING "ENGINEER, WERE THE DESIGNER ARE INDICATING "ENGINEER, WERE THE DESIGNER ARE INDICATING "ENGINEER, THE DESIGNER ARE INDICATING "ENGINEER, THE DESIGNER ARE INDICATING "ENGINEER, DESIGNER ARE INDICATING "ENGINEER, DESIGNER ARE INDICATING "ENGINEER, ARE INDICATING "ENGINEER, ARE INDICATING "ENGINEER, INDICATING "ENGINEER, INDICATING "ENGINEER, "ENGINEER, "ENGINEER, GEOTECHNICAL ENGINEER AND/OR ENGINEERING GEOLOGIST" THE ENGINEER AND/OR ENGINEERING GEOLOGIST" THE ENGINEER AND/OR ENGINEERING GEOLOGIST" THE AND/OR ENGINEERING GEOLOGIST" THE AND/OR ENGINEERING GEOLOGIST" THE ENGINEERING GEOLOGIST" THE ENGINEERING GEOLOGIST" THE GEOLOGIST" THE GEOLOGIST" THE THE THE CONTRACTOR SHALL UNDERSTAND THAT THE DESIGNER REFERS SHALL UNDERSTAND THAT THE DESIGNER REFERS SHALL UNDERSTAND THAT THE DESIGNER REFERS UNDERSTAND THAT THE DESIGNER REFERS UNDERSTAND THAT THE DESIGNER REFERS THAT THE DESIGNER REFERS THAT THE DESIGNER REFERS THE DESIGNER REFERS THE DESIGNER REFERS DESIGNER REFERS DESIGNER REFERS REFERS REFERS TO THE EASTERN FEDERAL LANDS CONTRACTING OFFICER. 2. THE CONTRACTOR MUST BE INFORMED THAT THE SPECIFICATIONS THE CONTRACTOR MUST BE INFORMED THAT THE SPECIFICATIONS CONTRACTOR MUST BE INFORMED THAT THE SPECIFICATIONS CONTRACTOR MUST BE INFORMED THAT THE SPECIFICATIONS MUST BE INFORMED THAT THE SPECIFICATIONS MUST BE INFORMED THAT THE SPECIFICATIONS BE INFORMED THAT THE SPECIFICATIONS BE INFORMED THAT THE SPECIFICATIONS INFORMED THAT THE SPECIFICATIONS INFORMED THAT THE SPECIFICATIONS THAT THE SPECIFICATIONS THAT THE SPECIFICATIONS THE SPECIFICATIONS THE SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS AND STANDARD MODELS FOR METAL BARRIERS, TERMINALS, STANDARD MODELS FOR METAL BARRIERS, TERMINALS, STANDARD MODELS FOR METAL BARRIERS, TERMINALS, MODELS FOR METAL BARRIERS, TERMINALS, MODELS FOR METAL BARRIERS, TERMINALS, FOR METAL BARRIERS, TERMINALS, FOR METAL BARRIERS, TERMINALS, METAL BARRIERS, TERMINALS, METAL BARRIERS, TERMINALS, BARRIERS, TERMINALS, BARRIERS, TERMINALS, TERMINALS, TERMINALS, TRANSITIONS, ETC. WILL BE IN COMPLIANCE WITH MASH (MANUAL ETC. WILL BE IN COMPLIANCE WITH MASH (MANUAL ETC. WILL BE IN COMPLIANCE WITH MASH (MANUAL WILL BE IN COMPLIANCE WITH MASH (MANUAL WILL BE IN COMPLIANCE WITH MASH (MANUAL BE IN COMPLIANCE WITH MASH (MANUAL BE IN COMPLIANCE WITH MASH (MANUAL IN COMPLIANCE WITH MASH (MANUAL IN COMPLIANCE WITH MASH (MANUAL COMPLIANCE WITH MASH (MANUAL COMPLIANCE WITH MASH (MANUAL WITH MASH (MANUAL WITH MASH (MANUAL MASH (MANUAL MASH (MANUAL (MANUAL (MANUAL FOR ASSESSING SAFETY HARDWARE), UPDATED IN JUNE 2018. 3. PRIOR BEGINNING THE CONSTRUCTION, THE SURFACE SHOULD BE PRIOR BEGINNING THE CONSTRUCTION, THE SURFACE SHOULD BE BEGINNING THE CONSTRUCTION, THE SURFACE SHOULD BE BEGINNING THE CONSTRUCTION, THE SURFACE SHOULD BE THE CONSTRUCTION, THE SURFACE SHOULD BE THE CONSTRUCTION, THE SURFACE SHOULD BE CONSTRUCTION, THE SURFACE SHOULD BE CONSTRUCTION, THE SURFACE SHOULD BE CONSTRUCTION, THE SURFACE SHOULD BE THE SURFACE SHOULD BE THE SURFACE SHOULD BE SURFACE SHOULD BE SURFACE SHOULD BE SHOULD BE SHOULD BE BE BE CLEANED OF ANY SOIL DISTURBED BY THE LANDSLIDE. WE OF ANY SOIL DISTURBED BY THE LANDSLIDE. WE OF ANY SOIL DISTURBED BY THE LANDSLIDE. WE ANY SOIL DISTURBED BY THE LANDSLIDE. WE ANY SOIL DISTURBED BY THE LANDSLIDE. WE SOIL DISTURBED BY THE LANDSLIDE. WE SOIL DISTURBED BY THE LANDSLIDE. WE DISTURBED BY THE LANDSLIDE. WE DISTURBED BY THE LANDSLIDE. WE BY THE LANDSLIDE. WE BY THE LANDSLIDE. WE THE LANDSLIDE. WE THE LANDSLIDE. WE LANDSLIDE. WE LANDSLIDE. WE WE WE RECOMMEND THAT A GEOTECHNICAL ENGINEER AND/OR THAT A GEOTECHNICAL ENGINEER AND/OR THAT A GEOTECHNICAL ENGINEER AND/OR A GEOTECHNICAL ENGINEER AND/OR A GEOTECHNICAL ENGINEER AND/OR GEOTECHNICAL ENGINEER AND/OR GEOTECHNICAL ENGINEER AND/OR ENGINEER AND/OR ENGINEER AND/OR AND/OR AND/OR GEOLOGIST BE PRESENT ON SITE WHEN AREA IS LEVELED TO BE PRESENT ON SITE WHEN AREA IS LEVELED TO BE PRESENT ON SITE WHEN AREA IS LEVELED TO PRESENT ON SITE WHEN AREA IS LEVELED TO PRESENT ON SITE WHEN AREA IS LEVELED TO ON SITE WHEN AREA IS LEVELED TO ON SITE WHEN AREA IS LEVELED TO SITE WHEN AREA IS LEVELED TO SITE WHEN AREA IS LEVELED TO WHEN AREA IS LEVELED TO WHEN AREA IS LEVELED TO AREA IS LEVELED TO AREA IS LEVELED TO IS LEVELED TO IS LEVELED TO LEVELED TO LEVELED TO TO TO OBSERVE AND CONFIRM THAT THE FILL AND THE CELULLAR AND CONFIRM THAT THE FILL AND THE CELULLAR AND CONFIRM THAT THE FILL AND THE CELULLAR CONFIRM THAT THE FILL AND THE CELULLAR CONFIRM THAT THE FILL AND THE CELULLAR THAT THE FILL AND THE CELULLAR THAT THE FILL AND THE CELULLAR THE FILL AND THE CELULLAR THE FILL AND THE CELULLAR FILL AND THE CELULLAR FILL AND THE CELULLAR AND THE CELULLAR AND THE CELULLAR THE CELULLAR THE CELULLAR CELULLAR CELULLAR CONFIED SYSTEM HAS BEEN CARRIED OUT ACCORDING TO THE SYSTEM HAS BEEN CARRIED OUT ACCORDING TO THE SYSTEM HAS BEEN CARRIED OUT ACCORDING TO THE HAS BEEN CARRIED OUT ACCORDING TO THE HAS BEEN CARRIED OUT ACCORDING TO THE BEEN CARRIED OUT ACCORDING TO THE BEEN CARRIED OUT ACCORDING TO THE CARRIED OUT ACCORDING TO THE CARRIED OUT ACCORDING TO THE OUT ACCORDING TO THE OUT ACCORDING TO THE ACCORDING TO THE ACCORDING TO THE TO THE TO THE THE THE RECOMMENDATIONS IN THE PLANS, SPECIFICATIONS AND IN THE PLANS, SPECIFICATIONS AND IN THE PLANS, SPECIFICATIONS AND THE PLANS, SPECIFICATIONS AND THE PLANS, SPECIFICATIONS AND PLANS, SPECIFICATIONS AND PLANS, SPECIFICATIONS AND SPECIFICATIONS AND SPECIFICATIONS AND AND AND GEOTECHNICAL RECOMENDATIONS. 4.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .