Report - Geo-Report_Addendum_1_Sch A_Hwy-384.pdf

PDF 983 KB Posted

Attached to
Landslide Repairs to Roadways in Ciales, Corozal, and Orocovis, Puerto Rico
Solicitation number
693C73-23-B-000010
Issued by

About this file

This federal solicitation seeks sealed bids from certified Small Business Concerns for landslide repairs to roadways in Ciales, Corozal, and Orocovis, Puerto Rico. The project consists of repairing damage caused by Hurricanes Irma and Maria through embankment reconstruction, reinforced soil slope systems, gabion walls, drainage systems, retaining walls, sheet pile walls, soldier pile retaining walls, milling, overlay, pavement reconstruction, signage, guardrails, and temporary traffic control. The work will be split into multiple schedules with a total expected cost between $10-20 million. Bids are due on or about April 14, 2023 as specified in Block 13a of the solicitation. Firms must register in the System for Award Management and complete annual representations and certifications at www.sam.gov.

View the file

Other files

File Type Posted
ROBO - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0007 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0006 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0005 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0004 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR (12).pdf PDF
Report - Geo_Report_Sch C_Hwy-285.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Report - Geo-Report_Sch A_Hwy-384.pdf PDF
Report - Geo-Report_Addendum_2_Sch A_Hwy-386.pdf PDF
Categorical Exclusion Form (NEPA)_CE_Sch B_Hwy-267.pdf PDF
Report - Environmental Study_Tree Inventory_Sch A_Hwy-384.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-282_283_Sch C_Hwy-281_285.pdf PDF
Report - Geo_Report_Sch B_Hwy-271.pdf PDF
NEPA CE_Sch C_Hwy-285_SHPO Acceptable.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 5 of 6.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Categorical Exclusion Form (NEPA)_ CE_Sch A_Hwy-384_385.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-385.pdf PDF
Report - Geo_Report_Sch A_Hwy-283.pdf PDF
Report - Geo-Report_Sch A_Hwy-386.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Plan_Set_Sch A_Hwy-282_part 2 of 5.pdf PDF
Report - Environmental Study_Tree Inventory_Sch A_Hwy-386.pdf PDF
Plan_Set_Sch A and Sch C_Hwy-281_282_283_285_part 1 of 5.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 3 of 4.pdf PDF
Report - Geo_Report_Sch B_Hwy-273.pdf PDF
Report - USACE_Sch A_Hwy-384.pdf PDF
Plan_Set_Sch C_Hwy-285_part 5 of 5.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 4 of 6.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-384_385.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 1 of 4.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 4 of 4.pdf PDF
Categorical Exclusion Form (NEPA)_CE_Sch C_Hwy-281.pdf PDF
NEPA CE_Sch B_Hwy-270_271_273_275_SHPO No Concurrence Letter.pdf PDF
Report - Environmental Study_Habitat_Sch A_Hwy-384.pdf PDF
Plan_Set_Sch A_Hwy-283_part 3 of 5.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 2 of 6.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-386.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-384.pdf PDF
NEPA CE_Sch B_Hwy-270_271_273_275_SHPO Concurrence Letter.pdf PDF
Report - Environmental Study_Habitat_Sch A_Hwy-386.pdf PDF
Plan_Set_Sch B_Hwy-267_270_271_273_275.pdf PDF
Report - Geo_Report_Sch B_Hwy-267.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 3 of 6.pdf PDF
NEPA CE_Sch C_Hwy-281_No SHPO Concurrence Email.pdf PDF
Categorical Exclusion Form (NEPA)_ CE_Sch B_Hwy-270_271_273_275.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEOCONSULT

Geotechnical engineers providing geotechnical engineering solutions .... Patricia A. Crumley, MECEE Tirso A. Alvarez, PhD Alan R. Crumley, MSCE

P.O. BOX 362040, SAN JUAN, PUERTO RICO 00936-2040 TEL (787) 783-3585 FAX (787) 793-0410 Founded 1981 – Peer Reviewed by ASFE www.geoconsult.us

ADDENDUM NUMBER ONE

TO

GEOTECHNICAL ENGINEERING REPORT

EROSION REMEDIATION

PR-5568 KILOMETER 0.7

Corozal, Puerto Rico

Report dated January 12, 2019 Addendum date March 7, 2019

I reviewed preliminary design drawings by BHA related to remediation of erosion from severe flows over roadway PR-5568 at kilometer 0.7 in Corozal, Puerto

Rico (see seven pages, attached). This area is subject to flooding upstream from the road, likely due to stream discharges that are almost at right angles to the Cibuco, but entering with much lower energy. The new design realigns the current stream and takes flow into a nearly- square box culvert with entry and exit flare walls, exiting into the Cibuco River at a shallower angle that does not significantly impede flow.

The nearest borings show residual soils that overlie weathered rock. At the culvert location, the slab will generally lie on weathered rock. From the borings, my opinion is that these soils can be cut without need for large rippers or explosives.

PR-5568, kilometer 0.7

Addendum No. 1 to Geotechnical Engineering Report

Given normal variations in these stream scenarios, changes might occur that require overexcavation and recompaction. This replacement can be conducted using any recovered clean gravel or imported material (AASHTO types A-1, A-3, A-2-4), compacted as specified by the Highway Authority.

The recommended ultimate bearing pressure for design of the culvert and flarewalls is 15 kips per square foot, or five kips per square foot in service loads.

Design of the mat foundation can be conducted using a modulus of subgrade reaction equal to 150 pounds per square inch, per inch (150 kci). Settlements of the culvert on weathered rock (borings DR-3 and DR-4) are expected to be less than 0.1 inches. Settlement on dense sands should be about five times this value, still insignificant. Overexcavation at the location of weathered rock is not necessary.

Some overexcavation and replacement of soft soils could be required, if found upon excavation near the wingwalls (boring DR-2, where loose fill is found near foundation bottom); this aspect of construction will be determined by the agency’s engineers during construction. I assume that the flarewalls will have construction joints to separate them from the culvert.

Side slopes on cut ground are shown at 1.5:1 H:V and 2:1 on fill slopes. In my opinion, these slopes are acceptable. The designer must review erosion mechanisms and protect the slopes.

PR-5568, kilometer 0.7

Addendum No. 1 to Geotechnical Engineering Report

The creek that currently discharges into kilometer 0.7 will be backfilled as the roadway is widened over the previous channel (e.g., stations 3+30 to 3+40). The creek bed must be cleaned before placement of new backfill, removing existing soft sediments.

For seismic design, the Site Class is “C”. AASHTO uses a 1/1000 exceedence interval, for which USGS probabilistic seismic hazard maps show 0.29 as the peak ground acceleration.

Alan R. Crumley, PE March 7, 2019 License 5828 San Juan, Puerto Rico File No. 3008-18

Alan Crumley Oval

Alan Crumley Oval

Alan Crumley Oval

Alan Crumley Oval

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Line

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

Line

Alan Crumley Text Box

DR-3

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box

DR-4

Alan Crumley Line

Alan Crumley Text Box

204.21 top of wx rock

Alan Crumley Text Box Stiff above

Alan Crumley Text Box

205.24 top of wx rock

Alan Crumley Rectangle

Alan Crumley Rectangle

Alan Crumley Rectangle

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

Alan Crumley Line

Alan Crumley Oval

Alan Crumley Oval

Alan Crumley Oval

Alan Crumley Polygon

Alan Crumley Polygon

Alan Crumley Text Box 205.2

Alan Crumley Line

Alan Crumley Text Box 204.6

Geoconsult Boring id

Geoconsult Boring id

Geoconsult Boring id

Geoconsult Boring id

Alan Crumley Text Box

DR-4

Alan Crumley Text Box

DR-3

Alan Crumley Text Box

DR-2

Alan Crumley Text Box

DR-1

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

Geoconsult Boring id

Alan Crumley Text Box Approximate boring locations

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Fill

Alan Crumley Text Box Clayey gravel

Alan Crumley Text Box Wx rock

Alan Crumley Text Box

DR-1

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

DR-1

Alan Crumley Line

Alan Crumley Text Box Fill

Alan Crumley Text Box Clayey gravel

Alan Crumley Text Box Wx rock

Alan Crumley Line

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box

DR-2

Alan Crumley Text Box Fill

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Wx rock

Alan Crumley Text Box

DR-3

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Fill

Alan Crumley Line

Alan Crumley Text Box Silty clay then clayey gravel

Alan Crumley Text Box Wx rock

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Review cleanup, possible overexcavation

Alan Crumley Line

Alan Crumley Text Box Clayey gravel, then sandy silt

Alan Crumley Text Box Auto. hammer N_ave = 24 N60= N_ave*1.3 = 31

DR-4

Alan Crumley Text Box Fill

Alan Crumley Line

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Clayey silt, relict joints

Alan Crumley Text Box Wx rock

Alan Crumley Line

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

DR-4

Alan Crumley Text Box Fill

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Clayey silt, relict joints

Alan Crumley Text Box Wx rock

Alan Crumley Line

Alan Crumley Text Box

DR-3

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Wx rock

Alan Crumley Text Box Silty clay then clayey gravel

Alan Crumley Line

Alan Crumley Text Box Fill

Alan Crumley Text Box

DR-3

Alan Crumley Text Box Fill

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Wx rock

Alan Crumley Line

Alan Crumley Text Box

DR-2

Alan Crumley Line

Alan Crumley Line

Alan Crumley Text Box Fill

Alan Crumley Text Box Clayey gravel, then sandy silt

Alan Crumley Text Box Wx rock

Alan Crumley Line

Alan Crumley Polygon

Alan Crumley Polygon

Alan Crumley Text Box

GEOCONSULT

Alan Crumley Text Box Geotechnical Engineers - San Juan, PR

Alan Crumley Line

Alan Crumley Text Box Remove all existing fill, review clayey gravel and decide if overexcavation is necessary (not expected, but possible) if beneath culvert; see section 5+00.

Alan Crumley Line

Alan Crumley Rectangle

Alan Crumley Text Box

AT CULVERT

Alan Crumley Text Box Auto. hammer N_ave = 24 N60= N_ave*1.3 = 31

Alan Crumley Line

Alan Crumley

Clayey gravel

Geotechnical Engineers