ROBO - PR ER DOT PRMNT RPR(12).pdf

PDF 114 KB Posted

Attached to
Landslide Repairs to Roadways in Ciales, Corozal, and Orocovis, Puerto Rico
Solicitation number
693C73-23-B-000010
Issued by

About this file

This document summarizes a federal solicitation for landslide repair services in Puerto Rico. The Eastern Federal Lands Highway Division of the US Department of Transportation issued solicitation number 693C73-23-B-000010 seeking sealed bids from small businesses to conduct landslide repairs along several roadways in Ciales, Corozal, and Orocovis. The work includes embankment reconstruction, retaining walls, drainage, pavement repair and replacement, guardrails, signage, and temporary traffic control. The project will be split into multiple schedules with an estimated total value between $10-20 million. Bids are due on June 20, 2023 at 2:00pm local time in Ashburn, Virginia. The performance period for the entire project awarded under all schedules is 1,180 calendar days.

View the file

Other files

File Type Posted
Amendment 0007 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0006 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0005 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0004 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(12).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR (12).pdf PDF
Report - Geo_Report_Sch C_Hwy-285.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Report - Geo-Report_Sch A_Hwy-384.pdf PDF
Report - Geo-Report_Addendum_2_Sch A_Hwy-386.pdf PDF
Categorical Exclusion Form (NEPA)_CE_Sch B_Hwy-267.pdf PDF
Report - Environmental Study_Tree Inventory_Sch A_Hwy-384.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-282_283_Sch C_Hwy-281_285.pdf PDF
Report - Geo_Report_Sch B_Hwy-271.pdf PDF
NEPA CE_Sch C_Hwy-285_SHPO Acceptable.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 5 of 6.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Categorical Exclusion Form (NEPA)_ CE_Sch A_Hwy-384_385.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-385.pdf PDF
Report - Geo_Report_Sch A_Hwy-283.pdf PDF
Report - Geo-Report_Sch A_Hwy-386.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Plan_Set_Sch A_Hwy-282_part 2 of 5.pdf PDF
Report - Environmental Study_Tree Inventory_Sch A_Hwy-386.pdf PDF
Plan_Set_Sch A and Sch C_Hwy-281_282_283_285_part 1 of 5.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 3 of 4.pdf PDF
Report - Geo-Report_Addendum_1_Sch A_Hwy-384.pdf PDF
Report - Geo_Report_Sch B_Hwy-273.pdf PDF
Report - USACE_Sch A_Hwy-384.pdf PDF
Plan_Set_Sch C_Hwy-285_part 5 of 5.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 4 of 6.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-384_385.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 1 of 4.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report - Lead and Asbestos_Sch B_Hwy-267_270_271_273_275_part 4 of 4.pdf PDF
Categorical Exclusion Form (NEPA)_CE_Sch C_Hwy-281.pdf PDF
NEPA CE_Sch B_Hwy-270_271_273_275_SHPO No Concurrence Letter.pdf PDF
Report - Environmental Study_Habitat_Sch A_Hwy-384.pdf PDF
Plan_Set_Sch A_Hwy-283_part 3 of 5.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 2 of 6.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-386.pdf PDF
Report - Environmental Study_Flora Fauna_Sch A_Hwy-384.pdf PDF
NEPA CE_Sch B_Hwy-270_271_273_275_SHPO Concurrence Letter.pdf PDF
Report - Environmental Study_Habitat_Sch A_Hwy-386.pdf PDF
Plan_Set_Sch B_Hwy-267_270_271_273_275.pdf PDF
Report - Geo_Report_Sch B_Hwy-267.pdf PDF
Report - Lead and Asbestos_Sch A_Hwy-386_part 3 of 6.pdf PDF
NEPA CE_Sch C_Hwy-281_No SHPO Concurrence Email.pdf PDF
Categorical Exclusion Form (NEPA)_ CE_Sch B_Hwy-270_271_273_275.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

Landslide Repairs in the Municipalities of Corozal, Ciales, and Orocovis

PROJECT: PR ER DOT PRMNT RPR(12)

SOLICITATION NO. 693C73-23-B-000010

June 20, 2023 at 2:00 p.m.

Ashburn, VA

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-23-B-000010 Project: PR ER DOT PRMNT RPR(12)

June 20, 2023, 2:00 p.m. local time

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Construcciones Jose Carro, S.E. SCHEDULE A $8,557,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$4,306,000.00

SCHEDULE C (GOVERNMENT OPTION 2)

$3,115,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$15,978,000.00

Disarrolladora J.A., Inc. SCHEDULE A $10,989,240.00

SCHEDULE B (GOVERNMENT OPTION 1)

$4,969,490.00

SCHEDULE C (GOVERNMENT OPTION 2)

$2,628,320.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$18,587,050.00

Design Build, LLC SCHEDULE A $11,939,341.00

SCHEDULE B (GOVERNMENT OPTION 1)

$6,233,245.00

SCHEDULE C (GOVERNMENT OPTION 2)

$2,378,745.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$20,551,331.00

LPC Contractors, Inc. SCHEDULE A $8,724,035.00

SCHEDULE B (GOVERNMENT OPTION 1)

$5,200,000.00

SCHEDULE C (GOVERNMENT OPTION 2)

$2,200,495.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$16,124,850.00

If the Government awards the contract as Schedules A + B + C, the performance period will be 1180 calendar days.

If separate: Schedule A will be 515 calendar days; Schedule B - the performance period of the contract will be extended 400 calendar days; and Schedule C -the performance period of the contract will be extended 265 calendar days

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-23-B-000010 Project: PR ER DOT PRMNT RPR(12)

June 20, 2023, 2:00 p.m. local time

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Novel Construction, LLC SCHEDULE A $9,996,738.00

SCHEDULE B (GOVERNMENT OPTION 1)

$2,781,597.00

SCHEDULE C (GOVERNMENT OPTION 2)

$1,202,665.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$13,981,000.00

Santo & Carro Enterprises SCHEDULE A $8,710,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$4,331,000.00

SCHEDULE C (GOVERNMENT OPTION 2)

$2,220,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$15,261,000.00

Engineer’s Estimate SCHEDULE A $6,480,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$3,620,000.00

SCHEDULE C (GOVERNMENT OPTION 2)

$1,900,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$12,000,000.00

If the Government awards the contract as Schedules A + B + C, the performance period will be 1180 calendar days.

If separate: Schedule A will be 515 calendar days; Schedule B - the performance period of the contract will be extended 400 calendar days; and Schedule C -the performance period of the contract will be extended 265 calendar days

Slide Number 1
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-23-B-000010� Project: PR ER DOT PRMNT RPR(12)�June 20, 2023, 2:00 p.m. local time �
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-23-B-000010� Project: PR ER DOT PRMNT RPR(12)�June 20, 2023, 2:00 p.m. local time�

File details come from the government source that posted it. Updated .