Reference_Structural_Record_Drawing.pdf
PDF 5 MB Posted
- Attached to
- Water Reclamation Sand and Sludge Management
- Solicitation number
- 26-008UO-HK-RFP
- Issued by
- Hillsborough County, Florida
About this file
This is a Reference Structural Record Drawing file supporting a Request for Proposals issued by the City of Plant City, Florida for sand and sludge management services at the Water Reclamation Facility located at 1500 Victoria Street. The document consists of signed Mylars in TIFF file format, containing structural reference drawings numbered 084 through 137 that serve as technical reference materials for the project. The RFP (No. 26-008UO-HK-RFP) solicits comprehensive sand filtration maintenance, sludge management, and facility cleaning services on an as-needed basis, including mobilization and demobilization, pressure washing and cleaning of treatment basins, grit removal and hauling, sludge pumping and hauling, sludge testing, sand media removal and replacement, and disposal of removed materials in compliance with applicable regulations. The proposal submission deadline is March 26, 2026 at 2:00 p.m. local time through the City's e-Procurement Portal, with a question submission deadline of March 16, 2026 at 5:00 p.m. The resulting contract will commence upon issuance for an initial three-year term with the possibility of two additional one-year renewal periods at the City Manager's sole discretion.
Pricing shall be submitted on a unit cost basis for all line items with mobilization and demobilization established as a fixed $50,000 lump sum, while all other items require unit pricing for measurement and payment purposes. The specific total contract value is not disclosed; however, costs will be based on actual work performed as verified by certified weight tickets, flow meter readings, and approved testing procedures. For renewal periods, contractors may request fee adjustments with ninety days' notice supported by Consumer Price Index documentation, with maximum allowable increases limited to four percent. The contract is non-exclusive with no minimum work guarantee, and the City reserves the right to terminate at any time with thirty days' notice or delete portions of the contract at will. Evaluation criteria weight contractor qualifications at thirty percent, project team qualifications at thirty percent, work narrative and safety plan at twenty percent, and cost evaluation at twenty percent. Contractors must maintain comprehensive insurance coverage including Workers' Compensation, Commercial General Liability and Property Damage Insurance of at least $500,000 per person and $1,000,000 per occurrence, and Commercial Automobile Liability Insurance of $500,000.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Signed Mylars TIFF files 084
| Signed Mylars TIFF files 085 |
| Signed Mylars TIFF files 086 |
| Signed Mylars TIFF files 087 |
| Signed Mylars TIFF files 088 |
| Signed Mylars TIFF files 089 |
| Signed Mylars TIFF files 090 |
| Signed Mylars TIFF files 091 |
| Signed Mylars TIFF files 092 |
| Signed Mylars TIFF files 093 |
| Signed Mylars TIFF files 094 |
| Signed Mylars TIFF files 095 |
| Signed Mylars TIFF files 096 |
| Signed Mylars TIFF files 097 |
| Signed Mylars TIFF files 098 |
| Signed Mylars TIFF files 099 |
| Signed Mylars TIFF files 100 |
| Signed Mylars TIFF files 101 |
| Signed Mylars TIFF files 102 |
| Signed Mylars TIFF files 103 |
| Signed Mylars TIFF files 104 |
| Signed Mylars TIFF files 105 |
| Signed Mylars TIFF files 106 |
| Signed Mylars TIFF files 107 |
| Signed Mylars TIFF files 108 |
| Signed Mylars TIFF files 109 |
| Signed Mylars TIFF files 110 |
| Signed Mylars TIFF files 111 |
| Signed Mylars TIFF files 112 |
| Signed Mylars TIFF files 113 |
| Signed Mylars TIFF files 114 |
| Signed Mylars TIFF files 115 |
| Signed Mylars TIFF files 116 |
| Signed Mylars TIFF files 117 |
| Signed Mylars TIFF files 118 |
| Signed Mylars TIFF files 119 |
| Signed Mylars TIFF files 120 |
| Signed Mylars TIFF files 121 |
| Signed Mylars TIFF files 122 |
| Signed Mylars TIFF files 123 |
| Signed Mylars TIFF files 124 |
| Signed Mylars TIFF files 125 |
| Signed Mylars TIFF files 126 |
| Signed Mylars TIFF files 127 |
| Signed Mylars TIFF files 128 |
| Signed Mylars TIFF files 129 |
| Signed Mylars TIFF files 130 |
| Signed Mylars TIFF files 131 |
| Signed Mylars TIFF files 132 |
| Signed Mylars TIFF files 133 |
| Signed Mylars TIFF files 134 |
| Signed Mylars TIFF files 135 |
| Signed Mylars TIFF files 136 |
| Signed Mylars TIFF files 137 |
File details come from the government source that posted it. Updated .