Reference F LVC scenarios.docx

DOCX document 346 KB Posted

Attached to
Undergraduate Jet Training System (UJTS) Request for Information March 2025
Solicitation number
25-0001_UJTS
Issued by

About this file

The document is an Appendix B draft UJTS Live, Virtual, and Constructive (LVC) Request for Information (RFI) describing technical scenario profiles for training simulations. The document outlines three primary scenario configurations: 1) GBTS (Ground-Based Training System) simulator to aircraft connection, supporting up to N live aircraft and M simulators, 2) GBTS standalone simulator scenarios with up to M assets and constructive bandits, and 3) Aircraft standalone scenarios with up to N live aircraft connections. Each scenario profile includes specifications for combining live friendly/foe assets with approximately 75 constructive bandits, designed to provide comprehensive training environment linkages across different simulation platforms.

The accompanying federal contract opportunity is a Department of the Navy Naval Air Systems Command Request for Information (RFI) for the Undergraduate Jet Training System (UJTS), dated 31 March 2025. This RFI is part of ongoing market research and includes eight attachments covering weapon system specifications, mission profiles, instructional media requirements, and training curriculum documents. The RFI emphasizes that it is for information gathering only, does not constitute a solicitation, and will not result in an immediate contract award. Potential respondents must have appropriate safeguarding procedures for controlled unclassified information and may request access through the Procuring Contracting Officer (PCO), with distribution limited to potential prime contractors.

View the file

Other files

File Type Posted
DRAFT H CLAUSES.pdf PDF
DRAFT Section B CLIN Structure.pdf PDF
UJTS RFI December 2025.pdf PDF
DRAFT H CLAUSES.pdf PDF
UJTS RFI August 2025.pdf PDF
Reference (F) Mode S FRD.pdf PDF
UJTS SOW release and RFI_June 2025.docx DOCX document
Reference (E) - RVSM FRD.pdf PDF
ADSB-FRD.pdf PDF
Industry Engagement April 2025 (1).pdf PDF
UJTS WSS Release and RFI 31 March 2025.pdf PDF
Reference G Training Facilities Report.pdf PDF
Reference B Mission Profiles.docx DOCX document
Reference D NFO Curriculum.pdf PDF
Reference E Strike E-2 Curriculum.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX B: DRAFT UJTS LVC RFI

DISTRIBUTION STATEMENT A: Approved for public release: distribution unlimited.

1. LVC Master Scenario

Profile Summary:

· Mission overview: training requirements to include real time linkage for a combination of up to M simulators and up to N UJTS aircraft.

1) GBTS simulator to aircraft connection (up to N live assets total and up to M simulators total)

2) Up to N live friendly/foe (Aircraft)

3) Up to M live friendly/foe (OFT)

4) ~75 Constructive bandits

2. GBTS Standalone Scenario

· Mission overview: training requirements to include linkage combination of up to M simulators

1) GBTS simulator to simulator connection (up to M assets total)

2) Up to M friendly/foe (OFT)

3) ~75 Constructive bandits

3. Aircraft Standalone Scenario

· Mission overview: training requirements to include linkage combination of up to N aircrafts

1) Aircraft to aircraft connection (up to N live assets total)

2) Up to N live friendly/foe (Aircraft)

3) ~75 Constructive bandits image1.png image2.png image3.png