Manual: 4Q1.7 Procedure: 224
Revision: 7
INSTRUCTIONS FOR THE ASSEMBLY, TESTING AND
INSPECTION OF THE BULLARD EVA PAPR
Effective Date: 08/16/2016 Type-Class: Tech-Ref Page: 1 of 25
1.0 INTRODUCTION
1.1 Purpose
To provide instructions for assembly, testing, and inspection of the Bullard Evolutionary Air (EVA) Powered Air Purifying Respirator (PAPR), with one of the following hoods:
RT1, RT3, 20TIC, or 20TICH with sleeve for breathing air tube and two breathing air tube clamps
RT1T, RT3T, 20TICT, or 20TICHT with threaded connection for breathing tube with threaded connection
1.2 Scope
This procedure applies to the assembly, testing and Quality Assurance (QA) of the Bullard EVA Powered Air Purifying Respirator with one of the following hoods:
RT1, RT3, 20TIC, or 20TICH with sleeve for breathing air tube and two breathing air tube clamps
RT1T, RT3T, 20TICT, or 20TICHT with threaded connection for breathing tube with threaded connection
This is a Reference Procedure. The user is not required to have this procedure present while performing the activity.
The following data/round sheets may be utilized in the performance of this procedure:
OSR 4-510, Respiratory Equipment Record and QA
2.0 GENERAL INFORMATION
2.1 Definitions and Abbreviations
dBA – decibels or dBA of sound pressure lpm – liters per minute mA - milliamperes mAh - milliampere-hour or one-thousandth of an ampere-hour mV – millivolt or one-thousandth of a volt
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Revision: 7 Page: 2 of 25
2.2 Responsibilities
1. The Respiratory Equipment Facility (REF) Lead is responsible for:
Evaluating OSR 4-510 to determine if significant defective items are reported and notifying the Respiratory Protection Program Administrator via email, Determining if issuance of a Nonconformance Report (NCR) is required and necessary, Initiating and responding to NCRs per Manual 1Q, 15-1, Control of Nonconforming Items.
2. REF Personnel are responsible for:
Performing assembly and testing of Bullard EVA PAPR’s with hood, Performing housekeeping after completion of work activity, Completing qualification training as specified in the Job Performance Standard, subcontract scope of work, or approved equal.
3. The Radiological Protection Department (RPD) is responsible for:
Monitoring reusable PAPR components prior to shipment from a radiological area to the REF.
4. The Field Industrial Hygiene (IH) is responsible for:
Developing change-out schedules for combination filters.
2.3 Training
REF personnel shall complete qualification training as specified in the Job Performance Standard or approved equal.
2.4 Information
1. Assembled PAPR unit will be delivered without batteries installed.
2. Assembled PAPR units without batteries installed will have a one year expiration date to be recorded on cover sheet.
3. Hardhats are only permitted with the 20TICH and 20TICHT hoods. Only Bullard hardhat models 3000WHT, 3000RWHT, 5100WHT, 5100RWHT or manufacturer approved equal are acceptable per National Institute for Occupational Safety and Health (NIOSH) approval.
2.5 Hood Description
The hoods noted in Section 1.0 are made of a DuPont Fabric called Tychem. This material is basically Tyvek, coated with polyethylene. This combination provides durability and maximum permeation protection. Tychem has been tested over a wide range of temperatures and various chemical classes.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 3 of 25
2.5.1 RT1/RT1T Hood with Inner Bib
The RT1/RT1T hood is held in place by an inflatable neck cuff which fits under the wearer’s chin. This prevents the hood from rising upwards when supplied with breathing air. Breathing air is supplied from a breathing tube connected to the back of the hood and the air is routed through overhead channels that deliver the air down across the lens of the hood.
The RT1/RT1T hood cape has straps that are placed under the wearer's arms and held in place by Velcro® to help hold the cape close to the wearer's body.
2.5.2 RT3/RT3T Hood with Inner Bib
The RT3/RT3T hood has a sportneck collar made from a soft nylon material. Breathing air is supplied from a breathing tube connected to the back of the hood and the air is routed through overhead channels that deliver the air down across the lens of the hood.
The RT3/RT3T hood also has an adjustable Velcro® strap in the hood to help shape the hood for better comfort. The RT3/RT3T hood cape also has straps that are placed under the wearer's arms and held in place by Velcro® to help hold the cape close to the wearer's body.
NOTE
The Bullard EVA PAPR with RT3 and RT3T hood does not permit the use of a hardhat.
Only the Bullard EVA PAPR with the 20TICH and 20TICHT hood is designed for use with a hardhat.
2.5.3 20TICH and 20TICHT Hood with inner Bib for Use with Head Protection
The 20TICH and 20TICHT must be worn with a Bullard hardhat. Only Bullard hardhats 3000WHT, 3000RWHT, 5100WHT, 5100RWHT or manufacturer approved equal are NIOSH approved for use with the EVA PAPR with the 20TICH and 20TICHT Hood. Breathing air is supplied from the breathing tube connected to the back of the hood and the air is routed through a sewn-in elastic channel.
2.5.4 20TIC and 20TICT Hood with Headband and Inner Bib
The 20TIC and 20TICT hood must be worn with an integral suspension for stability. Breathing air is supplied from the breathing tube connected to the back of the hood and air is routed through a sewn-in elastic channel.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 4 of 25
2.6 General Battery Guidelines
1. Bullard EVA PAPR battery packs are durable Lithium Polymer rechargeable batteries designed to deliver consistent power over a long life. The life of the Bullard battery pack will be significantly reduced when they are exposed to high heat over an extended period of time. To maximize battery life, these maintenance guidelines should be followed:
A. The battery should be removed from the blower unit when not in use.
Battery loses 8.3% of its life if stored in the blower.
B. Charge the battery before it is completely discharged. The low battery alarm indicates that the battery needs to be charged. It will not allow the battery to be discharged below a safe voltage for the cells. The six-port Evolutionary Air Gang Charger (EVAGC) can charge six batteries in four hours. The EVAGC charge is a trickle charger meaning the batteries may stay in the gang charger once fully charged.
C. Charge the batteries at room temperature or cooler. At higher temperatures, the battery pack may not accept a full charge. If the battery pack feels hot, let it cool for 30 minutes before charging.
D. Without periodic charging, the Lithium Polymer battery loses less than .5% of its charge each day. Allowing a battery to self-discharge during extended storage will not harm the battery pack. Discharging and re-charging the battery fully at least once every three months is suggested to ensure the longest possible life of the battery.
2.6.1 Disposal
1. Damaged or worn-out batteries should be disposed of in accordance with local, state and federal regulations at an approved hazardous waste recycling or disposal facility. Contact General Certification Official (GCO) for disposal requirements.
2. New EVA batteries are evaluated after 18 months. Therefore EVA batteries are to be returned to the REF for re-evaluation every 12 months.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 5 of 25
2.7 Checking Bullard Batteries on the EVA Evolutionary Air EVAluator
1. Key status EVAluator Criteria
Voltage: Approximately 16800 mV
Current: Charge is displayed if the battery is charging. 0 mA will be displayed if battery is not charging
Max Error: 2%
Absolute Charge: 95% or greater is acceptable
Fuel Gauge: Max 6300 mAh. Anything over 5985 mAh with an absolute charge of 95% or greater Is acceptable
2. Battery evaluation shall be performed on all Bullard batteries prior to being placed into service. Batteries shall meet the acceptance criteria listed above.
New batteries shall expire 18 months from initial evaluation and thereafter batteries shall be re-evaluated annually.
3.0 PRECAUTIONS AND LIMITATIONS
1. When using hand tools such as a screwdriver, wear a leather or puncture resistant glove on the hand opposite of the hand holding the tool.
2. The use of substitute parts or altering the respirators voids NIOSH certification. Approved spare parts from the manufacturer of the respirator being repaired must be used to maintain NIOSH certification of respirators.
3. Wear Hyflex, or equivalent, palm coated gloves to tighten hose clamps and filters.
4. Wear cut resistant gloves when using manual cutting tools such as a knife, box cutter.
5. All cutting tools (scissors) shall have cover or retractable blades when stored and not in use.
6. Control materials during work activities to avoid slipping/tripping hazards.
7. When examining the hoods while inflated, small pinholes may be observed in the stitched areas of the hoods, where during the sewing process, the sewing machine double stitched. These pinholes are expected. Large pinholes;
more than three stitches, in the stitched areas, are NOT acceptable and the hood shall be rejected for return to the supplier.
8. Reuse of Bullard hoods or breathing tubes must be approved by facility Radiological Protection (RP)/IH.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 6 of 25
4.0 PREREQUISITES
4.1 Tools and Equipment
EVAGC Gang Charger
EVA Evolutionary Air EVAluator
5.0 PERFORMANCE
5.1 Batteries
NOTE
1. The Bullard EVA PAPR uses Lithium Polymer batteries. One fully charged battery pack will power the blower for approximately four to eight hours depending upon factors such as speed selected, filter selected and filter loading.
2. Bullard batteries will be shipped separately if charged by the REF, or the facility will be responsible for charging batteries.
5.1.1 Charging New and Used Batteries Using EVAGC Gang Charger
1. INSTALL battery into EVAGC six-port Gang Charger, AND
ENSURE RED light is ON indicating battery is charging.
2. CONTINUE charging until the light illuminates GREEN indicating charging is complete.
5.1.2 Checking/Charging Bullard Batteries on the EVA Evolutionary Air EVAluator
1. CHARGE EVA batteries on gang charger.
2. REMOVE EVA battery from gang charger when LED illuminates GREEN next to the battery.
3. INITIALIZE EVA battery software on computer.
4. PLACE EVA battery into evaluator battery holder.
A. ENSURE the MODULE CONNECTED light is GREEN.
B. ENSURE the BATTERY INSERTED light is GREEN.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 7 of 25
5.1.2 Checking/Charging Bullard Batteries on the EVA Evolutionary Air EVAluator, (cont.)
5. EVALUATE battery status, AND
OBSERVE that the following conditions are shown:
Voltage shall be between 15960 mV and approximately 16800 mV
Absolute Charge shall be between 95% and 100%
Maximum error shall be 2% or less
Fuel Gauge shall be between 5985 mAh and 6425 mAh. On occasion the mAh may be over 6425 meaning that the battery has a higher capacity rating. This is acceptable if all other criteria are met.
NOTE
Battery may not charge if the voltage is around 16300 mV.
6. IF the above conditions are NOT met, THEN
CHECK to ensure the battery is charging.
A. IF the battery is charging, a Current value will be displayed, THEN
ALLOW the battery to continue charging.
B. PROCEED to Section 5.1.3 or 5.1.4.
7. IF the Current value is not displayed and the criteria in Step 5.1.2.5 is NOT met, THEN
REMOVE the battery from the EVAluator, AND
PLACE the battery in a PAPR motor/blower.
8. TURN the motor/blower ON, AND
RUN the motor/blower for approximately 30 minutes allowing the battery to discharge down to a level where it may begin charging.
9. PLACE the battery on charge.
A. IF using the EVAluator after motor/blower runs, THEN
1) OBSERVE that a Current value is displayed and the battery begins to charge.
2) ALLOW battery to charge until the criteria in Step 5.1.2.5 is met.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 8 of 25
5.1.2 Checking/Charging Bullard Batteries on the EVA Evolutionary Air EVAluator, (cont.)
Step 9A, (cont.)
3) IF the criteria in Step 5.1.2.5 is NOT met after two hours on charge, THEN
DISPOSE of the battery, AND
REPLACE with a new one.
B. IF using the gang charger after motor/blower runs, THEN
1) ALLOW battery to charge until the green LED Is illuminated.
2) REMOVE battery from charge.
3) PLACE on the EVAluator.
4) IF the battery meets the criteria in Step 5.1.2.5, THEN
PROCEED to Section 5.1.3 or 5.1.4.
5) IF the criteria in Step 5.1.2.5 is NOT met, THEN
DISPOSE of the battery, AND
REPLACE with a new.
5.1.3 New Battery Labeling
1. CREATE label to include the following:
Battery serial number
Battery evaluation date (month/year)
Battery evaluation expiration date; 18 months from evaluation date (month/year)
5.1.4 Used Battery Labeling
1. CREATE label to include the following:
Battery serial number
New battery evaluation date (month/year)
Battery evaluation expiration date; 12 months from previous evaluation date (month/year)
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 9 of 25
5.2 Assembly and Verification of the EVA Motor/Blower
1. VERIFY charge by depressing the button labeled PUSH on battery prior to installing battery into EVA PAPR unit, AND
CONFIRM all four LEDs will illuminate GREEN verifying battery is fully charged.
2. INSERT one fully charged battery in the EVA motor/blower, AND
ENSURE that a click is heard verifying the battery is completely engaged.
3. REVERIFY battery charge by depressing the button labeled PUSH on battery, AND
ENSURE all four LEDs illuminate GREEN verifying battery is FULLY charged.
4. OBTAIN new applicable filter (PAPRFC3/FC4), AND
INSPECT filter for any visible damage.
5. IF filter shows damage, THEN
DISCARD AND OBTAIN new filter.
6. ENSURE the filter cartridge label is present and legible, THEN
RECORD ‘Put into Service’ date on label.
7. THREAD the filter into the filter port until locking tab is secure.
8. IF chemical combination filter is requested, THEN
OBTAIN correct filter and install in same manner.
9. INSPECT 40 mm nut for signs of cracking or stress where nut is attached to EVA PAPR motor/blower.
10. ENSURE proper gasket is in the 40 mm nut.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 10 of 25
5.2 Assembly and Verification of the EVA Motor/Blower, (cont.)
NOTE
Savannah River Site (SRS) uses the 26-inch length breathing tube normally. The 22 and 32-inch breathing tubes are available by request.
11. THREAD the breathing tube into 40 mm nut on EVA PAPR motor/blower, AND
ENSURE breathing tube is hand tight. Do NOT over tighten and do NOT cross-thread.
12. SWITCH ON the EVA motor/blower unit.
13. HOLD the breathing tube in an upright vertical position.
14. PLACE the Bullard Airflow Indicator over the open end of the breathing tube with the PASS LINE on the Airflow Indicator furthest from the breathing tube.
15. APPLY a light pressure to the Airflow Indicator to get a reasonable seal at the breathing tube end.
16. ENSURE that the air outlet holes in the Airflow Indicator are not blocked.
17. OBSERVE the position of the floating ball.
NOTE
During airflow test, low flow alarm may activate, which is acceptable.
18. VERIFY where ball is to the PASS LINE.
A. IF the entire ball is completely above the PASS LINE on the Airflow indicator, THEN
PROCEED to Step 5.2.26.
B. IF any part of the floating ball is below the PASS LINE on the Airflow Indicator, THEN
CHECK the following:
Motor/blower malfunction
Clogged or damaged filter
Reverify battery charge
Battery malfunction
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 11 of 25
19. IF the motor/blower, filter and battery are functioning properly AND the floating ball remains below the PASS LINE, THEN
REMOVE the motor/blower from service, AND
NOTIFY the REF Lead.
20. IF motor/blower malfunctions (unusual noises, vibration, odor, etc.) is discovered, THEN
REMOVE motor/blower from service, AND
NOTIFY the REF LEAD.
21. IF the filter is suspect, THEN
REMOVE AND INSTALL new filter.
22. ENSURE filter cartridge label is legible.
23. DISCARD filters which are identified as having problems per 4Q1.7, Procedure 502, Solid Waste Handling and Disposal.
24. IF low battery charge, improper battery installation or battery malfunction is suspected, THEN
REMOVE battery, AND
INSTALL fully charged battery.
25. PLACE removed battery in an open port on the Gang Charger, AND
TEST by charging.
A. IF the battery fails to charge, THEN
REMOVE the battery from service, AND
NOTIFY the REF Lead.
26. COVER the breathing tube port with your hand, AND
WAIT approximately five seconds. The 77 dBA audible alarm will sound indicating a low flow condition of less than 185 lpm.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 12 of 25
27. REMOVE hand from the breathing tube port. Alarm will cease when flow returns to normal.
A. IF the low flow alarm does NOT sound, THEN
NOTIFY the REF Lead for further evaluation.
28. SWITCH motor/blower OFF.
5.3 Hood Assembly
1. Upon successful completion of the airflow and low flow alarm verification of motor/blower, OBTAIN appropriate hood for assembly.
2. PROCEED to appropriate section for hood to be assembled (5.3.1, 5.3.2, 5.3.3).
5.3.1 RT3 Hood Assembly
1. INSERT the breathing tube approximately five inches into breathing tube sleeve on the hood.
2. SECURE hood sleeve to the breathing tube using two S18051 clamps.
3. INSTALL clamps approximately one inch from the opening of the breathing tube sleeve.
A. ENSURE that one clamp opening/closure is facing the side of the hood sleeve and the other clamp opening/closure is facing the opposite side of the hood sleeve (see Figure 8.1).
B. TIGHTEN clamps with wrench being sure not to overtighten.
4. SWITCH motor/blower ON.
5. CHECK the integrity of the hood by grasping the bottom of the hood and holding it closed.
NOTE
Allow enough air to escape so the seams are NOT ripped or stressed.
6. While holding the hood CLOSED, EXAMINE the hood once inflated, especially at the seams for:
tears splits other defects
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 13 of 25
5.3.1 RT3 Hood Assembly, (cont.)
7. IF defects are found, THEN
PERFORM the following:
A. RECORD as a deficiency to be totaled for the day on OSR 4-510, AND
REMOVE the hood.
B. SEGREGATE defective hood, AND
NOTIFY REF Lead.
C. REPLACE defective hood with new hood, AND
REPEAT Steps 5.3.1.1 through 5.3.1.7.
8. COMPRESS hood until alarm sounds to verify low flow alarm sounds.
9. IF no defects are found, THEN
TURN motor/blower OFF.
10. IF battery from PAPR unit is to remain at Respiratory Equipment Facility, THEN
REMOVE battery from the unit and place in charger.
11. Using care, FLATTEN the hood, AND
GENTLY FOLD the hood and breathing tube over motor/blower.
12. Assembler SHALL INITIAL left bottom corner of Bullard insert (see Attachment 8.1).
13. RECORD expiration date of PAPR unit.
A. IF battery has been removed from the PAPR unit and remains at REF, THEN
RECORD expiration date of one year from date PAPR unit was assembled on Bullard insert.
14. PLACE PAPR into Bullard bag but do NOT seal bag.
15. PLACE bagged PAPR in designated location for peer inspection per Section 5.4.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 14 of 25
5.3.2 20TIC and 20TICH Hood Assembly
1. OBTAIN a new hood.
2. OBTAIN a motor/blower that has successfully completed airflow verification.
3. INSERT the breathing tube approximately five inches into breathing tube sleeve on the hood.
4. SECURE the hood sleeve to the breathing tube using two S18051 clamp.
A. INSTALL a clamp underneath the plastic anchor plate with the clamp opening/closure facing the plastic anchor plate (see Figure 8.2), AND
TIGHTEN clamp with wrench being sure not to overtighten.
B. INSTALL a second clamp around the breathing tube through the two holes in the anchor plate (see Figure 8.2), AND
TIGHTEN clamp with wrench being sure not to overtighten.
5. SWITCH motor/blower ON.
6. CHECK the integrity of the hood by grasping the bottom of the hood and holding it closed.
NOTE
Enough air should be allowed to escape so the seams are NOT ripped or stressed.
7. While holding the hood closed, EXAMINE the hood once inflated, especially at the seams for:
tears splits other defects
8. IF defects are found, THEN
PERFORM the following:
A. RECORD as a deficiency to be totaled for the day on OSR 4-510.
B. REMOVE the hood.
C. SEGREGATE defective hood for return to the supplier.
D. REPLACE defective hood with new hood, AND
REPEAT Steps 5.3.2.1 through 5.3.2.9.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 15 of 25
5.3.2 20TIC and 20TICH Hood Assembly, (cont.)
9. IF no defects are found, THEN
TURN motor/blower OFF.
10. IF battery from PAPR unit is to remain at Respiratory Equipment Facility, THEN
REMOVE battery from the unit and place in charger.
11. CAREFULLY FLATTEN the hood, AND
GENTLY FOLD hood and breathing tube over the motor/blower.
12. Assembler shall INITIAL left bottom corner of Bullard insert (see Attachment 8.1).
13. RECORD expiration date of PAPR unit.
A. IF battery has been removed from the PAPR unit and remains at REF, THEN
RECORD expiration date of one year from date PAPR unit was assembled on Bullard insert.
14. PLACE PAPR into Bullard bag but do NOT seal bag.
15. IF hardhat installation is requested by facility, THEN
PROCEED to Step 5.3.2.17.
16. IF hardhat installation is NOT requested, THEN
PLACE bagged PAPR in designated location for peer inspection per Section 5.4.
NOTE
1. User’s facility may assemble hardhats per the manufacturer’s assembly instructions.
2. Since there are several different model hardhats approved for use with the 20TICH and 20TICHT hoods, REF personnel SHALL follow the manufacturer’s assembly instructions provided with each hardhat, if assembly is requested.
3. Do NOT remove plastic from lens of hood. Plastic will be removed by field personnel before use.
17. Before inserting hardhat into hood, REMOVE the two Velcro® strips attached to the Velcro® piece sewn into the hood.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 16 of 25
5.3.2 20TIC and 20TICH Hood Assembly, (cont.)
18. APPLY the longer Velcro® tab to the underside of the brim of the hardhat, about 1/4 inch up from the edge.
19. APPLY the shorter Velcro® tab to the underside of the brim of the hardhat.
20. INSERT hardhat into 20TICH hood with cap visor facing front of hood.
21. TUCK cap brim on top of front elastic band sewn into hood.
22. LOOP the Velcro® strip sewn inside the hood around the back of the cap, AND
ATTACH it to the Velcro® tab previously installed inside the hardhat.
5.3.3 RT1T, RT3T, 20TICT, and 20TICHT Hood Assembly
NOTE
Hoods with a threaded port at the rear are designated with a “T” suffix.
1. OBTAIN a new hood.
2. OBTAIN a motor/blower that has successfully completed airflow verification.
3. THREAD the breathing tube fitting onto the hood fitting by turning the nut clockwise until hand tight.
4. ENSURE cross threading of connections does not occur (see Figure 8.3).
5. SWITCH motor/blower ON.
6. CHECK the integrity of the hood by grasping the bottom of the hood and holding it closed.
NOTE
Allow enough air to escape so the seams are NOT ripped or stressed.
7. While holding the hood closed, EXAMINE the hood once inflated, especially at the seams for:
tears splits other defects
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 17 of 25
5.3.3 RT1T, RT3T, 20TICT, and 20TICHT Hood Assembly, (cont.)
8. IF defects are found, THEN
PERFORM the following:
A. RECORD as a deficiency to be totaled for the day on OSR 4-510.
B. REMOVE the hood.
C. SEGREGATE defective hood for return to the supplier.
D. REPLACE defective hood with new hood, AND
REPEAT Section 5.3.3.1 through 5.3.3.8.
9. IF no defects are found, THEN
TURN motor/blower OFF.
10. IF battery from PAPR unit is to remain at Respiratory Equipment Facility, THEN
REMOVE battery from the unit and place in charger.
11. CAREFULLY FLATTEN the hood, AND
GENTLY FOLD hood and breathing tube over the motor/blower.
12. Assembler SHALL INITIAL left bottom corner of Bullard insert (see Attachment 8.1).
13. RECORD expiration date of PAPR unit.
A. IF battery has been removed from the PAPR unit and remains at Respiratory Equipment Facility, THEN
RECORD expiration date of one year from date PAPR unit was assembled on Bullard insert.
14. PLACE PAPR into Bullard bag but do NOT seal bag.
15. IF hardhat installation is requested by facility, THEN
PROCEED to Step 5.3.3.17.
16. IF hardhat installation is NOT requested, THEN
PLACE bagged PAPR in designated location for peer inspection per Section 5.4.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 18 of 25
5.3.3 RT1T, RT3T, 20TICT, and 20TICHT Hood Assembly, (cont.)
NOTE
1. User’s facility may assemble hardhats per the manufacturer’s assembly instructions.
2. Since there are several different model hardhats approved for use with the 20TICH and 20TICHT hoods, REF personnel SHALL follow the manufacturer’s assembly instructions provided with each hardhat, if assembly is requested.
3. Do NOT remove plastic from lens of hood. Plastic will be removed by field personnel before use.
CAUTION
Hardhats are only permitted with the 20TICH and 20TICHT hoods. Only Bullard models 3000WHT, 3000RWHT, 5100WHT, 5100RWHT or manufacturer approved equal are acceptable per NIOSH approval
17. REMOVE the two Velcro® strips attached to the Velcro® piece sewn into the hood before inserting hardhat into hood.
18. APPLY the longer Velcro® tab to the underside of the brim of the hardhat, about 1/4 inch up from the edge.
19. APPLY the shorter Velcro® tab to the underside of the brim of the hardhat.
20. INSERT hardhat into 20TICHT hood with cap visor facing front of hood.
21. TUCK cap brim on top of front elastic band sewn into hood.
22. LOOP the Velcro® strip sewn inside the hood around the back of the cap, AND
ATTACH it to the Velcro® tab previously installed inside the hardhat.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 19 of 25
5.4 Inspection
1. Peer VERIFY the completed and assembled PAPR for quality prior to each being sealed in a Bullard bag, AND
ENSURE the following:
Appropriate filter is installed and secured by locking tab
Filter cartridge label is legible
Barcode tag is present and legible
Tightness of breathing tube
No visual defects noted without inflation
Clamps, if used, are in correct position and secure
2. Inspector INITIAL the upper right corner of the Bullard insert (see Attachment 8.1) upon completion of the inspection.
3. ENSURE appropriate expiration date is identified.
4. INSERT Bullard insert into bag prior to sealing.
NOTE
Assembled PAPR units without batteries installed will have a one year expiration date.
5. SEAL Bullard bag.
5.5 Disassembly of Bullard EVA PAPRs
NOTE
Reuse of Bullard hoods or breathing tubes must be approved by facility RP/IH and agreed to by the RPPA.
1. WHEN preparing Bullard EVA PAPRs, THEN
ENSURE complete disassembly prior to assembly.
2. MAINTAIN disassembled and assembled EVA PAPR’s in separate designated containers. DO NOT COMMINGLE.
3. REMOVE used batteries, AND
PLACE in EVAGC Gang Charger or in a designated location for charging at a later date.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 20 of 25
5.5 Disassembly of Bullard EVA PAPRs, (cont.)
4. INSPECT motor/blower for:
damage cracks broken or missing parts
5. IF damage, cracks or broken/missing parts are noted, THEN
NOTIFY the REF Lead.
6. VERIFY barcode is present and legible.
IF barcode is NOT present or legible, THEN
INSTALL new barcode.
7. IF a new barcode is installed because old barcode is missing, illegible or damaged, THEN
RECORD in the log and Respirator Issuance Tracking System (RITS).
8. PROCEED to Section 5.2, Assembly and Airflow Verification of EVA Motor/blower, AND
FOLLOW steps accordingly.
5.6 Packaging
1. PLACE NO more than three Bullard EVA PAPRs in shipping container/box.
2. COMPLETE OSR 4-361, Respiratory Equipment Facility Respirator Shipping Record for each delivery, AND
RECORD on order sheet.
5.7 Returning Expired EVA PAPRs to Service
1. REMOVE EVA PAPR from bag.
2. INSPECT the EVA PAPR and the applicable hood per sections within this procedure.
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 21 of 25
6.0 REFERENCES
Bullard EVA Blower Assembly User Manual
Bullard EVA Series Powered Air Purifying Respirator User Manual
Hazard Analysis INF-21798
1Q, 15-1, Control of Nonconforming Items
4Q1.7, 502, Solid Waste Handling and Disposal
OSR 4-361, Tag: Respiratory Equipment Facility Respirator Shipping Record
OSR 4-510, Respiratory Equipment Record and QA
7.0 RECORDS
Records generated as a result of implementing this procedure are maintained in accordance with Manual 1B, Procedure 3.31, Records Management.
8.0 ATTACHMENTS
Figure 8.1 Positions of Two S18051 Clamps on the RT1 and RT3 Hoods
Figure 8.2 Positions of Two S18051 Clamps on the 20TICH and 20TIC Hoods
Figure 8.3 Nut on “T” Series Hood
Attachment 8.1 Example of Clean EVA PAPR Hood Insert
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 22 of 25
FIGURE 8.1
Positions of Two S18051 Clamps on the RT1 and RT3 Hoods
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 23 of 25
FIGURE 8.2
Positions of Two S18051 Clamps on the 20TICH and 20TIC Hoods
View from Back View from Side
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 24 of 25
FIGURE 8.3
Nut on "T" Series Hood
Instructions for the Assembly, Testing and Inspection of the Bullard EVA PAPR
Page: 25 of 25
ATTACHMENT 8.1
Example of Clean EVA PAPR Hood Insert
CLEAN EVA
PAPR HOOD
RT1 RT1T
RT3 RT3T
20TIC 20TICT
20TICH 20TICHT
THIS DEVICE HAS BEEN
INSPECTED AND TESTED,
AND IS READY FOR USE.
AFTER USE, PLACE IN
FACILITY DESIGNATED
LOCATION.
EXPIRATION DATE -
USE TIME: Maximum 4 Hours
Maximum 7 Hours
USER INSTRUCTIONS:
1. Install battery and verify battery has full charge (all LEDs are green)
2. Turn motor/blower on and recheck that battery has full charge (all LEDs are green)