This standard operating procedure document outlines configuration management and change management procedures for the Defense Information Systems Agency's information technology infrastructure. It defines configuration item categories, triggers for change requests, and procedures for initial population, adding, deleting, or modifying configuration items in the configuration management database. Roles and responsibilities are included for various change and configuration management roles. The document also provides details on configuration management and change control board processes, acronym definitions, standard change request categories and required attachments, and related workflow diagrams. Appendices include additional information on creating scheduled change calendar entries and lists of referenced documents.

This federal contract opportunity posting is for the Defense Enclave Services Indefinite Delivery Indefinite Quantity contract with an anticipated award in the first quarter of fiscal year 2022. The single-award IDIQ is expected to have a ceiling of multiple billions of dollars over a ten-year period consisting of a four-year base and three two-year options. The contract will include firm-fixed-price, labor hour, and cost reimbursable line items. A minimum 25% small business participation goal has been set for the $11.2 billion ceiling value. The Defense Information Systems Agency will leverage this contract to manage, operate, and support the network architecture for 22 Defense Agencies and Field Activities within the Fourth Estate, providing integrated and standardized information technology services to improve security, availability, and reliability.

View the file

Other files

File Type Posted
Attach 33 Additional Q A RFP 02052021.xlsx XLSX spreadsheet
Reading Library 8 - DISANet Authorized Hardware List 11092020.xlsx XLSX spreadsheet
Amd 06 final.pdf PDF
Reading Library 12 - DoDNet Equipment Management Consolidated Product List (2020).xlsx XLSX spreadsheet
Attach 21 SOO Appendix F DES TO 0001 DAFA Data Calls 02052021.xlsx XLSX spreadsheet
Amd 05 final.pdf PDF
Attach 15 SOO Appendix F DES IDIQ DAFA Data Calls 01282021.xlsx XLSX spreadsheet
Attach 8 IDIQ Labor Rates 01272021 (v1) (PROTECTED).xlsx XLSX spreadsheet
Attach 15 SOO Appendix F DES IDIQ DAFA Data Calls 01272021.xlsx XLSX spreadsheet
Reading Library 11-DISANet Authorized Software List NIPR-SIPR 01272021.xlsx XLSX spreadsheet
Attach 23 TO 0001 DD254 01272021.pdf PDF
Attach 11 SOO Appendix B DES IDIQ places of performance 01272021.docx DOCX document
Attach 9 TO 0001 SOO 01272021.docx DOCX document
Attach 31 SOO Appendix A-DES TO 001 Services Summary 01272021.docx DOCX document
Attach 21 SOO Appendix F DES TO 0001 DAFA Data Calls 01272021.xlsx XLSX spreadsheet
Attach 32 Q A RFP.xlsx XLSX spreadsheet
Attach 27 Labor Category Descriptions 01272021.docx DOCX document
Attach 14 SOO Appendix E - DES IDIQ PWS Template 01272021.docx DOCX document
Amd 04 final.pdf PDF
Attach 17 SOO Appendix B DES TO 0001 Places of Performance 01272021.docx DOCX document
Reading Library 13 DISA High Performing Sites 01272021.xlsx XLSX spreadsheet
Attach 28 DES TO 001 CLIN Structure 01272021 (DON).xlsx XLSX spreadsheet
Attach 29 SOO Appendix A Services Summary 01272021.docx DOCX document
Attach 22 SOO Appendix G DES TO 0001 Glossary 01272021.docx DOCX document
Reading Library 2 - DISANET NIPR World Wide - May 2019-redacted.jpg JPG image
Reading Library 2 - DISANET NIPR World Wide - May 2019-redacted17Dec.pdf PDF
Reading Library 2 - DISANET NIPR World Wide - May 2019-redacted.pdf PDF
Attach 30 QA DRFP_12032020.xlsx XLSX spreadsheet
Attach 8 IDIQ Labor Rates 12102020 (v1) (PROTECTED).xlsx XLSX spreadsheet
HC104720R0014 amd 01.pdf PDF
Reading Library 3 - DSMC Event Management SOP_4 August 2020_Redacted.pdf PDF
Attach 10 Non disclosure agreements contractors.docx DOCX document
Attach 16 SOO Appendix G -Glossary 09232020.docx DOCX document
Reading Library 5 - Legacy SOP_ DSMC Event Management_Redacted.pdf PDF
Attach 9 TO 0001 SOO 12032020.docx DOCX document
Attach 6 Past Performance Questionnaires.docx DOCX document
Attach 7 Sample Consent Letter.docx DOCX document
Attach 22 SOO Appendix G -DES TO 0001 Glossary.docx DOCX document
Attach 29 SOO Appendix A Services Summary.docx DOCX document
Reading Library 12 - Equipment Management Consolidated Product List (2020).xlsx XLSX spreadsheet
Reading Library 9 - DISA ITSM Flow Chart.pptx PPTX presentation
Reading Library 11 - DISANet Authorized Software List NIPR 2020-11-17.xlsx XLSX spreadsheet
Attach 19 SOO Appendix D - DES TO 0001 QASP 12032020.docx DOCX document
Attach 13 SOO Appendix D- DES IDIQ GSC Workload - 09222020.docx DOCX document
Attach 31 SOO Appendix A-DES TO 001 Services Summary 120220.docx DOCX document
Attach 3 Subcontracting Plan Checklist.docx DOCX document
Attach 28 DES TO 0001 CLIN Structure 12082020.xlsx XLSX spreadsheet
Reading Library 8 - Approved Hardware List 11092020.xlsx XLSX spreadsheet
Reading Library 4 - Legacy Process_After Hours Outage Notification_Redacted.pdf PDF
Reading Library 7 - Legacy SOP_Problem Management_Redacted.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IT Enterprise Change and Configuration Management Standard Operating Procedure

Version 2.6 Page | iii

Table of Contents

1 Purpose

2 Scope

2.1 Configuration Item Categories

3 Trigger

4 Procedures

4.1 Change Management Procedures

4.1.1 Information Technology Service Management

4.2 Configuration Management Procedures

4.2.1 Initial Population

4.2.2 Adding, Deleting, or Modifying a Configuration Item

4.2.3 DISANet Requirements Board/Change and Control Board

4.2.4 Verification and Audit Process

Appendix A: Roles and Responsibilities

Appendix B: Acronyms

Appendix C: Standard and Normal SRM CR Categories

Appendix D: Workflow Diagrams

Appendix E: Creating an Entry in the Scheduled Changes Calendar

Appendix F: Related Documents/Links

Appendix G: References

Authorizing Signatures

Hist ori ca l R efe ren ce D oc um en t

Version 2.6 Page | iv

List of Tables Table 1: Configuration Item Categories Table 2: CM and ChM Roles and Responsibilities Table 3: RACI Defined Table 4: CI Owner Team RACI Chart Table 5: Acronym List Table 6: Standard and Normal SRM Change Request Categories

List of Figures Figure 1: Initial Population of the CMDB Figure 2: Verification and Audit Process Figure 3: HBSS Exception for External HDD Request (S005) Figure 4: BPA Purchase Request (S005) Figure 5: Re-image Request (S005) Figure 6: Software Request (S006) Figure 7: Firewall Change Request (S007) Figure 8: Physical Port Activation (S009) Figure 9: DNS IP Request (S012) ca l R efe ren ce D oc um

Version 2.6

Page | 4

4.2.2 Adding, Deleting, or Modifying a Configuration Item

To add, delete, or modify a CI, the first step is to submit a CR via the SRM to request the addition/deletion/modification of the CI. All DISANet customers have access to SRM through the DISA Enterprise Portal Services (DEPS) homepage. DISANet services and products can be requested using this tool. These are the most appropriate SRM categories for CIs:

• Normal changes:

o S005 – Hardware o S007 – New Network Device/Configuration o S011 – Server o S012 – DNS/IP

• Standard changes:

o S006 – Approved Software (software must be on Approved Software List) o S009 – Physical Port Activation

Each request type needs specific required attachments and follows a unique workflow. See Appendix C for the table of required attachments and Appendix D for request workflows. Once the user has completed their desired request category and attached the required attachments, the request will be converted into a REQ (Request Identification) and routed to the Approval Central module. Within Approval Central, the requestor’s supervisor can review the REQ and must approve the REQ before the REQ is routed to th Change Management (ChM) Team for review.

The status of the REQ will not change until approved by the ChM Team. ChM verifies that the REQ has the required documents and will either Reject, Hold, or Approve the REQ:

• Rejecting the REQ will no ify the user and provide a justification for rejection. Users are then able to resubmit the REQ with corrections entered.

• Putting the REQ on hold will keep the REQ within Approval Central until DRB review can take place.

• Approving the REQ will route the REQ to the Change Management Module (CMM) and create a CR identification for the request. ChM will need to go into the CMM to route the request to the appropriate request coordinator.

4.2.3 DISANet Requirements Board/Change and Control Board

All normal requests submitted via SRM require DRB/CCB review prior to implementation. For details of the DRB/CCB process, please refer to the IT Enterprise DRB and CCB Meetings SOP, located as DRB/CCB SOP in Appendix F: Related Documents/Links. Hist ori ca l R efe ren ce

D oc um

Page | 7

The individual(s) who needs to be informed after a decision or action is taken. This incorporates one-way communication.

ca l R efe ren ce D oc um

Page | 14

Appendix D: Workflow Diagrams

Figure 3: HBSS Exception for External HDD Request (S005) ca l R efe ren ce D oc um

Page | 15

Figure 4: BPA Purchase Request (S005) ca l R efe ren ce D oc um

Page | 16

Figure 5: Re-image Request (S005) ca l R efe ren ce D oc um

Page | 17

Figure 6: Software Request (S006) ca l R efe ren ce D oc um

Page | 18

Figure 7: Firewall Change Request (S007) ca l R efe ren ce

D oc um

Page | 19

Figure 8: Physical Port Activation (S009) ca l R efe ren ce D oc um

Page | 20

Figure 9: DNS IP Request (S012) ca l R efe ren ce D oc um

Page | 21

Appendix E: Creating an Entry in the Scheduled Changes Calendar

1. Go to https://disa.deps.mil/org/SE6/DEMI/Lists/DEMI/Date%20List.aspx.

2. Scroll to the bottom of the page.

3. Click on the + Add new item link.

4. The “DEMI _ New Item” window displays.

ca l R efe ren ce D oc um

Page | 22

5. Fill out the following fields:

a. Title

b. Network

c. NCR Sites

d. Remote Sites

e. Propped – Date entry created

f. Suspense – Date of Action

g. Completed – Date Action completed

h. DCCB Reviewer

i. Subject

j. Notice Required

k. Subject Type

l. DISANET Asset Name

m. Status

n. Is rollback plan included?

o. Comments

6. Click Save.

7. The entry has now been added to the Scheduled Changes Calendar.

ca l R efe ren ce D oc um

Page | 23

Appendix F: Related Documents/Links

1. BMC Remedy ITSM system:

https://webitsm.csd.disa.mil/arsys/forms/itsmapp1.csd.disa.mil/SHR:LandingConsole/Def ault+Administrator+View/?cacheid=8deae312

2. DRB/CCB SOP:

https://disa.deps.mil/org/SE6/ISCDESS/EnterpriseArchitecture/SitePages/Home.aspx

3. DISANet Scheduled Change Calendar:

https://disa.deps.mil/org/SE6/DEMI/Lists/DEMI/Date%20List.aspx ca l R efe ren ce D oc um

Page | 24

Appendix G: References

1. System Change Request SOP

2. Remedy ITSM Request Fulfillment SOP

3. Release and Deployment/SCCM SOP ca l R efe ren ce D oc um

File details come from the government source that posted it. Updated .