R002489_ICE.pdf

PDF 320 KB Posted

Attached to
Request for Quotes (RFQ) - Nintex Workflow Essentials Renewal
Solicitation number
260521
Issued by
Orange County, California

About this file

This Independent Cost Estimate (ICE) document was prepared by the Orange County Transportation Authority (OCTA) for the renewal of Nintex Workflow Essentials with Overage Instances (Nintex Automation Cloud). The procurement covers subscription support for workflow automation, actions, forms integration, and task management services for a total of 10,000 instances, comprised of a 7,500-instance base package plus an additional 2,500 overage instances. The contract term runs from October 1, 2026, through September 30, 2027, with a renewal option through July 7, 2026. The requisition number is R002489, and the request was submitted by Katrena Schulze, IS Section Manager III, on July 7, 2026.

The total estimated cost for this procurement is $45,000 for the one-year term, based on market research and previous purchases with Nintex. The entire cost is categorized as Information Technology Support in the estimate breakdown. All responding firms must be authorized Nintex resellers and must provide proof of authorization; unauthorized quotes and alternative manufacturers will be deemed non-responsive or result in no-bid determinations. The award will be made to the lowest responsive and responsible bidder on a lump sum basis, with delivery by electronic download only. No tangible items will be accepted as part of this procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT COST ESTIMATE (ICE)

FA-CAMM-006.docm (09/25/15) Page 1 of 3

INSTRUCTIONS

Complete and submit all three pages to Contracts Administration & Materials Management (CAMM), along with your requisition and scope of work. CAMM will not start the procurement until all three documents have been received.

PART I – GENERAL INFORMATION

Project Description: Renewal for Nintex Workflow Essentials with Overage Instances (Nintex Automation Cloud).

SHADED AREA FOR PROCUREMENT USE ONLY

Assigned Buyer No.:

D/M/WBE%:

Purchase Requisition No.: R002489

New Contract / Procurement

Contract Amendment Current IFAS Printout Contract / PO No.:

(Required for Amendments)

Contract Task Order

Option Term

Date: 7/7/2026

Requestor: Katrena Schulze IS Section Manager III Phone Ext.: 5776 Name Title

Signature:

Cost Estimate: $ 45,000.00 (include shipping, handling and taxes, if applicable)

PART II – ESTIMATE GUIDE

Please substantiate the estimate using the following information.

Estimate Type Items to Include Where to Find Supporting Information

Services (Other than A&E)

1. Tasks you want done

2. Types of people needed (i.e., supervisor, administrative assistant, other)

3. Positions required (i.e., Project Manager, Deputy PM, Senior Engineer / Planner, other)

4. Estimated hours by position

5. Salary / billing rates applied

6. Prevailing wage rate category applied

7. Profit / applied fee

8. Direct expenses

9. Completion schedule

1. Current or past contracts for similar services

2. Other properties / departments doing similar work

3. Historical price and cost data

Estimate Guide Continued

FA-CAMM-006.docm (09/25/15) Page 2 of 3

Estimate Type Items to Include Where to Find Supporting Information

Architects, Engineers, Designers

1. Tasks you want done

2. Types of people needed (i.e., engineers, administrative assistant, other)

3. Positions (Project Manager, Deputy PM, Senior Engineer / Planner, other)

4. Estimated hours by position

5. Salary / billing rates applied

6. Profit / applied fee

7. Overhead rate (%)

8. Direct expenses

9. Completion schedule

1. Current or past contracts for similar services

2. Other properties / departments doing similar work

3. Historical price and cost data

Goods/Equipment 1. Product needed

2. Quantity

3. Unit price

4. Markups, overhead, profit

5. Delivery schedule desired

6. Warranty

1. Vendor survey / market survey

2. Current or past contracts for the same or similar product

3. Historical price and cost data

4. Various published indices

Construction 1. Product needed

2. Labor (at a minimum use Davis Bacon)

3. Materials

4. Bonds

5. Insurance

6. Mobilization

7. Equipment

8. Markups, fringes, overheads, profit

9. Completion schedule

1. “Means Book”

2. “Blue Book”

3. Davis Bacon wage rates / prevailing wages

4. Current or past contracts for the same project

5. Historical price and cost data

Additional Information: Annual renewal for Nintex Workflow Essentials with Overage Instances (previously called Nintex Automation Cloud). Subscription support for workflow automation and actions, forms integration, task management for 7,500 instances (base package). Including an additional 2,500 instances to make 10,000 instances total. Price based on market research, and based on previous purchases with Nintex.Coverage term: 10/1/2026 - 9/30/2027. Workspace ID: 2d61f158-b664-48a4-ac74-2a1f9e973530

FA-CAMM-006.docm (09/25/15) Page 3 of 3

PART III – INDEPENDENT COST ESTIMATE

Using the information provided in Part II, prepare the ICE for your procurement.

Use any or all of the categories listed below.

Prepared By: Katrena Schulze Date: 7/7/2026

Signature:

DESCRIPTION OF COST ELEMENTS

1. DIRECT LABOR

(List of Labor Categories)

Estimated Hours

Rate Per Hour ($)

Estimated Cost ($)

Total Est.

Cost ($)

$ $ 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00

Total Direct Labor: $ 0.00

2. OVERHEAD

Rate (%)

(use decimal input)

Total Labor ($)

Estimated Cost ($)

Total Est.

Cost ($)

% $ 0.00 $ 0.00 $ 0.00

3. MATERIALS/SERVICES (Excluding Information Technology [IT]) Estimated Cost ($)

Total Est.

Cost ($)

$ $ 0.00

4. INFORMATION TECHNOLOGY SUPPORT Estimated Cost ($)

Total Est.

Cost ($)

Nintex Workflow Essentials (Nintex Automation Cloud) $ 45,000.00

Total IT Support: $ 45,000.00

5. TRAVEL Estimated Cost ($)

Total Est.

Cost ($)

$ $ 0.00

6. SUBCONTRACTOR(S) / CONSULTANT(S) Estimated Cost ($)

Total Est.

Cost ($)

Total Subcontractor(s) / Consultant(s): $ 0.00

7. OTHER DIRECT COSTS Estimated Cost ($)

Total Est.

Cost ($)

$ $ 0.00

8. TOTAL ESTIMATED COST: $ 45,000.00