About this file

A-Proposal Checklist

View the file

Other files

File Type Posted
Attachment_J_-_Inspection_Points_Template.xls XLS spreadsheet
Amendment 002 QMAE-CR-110003-N Page 1.pdf PDF
QMAE-CR-110003-N Amendment 002 Pages 2-4.pdf PDF
Attachment C-DRAFT Fed Std 833F Item 398 Heavy Duty Over the Road Touring Coach 06.24.2011.pdf PDF
QMAE-CR-110003-N Amendment 001 page 1.pdf PDF
Attachment C-DRAFT Fed Std 833F Item 202C Type A School Bus Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 301C-304C Type A School Bus 06.24.2011.pdf PDF
Attachment c-Item 888E.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 259W-263W Medium Duty Shuttle Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 341N-347L Light Duty Shuttle Bus 06.24.2011.pdf PDF
Attachment_A_-_Proposal_Checklist.pdf PDF
Attachment C-DRAFT 2012 Fed Std 833F Bus Options Appendix A Specifications 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Item 398D Double Deck Touring Bus 06.24.2011.pdf PDF
Amendment 001 QMAE-CR-110003-N Pages 2-13.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 236A-238A Type D Rear Engine Work Bus Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 320A-332A Types C and D Front Engine Work Bus 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 220C-232C Types C and D Front Engine School Bus Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Item 390 Heavy Duty Intercity Commuter Coach 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 336C-338C Type D Rear Engine School Bus 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 336A-338A Type D Rear Engine Work Bus 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 236C-238C Type D Rear Engine School Bus Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 359W-363W Medium Duty Shuttle Bus 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 220A-232A Types C and D Front Engine Work Bus Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 241N-247 Light Duty Shuttle Basic 06.24.2011.pdf PDF
Attachment C-DRAFT Fed Std 833F Items 320C-332C Types C and D Front Engine School Bus 06.24.2011.pdf PDF
Attachment_D_-_Weekly_Vendor_Status_Submission_Requirements.pdf PDF
Attachment C- 531E.pdf PDF
Attachment C-561E.pdf PDF
QMAE-CR-110003-N.pdf PDF
Attachment_D_-_Weekly_Status_Reports_EXAMPLE.xlsx XLSX spreadsheet
Attachment G-GSA 1678.pdf PDF
Attachment C-Item_888E.pdf PDF
Attachment_B_-_Technical_Exceptions_Worksheet.xlsx XLSX spreadsheet
Attachment_F_-_AutoChoice_Online_Ordering_Instructions.pdf PDF
Attachment_E_-_Small_Business_Subcontracting_Plan.pdf PDF
Attachment C-2012 Fed Std 794AE 7.1.11.pdf PDF
Attachment_I_-_Dealers_Layout.xlsx XLSX spreadsheet
Attachment H AUTOBID Vendor Instructions.pdf PDF
Attachment C-2012 Fed Std 807T 7.1.11.pdf PDF
Attachment C-571E.pdf PDF
2012 Fed Std 807T 7.1.11.pdf PDF
Item_888E.pdf PDF
AutoBid_Vendor_Instructions.pptx PPTX presentation
571E federal standard.pdf PDF
531E federal standard.pdf PDF
2012 Fed Std 794AE 7.1.11.pdf PDF
561E Federal Standard.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A – PROPOSAL CHECKLIST

This proposal checklist is to assist Offerors in ensuring that hardcopy proposals are complete. A copy of this completed checklist must be included with offers submitted in hard copy. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.

Proposal Checklist

Volume 1—Administrative Requirements

1 ORIGINAL HARDCOPY OFFER AND 2 COPIES (1 PAPER AND 1

ELECTRONIC) REQUIRED

Included/ Completed

GSA

Use

TAB A – Solicitation

Completed Proposal Checklist

Completed solicitation in its entirety pages 1-114 (This includes Signed and dated SF1449 {complete with blocks 17(a), 30(a), 30(b) and 30(c)}, all solicitation “fill-in” sections, and signed and dated amendments(if any)

TAB B – Financial Data

TAB C – Proof of registration in Central Contractor Registry (CCR)

TAB D – Proof of registration in Online Representations & Certifications Application (ORCA)

TAB E – Proof of completion of VETS-100A reporting requirement

TAB F – Letter of Supply

TAB G – Inspection Point(s) / Place of Performance

TAB H – Dealer’s Layout Form

TAB I – Small Business Subcontracting Plan (Large Business Only)

1 original and 1 copy of complete paper proposal

Complete electronic copy on CD-ROM/USB Drive

Volume 2—Technical Proposal

GSA

Use

TAB A – Technical Capability

TAB B – Exceptions to Federal Vehicle Standards 794AE and/or 807T

TAB C – Model Information

TAB D – Information to satisfy Public Law 94-163 (Section 510)

TAB E – Destination State Information

TAB F – Management Capabilities

TAB G – Past Performance

Volume 3—Price Proposal

GSA

Use

Factor 4 – Price

Base Year model price (base model includes consignee delivery within the contiguous 48 states and District of Columbia and available vehicle colors)

ATTACHMENT A – PROPOSAL CHECKLIST

Make and Model Name

All available optional equipment

Hard copy AutoBid print out (Not required for 888E submissions)

AutoBid Entry

GSA

Use

GSA

Use

531E- Pricing Completed and submitted by 2:00pm September 14, 2011

561E- Pricing Completed and submitted by 2:00pm September 14, 2011

571E- Pricing Completed and submitted by 2:00pm September 14, 2011

888E- Offeror agrees to submit pricing in Autobid as soon a Standard Item designation is assigned.

File details come from the government source that posted it. Updated .