Proposal_Checklist_QMAA-HM-140013-D_rev_1.pdf
PDF 217 KB Posted
- Attached to
- Mobile Communications Vehicle (MCV)
- Solicitation number
- QMAA-HM-140013-D
- Issued by
-
GSA Federal Acquisition Service
About this file
Revised Proposal Checklist
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QMAA-HM-140013-D– PROPOSAL CHECKLIST
This proposal checklist is to assist Offerors in ensuring that proposals are complete. An electronic copy of this completed checklist must be included with all offers submitted. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.
Proposal Checklist
Volume 1—Business Proposal
(ELECTRONIC VERSION ONLY - .zip file)
Included/ Completed
GSA
Use
Completed Proposal Checklist
TAB A – SAM Information – with complete Reps and Certs
TAB B – Financial Information GSA Form 527
TAB C – Vendor Response Document (DO NOT include entire solicitation document)
TAB D – Small Business Subcontracting Plan (Large Business Only)
TAB E – Proof of completion of VETS-100A reporting requirement
TAB F – Inspection Point/ Place of Performance attachment
TAB G – Product Description (PD) Fill Ins – Do not send whole PD
TAB H – Signed copies of all Solicitation amendments
Volume 2—Price Proposal
GSA
Use
Factor E – Price
TAB A – Signed and dated SF1449 {complete with blocks 17(a), 30(a), 30(b) and 30(c)}
Price Breakdown for CLIN 0001A, 0001B, 1001A, & 1001B –separate from SF1449
Price Breakdown for Spare Parts Kits for CLINs 0004 & 1004 - Pages 3-5 of SF1449
Volume 3—Technical Proposal
GSA
Use
Technical Capability
TAB 1 – Verification Cross Reference Matrix (VCRM)
TAB 2 – Exception spreadsheet
TAB 3 – Brand Name or Equal
TAB 4 – Alternate HVAC system (if applicable)
TAB 5 – Preliminary Drawings
TAB 6 - Factor A: Relevant Experience
TAB 7 - Factor B: Management and Quality Control Plan Approach
TAB 8 – Factor C: Technical Approach
Sub-factor C(1): Understanding of Technical Requirements
Sub-factor C(2): Feasibility and Completeness of Approach
Sub-factor C(3) Technical Approach for Production and Scheduling
TAB 9 – Factor D: Past Performance Projects
File details come from the government source that posted it. Updated .