Proposal_Checklist_QMAA-HM-140013-D_rev_1.pdf

PDF 217 KB Posted

Attached to
Mobile Communications Vehicle (MCV)
Solicitation number
QMAA-HM-140013-D
Issued by

About this file

Revised Proposal Checklist

View the file

Other files

File Type Posted
SF1449_MCV_121214.pdf PDF
QMAA-HM-140013-D_contd121514.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0011.pdf PDF
MCV-QMAA-HM-140013-D_Rev_121514.pdf PDF
RFP_Addendum_-_Instructions_to_Offerors_and_Basis_for_Award_REV121514.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0010.pdf PDF
SF1449_MCV_11242014.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0009.pdf PDF
MCV_PD_Amendment_11.19.2014_(1).docx DOCX document
SF1449_MCV_11192014.pdf PDF
SF1449_MCV_10242014.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0008.pdf PDF
RFP_Addendum_-_Instructions_to_Offerors_and_Basis_for_Award_REV101714.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0007.pdf PDF
SF1449_MCV_10172014.pdf PDF
2014-10-06-MCV_VCRM-U.1.0.xlsx XLSX spreadsheet
MCV_PD_Amendment_10.06.2014_.pdf PDF
SF1449_MCV_10062014.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0006.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0005_rev1.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0005.pdf PDF
RFP_Addendum_-_Instructions_to_Offerors_and_Basis_for_Award_REV082014.pdf PDF
SF30_QMAA-HM-140013-D_Amendment_0001.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0003.pdf PDF
MCV-QMAA-HM-140013-D_Rev_07029014.pdf PDF
SF1449_MCV_07029014.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0004.pdf PDF
SF_30_QMAA-HM-140013-D_Amendment_0002.pdf PDF
MCV_PD_Amendment_07.23.2014.pdf PDF
SF1449_MCV_07022014.pdf PDF
MCV-QMAA-HM-140013-D_Rev_07022014.pdf PDF
SF1449_MCV_06302014.pdf PDF
MCV-QMAA-HM-140013-D_Rev_06302014.pdf PDF
IBR_clauses.pdf PDF
Questions_and_Responses_QMAA-HM-140013-D.pdf PDF
RFP_Addendum_-_Instructions_to_Offerors_and_Basis_for_Award_REV063014.pdf PDF
Vendor_Response_Document-QMAA-HM-140013-D.pdf PDF
Proposal_Checklist_QMAA-HM-140013-D.pdf PDF
QMAA-HM-140013-D__Technical_Exceptions_Spreadsheet__MCV.xlsx XLSX spreadsheet
MCV_Inspection_Points_Template_Final.xlsx XLSX spreadsheet
RFP_Addendum_-_Instructions_to_Offerors_and_Basis_for_Award_REV.pdf PDF
QMAA-HM-140013-D_Small_Business_Subcontracting_Plan.docx DOCX document
MCV_Final_PD.pdf PDF
GSA527.pdf PDF
QMAA-HM-140013-D_contd.pdf PDF
RFP_Addendum_-_Instructions_to_Offerors_and_Basis_for_Award.pdf PDF
MCV_1449.pdf PDF
MCV-QMAA-HM-140013-D.pdf PDF
SPAWAR_MCV_Drawing_SOP-U.1.0_(2)_(1).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QMAA-HM-140013-D– PROPOSAL CHECKLIST

This proposal checklist is to assist Offerors in ensuring that proposals are complete. An electronic copy of this completed checklist must be included with all offers submitted. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.

Proposal Checklist

Volume 1—Business Proposal

(ELECTRONIC VERSION ONLY - .zip file)

Included/ Completed

GSA

Use

Completed Proposal Checklist

TAB A – SAM Information – with complete Reps and Certs

TAB B – Financial Information GSA Form 527

TAB C – Vendor Response Document (DO NOT include entire solicitation document)

TAB D – Small Business Subcontracting Plan (Large Business Only)

TAB E – Proof of completion of VETS-100A reporting requirement

TAB F – Inspection Point/ Place of Performance attachment

TAB G – Product Description (PD) Fill Ins – Do not send whole PD

TAB H – Signed copies of all Solicitation amendments

Volume 2—Price Proposal

GSA

Use

Factor E – Price

TAB A – Signed and dated SF1449 {complete with blocks 17(a), 30(a), 30(b) and 30(c)}

Price Breakdown for CLIN 0001A, 0001B, 1001A, & 1001B –separate from SF1449

Price Breakdown for Spare Parts Kits for CLINs 0004 & 1004 - Pages 3-5 of SF1449

Volume 3—Technical Proposal

GSA

Use

Technical Capability

TAB 1 – Verification Cross Reference Matrix (VCRM)

TAB 2 – Exception spreadsheet

TAB 3 – Brand Name or Equal

TAB 4 – Alternate HVAC system (if applicable)

TAB 5 – Preliminary Drawings

TAB 6 - Factor A: Relevant Experience

TAB 7 - Factor B: Management and Quality Control Plan Approach

TAB 8 – Factor C: Technical Approach

Sub-factor C(1): Understanding of Technical Requirements

Sub-factor C(2): Feasibility and Completeness of Approach

Sub-factor C(3) Technical Approach for Production and Scheduling

TAB 9 – Factor D: Past Performance Projects

File details come from the government source that posted it. Updated .