Q&A Document 6.pdf

PDF 2 KB Posted

Attached to
Middle Mile Design & Engineering
Solicitation number
072024-01
Issued by
Clay County, Tennessee

About this file

This document is a Questions & Answers (Q&A) document for Solicitation 072024-01 for Middle Mile Design & Engineering, issued by Newport Utilities. The Q&A addresses a specific inquiry (Q14) regarding the Pole Loading Analysis reporting requirements for the project.

The document clarifies that a full report will be required for all poles that were analyzed, not just those with changes resulting from the analysis. The Q&A was issued on 09/06/2024 and provides specific guidance to potential bidders about the scope and depth of reporting expected for the pole loading component of the middle mile design and engineering project.

View the file

Other files

File Type Posted
Poles.sbn —
Poles.shp —
Q&A Document 1.pdf PDF
Q&A Document 2.pdf PDF
Q&A Document 4.pdf PDF
South_340.kmz KMZ file
Middle Mile Design Area Estimated Mileage.xlsx XLSX spreadsheet
Middle Mile Scope of Work Design.pdf PDF
Poles.cpg —
Poles.dbf DBF file
Poles.prj —
Poles.shx —
Q&A Document 3.pdf PDF
Zoom meeting Design _ Engineering.pdf PDF
Contract Certifications.pdf PDF
Liberty_Hill.kmz KMZ file
Q&A Document 5.pdf PDF
Q&A Document 8.pdf PDF
Wiley_Town.kmz KMZ file
Byrd Anti-Lobbying Certification.pdf PDF
Middle Mile Contract Design.pdf PDF
Poles.sbx —
Poles.shp.xml XML file
Q&A Document 7.pdf PDF
West_Parrottsville.kmz KMZ file
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 6

Solicitation 072024-01 - Middle Mile Design & Engineering

Buying Organization Newport Utilities

No Question/Answer Question Date

Q14 Question: Pole Loading Analysis

How should we approach the reporting for the Pole Loading Analysis? Do we only need to report the changes resulting from the analysis, or will a full report be required for all poles that were analyzed?

Answer: A full report will be required for all poles that were analyzed.

09/06/2024

Questions & Answers - 6