This document is a Questions & Answers (Q&A) document for Solicitation 072024-01 for Middle Mile Design & Engineering, issued by Newport Utilities. The Q&A addresses a specific inquiry (Q14) regarding the Pole Loading Analysis reporting requirements for the project.
The document clarifies that a full report will be required for all poles that were analyzed, not just those with changes resulting from the analysis. The Q&A was issued on 09/06/2024 and provides specific guidance to potential bidders about the scope and depth of reporting expected for the pole loading component of the middle mile design and engineering project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Poles.sbn | — | |
| Poles.shp | — | |
| Q&A Document 1.pdf | ||
| Q&A Document 2.pdf | ||
| Q&A Document 4.pdf | ||
| South_340.kmz | KMZ file | |
| Middle Mile Design Area Estimated Mileage.xlsx | XLSX spreadsheet | |
| Middle Mile Scope of Work Design.pdf | ||
| Poles.cpg | — | |
| Poles.dbf | DBF file | |
| Poles.prj | — | |
| Poles.shx | — | |
| Q&A Document 3.pdf | ||
| Zoom meeting Design _ Engineering.pdf | ||
| Contract Certifications.pdf | ||
| Liberty_Hill.kmz | KMZ file | |
| Q&A Document 5.pdf | ||
| Q&A Document 8.pdf | ||
| Wiley_Town.kmz | KMZ file | |
| Byrd Anti-Lobbying Certification.pdf | ||
| Middle Mile Contract Design.pdf | ||
| Poles.sbx | — | |
| Poles.shp.xml | XML file | |
| Q&A Document 7.pdf | ||
| West_Parrottsville.kmz | KMZ file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers - 6
Solicitation 072024-01 - Middle Mile Design & Engineering
Buying Organization Newport Utilities
No Question/Answer Question Date
Q14 Question: Pole Loading Analysis
How should we approach the reporting for the Pole Loading Analysis? Do we only need to report the changes resulting from the analysis, or will a full report be required for all poles that were analyzed?
Answer: A full report will be required for all poles that were analyzed.
09/06/2024
Questions & Answers - 6
File details come from the government source that posted it. Updated .