This document is a Request for Proposal (RFP) issued by Newport Utilities for a Middle Mile Design & Engineering project in Cocke County, Tennessee. The project involves comprehensive fiber-to-the-home (FTTH) design services for four specific areas: Wiley Town, Liberty Hill, South 340, and West Parrotsville. The contractor will be responsible for completing design, field verification, make-ready engineering, construction documentation, and as-built updates, which include tasks such as proposing cabinet and splitter locations, designing fiber routes, collecting pole data, performing make-ready engineering, and producing detailed construction documentation.

The design services will be billed according to a structured milestone payment schedule, with invoicing broken down into four stages: Preliminary Design (30%), Final Design (30%), Construction Documents (30%), and As-Builts (10%). The project involves designing both buried and aerial fiber routes across multiple locations, with total footage ranging from 10,402 to 579,005 linear feet depending on the specific area. The RFP includes specific requirements for deliverables at each stage, such as providing KMZ/shapefiles, preliminary bill of materials, construction drawings, and ESRI-compatible shapefiles. The document also specifies that no prevailing wage or retainage will apply, and includes provisions for invoicing, payment terms, and late payment fees.

View the file

Other files

File Type Posted
Poles.sbn —
Poles.shp —
Q&A Document 1.pdf PDF
Q&A Document 2.pdf PDF
Q&A Document 4.pdf PDF
South_340.kmz KMZ file
Middle Mile Design Area Estimated Mileage.xlsx XLSX spreadsheet
Poles.cpg —
Poles.dbf DBF file
Poles.prj —
Poles.shx —
Q&A Document 3.pdf PDF
Zoom meeting Design _ Engineering.pdf PDF
Byrd Anti-Lobbying Certification.pdf PDF
Middle Mile Contract Design.pdf PDF
Poles.sbx —
Poles.shp.xml XML file
Q&A Document 6.pdf PDF
Q&A Document 7.pdf PDF
West_Parrottsville.kmz KMZ file
Contract Certifications.pdf PDF
Liberty_Hill.kmz KMZ file
Q&A Document 5.pdf PDF
Q&A Document 8.pdf PDF
Wiley_Town.kmz KMZ file
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: Date:

Initial: Initial:

Newport Utilities Request for Proposal

Bid# 072024-01 Middle Mile Design & Engineering

1. Date: 7/31/2024

2. Project Name: Cocke County FTTH

3. Project Number: 072024-01

4. Jobsite: Cocke County, TN

5. Client: Newport Utilities

6. Client Address: 170 Cope Blvd, Newport TN 37821

7. Contractor Name:

8. Contractor Address:

9. Scope of Work

Contractor (name) will complete the design, field verification, make-ready, construction documents, and as- built for the all homes within the areas identified as Wiley Town, Liberty Hill, South 340 and West Parrotsville.

• Perform all planning activities necessary to ensure each residence is passed with a single fiber o Propose cabinet locations o Propose splitter and splice closure locations o Propose fiber routes and fiber sizes o Propose the most appropriate & cost-effective construction method

• Perform field verification of the design o Evaluate routes for efficiency and constructibility based on conditions, while following existing power lines as much as possible.

o Collect road widths and right-of-way (ROW) widths o Document surface features present within the ROW o Identify the most suitable construction method (bore, plow, trench, aerial) o Identify the most suitable locations for vaults, splice closures, slack loops, and cabinets

• Collect Pole Data o Measure and record existing attachment heights, span lengths, and mid-span heights o Record GPS locations o Capture 3 pictures per pole o Perform visual make-ready

• Perform Make-Ready Engineering o Determine guying requirements (e.g., new anchors, pole to pole, strand extension to existing anchors).

o Prepare ‘Pole Data Sheets’ or equivalent requirement containing existing and proposed attachment heights for all utilities including ‘mid-span’ of lowest utility for pole attachment applications with pole owners and other pole users.

o Prepare all applicable wind/ice loading calculations, when required, and any other requirements necessary to attach to poles.

• Produce detailed construction documentation sets o Construction drawings in PDF format o Bill-of-Materials (BOM), listing all labor and materials required to build the network o Splice Sheets

• Apply for and acquire ROW permits if necessary

• Complete redline review and as-built updates

• Provide ESRI-compatible shapefiles of the design to Newport Utilities once as-builts are completed

The design services provided within the scope of this project will be billed at the following rates:

Invoicing Milestones

Description Invoicing Milestone

Deliverables

Preliminary Design (HLD)

30% of Unit Rate

Completion of preliminary design per LCP area; Please provide KMZ and/or shapefiles of the design and a preliminary BOM.

Final Design

(LLD)

30% of Unit Rate

Completion of all fielding activities, make-ready engineering, and all final design updates per LCP area. Please provide updated shapefiles and/or KMZ of the design.

Construction Documents

30% of Unit Rate

Completion of all documents necessary for construction, per LCP area. Please provide construction drawings in PDF format, splice matrices, final BOM, and approved permits.

As-Builts 10% of Unit Rate

Completion of all as-built updates. Please provide ESRI compatible shapefiles of the design that incorporate all construction changes documented in the redlines provided by the contractor.

Professional Fees

Additional services beyond the scope of services presented herein would be immediately identified as the need arises.

1. Owner certifies that this is not a prevailing wage project at this time. In the event that this project is later deemed to be a prevailing wage project, Owner will re-evaluate rates with Contractor in order to ensure compliance for both Owner and Contractor.

2. No Liquidated Damages shall apply in the event of delay.

3. No retainage shall apply to this project.

4. The Owner shall provide the Works to be carried out under this project in a timely and logical fashion, so that the Contractor can properly plan for the workload and allocate resources. If the Owner suspends work or terminates the contract for convenience, the Contractor shall invoice for any deliverables or work-in-progress not yet invoiced prior to the termination or suspension date. If the Contractor incurs any stand-down costs caused by the suspension of work or termination of contract, those costs will be documented and passed through to the Owner.

5. Invoice/Payment - Contractor may submit a proper invoice while following the Invoicing Milestones on page 3. The Owner shall notify the Contractor of any deficiencies associated with the invoice within 3 business days of receipt. If payment is not received by the first day following the due date, a late payment fee of 1.5% per month on the balance due shall apply.

6. The points of contact for contractual and technical matters for this agreement are set forth below. Each party agrees to accept facsimiles (faxes) and e-mail where the agreement requires written notice. All notices and sent by either party shall be to the following addresses:

For Contractual Matters For Contractual Matters Newport Utilities PO Box 519 Newport, TN 37822 Jared Cox, Broadband Outside Supervisor

(423) 532-3552 Fax: Fax:

jcox@newportutilities.com

OWNER: CONTRACTOR:

Approved by Newport Utilities Accepted by:

mailto:jcox@newportutilities.com

By: By:

Title: Title:

Date: Date:

The work described in this Work Order shall be performed under all of the terms and conditions set forth in the “Agreement Between Newport Utilities. and Contractor, dated Month, Day, Year.

3. Project Number: 072024-01
Invoicing Milestones