This document is a Questions & Answers (Q&A) document for Solicitation 072024-01, a Middle Mile Design & Engineering project for Newport Utilities. The Q&A addresses three key questions from potential bidders regarding pole loading analysis, available project data, and permitting specifications. The solicitation provides detailed guidance on when pole loading studies are required, including scenarios such as reaching 35% or greater of the rated breaking strength of the conductor, poles with guying or specific angular configurations, and communication section population. The document also confirms that multiple pole loading software options are acceptable.

The Q&A clarifies that comprehensive geospatial data will be available at project handoff through NISC mapping, including shapefiles and KMZ files for poles, primaries, transformers, secondaries, customer points, and meter locations. Notably, the document indicates that no specific city or county permits will be required for this project. The Q&A was issued on 08/30/2024, providing potential bidders with critical technical and procedural information to support their proposal preparation for the Middle Mile Design & Engineering project with Newport Utilities.

View the file

Other files

File Type Posted
Middle Mile Design Area Estimated Mileage.xlsx XLSX spreadsheet
Middle Mile Scope of Work Design.pdf PDF
Poles.cpg —
Poles.dbf DBF file
Poles.prj —
Poles.shx —
Zoom meeting Design _ Engineering.pdf PDF
Poles.sbn —
Poles.shp —
Q&A Document 1.pdf PDF
Q&A Document 2.pdf PDF
Q&A Document 4.pdf PDF
South_340.kmz KMZ file
Byrd Anti-Lobbying Certification.pdf PDF
Middle Mile Contract Design.pdf PDF
Poles.sbx —
Poles.shp.xml XML file
Q&A Document 6.pdf PDF
Q&A Document 7.pdf PDF
West_Parrottsville.kmz KMZ file
Contract Certifications.pdf PDF
Liberty_Hill.kmz KMZ file
Q&A Document 5.pdf PDF
Q&A Document 8.pdf PDF
Wiley_Town.kmz KMZ file
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 3

Solicitation 072024-01 - Middle Mile Design & Engineering

Buying Organization Newport Utilities

No Question/Answer Question Date

Q2 Question: Pole Loading Analysis

1.When will Pole Loading be required?

2.Is there a specific loading software required (Pole Foreman, OCALC, SPIDACALC)?

Answer: 1.If you reach 35% or greater of the rated breaking strength of the conductor based on maximum design tension then a pole loading study will be required. Any pole with guying, angle, dead-end, or span guys will require a pole loading study. Pole with angles of more than 10 degree or un-guyed, angle between spans is 170 degrees or smaller, poles with class 4 or smaller all require a pole loading study. If 25% of communication section has been populated then a Pole Loading study will be required. Any span length greater than 250ft will require a pole loading study. 2.Any of the software listed or equivalents is fine.

08/30/2024

Q3 Question: Available DATA

1.What data is available or will be provided at project handoff? Will shapefile data of Poles, Primaries, Transformers, Secondaries, customer points/meter locations, etc. be provided?

Answer: 1.All of the above and others options are available at project handoff through our NISC mapping via shapefiles, KMZs, etc.

08/30/2024

Q4 Question: Permitting Specifications

1.Are there any specific city or county permits required?

2.Can example permit examples be provided?

Answer: 1.No permits will be required.

08/30/2024

Questions & Answers - 3

File details come from the government source that posted it. Updated .