Q-25-03-COC_Evaluation_Commitee_Recommendation.pdf
PDF 6 MB Posted
- Solicitation number
- Q-25-03-COC
- Issued by
- Brevard County, Clewiston City, Florida
About this file
This document is an Evaluation Committee Recommendation from the City of Cocoa Purchasing Department for a Request for Qualifications (RFQ) Q-25-03-COC seeking engineering services for the Pineda Causeway Phase 2 Water Main Installation. The City solicited proposals on November 22, 2024, through VendorLink, with simultaneous advertisement in Florida Today newspaper and on the city's website. A total of 1,742 notifications were sent out, with 36 individual downloads of the RFQ. Two engineering firms submitted proposals: Kimley Horn and Associates, Inc. and CHA Inc. The Evaluation Committee, comprised of city staff, conducted a public proposal opening on January 10, 2025, and held a public meeting on January 16, 2025, to review the submissions. The firms also provided oral presentations on January 29, 2025.
The evaluation process involved scoring proposals across multiple criteria, including firm qualifications, project team qualifications, experience and performance, project approach, and location. The scoring was weighted across different categories, with a total possible score of 100 points. Kimley Horn and Associates scored 92.17 points and ranked first, while CHA Consulting scored 91.67 points and ranked second. Both proposals were deemed highly professional. The next step is for the City Manager and City Attorney to enter into negotiations with the top-ranked firm (Kimley Horn), with the option to negotiate with the second-ranked firm if the initial negotiations are unsuccessful. The recommendation was prepared by Brian Dale, Purchasing Manager for the City of Cocoa, and submitted to the Cocoa City Council for review.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing 65 Stone Street » Cocoa, FL 32922
PHONE: (321) 433-8833
EMAIL: purchasing@cocoafl.gov
February 4, 2025
To: Cocoa City Council
Re: Evaluation Committee Recommendation for Qualifications (RFQ) Q-25-03-COC
The City of Cocoa Purchasing Division solicited the RFQ for Engineering Services for the Pineda Causeway Phase 2 Water Main Installation in the City9s bidding platform, VendorLink, on November 22, 2024. The solicitation was simultaneously advertised in the Florida Today newspaper and posted to the City of Cocoa9s website. A total of 1,742 notifications were sent out to vendors with 36 individual downloads of the RFQ.
A public proposal opening was conducted by the Purchasing Division on January 10, 2025.
The City received responses from two engineering firms:
e Kimley Horn and Associates, Inc e CHA Inc.
On January 16, 2025 the Evaluation Committee held a public meeting to review the response to the solicitation. The committee was comprised of the following individuals:
e Katheryn Ennis, Utilities Deputy Director, City of Cocoa e John Perrin, Senior Engineer, City of Cocoa e Josh Frary, Utilities Associate Engineer Ill, City of Cocoa
During the meeting, the committee reviewed the RFQ requirements, the evaluation criteria and the proposals submitted. The committee decided that in addition to the written submittals, oral presentation would be required by the proposers to facilitate the evaluation process.
Representatives from both firms met with the Evaluation Committee at separate times on January 29, 2025, to present their proposal and to respond to committee members questions.
The Evaluation Committee then independently submitted their scoring results to the Purchasing Division on or before February 3, 2025. On February 4, 2025, The Evaluation
Committee reconvened in a public meeting to discuss their scoring results and to finalize its recommendations to City Council.
The scoring results were compiled by the Purchasing Division and summarized in the following table:
Firm Project MWBE Qual. Team Experience | Approach | Location | Firm Total
Rank| _Firm _| [20 pts] | [25 pts] | [25pts]_| [13 pts] | [15 pts] | [2 pts] | [100 pts] | cee _ Kimley-Horn Se i ae YS eee Be sheces oom Sis citer se Saat a
2 CHA Consulting 19.2 23.9 23.17 10.4 15 0 91.67
Stay Connected: www.CocoaFL.org 0o0®@
Both proposals were highly professional, demonstrating the capacity of each firm to successfully execute the project.
In accordance with the RFQ process, the City Manager and City Attorney will now enter into negotiations with the top-ranked firm. Should these negotiations prove unsuccessful, discussions will commence with the second-ranked firm. If an agreement cannot be reached with the second-ranked firm, a new RFQ process will be initiated.
A copy of the evaluation scoring results and evaluator comments are attached to this recommendation for your review.
Should there be additional questions or clarification needed please contact the Purchasing
Department at purchasing@cocoafl.gov.
Sincerely, Brian Dale
Purchasing Manager
City of Cocoa
Stay Connected: www.CocoaFL.org fT vin)
PURCHASING DEPARTMENT
Xs ) 433-6655
EMAIL: PURCHASING@:COCOFL.ORG
Technical Evaluation Score Sheet Summary
Q-25-03-COC
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Instructions:
1. Enter your Name and Title: Name Josh Frary Title Utility Engineer III
2. Review each of the submittal
3. Enter your scores on the corresponding worksheet in the workbook
4. Enter completion date and notes if any on each worksheet
5. Completed worksheets to be submitted by the Due Date: 4/29/2025 Upload to Vendorlink
Submittal List 20 2 25 25 13 15 100 8Gompany Proj:sTeam9
Qual: Qual Location Total Score Worksheet Bid9 Tab #. Firm: Name Experience Proj, Appr. Rank 4
1-KH 1 KIMLEY HORN ;
[2-CHA 2 CHA CONSULTING 18.4 0 24.5 22 10.4 15 90.3 2
Joshua Frary
Utilitv Enaineer Ill
Summary Pg. 1 of 1
Technical Evaluation Scoring Sheet
Q-25-03-COC
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Proposer: KIMLEY HORN
, . . Score Points Section Document Points | Weight (0-5) Awarded
Responsiveness of Prime 20% 5 4
Sufficient Resources Available 20 20% 5 4
Efnni's Cualifieations Similar Projects 20% 5 4
Proven Track Record 40% 4 6.4
Subtotal 18.4
Certified Minority Business Enterprise 2 100% LC] 0
Project Manager Experience 45% 4 9
Project Team's Qualifications Project EneinGer Experience 25 45% 5 11.25
Organizational Structure 10% 5 2.5
Subtotal} 22.75
Project 1 20% 5 5
Project 2 20% 4 4
Experience and Perfomance Project 3 -3 20% 5 5 Project 4 20% 5 5
Project 5 20% 4 4
Subtotal 23
Project Approach 13 100% 5 13
: Project Manager, Engineer and Office hesatlon Location within 75 miles of the City a ee ie
Total Points 92.15
Column Definition
Section
Document
Points
Weight
Score
Points awarded
Evaluation Criteria sections as defined in the RFP
Required documentation requested to be submitted in each tab
Total Point Value for Tab or section in the RFP
Prorate of Points towards each document being reviewed
O-Not Covered, 1-Poor, 2- Below Avg, 3- Average, 4-Above Avg, 5-Excellent
Points Awarded = Points * Weight * (Score/5)
Evaluator Name
Evaluator Title
Date Completed
Josh Frary
Utility Engineer III
Friday, January 31, 2025
Notes:
1-KH Pg. 1 of 1
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Proposer: CHA CONSULTING i . . Score Points Section Document Points | Weight (4-10) | Awarded
Responsiveness of Prime 20% 4 3,2
Sufficient Resources Available 20 20% 5 4
Firm's Qualifications Similar Projects 20% 4 3.2
Proven Track Record 40% 5 8
Subtotal 18.4
Certified Minority Business Enterprise 2 100% L] 0
Project Manager Experience 45% 5 11.25
; ; hphe a Project Engineer Experience 25 45% 5 11.25
Project Team's Qualifications Organizational Structure 10% 4 2
Subtotal 24.5
Project 1 20% 5 5
Project 2 20% 4 4
Experience and Perfomance Project 3 2 20% 4 4 Project 4 20% 4 4
Project 5 20% 5 5
Subtotal 22
Project Approach 13 100% 4 10.4 aiaé ee Menaeet EnBineet and Oilre 15 100% 15
Location within 75 miles of the City
Total Points 90.3
Column Definition
Section
Document
Points
Weight
Score
Points awarded
Evaluation Criteria sections as defined in the RFP
Required documentation requested to be submitted in each tab
Total Point Value for Tab or section in the RFP
Prorate of Points towards each document being reviewed
0-Not Covered, 1-Poor, 2- Below Avg, 3- Average, 4-Above Avg, 5-Excellent
Points Awarded = Points * Weight * (Score/5)
Evaluator Name
Evaluator Title
Date Completed
Josh Frary
Utility Engineer III
Friday, January 31, 2025
65 Stone Street » Cocoa, FL 34922
PHONE: (324) 433-8832
FAX: (32%) 432-8685
EMATL: DURCHASING jiCOCOFL.ORG
Technical Evaluation Score Sheet Summary
Q-25-03-COC
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Instructions:
1. Enter your Name and Title: Name Katherine Ennis Title Deputy Utilties Director
2. Review each of the submittal
3. Enter your scores on the corresponding worksheet in the workbook
4. Enter completion date and notes if any on each worksheet
5. Completed worksheets to be submitted by the Due Date: 1/29/2025 Upload to Vendorlink
Submittal List 20 2 25 25 13 15 100 = ompa = Pro . =
O ee Bid lan F 5 D Oj. ADP O O O O x
= Sa = Qua Qua a
1-KH 1 KIMLEY HORN 19.2 0 22.75 22 13 15 91.95 2
2-CHA 2 CHA CONSULTING 20 0 22.75 24 10.4 15 92.15 1|
Katherine Katherine Enns : Date: 2025.02.03
X Ennis 08:14:30 -05'00"
Summary Pg. 1 of 3
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Proposer: KIMLEY HORN
: , . Score Points Section Document Points | Weight (0-5) Awarded
Responsiveness of Prime 20% 5 4
Sufficient Resources Available 30 20% 5 4
Firms Qualifeations Similar Projects 20% 4 332
Proven Track Record 40% 5 8
Subtotal 19.2
Certified Minority Business Enterprise 2. 100% LI] 0
Project Manager Experience 45% 5 11.25
Project Team's Qualifieations Project Engineer Experience 25 45% 4 9
Organizational Structure 10% 5 2.5
Subtotal] 22.75
Project 1 20% 5 5
Project 2 20% 5 5
Experience and Perfomance Project 3 2 20% 4 a Project 4 20% 4 4
Project 5 20% 4 4
Subtotal 22
Project Approach 13 100% 5 13 i Project Manager, Engineer and Office pocation Location within 75 miles of the City oe 100% a : 1
Total Points 91.95
Column Definition
Section
Document
Points
Weight
Score
Points awarded
Evaluation Criteria sections as defined in the RFP
Required documentation requested to be submitted in each tab
Total Point Value for Tab or section in the RFP
Prorate of Points towards each document being reviewed
0-Not Covered, 1-Poor, 2- Below Avg, 3- Average, 4-Above Avg, 5-Excellent
Points Awarded = Points * Weight * (Score/5)
Evaluator Name
Evaluator Title
Date Completed
Katherine Ennis
Deputy Utilities Director
Monday, February 3, 2025
1-KH Pg. 2 of 3
OGGA
PLORIDA
Technical Evaluation Scoring Sheet
Q-25-03-COC
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Proposer: CHA CONSULTING
Scor Point Section Document Points | Weight 4 Awarded
Responsiveness of Prime 20% 5 4
Sufficient Resources Available 20 20% 5 4
ERE : =
Firm's Gualifications Similar Projects 20% 5 4
Proven Track Record 40% 5 8
Subtotal 20
Certified Minority Business Enterprise 2 100% CL]. 0
Project Manager Experience 45% 5 11.25
- ; ; 5 o
Projest Team9: Qualifications Project engineer Experience 45% 4 9
Organizational Structure 10% 5 2.5
Subtotal] 22.75
Project 1 20% 5 5
Project 2 Be 20% 5 5
Experience and Perfomance Project 3 20% 4 4 Project 4 20% 5 5
Project 5 20% 5 5
Subtotal 24
Project Approach 13 100% 4 10.4
: Project Manager, Engineer and Office Locat 15 100% 15 ee Location within 75 miles of the City 2 uo
Total Points 92.15
Column Definition
Section
Document
Points
Weight
Score
Points awarded
Evaluation Criteria sections as defined in the RFP
Required documentation requested to be submitted in each tab
Total Point Value for Tab or section in the RFP
Prorate of Points towards each document being reviewed
O-Not Covered, 1-Poor, 2- Below Avg, 3- Average, 4-Above Avg, 5-Excellent
Points Awarded = Points * Weight * (Score/5)
Evaluator Name
Evaluator Title
Date Completed
Katherine Ennis
Deputy Utilities Director
Monday, February 3, 2025
6D Stone Street + Cocoa, FL 32922
PHONE: (324) 433-8832
FAX: (32%) 432-8685
EMAIL: DURCHASING GtCOCOFL.ORG
Technical Evaluation Score Sheet Summary
Q-25-03-COC
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Instructions:
1. Enter your Name and Title: Name John Perrin Title Senior Engineer
2. Review each of the submittal
3. Enter your scores on the corresponding worksheet in the workbook
4, Enter completion date and notes if any on each worksheet
5. Completed worksheets to be submitted by the Due Date: 4/29/2025 Upload to Vendorlink
Submittal List ; 20 2 25 25 13 15 100 Company Proj. Team
Worksheet Bid Tab # Firm Name Qual. Qual Experience Proj:Appr. Location Total Score Rank
1-KH ee KIMLEY HORN 19.2 0 ~ 23.3125 22.5 12.35 15s «92.3625
|2-CHA 2 CHA CONSULTING 19.2 0 24.4375 23.5 10.4 15 92.5375 1|
2/3/2025
Xx John Perrin
Signed by: John Perrin
Summary Pg. 1 of 3
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Proposer: KIMLEY HORN
. . . Score Points Section Document Points | Weight (0-5) awanled
Responsiveness of Prime 20% 5 4
Sufficient Resources Available 0 20% 5 4
Femnle Qualifications Similar Projects 20% 4 3.2
Proven Track Record 40% 5 8
Subtotal 19.2
Certified Minority Business Enterprise 2 100% <L 0
Project Manager Experience 45% 4.5 10.125
Project Team's Qualifications Project Bubaeet Experience 25 45% 4.75 10.6875
Organizational Structure 10% 5 2.5
Subtotal} 23.3125
Project 1 20% 5 5
Project 2 20% 5 5
Experience and Perfomance Project 3 2p 20% 4 ay Project 4 20% 4 4 Project 5 20% 4.5 4.5
Subtotal 22.5
Project Approach 13 100% 4.75 12.35
: Project Manager, Engineer and Office
Focanon Location within 75 miles of the City Wa eae El te Total Points 92.3625
Column Definition
Section
Document
Points
Weight
Score
Points awarded
Evaluation Criteria sections as defined in the RFP
Required documentation requested to be submitted in each tab
Total Point Value for Tab or section in the RFP
Prorate of Points towards each document being reviewed
O-Not Covered, 1-Poor, 2- Below Avg, 3- Average, 4-Above Avg, 5-Excellent
Points Awarded = Points * Weight * (Score/5)
Evaluator Name
Evaluator Title
Date Completed
John Perrin
Senior Engineer
Monday, February 3, 2025
Notes: Score range for each firm is 0-5.
1-KH Pg. 2 of 3
Engineering Services for the Pineda Causeway Phase 2 Water Main Installation
Proposer: CHA CONSULTING
S Point Section Document Points | Weight asi Meranded
Responsiveness of Prime 20% 4.5 3.6
Sufficient Resources Available 0 20% 5 4 Sane : 5
Firms Qualifications Similar Projects 20% 5 4
Proven Track Record 40% 4.75 7.6
Subtotal 19.2
Certified Minority Business Enterprise 2 100% Fil 0
Project Manager Experience 45% 4.75 10.6875 j i i 25 9 . Projeatleam9s Qualitivations Project Engineer Experience 45% 5 11.25
Organizational Structure 10% 5 2.5
Subtotal] 24.4375
Project 1 20% 5 5
Project 2 Be 20% 5 5
Experience and Perfomance Project 3 20% 4 a:
Project 4 20% 4.5 4.5
Project 5 20% 5 5
Subtotal 23.5
Project Approach 13 100% 4 10.4
Loaation elise Manag allies and culic 15 100% 15
Location within 75 miles of the City
Total Points 92.5375
Column Definition
Section
Document
Points
Weight
Score
Points awarded
Evaluation Criteria sections as defined in the RFP
Required documentation requested to be submitted in each tab
Total Point Value for Tab or section in the RFP
Prorate of Points towards each document being reviewed
O-Not Covered, 1-Poor, 2- Below Avg, 3- Average, 4-Above Avg, 5-Excellent
Points Awarded = Points * Weight * (Score/5)
Evaluator Name John Perrin
Evaluator Title Senior Engineer
Date Completed Monday, February 3, 2025
Notes: Score range for each firm is 0-5.
File details come from the government source that posted it. Updated .