PWS ATTACHMENT C - Quality Assurance Surveillance Plan.docx

DOCX document 19 KB Posted

Attached to
Boiler Safety Device Testing
Solicitation number
36C26126Q0778
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for monitoring contractor performance on Boiler Safety Device Testing Services provided to the VA Central California Health Care System in Fresno, California. The QASP establishes the framework for the Contracting Officer's Representative (COR) and Government personnel to systematically monitor and verify contractor compliance with the Performance Work Statement (PWS) throughout the contract period. The plan does not modify contract terms and conditions; in case of conflict with the PWS, the PWS controls.

The QASP defines ten performance standards with corresponding surveillance methods and 100% acceptable quality levels: monthly boiler safety device testing activities, annual boiler safety device testing and inspection cycles, completion of Government-provided testing forms and checklists, submission of complete inspection and testing reports with specified details, deficiency identification and reporting, operational coordination with VA Central Energy Plant personnel, OSHA and facility safety compliance, use of qualified personnel with required certifications and licenses, timely documentation submission, and safety protocol adherence. Surveillance methods include direct observation, document review, coordination verification, and follow-up inspections. The COR maintains comprehensive documentation including completed surveillance records, inspection reports, forms, checklists, identified deficiencies, corrective actions, and invoice validation records to support contractor performance evaluations, contract administration, and future acquisition planning. Performance deficiencies, such as failure to complete required testing, incomplete documentation, unauthorized outages, or use of unqualified personnel, shall be documented and reported to the Contracting Officer for appropriate action.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

Quality Assurance Surveillance Plan Boiler Safety Device Testing Services

C.1 PURPOSE

The purpose of this Quality Assurance Surveillance Plan (QASP) is to provide a systematic method for monitoring contractor performance associated with the Boiler Safety Device Testing Services contract for the VA Central California Health Care System (VACCHCS), Fresno, California.

This QASP identifies the performance standards, surveillance methods, deliverables, acceptable quality levels (AQLs), and Government surveillance responsibilities associated with the contract.

The QASP will be utilized by the Contracting Officer’s Representative (COR) and Contracting Officer to monitor contractor performance and verify compliance with the Performance Work Statement (PWS).

This QASP does not alter, modify, or add to the terms and conditions of the contract. In the event of a conflict between the QASP and the PWS, the PWS shall control.

C.2 GOVERNMENT SURVEILLANCE RESPONSIBILITIES

The COR or designated Government representative is responsible for:

1. Monitoring contractor performance;

2. Reviewing submitted reports and completed Government-provided testing forms/checklists;

3. Verifying required inspection and testing activities were completed;

4. Verifying required documentation was submitted within the required timeframe;

5. Documenting performance deficiencies or concerns;

6. Coordinating access and operational scheduling requirements with Central Energy Plant personnel;

7. Maintaining contract performance documentation;

8. Supporting invoice validation; and

9. Notifying the Contracting Officer of contractor performance concerns.

C.3 PERFORMANCE STANDARDS AND SURVEILLANCE METHODS

Performance Objective
Performance Standard
Surveillance Method
Acceptable Quality Level (AQL)
Monthly Boiler Safety Device Testing Activities
Contractor completes required monthly boiler safety device testing activities in accordance with the PWS and applicable Government-provided testing forms/checklists.
Review of submitted documentation, direct observation, and COR validation.
100% completion of scheduled monthly testing activities.
Assigned Annual Boiler Safety Device Testing/Inspection Cycle
Contractor completes the assigned annual boiler safety device testing/inspection cycle in accordance with the PWS and applicable Government-provided testing forms/checklists.
Review of completed inspection/testing documentation, direct observation when applicable, and COR verification.
100% completion of the assigned annual cycle.
Government-Provided Testing Forms/Checklists
Contractor completes and submits applicable Government-provided testing forms/checklists for the inspection/testing activities performed. This includes current, updated, revised, or replacement forms/checklists provided by the Government that document the same required inspection/testing services under the PWS.
Documentation review.
100% completion of applicable forms/checklists.
Inspection/Test Reports
Contractor submits complete inspection/testing reports following completion of required services. Reports clearly identify the equipment inspected or tested, testing performed, results obtained, deficiencies identified, technician name(s), date of service, and applicable checklist/form completed.
Documentation review.
100% compliance.
Deficiency Identification and Reporting
Contractor documents and reports identified deficiencies, unsafe conditions, failed safety devices, non-compliant conditions, abnormal operating conditions, and recommended corrective actions.
Documentation review and COR validation.
100% compliance.
Operational Coordination
Contractor coordinates access, outages, shutdowns, system isolations, equipment openings, and testing activities with VA Central Energy Plant personnel prior to performance.
COR observation, coordination verification, and review of communications.
No unauthorized outages, shutdowns, disruptions, or testing activities.
Safety Compliance
Contractor complies with applicable OSHA, VA, facility safety, lockout/tagout, confined space, hot work, PPE, and other safety requirements applicable to the work performed.
Direct observation, documentation review, and COR validation.
100% compliance.
Qualified Personnel
Contractor utilizes personnel meeting the qualification, licensing, certification, training, and experience requirements identified in the PWS.
Certification/license review, documentation review, and COR validation.
100% compliance.
Documentation Timeliness
Contractor submits completed Government-provided forms/checklists, inspection/testing reports, and required documentation within the timeframe required by the PWS unless otherwise directed by the COR.
Documentation review and receipt date verification.
100% compliance.

C.4 PERFORMANCE DEFICIENCIES

If contractor performance deficiencies are identified, the COR shall document the issue and notify the Contracting Officer for further action as appropriate.

Examples of performance deficiencies may include, but are not limited to:

1. Failure to complete required monthly boiler safety device testing activities;

2. Failure to complete the assigned annual boiler safety device testing/inspection cycle;

3. Incomplete, inaccurate, illegible, or missing Government-provided testing forms/checklists;

4. Late or missing inspection/testing reports;

5. Failure to identify, document, or report deficiencies;

6. Failure to coordinate access, outages, shutdowns, system isolations, equipment openings, or testing activities with VA personnel prior to performance;

7. Unauthorized outage, shutdown, testing activity, or disruption to boiler plant operations;

8. Failure to comply with applicable safety requirements;

9. Use of personnel who do not meet contract qualification requirements; and

10. Failure to correct documentation or performance concerns identified by the COR or Contracting Officer.

C.5 DOCUMENTATION

The COR shall maintain documentation associated with contract surveillance and contractor performance.

Documentation may include:

1. Completed surveillance records;

2. Contractor inspection/testing reports;

3. Completed Government-provided testing forms/checklists;

4. Records of monthly testing activities completed;

5. Records of the assigned annual boiler safety device testing/inspection cycle completed;

6. Identified deficiencies and related communications;

7. Contractor corrective actions or responses;

8. Safety or operational coordination documentation;

9. Performance discussions and communications;

10. Invoice validation documentation; and

11. Other contract administration records associated with contractor performance.

C.6 SURVEILLANCE METHODS

Government surveillance methods may include:

1. Direct observation;

2. Review of completed reports, forms, and checklists;

3. Validation of completed inspection/testing activities;

4. Coordination with VA Central Energy Plant personnel;

5. Review of contractor qualifications, licenses, certifications, and training documentation;

6. Documentation review;

7. Follow-up inspections or verification activities;

8. Review of contractor communications regarding scheduling, access, outages, shutdowns, and equipment openings; and

9. Invoice support documentation review.

C.7 CONTRACTOR PERFORMANCE RECORDS

Contractor performance records and surveillance documentation maintained under this QASP may be utilized to support:

1. Contractor performance evaluations;

2. Invoice validation;

3. Contract administration documentation;

4. Corrective action requests;

5. Contract file documentation;

6. Future acquisition planning; and

7. Any other contract administration action deemed appropriate by the Contracting Officer.