This is a Performance Work Statement attachment detailing the equipment and safety device inventory subject to inspection and testing services under the boiler safety device testing contract for VA Central California Health Care Systems.

The contractor shall perform monthly inspection and testing activities on three Cleaver Brooks boilers (Model 3WI 200-300-200ST), three boiler economizers manufactured by Cain Industries, associated feed tanks, and steam reducing stations. Pressure vessel inspections are required on the three boiler vessels (waterside, fireside, and integrity inspections), one deaerator tank, and one condensate tank. The safety device testing program encompasses 60 distinct Boiler Equipment Interface (BEI) safety devices requiring regular testing and validation, including high and low water alarms on condensate and deaerator tanks; deaerator overflow drain and safety valve systems; multiple liquid relief valves; carbon monoxide and combustible gas alarms; emergency stop panic buttons; fuel gas pressure alarms and cutoff switches; automatic fuel gas and oil shutoff valves with seat leakage testing; flame scanner systems; igniter timing verification; purge timing validation; forced draft damper proving switches; combustion air pressure switches; furnace pressure interlocks; flue gas recirculation damper interlocks; low oxygen level interlocks; fuel oil pressure controls; atomizing media pressure switches; oil burner position switches; outside air damper and makeup unit interlocks; and steam safety valve accumulation testing at high fire conditions. The inventory specifies quantities for each device and indicates which devices require BEI testing, establishing the comprehensive scope of monthly and annual safety device inspection and testing activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

Equipment and Safety Device Inventory The contractor shall perform inspection/testing services for the equipment and safety devices listed below, as applicable to the required monthly testing activities and the assigned annual boiler safety device testing/inspection cycle.

A.1 Boiler Plant Equipment

Equipment/System
Manufacturer
Model Number
Quantity
Inspection Type
Cleaver Brooks Boiler
Cleaver Brooks
3WI 200-300-200ST
3
Operational / Integrity Inspection
Boiler Economizers
Cain Industries
S/N 4849, 4850, 4851
3
Operational / Integrity Inspection
Deaerator Feed Tank
Parker Boiler CO.
61466
1
Integrity Inspection
Condensate Feed Tank
Parker Boiler CO.
61464
1
Integrity Inspection
Steam Reducing Stations
Armstrong

Spirax Sarco 94115080 71417

2
Operational Inspection

A.2 Pressure Vessel Inspections

Equipment/System
Quantity
Inspection Type
Boiler Vessel Inspection (Waterside/Fireside/Integrity)
3
Pressure Vessel Inspection
Deaerator Tank Integrity Inspection
1
Integrity Inspection
Condensate Tank Integrity Inspection
1
Integrity Inspection

A.3 BEI Safety Devices

Safety Device
Quantity
BEI Testing Required
High Water Alarm on Condensate Tank (HWACT)
1
Yes
Low Water Alarm on Condensate Tank (LWACT)
1
Yes
High Water Alarm on Deaerator Tank (HWADT)
1
Yes
Low Water Alarm on Deaerator Tank (LWADT)
1
Yes
Deaerator Overflow Drain System (DAODS)
1
Yes
Deaerator Safety Valve (DASV)
1
Yes
Safety Valve Following PRV (SVFPRV) – Deaerator
1
Yes
Safety Valve Following PRV (SVFPRV) – Other
1
Yes
Liquid Relief Valve on Oil Pump Set (LRVOPS)
3
Yes
Liquid Relief Valve on Economizer (LRVE)
3
Yes
Carbon Monoxide and Combustible Gas Alarms in Boiler Plant (CMCGABP)
3
Yes
Emergency Stop Panic Button (ESPB)
4
Yes
High Fuel Gas Pressure Alarm on Main Gas Line (HFGPAMG)
1
Yes
Low Water Alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)
3
Yes
High Water Alarm on Boiler (HWAB)
3
Yes
High / High High Boiler Steam Pressure Limit Switches (HBSPLS & HHBSPLS)
3
Yes
Steam Safety Valves on Boiler (SVB)
6
Yes
Safety Device
Quantity
BEI Testing Required
Low Fuel Gas Pressure Cutoff Switch (LFGPCS)
3
Yes
High Fuel Gas Pressure Cutoff Switch (HFGPCS)
3
Yes
Automatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV) – Main Gas
3
Yes
Automatic Pilot Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV) – Pilot Line
3
Yes
Proof of Closure on Automatic Fuel Shutoff Valves (POC-AFGSOV) – Natural Gas
3
Yes
Flame Scanner – Main Flame Out (FSMFO)
3
Yes
Flame Scanner Not Sensing Igniter Spark (FSNSIS)
3
Yes
Igniter Timing (IT)
3
Yes
Main Flame Ignition Timing (MFIT)
3
Yes
Pre-Purge and Post-Purge Timing (PPT)
3
Yes
Low-Fire Proving Switch (LFPS)
3
Yes
Forced Draft Damper Wide-Open Pre-Purge Proving Switch (FDDWOPS)
3
Yes
Combustion Air Pressure Switch (CAPS) – Variable Speed Fan
3
Yes
Purge Airflow Proving Switch (PAPS)
3
Yes
Forced Draft Motor Interlock Switches (FDMIS)
3
Yes
Outlet Stack Damper Position Interlock Switch (OSDPI)
3
Yes
Furnace Pressure Interlock (FPI)
3
Yes
Low Pilot Fuel Gas Pressure Cutoff Switch (LPFGPCS)
3
Yes
Flue Gas Recirculation Damper Interlock (FGRDI)
3
Yes
Low Flue Gas Oxygen Level Interlock (LFGOLI)
3
Yes
Low Fuel Oil Pressure Cutoff Switch (LFOPCS)
3
Yes
High Fuel Oil Pressure Cutoff Switch (HFOPCS)
3
Yes
Low Atomizing Media Pressure Switch (LAMPS)
3
Yes
Low Atomizing Media Differential Pressure Switch (LAMDPS)
3
Yes
Secondary Low Atomizing Media Pressure Switch (SLAMPS)
1
Yes
Automatic Fuel Oil Shutoff Valves (AFOSV) – Seat Leakage
3
Yes
Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC-AFOSV)
3
Yes
Oil Burner Position Switch (OBPS)
3
Yes
Outside Air Damper Interlock with Alarm (OADIA)
1
Yes
Outside Air Make Up Unit Interlock with Alarm (OAMUIA)
1
Yes
Steam Safety Valves (accumulation test at high fire)
3
Yes

File details come from the government source that posted it. Updated .