PTS Fire and Lighting Reno_220107_Specs.pdf

PDF 3 MB Posted

Attached to
Renovate PTS Fire Suppression System - Mike Monroney Aeronautical Center - Oklahoma City
Solicitation number
6973GH-22-R-00075
Issued by

About this file

This is a solicitation for a renovation project at the PTS facility located at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. The scope of work includes upgrading the fire suppression, fire alarm, ceiling, and lighting systems. All work must meet requirements in the project drawings and specifications and be approved by the Contracting Officer's Representative. The contractor must pre-order and have on-site all required materials prior to scheduled phasing start dates to complete each phase on time. The solicitation is issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services.

View the file

Other files

File Type Posted
98-0225PS600.pdf PDF
98-0225PS710.pdf PDF
Sidewalk Canopy _98-0225PL502.pdf PDF
98-0225PS002.pdf PDF
98-0225PS601.pdf PDF
98-0225PS700.pdf PDF
98-0225PS603.pdf PDF
98-0225PS003.pdf PDF
98-0225PS604.pdf PDF
98-0225PS001.pdf PDF
98-0225PS100.pdf PDF
98-0225PS703.pdf PDF
98-0225PS301.pdf PDF
98-0225PS005.pdf PDF
98-0225PS702.pdf PDF
98-0225PS711.pdf PDF
98-0225PS701.pdf PDF
Past Performance Survey.pdf PDF
98-0225PS602.pdf PDF
98-0225PS004.pdf PDF
6973GH-22-R-00075-0001.pdf PDF
98-0225PS300.pdf PDF
213000 FIRE PUMP ENCLOSURE.pdf PDF
SHEET FS-6 FIRE WATER PLAN.pdf PDF
Pre Bid RFIs with Responses.pdf PDF
Past Performance Survey.pdf PDF
Client Authorization Letter.pdf PDF
PTS Fire and Lighting Reno-20220107_Dwgs.pdf PDF
SF 25 Performance Bond.pdf PDF
Wage Rate Determination - 25 Feb 22.pdf PDF
6973GH-22-R-00075.pdf PDF
Contractors Release.pdf PDF
SF25A - Payment Bond.pdf PDF
SOW WO 20-004873 PTS Replace Fire Suppression 1-21-22.pdf PDF
Operational Controls.pdf PDF
Chapter_33-Construction Safety.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a limited liability company member, american institute of architects www.smallarchitects.com

Specifications Type “B” Submittal

FAA-MMAC

232-PTS Fire Suppression System and Lighting Renovation

Project No. 2020-004873

Contract # DTFAAC-13-D-00037

Submitted: January 7, 2022

WO 2020-004873: B232 Sprinkler Replacement

00.01.07 - 1 SEAL AND SIGNATURE PAGE

SEAL AND SIGNATURE PAGE

ARCHITECT

(Sections denoted in the Table of Contents with the designation ARCH after the section name are prepared by the Architect)

SMALL ARCHITECTS

108 South Broadway Edmond, OK 73034 Phone 405.840.1111 Fax 405.840.1191

Contact:

Thomas Small, AIA

ARCHITECT

FIRE PROTECTION ENGINEER

designation FPE after the section name are prepared by the Mechanical/Plumbing Engineer)

Paradign Building Science & Engineering, PLLC P.O. Box 204 Choctaw, OK 73020 Phone 405.306.1400

Lance LaRue, P.E.

FPE

ELECTRICAL ENGINEER

designation ELEC after the section name are prepared by the Mechanical/Plumbing Engineer)

ZRHD, Inc.

1318 N. Robinson Oklahoma City, OK 73103 Phone 405.942.8475

Wayne Wright, P.E.

ELEC

01/06/2022

00.01.10 - 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

00.01.07 - SEALS PAGE (ARCH)

00.01.10 - TABLE OF CONTENTS

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01.10.00 - SUMMARY (ARCH)

01.20.00 - PRICE AND PAYMENT PROCEDURES (ARCH)

01.30.00 - ADMINISTRATIVE REQUIREMENTS (ARCH)

01.40.00 - QUALITY REQUIREMENTS (STRUCT)

01.45.33 - CODE-REQUIRED SPECIAL INSPECTIONS (ARCH)

01.50.00 - TEMPORARY FACILITIES AND CONTROLS (ARCH)

01.60.00 – PRODUCT REQUIREMENTS

01.70.00 - EXECUTION AND CLOSEOUT REQUIREMENTS (ARCH)

01.74.19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL (ARCH)

01.78.00 - CLOSEOUT SUBMITTALS (ARCH)

01.79.00 - DEMONSTRATION AND TRAINING (ARCH)

01.91.13 - GENERAL COMMISSIONING REQUIREMENTS (ARCH)

DIVISION 02 -- EXISTING CONDITIONS

02.41.00 - DEMOLITION (ARCH)

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

07.90.05 - JOINT SEALERS (ARCH)

DIVISION 09 -- FINISHES

09.21.16 - GYPSUM BOARD ASSEMBLIES (ARCH)

09.51.00 - ACOUSTICAL CEILINGS (ARCH)

09.90.00 - PAINTING AND COATING (ARCH)

DIVISION 21 -- FIRE SUPPRESSION

21.13.13 - WET SPRINKLER SYSTEM (FPE)

21.13.18 – PREACTION SPRINKLER SYSTEM (FPE)

DIVISION 26 – ELECTRICAL

26.05.19 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26.05.33 – RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26.0923 – LIGHTING CONTROL DEVICES

26.27.26 – WIRING DEVICES

14.31.004 / FAA Building 185 00.01.10 - 2 TABLE OF CONTENTS

26.51.19 – LED INTERIOR LIGHTING

26.52.13 – EMERGENCY AND EXIT LIGHTING

26.56.19 – LED EXTERIOR LIGHTING

END OF SECTION

01.10.00 - 1 SUMMARY

SECTION 01.10.00

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: MMAC 232-PTS Fire Suppression System Renovation.

B. Owner's Name: FAA.

C. Architect's Name: Small Architects.

D. The Project consists of the replacement of the existing fire sprinkler piping and repair existing fire alarm system.

1.02 CONTRACT DESCRIPTION

A. Contract Type: A single prime contract based on a Stipulated Price.

1.03 WORK DESCRIPTION

A. Work Location: Federal Aviation Administration Mike Monroney Aeronautical Center 232- PTS Building.

1. 8101 S. MacArthur Blvd., Oklahoma City, Oklahoma, 73169.

B. Completion of Work: The Contractor shall be required to (a) commence Work under this contract within the designated calendar days after the date the Contractor receives the notice to proceed, (b) execute the Work diligently, and (c) complete the entire Work ready for occupancy and use not later than 120 days after notice to proceed.

C. Work includes: All labor, materials, and equipment necessary to replace fire sprinkler piping for both preaction system and wet system, fire alarm work, and new construction of existing finishes as required to complete the work identified in the “For Construction” Drawings.

1.04 OWNER OCCUPANCY

A. Owner intends to continue to occupy the existing building during the entire construction period, except for the time between October 13, 2022 and January 5, 2023. During this period the Contractor is expected to substantially complete the work.

B. Owner intends to occupy the Project upon Substantial Completion.

C. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.

D. Work Sequence: Contractor shall submit a detailed construction phasing schedule describing when each phase of construction is scheduled.

1.05 CONTRACTOR USE OF SITE AND PREMISES

A. Provide access to and from site as required by law and by Owner:

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

2. Do not obstruct roadways, sidewalks, or other public ways without permit.

B. Safety Requirements: Contractor shall comply with the Safety FAA/MMAC standards. A copy of this report will be attached to the contract sent by the Contracting Officer.

C. Security Requirements: Contractor shall comply with all applicable Department of Transportation (DOT), FAA, and MMAC security directives while performing Work of this Contract.

D. Time Restrictions: Work shall be conducted between 7:00 a.m. and 4:30 p.m. on normal government workdays. No Work shall occur at night, or on Saturday's, Sundays, or designated government holidays unless approved by the Contracting Officer seven (7) days in advance.

E. Existing building spaces may not be used for storage.

F. Utility Outages and Shutdown: Coordinate with the Contracting Office and Project Manager at 954-4574. Outages affecting FAA Operations are required to be accomplished at night, or on Saturday's, Sunday's, or designated government holidays. Prior to any outage or shutdown,

01.10.00 - 2 SUMMARY

fourteen (14) working days notification must be made to coordinate scheduling of any Work to be performed during any hours.

1. Prevent accidental disruption of utility services to other facilities.

G. The FAA project Manager's phone number is 405-954-4765.

1.06 ALTERNATES - NONE

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

01.20.00 - 1 PRICE AND PAYMENT

PROCEDURES

SECTION 01.20.00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Procedures for preparation and submittal of applications for progress payments.

B. Documentation of changes in Contract Sum and Contract Time.

C. Change procedures.

D. Correlation of Contractor submittals based on changes.

E. Procedures for preparation and submittal of application for final payment.

1.02 SCHEDULE OF VALUES

A. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Architect for approval.

B. Forms filled out by hand will not be accepted.

C. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the specification section. Identify site mobilization.

1.03 APPLICATIONS FOR PROGRESS PAYMENTS

A. Payment Period: Submit at intervals stipulated in the Agreement.

B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval.

C. Forms filled out by hand will not be accepted.

D. Execute certification by signature of authorized officer.

E. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and for stored products.

F. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of work.

G. Submit one electronic and three hard-copies of each Application for Payment.

H. Include the following with the application:

1. Transmittal letter as specified for submittals in Section 01.30.00.

2. Construction progress schedule, revised and current as specified in Section 01.30.00.

3. Affidavits attesting to off-site stored products.

I. When Architect requires substantiating information, submit data justifying dollar amounts in question. Provide one copy of data with cover letter for each copy of submittal. Show application number and date, and line item by number and description.

1.04 MODIFICATION PROCEDURES

A. For minor changes not involving an adjustment to the Contract Sum or Contract Time, Architect will issue instructions directly to Contractor.

B. For other required changes, Architect will issue a document signed by Owner instructing Contractor to proceed with the change, for subsequent inclusion in a Change Order.

1. The document will describe the required changes and will designate method of determining any change in Contract Sum or Contract Time.

2. Promptly execute the change.

C. For changes for which advance pricing is desired, Architect will issue a document that includes a detailed description of a proposed change with supplementary or revised drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor shall prepare and submit a fixed price quotation within 14 days.

01.20.00 - 2 PRICE AND PAYMENT

PROCEDURES

D. Contractor may propose a change by submitting a request for change to Architect, describing the proposed change and its full effect on the work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation.

Document any requested substitutions in accordance with Section 01.60.00.

E. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract.

1. For change requested by Architect for work falling under a fixed price contract, the amount will be based on Contractor's price quotation.

2. For change requested by Contractor, the amount will be based on the Contractor's request for a Change Order as approved by Architect.

3. For pre-determined unit prices and quantities, the amount will based on the fixed unit prices.

F. Substantiation of Costs: Provide full information required for evaluation.

1. On request, provide the following data:

a. Quantities of products, labor, and equipment.

b. Taxes, insurance, and bonds.

c. Overhead and profit.

d. Justification for any change in Contract Time.

e. Credit for deletions from Contract, similarly documented.

G. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.

H. After execution of Change Order, promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum.

I. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit.

J. Promptly enter changes in Project Record Documents.

1.05 APPLICATION FOR FINAL PAYMENT

A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due.

PART 2 PRODUCTS - NOT USED

01.30.00 - 1 ADMINISTRATIVE

REQUIREMENTS

SECTION 01.30.00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. General administrative requirements.

B. Preconstruction meeting.

C. Progress meetings.

D. Construction progress schedule.

E. Submittals for review, information, and project closeout.

F. Number of copies of submittals.

G. Submittal procedures.

1.02 GENERAL ADMINISTRATIVE REQUIREMENTS

A. Conform to requirements of Section 01.70.00 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 PRECONSTRUCTION MEETING

A. Owner will schedule a meeting after Notice of Award.

B. Attendance Required:

1. Owner.

2. Architect.

3. Contractor.

C. Agenda:

1. Distribution of Contract Documents.

2. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.

3. Designation of personnel representing the parties to Contract, Owner and Architect.

4. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

5. Scheduling.

D. Contractor shall record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.

3.02 PROGRESS MEETINGS

A. Contractor shall schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.

B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.

C. Attendance Required:

1. Contractor.

2. Owner.

3. Architect.

4. Contractor's superintendent.

5. Major subcontractors.

D. Agenda:

1. Review minutes of previous meetings.

2. Review of work progress.

01.30.00 - 2 ADMINISTRATIVE

3. Field observations, problems, and decisions.

4. Identification of problems that impede, or will impede, planned progress.

5. Review of submittals schedule and status of submittals.

6. Maintenance of progress schedule.

7. Corrective measures to regain projected schedules.

8. Planned progress during succeeding work period.

9. Maintenance of quality and work standards.

10. Effect of proposed changes on progress schedule and coordination.

11. Other business relating to work.

E. Record minutes and distribute copies within two days after meeting to participants, with copies to Architect, Owner, participants, and those affected by decisions made.

3.03 CONSTRUCTION PROGRESS SCHEDULE

A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.

B. Within 10 days after joint review, submit complete schedule.

C. Submit updated schedule with each Application for Payment.

3.04 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

B. Submit to Architect for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.

C. Samples will be reviewed for aesthetic, color, or finish selection.

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01.78.00 - Closeout Submittals.

3.05 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

4. Inspection reports.

5. Manufacturer's instructions.

6. Manufacturer's field reports.

7. Other types indicated.

3.06 SUBMITTALS FOR PROJECT CLOSEOUT

A. Submit Correction Punch List for Substantial Completion.

B. Submit Final Correction Punch List for Substantial Completion.

C. When the following are specified in individual sections, submit them at project closeout in conformance to requirements of Section 01.78.00 - Closeout Submittals:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Bonds.

5. Other types as indicated.

3.07 NUMBER OF COPIES OF SUBMITTALS

A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.

01.30.00 - 3 ADMINISTRATIVE

B. All Mechanical Submittals must be submitted Electronically and 2 physical paper copies.

C. Samples: Submit the number specified in individual specification sections; one of which will be retained by Architect.

1. Retained samples will not be returned to Contractor unless specifically so stated.

3.08 SUBMITTAL PROCEDURES

A. General Requirements:

B. Shop Drawing Procedures:

1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting the Contract Documents and coordinating related Work.

2. Generic, non-project specific information submitted as shop drawings do not meet the requirements for shop drawings.

C. Submittals shall be submitted electronically thru an online project management software. If Contractor does not have access to an online project management software, the Architect will provide access to Procore software for the Contractor's use.

D. Transmit each submittal with approved form.

E. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.

F. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.

G. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.

H. Schedule submittals to expedite the Project, and coordinate submission of related items.

I. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.

J. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.

K. Provide space for Contractor and Architect review stamps.

L. When revised for resubmission, identify all changes made since previous submission.

M. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.

N. Submittals not requested will not be recognized or processed.

01.40.00 - 1 QUALITY REQUIREMENTS

SECTION 01.40.00

QUALITY REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Submittals.

B. Testing and inspection agencies and services.

C. Control of installation.

D. Mock-ups.

E. Tolerances.

F. Defect Assessment.

1.02 SUBMITTALS

A. See Section 01.30.00 - Administrative Requirements, for submittal procedures.

B. Design Data: Submit for Architect's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information.

C. Test Reports: After each test/inspection, promptly submit two copies of report to Architect and to Contractor.

1. Include:

a. Date issued.

b. Project title and number.

c. Name of inspector.

d. Date and time of sampling or inspection.

e. Identification of product and specifications section.

f. Location in the Project.

g. Type of test/inspection.

h. Date of test/inspection.

i. Results of test/inspection.

j. Conformance with Contract Documents.

k. When requested by Architect, provide interpretation of results.

2. Test report submittals are for Architect's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information.

1.03 TESTING AND INSPECTION AGENCIES AND SERVICES

A. Contractor shall employ and pay for services of an independent testing agency to perform other specified testing.

B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding.

01.40.00 - 2 QUALITY REQUIREMENTS

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have Work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

3.02 MOCK-UPS

A. Tests shall be performed under provisions identified in this section and identified in the respective product specification sections.

B. Assemble and erect specified items with specified attachment and anchorage devices, flashings, seals, and finishes.

C. Accepted mock-ups, if required, shall be a comparison standard for the remaining Work.

D. Where mock-up has been accepted by Architect and is specified in product specification sections to be removed, protect mock-up throughout construction, remove mock-up and clear area when directed to do so by Architect.

3.03 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.

Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

3.04 TESTING AND INSPECTION

A. Testing Agency Duties:

1. Provide qualified personnel at site. Cooperate with Architect and Contractor in performance of services.

2. Perform specified sampling and testing of products in accordance with specified standards.

3. Ascertain compliance of materials and mixes with requirements of Contract Documents.

4. Promptly notify Architect and Contractor of observed irregularities or non-conformance of Work or products.

5. Perform additional tests and inspections required by Architect.

6. Submit reports of all tests/inspections specified.

B. Limits on Testing/Inspection Agency Authority:

1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.

2. Agency may not approve or accept any portion of the Work.

3. Agency may not assume any duties of Contractor.

4. Agency has no authority to stop the Work.

C. Contractor Responsibilities:

1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing.

2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.

3. Provide incidental labor and facilities:

a. To provide access to Work to be tested/inspected.

b. To obtain and handle samples at the site or at source of Products to be tested/inspected.

c. To facilitate tests/inspections.

01.40.00 - 3 QUALITY REQUIREMENTS

d. To provide storage and curing of test samples.

4. Notify Architect and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.

5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.

D. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Architect.

E. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor.

3.05 DEFECT ASSESSMENT

A. Replace Work or portions of the Work not conforming to specified requirements.

B. If, in the opinion of Architect, it is not practical to remove and replace the Work, Architect will direct an appropriate remedy or adjust payment.

GNAS Mech & Lighting Upgrades 01.45.33 - 1 CODE-REQUIRED SPECIAL

INSPECTIONS

SECTION 01.45.33

CODE-REQUIRED SPECIAL INSPECTIONS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Code-required special inspections.

1.02 DEFINITIONS

A. Code or Building Code: ICC (IBC), 2015 Edition of the International Building Code and specifically, Chapter 17 - Special Inspections and Tests.

B. Authority Having Jurisdiction (AHJ): Agency or individual officially empowered to enforce the building, fire and life safety code requirements of the permitting jurisdiction in which the Project is located.

C. Special Inspection:

1. Special inspections are inspections and testing of materials, installation, fabrication, erection or placement of components and connections mandated by the AHJ that also require special expertise to ensure compliance with the approved contract documents and the referenced standards.

2. Special inspections are separate from and independent of tests and inspections conducted by Owner or Contractor for the purposes of quality assurance and contract administration.

1.03 REFERENCE STANDARDS

A. ACI 318 - Building Code Requirements for Structural Concrete and Commentary; 2011.

B. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2015.

C. AWS D1.3/D1.3M - Structural Welding Code - Sheet Steel; 2008.

D. AWS D1.4/D1.4M - Structural Welding Code - Reinforcing Steel; 2011.

E. ICC (IBC) - International Building Code; 2018.

1.04 SPECIAL INSPECTION AGENCY

A. The contractor will employ services of a Special Inspection Agency to perform inspections and associated testing and sampling required by the building code and the City of Oklahoma City.

These independent firms shall not be affiliated with or have had any business relation, nor any other relationship that would imply any conflict of interest with respect to the Contractor. The fees for such testing and inspections shall be included in the Base Bid Amount.

B. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of Contract Documents.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 SPECIAL INSPECTIONS FOR STEEL CONSTRUCTION

A. High-Strength Bolt, Nut and Washer Material:

1. Verify identification markings conform to ASTM standards specified in the approved contract and to AISC 360, Section A3.3; periodic.

2. Submit manufacturer's certificates of compliance; periodic.

B. High-Strength Bolting Installation: Verify items listed below comply with AISC 360, Section M2.5.

1. Snug tight joints; periodic.

C. Weld Filler Material:

1. Verify identification markings conform to AWS standards specified in the approved contract documents and to AISC 360, Section A3.5; periodic.

2. Submit manufacturer's certificates of compliance; periodic.

GNAS Mech & Lighting Upgrades 01.45.33 - 2 CODE-REQUIRED SPECIAL

E. Welding:

1. Structural Steel:

a. Complete and Partial Joint Penetration Groove Welds: Verify compliance with AWS D1.1/D1.1M; continuous.

b. Multipass Fillet Welds: Verify compliance with AWS D1.1/D1.1M; continuous.

c. Single Pass Fillet Welds Less than 5/16 inch (7.94 mm) Wide: Verify compliance with AWS D1.1/D1.1M; periodic.

d. Plug and Slot Welds: Verify compliance with AWS D1.1/D1.1M; continuous.

e. Single Pass Fillet Welds 5/16 inch (7.94 mm) or Greater: Verify compliance with AWS D1.1/D1.1M; continuous.

f. Floor and Roof Deck Welds: Verify compliance with AWS D1.3/D1.3M; continuous.

2. Reinforcing Steel: Verify items listed below comply with AWS D1.4/D1.4M and ACI 318, Section 3.5.2.

a. Verification of weldability; periodic.

b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames as well as boundary elements of special structural walls of concrete and shear reinforcement; continuous.

c. Shear reinforcement; continuous.

d. Other reinforcing steel; periodic.

3.02 SPECIAL INSPECTIONS FOR CONCRETE CONSTRUCTION

A. Reinforcing Steel, Including Prestressing of Tendons and Placement: Verify compliance with approved contract documents and ACI 318, Sections 3.5 and 7.1 through 7.7; periodic.

B. Reinforcing Steel Welding: Verify compliance with AWS D1.4/D1.4M and ACI 318, Section 3.5.2; periodic.

C. Bolts Installed in Concrete: Where allowable loads have been increased or where strength design is used, verify compliance with approved contract documents and ACI 318, Sections

8.1.3 and 21.2.8 prior to and during placement of concrete; continuous.

D. Design Mix: Verify plastic concrete complies with the design mix in approved contract documents and with ACI 318, Chapter 4 and 5.2; periodic.

E. Specified Curing Temperature and Techniques: Verify compliance with approved contract documents and ACI 318, Sections 5.11 through 5.13; periodic.

F. Concrete Strength in Situ: Verify concrete strength complies with approved contract documents and ACI 318, Section 6.2, for the following.

G. Formwork Shape, Location and Dimensions: Verify compliance with approved contract documents and ACI 318, Section 6.1.1; periodic.

3.05 A-1 SURVEY

A. The MMAC is on OCAT leased land and adjacent to runways. Airway clearance is required by registering objects over 27' high. The Contractor shall perform the survey for crane use and obtain approval from the Director of Airport Operations if a crane over 27’ in height will be used.

A survey is required at the conclusion of the project to register a new building, light poles, and constructed objects over 27' high.

3.06 OTHER SPECIAL INSPECTIONS

A. Provide for special inspection of work that, in the opinion of the AHJ, is unusual in nature.

B. For the purposes of this section, work unusual in nature includes, but is not limited to:

1. Construction materials and systems that are alternatives to materials and systems prescribed by the building code.

2. Unusual design applications of materials described in the building code.

3. Materials and systems required to be installed in accordance with the manufacturer's instructions when said instructions prescribe requirements not included in the building code or in standards referenced by the building code.

GNAS Mech & Lighting Upgrades 01.45.33 - 3 CODE-REQUIRED SPECIAL

3.07 SPECIAL INSPECTION AGENCY DUTIES AND RESPONSIBILITIES

A. Special Inspection Agency shall:

1. Provide qualified personnel at site. Cooperate with Architect and Contractor in performance of services.

2. Perform specified sampling and testing of products in accordance with specified reference standards.

3. Ascertain compliance of materials and products with requirements of Contract Documents.

4. Promptly notify Architect and Contractor of observed irregularities or non-conformance of work or products.

5. Perform additional tests and inspections required by Architect.

6. Submit reports of all tests or inspections specified.

B. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Architect.

C. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor.

01.50.00 - 1 TEMPORARY FACILITIES AND

CONTROLS

SECTION 01.50.00

TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Temporary sanitary facilities.

B. Temporary Controls: Barriers, enclosures, and fencing.

C. Security requirements.

D. Safety requirements.

E. Vehicular access and parking.

F. Waste removal facilities and services.

1.02 TEMPORARY UTILITIES

A. Provide and pay for all electrical power, lighting, water, heating and cooling, and ventilation required for construction purposes.

B. Use trigger-operated nozzles for water hoses, to avoid waste of water.

1.03 TELECOMMUNICATIONS SERVICES

A. Provide, maintain, and pay for telecommunications services to field office, if selected to do so, at time of project mobilization.

B. Telecommunications services shall include:

1. Windows-based personal computer dedicated to project telecommunications, with necessary software and laser printer.

2. Telephone Land Lines: One line, minimum; one handset per line.

3. Internet Connections: Minimum of one; DSL modem or faster.

4. Email: Account/address reserved for project use.

5. Facsimile Service: Minimum of one dedicated fax machine/printer, with dedicated phone line.

1.04 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

B. Maintain daily in clean and sanitary condition.

1.05 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.

B. Proper signage is required on the fencing and barriers leading into the construction area. "PPE Required", "Hardhats Required", ect.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.06 FENCING

A. Provide 6 foot (1.8 m) high fence around lay-down site; equip with vehicular and pedestrian gates with locks.

1.07 INTERIOR ENCLOSURES

A. Provide temporary enclosures over equipment to remain to prevent penetration of dust and moisture into equipment and to prevent damage.

B. Construction: Framing and reinforced polyethylene sheet materials with closed joints and sealed edges at intersections with existing surfaces:

01.50.00 - 2 TEMPORARY FACILITIES AND

CONTROLS

1.08 SECURITY - SEE SECTION 01.35.53

A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from unauthorized entry, vandalism, or theft.

1.09 SAFETY

A. Periodic safety inspections are required on this project by a competent person. Known hazzards shall be mitigated as soon as possible.

1.10 VEHICULAR ACCESS AND PARKING

A. Comply with regulations relating to use of streets and sidewalks, access to emergency facilities, and access for emergency vehicles.

B. Coordinate access and haul routes with governing authorities and Owner.

C. Provide and maintain access to fire hydrants, free of obstructions.

D. Provide means of removing mud from vehicle wheels before entering streets.

E. Provide temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking.

1.11 WASTE REMOVAL

A. See Section 01.74.19 - Construction Waste Management and Disposal, for additional requirements.

B. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.

C. Provide containers with lids. Remove trash from site periodically.

D. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.

E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

1.12 FIELD OFFICES

A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.

B. Provide space for Project meetings, with table and chairs to accommodate 6 persons.

C. Locate offices a minimum distance of 30 feet (10 m) from existing and new structures.

1.13 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, materials, prior to Date of Substantial Completion inspection.

B. Remove underground installations to a minimum depth of 2 feet (600 mm). Grade site as indicated.

C. Clean and repair damage caused by installation or use of temporary work.

PART 2 PRODUCTS - NOT USED

01.60.00 - 1 PRODUCT REQUIREMENTS

SECTION 01.60.00

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Re-use of existing products.

B. Transportation, handling, storage and protection.

C. Product option requirements.

D. Substitution limitations.

E. Procedures for Owner-supplied products.

F. Maintenance materials, including extra materials, spare parts, tools, and software.

1.02 RELATED REQUIREMENTS

A. Section 01.25.00 - Substitution Procedures: Substitutions made during and after the Bidding/Negotiation Phase.

1.03 SUBMITTALS

A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

B. All chemicals, lubricants, paints, solvents, sealants, adhesives, patching materials, cements, foam insulation and gypsum wall board and other materials that my potentially contain ACM must have Material Safety Data Sheets (SDS) submitted prior to installation.

C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

PART 2 PRODUCTS

2.01 EXISTING PRODUCTS

A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by the Contract Documents.

B. Unforeseen historic items encountered remain the property of the Owner; notify Owner promptly upon discovery; protect, remove, handle, and store as directed by Owner.

C. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the Owner, or otherwise indicated as to remain the property of the Owner, become the property of the Contractor; remove from site.

2.02 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by the Contract Documents.

2.03 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:

Submit a request for substitution for any manufacturer not named.

01.60.00 - 2 PRODUCT REQUIREMENTS

2.04 MAINTENANCE MATERIALS

A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.

B. Deliver to Project site; obtain receipt prior to final payment.

PART 3 EXECUTION

3.01 SUBSTITUTION LIMITATIONS

A. See Section 01.25.00 - Substitution Procedures.

B. Contracting Officer will consider requests for Substitutions only within ten (10) days after award of Contract.

C. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.

D. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.

E. A request constitutes a representation that the Contractor:

1. Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.

2. Will provide the same warranty for the Substitution as for the specified Product.

3. Will coordinate installation and make changes to other Work, which may be required for the Work to be completed with no additional cost to the FAA.

4. Waives claims for additional costs or time extension, which may subsequently become apparent.

5. Will reimburse Contracting Officer for review or redesign services associated with re-approval for authorities.

F. Substitutions will not be considered when they are indicated or implied on shop drawing or Product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.

G. Substitution Submittal Procedure:

1. Submit three (3) copies of request for Substitution for consideration on Substitution Request Form attached to this section. Limit each Substitution Request Form to one (1) proposed Substitution.

2. Submit shop drawings, Product data, and certified test results attesting to the proposed Product equivalence.

3. The Contracting Officer will notify Contractor in writing of decision to accept or reject request.

H. If request for substitution is not accepted by the Contracting Officer, Contractor is responsible for supplying item as originally specified or an acceptable substitution without additional cost to the FAA.

3.02 OWNER-SUPPLIED PRODUCTS

A. Owner's Responsibilities:

1. Arrange for and deliver Owner reviewed shop drawings, product data, and samples, to Contractor.

2. Arrange and pay for product delivery to site.

3. On delivery, inspect products jointly with Contractor.

4. Submit claims for transportation damage and replace damaged, defective, or deficient items.

5. Arrange for manufacturers' warranties, inspections, and service.

B. Contractor's Responsibilities:

1. Review Owner reviewed shop drawings, product data, and samples.

2. Receive and unload products at site; inspect for completeness or damage jointly with Owner.

01.60.00 - 3 PRODUCT REQUIREMENTS

3. Handle, store, install and finish products.

4. Repair or replace items damaged after receipt.

3.03 TRANSPORTATION AND HANDLING

A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.

B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.

C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

D. Transport and handle products in accordance with manufacturer's instructions.

E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.

H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.

3.04 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.

E. For exterior storage of fabricated products, place on sloped supports above ground.

F. Provide off-site storage and protection when site does not permit on-site storage or protection.

G. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.

H. Comply with manufacturer's warranty conditions, if any.

I. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

J. Prevent contact with material that may cause corrosion, discoloration, or staining.

K. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

L. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

01.70.00 - 1 EXECUTION AND CLOSEOUT

SECTION 01.70.00

EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Requirements for alterations work, including selective demolition, except removal, disposal, and/or remediation of hazardous materials and toxic substances.

C. Pre-installation meetings.

D. Cutting and patching.

E. Surveying for laying out the work.

F. Cleaning and protection.

G. Starting of systems and equipment.

H. Demonstration and instruction of Owner personnel.

I. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.

J. General requirements for maintenance service.

1.02 RELATED REQUIREMENTS

A. Section 01.79.00 - Demonstration and Training: Demonstration of products and systems to be commissioned and where indicated in specific specification sections

B. Section 07.84.00 - Firestopping.

1.03 PROJECT CONDITIONS

A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

B. Dust Control: Execute work by methods to minimize raising dust from construction operations.

Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.

1. Provide dust-proof barriers between construction areas and areas continuing to be occupied by Owner.

C. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

PART 2 PRODUCTS

2.01 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.

C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01.60.00 - Product Requirements.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

01.70.00 - 2 EXECUTION AND CLOSEOUT

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

E. Verify that utility services are available, of the correct characteristics, and in the correct locations.

F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 PREINSTALLATION MEETINGS

A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section.

B. Require attendance of parties directly affecting, or affected by, work of the specific section.

C. Notify Architect four days in advance of meeting date.

D. Prepare agenda and preside at meeting:

1. Review conditions of examination, preparation and installation procedures.

2. Review coordination with related work.

E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.

3.04 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.05 ALTERATIONS

A. Drawings showing existing construction and utilities are based on casual field observation and existing record documents only.

1. Verify that construction and utility arrangements are as indicated.

2. Report discrepancies to Architect before disturbing existing installation.

3. Beginning of alterations work constitutes acceptance of existing conditions.

B. Remove existing work as indicated and as required to accomplish new work.

1. Remove items indicated on drawings.

2. Relocate items indicated on drawings.

3. Where new surface finishes are to be applied to existing work, perform removals, patch, and prepare existing surfaces as required to receive new finish; remove existing finish if necessary for successful application of new finish.

4. Where new surface finishes are not specified or indicated, patch holes and damaged surfaces to match adjacent finished surfaces as closely as possible.

C. Services (Including but not limited to HVAC, Plumbing, Fire Protection, Electrical, and Telecommunications): Remove, relocate, and extend existing systems to accommodate new equipment.

01.70.00 - 3 EXECUTION AND CLOSEOUT

1. Maintain existing active systems that are to remain in operation; maintain access to equipment and operational components; if necessary, modify installation to allow access or provide access panel.

2. Where existing systems or equipment are not active and Contract Documents require reactivation, put back into operational condition; repair supply, distribution, and equipment as required.

3. Where existing active systems serve occupied facilities but are to be replaced with new services, maintain existing systems in service until new systems are complete and ready for service.

a. Disable existing systems only to make switchovers and connections; minimize duration of outages.

b. Provide temporary connections as required to maintain existing systems in service.

4. Verify that abandoned services serve only abandoned facilities.

5. Remove abandoned pipe, ducts, conduits, and equipment, including those above accessible ceilings; remove back to source of supply where possible, otherwise cap stub and tag with identification; patch holes left by removal using materials specified for new construction.

D. Protect existing work to remain.

1. Prevent movement of structure; provide shoring and bracing if necessary.

2. Perform cutting to accomplish removals neatly and as specified for cutting new work.

3. Repair adjacent construction and finishes…

This is the start of the file's text. The full file is on GovTribe.