This document is a project description for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements contract opportunity at Crater Lake National Park in Oregon.
The work consists of aggregate base trail reconstruction, slope stabilization, wall construction, marina reconstruction with a new building and fixed pier structure, and removal and replacement of an existing restroom. The project length is approximately 1.026 miles with a tentative completion date of Fall 2027. The estimated price range for this negotiated, firm-fixed-price contract with a base and four options is between $30,000,000 and $40,000,000. This solicitation is being offered for full and open competition and is anticipated to be issued in Winter 2024/2025. The Department of Transportation Federal Highway Administration is the procuring agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
Crater Lake National Park, Klamath County, Oregon
The work consists of aggregate base trail reconstruction (1.026 miles), slope stabilization, slope protection, walls (dry stack rockery, soil nail, gabion, Mechanically Stabilized Earth Wall, and stone masonry), reconstruction of marina with floating dock system, new building structure at Cleetwood marina, new fixed pier structure at Cleetwood marina, removal of existing restroom at Cleetwood marina, and new vault toilet restroom at Cleetwood marina
Project length: 1.026 miles
Tentative Fixed Completion Date: Fall 2027
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $30,000,000 and $40,000,000
Location: Crater Lake National Park- 71 miles N of Klamath Falls, Oregon.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
B as e S ch ed u le
O p ti o n W
S ch ed ti o
X ed ti o
Y ed ti o
Z ed
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes No No No
15201-0000, CONSTRUCTION SURVEY AND
STAKING, LPSM 1 1
153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes Yes Yes
15301-0000, CONTRACTOR QUALITY
CONTROL AND ASSURANCE, LPSM 1 1
154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes Yes
15401-0010, CONTRACTOR TESTING, LPSM 1 1
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes Yes
15501-0000, CONSTRUCTION SCHEDULE,
LPSM 1 1
157 Soil Erosion & Sediment Control (erosion control devices)
15702-2000, SOIL EROSION CONTROL,
TURBIDITY MONITORING, LPSM 1
15705-1400, SOIL EROSION CONTROL,
FIBER ROLL (COIR ROL), LNFT 4300
e S ch ed ti o ed ti o ed ti o ed ti o ed
15705-1400, SOIL EROSION CONTROL,
FIBER ROLL, LNFT 3150
15705-2000, SOIL EROSION CONTROL,
FLOATING TURBIDITY CURTAIN (SEASON
2), LNFT 7900
15705-2000, SOIL EROSION CONTROL,
FLOATING TURBIDITY CURTAIN (SEASON
3), LNFT 7900
15705-2000, SOIL EROSION CONTROL,
FLOATING TURBIDITY CURTAIN (SEASON
1), LNFT 7900
15710-0100, SOIL EROSION CONTROL,
FILTER ROCK, CUYD 140
DIVISION 200 – Earthwork
203 Removal of Structures & Obstructions (structures, demolition)
20301-0080, REMOVAL OF BENCH, EACH 5
20301-2100, REMOVAL OF RESTROOM
FACILITY, EACH 1
20302-0700, REMOVAL OF FENCE, LNFT 500
20303-1600, REMOVAL OF PAVEMENT,
ASPHALT, SQYD 40
204 Excavation & Embankment
20401-0000, ROADWAY EXCAVATION
(TRAIL), CUYD 2200
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No No No No No
208 Structure Excavation
20811-0000, SHORING AND BRACING
(14+50 TO 20+00), SQFT 1150
20811-0000, SHORING AND BRACING
(47+50 TO 49+00), SQFT 1240
20811-0000, SHORING AND BRACING
(50+00 TO 54+00), SQFT 2550
20811-0000, SHORING AND BRACING
(56+75 TO 58+50), SQFT 1550
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap
25101-0600, PLACED RIPRAP, METHOD A,
CLASS 6, CUYD 210
25125-0000, BOULDER, EACH 20
e S ch ed ti o ed ti o ed ti o ed ti o ed
252 Rockery, Special Rock Embankment, and Rock Buttress
25210-0000, ROCKERY (DRY STACK, 2V:1H),
SQFT 1800
25210-0000, ROCKERY (DRY STACK, 8V:1H),
SQFT 2050
253 Gabions & Revet Mattresses
25301-0000, GABIONS, SQFT 3300
255 Mechanically Stabilized Earth Walls (retaining walls)
25501-1000, MECHANICALLY STABILIZED
EARTH WALL, WELDED WIRE FACE, SQFT 6450
259 Soil Nail Retaining Walls
25902-0000, SOIL NAIL RETAINING WALL,
SQFT 3619
260 Rock Bolts & Dowels
26001-0000, ROCK BOLT (25 KIPS), LNFT 2746 2971
26001-0000, ROCK BOLT (50 KIPS), LNFT 551 919
26002-0000, ROCK DOWL, LNFT 167 144
DIVISION 300 – Aggregate and Base Courses
302 Minor Crushed Aggregate
30201-2000, ROADWAY AGGREGATE,
METHOD 2, CUYD 900
DIVISION 550 – Bridge Construction
552 Structural Concrete (concrete – major structures)
55201-0200, STRUCTURAL CONCRETE,
CLASS A (AE), CUYD 4 7
554 Reinforcing Steel
55401-1000, REINFORCING STEEL
(GALVANIZED), LB 730 400
555 Steel Structures (structures, steel)
55501-0000, STRUCTURAL STEEL (OPEN
GRID STEEL DECKING), LPSM ALL
55502-0000, STRUCTURAL STEEL,
FURNISHED, FABRICATED, AND ERECTED,
LB 11250 11600
556 Bridge Railing
55601-0900, BRIDGE RAILING, STEEL
(PEDESTRIAN), LNFT 127
566 Shotcrete e S ch ed ti o ed ti o ed ti o ed ti o ed
56603-0000, REINFORCED SHOTCRETE,
SQYD 478 1158
567 Micropiles
56701-0000, MICROPILE (10.75-INCH
DIAMETER), LNFT 600 725
56705-0000, MICROPILE LOAD
VERIFICATION TEST, EACH 1
56706-0000, MICROPILE PROOF LOAD
TEST, EACH 1 1
DIVISION 600 – Incidental Construction
619 Fences, Gates, Cattle Guards & Bollard Posts
61901-2000, FENCE, CHAIN LIKN, 72-INCH
HEIGHT (TEMPORARY), LNFT 450
620 Stone Masonry
62003-0000, STONE MASONRY
(UNDERPINNING WITH MICROPILES), LPSM 1
62027-0000, REMOVE AND RESET STONE
MASONRY (TOP COURSE), LNFT 60
62031-0000, REPOINT STONE MASONRY,
SQFT 425
621 Monuments & Markers (construction survey & staking) (yes/no) No No No No No
622 Rental Equipment (yes/no) Yes No No No No
62201-0000, EQUIPMENT (MINI DUMP),
HOUR 420
62201-3000, HYDARULIC EXCAVATOR (MINI
WITH THUMB ATTACHMENT), HOUR 420
62201-3900, SNOW PLOW, HOUR 510
623 General Labor (yes/no) Yes Yes Yes Yes Yes
62301-0000, GENERAL LABOR, HOUR 200 40 40 40 40
62302-0100, SPECIAL LABOR, SLOPE
SCALING, HOUR 4650 3550
633 Permanent Traffic Control (traffic control devices)
633301-1000, SIGN SYSTEM, GOVERNMENT
FURNISHED SIGN, EACH 1
635 Temporary Traffic Control
63502-0500, TEMPORARY TRAFFIC
CONTROL, BARRICADE TYPE 2, EACH 22
63502-0600, TEMPORARY TRAFFIC
CONTROL, BARRICADE TYPE 3, EACH 3
63502-1300, TEMPORARY TRAFFIC
CONTROL, DRUM, EACH 6
e S ch ed ti o ed ti o ed ti o ed ti o ed
63502-2000, TEMPORARY TRAFFIC
CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN, EACH 2
63504-1000, TEMPORARY TRAFFIC
CONTROL, CONSTRUCTION SIGN, SQFT 300
63506-0500, TEMPORARY TRAFFIC
CONTROL, FLAGGER, HOUR 1550
63506-0500, TEMPORARY TRAFFIC
CONTROL, FLAGGER (TRAILHEAD), HOUR 5300
63507-0700, TEMPORARY TRAFFIC
CONTROL, TRAFFIC CONTROL
SUPERVISOR, DAY 440
645 Locating Utilities
64501-0000, LOCATED UTILITIES, LPSM 1
646 Roadside Development (use pay item description)
64602-1000, BUILDING, RESTROOM
FACILITY, LPSM 1
64602-2000, BUILDING, SUPPORT BUILDING
(CONCESSIONAIRE BUILDING), LPSM 1
64603-0000, FIXTURE (FLOATS, TYPE 1),
EACH 1
64603-0000, FIXTURE (FLOATS, TYPE 2),
EACH 2
64603-0000, FIXTURE (FLOATS, TYPE 3),
EACH 1
64603-0000, FIXTURE (LIFE RING STATION),
EACH 1
64603-0000, FIXTURE (FIRE EXTINGUISHER
STATION), EACH 2
64603-0000, FIXTURE (SAFETY LADDER),
EACH 2
64603-0000, FIXTURE (DAVIT), EACH 1
64603-0000, FIXTURE (VACUUM TRAILER),
EACH 1
64603-0300, FIXTURE, BENCH (STONE),
EACH 11
64605-0000, FIXTURE (GANGWAY), LPSM 1
64605-0000, FIXTURE (GANGWAY HOIST
ASSEMBLY), LPSM 1
64620-0000, REMOVE AND RESET (LARGE
EXISTING FUEL TANK AND UTILITY
STORAGE), EACH 1
64620-0000, REMOVE AND RESET (SMALL
EXISTING FUEL TANK), EACH 1
651 Rockfall Protection e S ch ed ti o ed ti o ed ti o ed ti o ed
65101-1000, DRAPED ROCKFALL
PROTECTION, WIRE MESH, SQYD 4500
654 Draped Rockfall Protection
65401-1000, ROADSIDE ROCKFALL
PROTECTION, FENCE (US9), LNFT 655
65401-1000, ROADSIDE ROCKFALL
PROTECTION, FENCE (US7), LNFT 276
655 Anchored Wire Mesh System
65501-0000, ANCHORED WIRED MESH
SYSTEM, SQYD 3280
65502-0000, ADDITIONAL ANCHOR NAIL,
EACH 110
656 Temporary Rockfall Projection
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US1), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US2), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US3-A), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US3-B), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US4), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US5), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US6), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US7), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US8), LPSM 1
65602-0000, TEMPORARY ROADWAY
ROCKFALL PROTECTION (US9), LPSM 1