This document appears to be a pre-advertisement plan for a federal contract opportunity. The opportunity is for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements project located in Crater Lake National Park, Oregon. The work includes rehabilitation of a 1.1-mile trail, rockfall mitigation, replacement of a failed marina bulkhead/dock, and replacement of composting toilets and a temporary concessionaire booth. The contract is anticipated to be a negotiated, firm-fixed-price base with 4 options, with an estimated price range between $30,000,000 and $40,000,000. The project is anticipated to be solicited in winter 2024/2025 and awarded for full and open competition on an unrestricted basis. The contract will be administered by the Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANAGERPROJECT MANAGER
C. WARREN
P A
C F
I C
I O
E C
A N
COLUMBIA R
IV
ER
S N
A K E
R
IV
E R
Lake
Malheur Lake
Harney
Lake
Summer
D
ES
C H
U T
E S
R I V
E R
Lake
Klamath
Upper
Abert
Lake
WASHINGTON
I D
A H
O
CALIFORNIA
OREGON KEY MAP
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
Grants Pass
MEDFORD
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
395101
395197
20 20
NEVADA
Project Location
(80 Miles) and To Roseburg
Lake
Diamond Lake
Miller
(65 Miles) To Bend
CHEMULT
NATIONAL
PARK
LAKE
CRATER
R im
Drive
Lake Crater
Castle Creek
CREEK
UNION
(57 Miles) and To Medford
(72 Miles)
Falls
To Klamath
PROJECT LOCATION
C r e s t
P a c if ic
PROSPECT
A nnie
C r e e k
N a ti o n a l
S c e n ic
T ra il
SCALE IN MILES
R iv e r
R o g u e
N
PARKING AREA
RIM VILLAGE
TURNOUT
SKELL HEAD
5 105
PARKING AREA
TRAILHEAD
CLEETWOOD COVE
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
-Additional slope stabilization
OPTION Z
-New vault toilet restroom at Cleetwood marina
-Removal of existing restroom at Cleetwood marina
OPTION Y
-New Fixed Pier Structure at Cleetwood marina
OPTION X
-New Building Structure at Cleetwood marina
OPTION W
-Reconstruction of marina with Floating Dock System
Mechanically Stabilized Earth Wall, and Stone Masonry)
-Walls (Dry Stack Rockery, Soil Nail, Gabion, -Slope protection
-Slope stabilization
-Aggregate base trail reconstruction (1.026 miles)
SCHEDULE - BASE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
SPECIFICATION:
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
LENGTH 1.026 MILES
Crater Lake National Park
Superintendent, AND MARINA IMPROVEMENTS
CLEETWOOD TRAIL
OR NPS CRLA 2018(1)
KLAMATH COUNTY, OREGON
CRATER LAKE NATIONAL PARK
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
Entrance
North for Vicinity Map
See Sheet A.4
See sheet A.2 for Index to Sheets
NATIONAL
PARK
SERVICE
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
APPROVED:
Western Federal Lands Highway Division
Chief of Engineering, Nation Park Service Pacific West Region
Regional Director, :4
P M
J u ly
T
IT
L
E S
H E
T c p w w o r k
\d
\c r la
P
L N
A
.d g n
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) A.1
NPS Drwg No. 186271 NPS PMIS No. 264912
NOT FOR CONSTRUCTION
:3 u ly
IN
D E
X T
O S
H E
E p w w o r k
\d
\c r la
P
L N
A
.d g n
INDEX TO SHEETS
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) A.2
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
BH TP
DI
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
WFLHD DETAIL
ABBREVIATIONS
PLAN SYMBOLS AND
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:1
A
M a y
D e t W
-1 p w
-w o rk \d
\c rl a
W
-1
.d g n
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) A.3
G
G
RP
G
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
TP
SG1901
SG19-01
0 1 2 3
SCALE IN MILES
N
Island
Wizard
CRATER LAKE
Lodge
Crater Lake Notch
Kerr
Little Cast le Creek
M u n so n
C re e k
M id d le F o r k
Rock
Mazama
Hill
Grouse
Rock
Liao
Peak
Hillman
House Lookout
Sun Creek
R I
M
PARK
NATIONAL
CRATER LAKE
Headquarters
Park
E a s t F o r k
RIM
R
IM
D R
IV
E
S k e ll C h a n n e l
Cove
Cleetwood
Point
Pumice
Point
Palisade Bay
Steel
Bay
Liao
Point Merriam
Point
Discovery
Point
Eagle
Ship
Phantom
Chaski Bay
Bay
Danger
Rock
Sentinel
Bay
Cloudcap
Cove
Grotto
W E S
T
R d
V a ll e y
Cas tle
Cre ek
T ra p p e r
C re e k
Campground
Mazama
EAST
E A
D
IV
E
Parking Area
Trailhead
Cleetwood Cove
0 1 2 3
SCALE IN MILES
Island
Wizard
Lodge
Crater Lake Notch
Kerr
Little Cast le Creek
M u n so n
C re e k
M id d le F o r k
Cloudcap
Hill
Grouse
Rock
Liao
Peak
Hillman
House Lookout
Sun Creek
R I
M
PARK
NATIONAL
CRATER LAKE
Headquarters
Park
P in n a c le s R o a d
E a s t F o r k
PROJECT LOCATION
DRIVE
R
IM
D R
IV
E
S k e ll C h a n n e l
Bay
Liao
Point Merriam
Point
Discovery
Point
Eagle
Ship
Phantom
Chaski Bay
Bay
Danger
Rock
Sentinel
Bay
Cloudcap
Cove
Grotto
W E S
T
R d
V a ll e y
Cas tle
Cre ek
T ra p p e r
C re e k
Campground
Mazama
EAST
E A
IV
E
(D e a d E n d R o a d
CRATER LAKE
OR NPS CRLA 2018(1)
END PROJECT
64+66.60
OR NPS CRLA 2018(1)
BEGIN PROJECT
10+48.00
OR NPS CRLA 2018(1)
E=4497630.963
N=482506.946
E=4495960.507
N=481150.563 see Section F and J for details
Staging area, Cleetwood Cove Trailhead Parking Lot
[1]
Cleetwood Cove Trail (BASE)
Fixed Pier Structure (OPTION X)
Building Structure (OPTION W)
Floating Dock System (BASE)
Cleetwood Cove Marina
RIM
EAST
DRIV
E
Cleetwood Cove Restroom (OPTION Y)
200 4000200
SCALE IN FEET
FOOTNOTE:
See Section G and Section Z for specific locations for the Slope Stabilization. See Section H for Slope Protection locations.
[1] m ile s
T o K la m a th Fa lls
~18 miles
To Union Creek m il e
T o N o r th E n tr a n c e
Overlook
Skell Head
:4 u ly
V
IC
IN
IT
Y
M p w w o r k
\d
\c r la
P
L N
A
.d g n
VICINITY MAP
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) A.4
NO SCALE
NOTE:
provided under Special Contract Requirements Section 152.04.
according to the proposed finished surface data
. Construct variation of slopes, clearing limits, and roadway widths 1
TYPICAL SECTION
CLEETWOOD TRAIL
10+48 TO 64+50 (TRAIL)
CL
grade
Profile
[1]
1.5%
Existing ground
6-inch compacted depth
Roadway aggregate, method 2, Trail width
1:
m ax . 1:2 m ax.
T o p e d g e o f t r a il
T r a il
C o n s tr u c ti o n
L im it
T r a il
C o n s tr u c ti o n
L im it
T o p e d g e o f t r a il
T r a il
C o n s tr u c ti o n
L im it
See Section I for locations, wall type, and details
See Section I for locations, wall type, and details
FOOTNOTE:
Construct slope directing towards Crater Lake.
[1]
1:
Embankment
T o p e d g e o f t r a il
T r a il
C o n s tr u c ti o n
L im it
T r a il
C o n s tr u c ti o n
L im it
Top edge of trail
Top edge of trail
See Section I for details
See Section I for details
Embankment
6' VariableVariable
Variable
Variable
Variable
:0 u ly
T
Y P
IC
A
L S
E C
T
IO
N
S H
E E
T
O F p w w o r k \d
\c r la
P
L N
C
.d g n
TYPICAL SECTION (SHEET 1 OF 4)
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) C.1
provided under Special Contract Requirements Section 152.04.
. Construct variation of slopes, clearing limits, and roadway widths according to the proposed finished surface data1
TYPICAL SECTION
CLEETWOOD TRAIL - MARINA PATHWAY
2+00 TO 2+80 (MARINA)
CL
grade
Profile
1.5%
Embankment
Existing ground
6-inch compacted depth
Roadway aggregate, method 2, Trail width
1:
1:2 T r a il
C o n s tr u c ti o n
L im it
T r a il
C o n s tr u c ti o n
L im it o f t r a il
T o p e d g e o f t r a il
T o p e d
Placed riprap, class 6 see sheet D.56 for Plan and Profile alignment
"RIPRAP" Profile point, 6'Variable Variable
:3
J u n e
T
Y P
IC
A
L S
E C
T
IO
N
S H
E E
T
O F p w w o r k \d
\c r la
P
L N
C
.d g n
TYPICAL SECTION (SHEET 2 OF 4)
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) C.2
provided under Special Contract Requirements Section 152.04.
. Construct variation of slopes, clearing limits, and roadway widths according to the proposed finished surface data1
LC
6-inch compacted depth
Roadway aggregate, method 2, existing bulk head to be removed
Existing ground, Placed riprap, class 6 see sheet D.56 for Plan and Profile alignment
"RIPRAP" Profile point, TYPICAL SECTION
CLEETWOOD TRAIL - RIPRAP
4+00 TO 5+40 (RIPRAP)
Variable
Trail width
T r a il
C o n s tr u c ti o n
L im it
T r a il
C o n s tr u c ti o n
L im it o f t r a il
T o p e d o f t r a il
T o p e d
Embankment
LC
1:6
1:
1:
-1.5% +1.5%1:2
0%
0%4
Variable Variable
:0 u ly
T
Y P
IC
A
L S
E C
T
IO
N
S H
E E
T
O F p w w o r k \d
\c r la
P
L N
C
.d g n
TYPICAL SECTION (SHEET 3 OF 4)
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) C.3
provided under Special Contract Requirements Section 152.04.
. Construct variation of slopes, clearing limits, and roadway widths according to the proposed finished surface data1
CONNECTION AT RESTROOM
CLEETWOOD TRAIL
CL
grade
Profile
1.5%
Existing ground 6-inch compacted depth
Roadway aggregate, method 2, Trail width
1:
m ax
T o p e d g e o f t r a il
T r a il
C o n s tr u c ti o n
L im it
T o p e d g e o f t r a il
Sidewalk, concrete see Section Y for details
Building, Restroom Facility, 0%
6'Variable
:5
J u n e
T
Y P
IC
A
L S
E C
T
IO
N
S H
E E
T
O F p w w o r k \d
\c r la
P
L N
C
.d g n
TYPICAL SECTION (SHEET 4 OF 4)
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) C.4
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE NOTE:
1 482528.476 4497684.789 6823.930 42°58'46.91143"N 122°04'58.99566"W 1.
2 482406.691 4497516.203 6775.556 42°58'45.67714"N 122°05'01.23238"W
3 482308.440 4497457.161 6700.611 42°58'44.69575"N 122°05'02.00157"W
4 482259.138 4496880.444 6622.715 42°58'44.10101"N 122°05'09.74653"W
5 482106.562 4496508.041 6548.977 42°58'42.52442"N 122°05'14.71686"W
6 481537.746 4496002.240 6429.056 42°58'36.81180"N 122°05'21.37519"W
7 481519.985 4496007.129 6415.552 42°58'36.63731"N 122°05'21.30489"W
8 481860.867 4496490.406 6380.225 42°58'40.09453"N 122°05'14.89141"W
9 481879.432 4496677.438 6367.359 42°58'40.31290"N 122°05'12.38040"W
10 481875.275 4496770.171 6324.975 42°58'40.28919"N 122°05'11.13200"W
11 481793.872 4496658.638 6276.626 42°58'39.46435"N 122°05'12.61147"W
12 481347.080 4496192.831 6182.804 42°58'34.96443"N 122°05'18.76296"W
13 481183.286 4495971.884 6193.471 42°58'33.30533"N 122°05'21.69300"W
14 481146.977 4495986.936 6192.328 42°58'32.94954"N 122°05'21.48128"W
PROJECT :Cleetwood Tral
DATE OF FIELD WORK : 10/2016
PROJECT UNITS :International Foot COORDINATE SYSTEM : Oregon south SPCS NAD83 2011
EPOCH DATE : 2010.0000
VERTICAL DATUM : NGVD29 based on USGS lake Level gauge 11492200
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by .99959236, the calculated average combined scale factor for project.
Description
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar
2" Alum cap on 5/8" Rebar c:
\p w -w or k\ d0 cr la
_S ur ve y
C on tr ol
_D .0
1.
xl sx ]S he et
-J un -2
:2
N
PS
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.1
SHEET
NUMBER
NPS CRLA 2018(1)OR
NPS PMIS No. 264912 NPS Drwg. No. 186271
SURVEY CONTROL
due to space needed to build
-Keep out, don't have trail on top
Gabion
US9
US8
US7
US1
US2
US3-B
US4
US5
US6
US3-A
G
DI
G
RP
SG19-01
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
10CP
CP
CP
CP
LEGEND
Unstable Slope area No. 2
Unstable Slope area No. 1
Unstable Slope area No. 7
Unstable Slope area No. 6
Unstable Slope area No. 5
Unstable Slope area No. 9
Unstable Slope area No. 8
Unstable Slope area No. 4
Unstable Slope area No. 3-B
Unstable Slope area No. 3-A
N
EAST R
IM
D
RI
VE
see Section F for details
Trailhead Parking Lot, Cleetwood Cove
CRATER LAKE
CRATER LAKE
CRATER LAKE
see sheets D.15-52 for details
Line to be constructed, "TRAIL"
BEGIN PROJECT
10+48.00
OR NPS CRLA 2018(1)
END PROJECT
64+66.60
OR NPS CRLA 2018(1)
see Section R for details and utility storage, Large existing fuel tank see Section S for details
Fixed Pier Structure, station)
(Existing gauging
Do not disturb see Section Y for details
Buliding, Restroom facility, Existing restroom, Option Y
NOTE:
2. For wall locations, see Section I.
1. For rock scaling locations (US#), see Section G, H, and Z.
See sheet D.4-7 for details
Switchback 1, See sheet D.11-14 for details
Switchback 3, for details
See sheet D.8-10
Switchback 2, 100 200050100
Scale in feet see Section R for details
Existing fuel line, see Section T for details
Floating Dock System, see Section R for details
Small existing fuel tank, see Sheet D.58 for details
Removal of existing bulkhead Marina, see Section P for details
(concessionaire building), Building, support building
61+17 to 61+33 LT
7 4
49 5
:0 u ly
S
IT
E
P L p w w o r k \d
\c r la
P
L N
D
.d g n
SITE PLAN
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.3
US1
G
LEGEND
Unstable Slope area No. 2
Unstable Slope area No. 1
Unstable Slope area No. 7
Unstable Slope area No. 6
Unstable Slope area No. 5
Unstable Slope area No. 9
Unstable Slope area No. 8
Unstable Slope area No. 4
Unstable Slope area No. 3-B
Unstable Slope area No. 3-A
B
B
C
C
EAST RIM DRIVE
and outside of proposed trail construction area
Dispose of scaled debris south and southeast of indicated line
General scaling limits, CP
CP
see Section R for details
Existing fuel line, Line to be constructed
"TRAIL"
Trail Limit of Construction
20 4001020
Scale in feet
NOTE:
3. See sheet D.7 for Section C-C.
2. See sheet D.6 for Section B-B.
1. See sheet D.5 for Section A-A.
Top edge of trail
:5 u ly
S
W
IT
C H
B A
C K
P L p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 1 - PLAN
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.4
LC
LC
LC
See Section I for details
See Section I for details
See Section I for details
SECTION A-A
Existing ground
NO SCALE
Design Grade: 6,782.8'
13+02
Design Grade: 6,779.2'
13+43
Design Grade: 6,761.8'
15+44
Design Grade: 6,754.7'
15+93
Design Grade: 6,698.6'
19+59
See Section C for details
See Section C for details
See Section C for details
See Section C for details
:0 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
-A p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 1 - SECTION A-A
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.5
SECTION B-B
LC
LC
LC
LC
See Section I for details
See Section I for details
See Section I for details
See Section I for details
Existing ground
NO SCALE
Design Grade: 6,793.7'
12+15
Design Grade: 6,776.3'
14+29
Design Grade: 6,773.3'
14+60
Design Grade: 6,742.9'
16+76
Design Grade: 6,712.5'
18+77
See Section C for details
See Section C for details
See Section C for details
See Section C for details
See Section C for details
:0 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
B -B p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 1 - SECTION B-B
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.6
SECTION C-C
See Section I for details
See Section I for details
LC
LC
Existing ground
NO SCALE
Design Grade: 6,730.1'
17+71
Design Grade: 6,726.4'
17+93
See Section C for details
See Section C for details
:0 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
C -C p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 1 - SECTION C-C
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.7
US9
US5
CP
CP
LEGEND
Unstable Slope area No. 2
Unstable Slope area No. 1
Unstable Slope area No. 7
Unstable Slope area No. 6
Unstable Slope area No. 5
Unstable Slope area No. 9
Unstable Slope area No. 8
Unstable Slope area No. 4
E
E
20 4001020
Scale in feet
2. See sheet D.10 for Section E-E.
1. See sheet D.9 for Section D-D.
NOTE:
Line to be constructed
"TRAIL"
TRAIL Construction Limit
Top edge of trail
:5 u ly
S
W
IT
C H
B A
C K
P L p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 2 - PLAN
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.8
SECTION D-D
NO SCALE
LC
LC
Existing ground
Design Grade: 6,447.1'
36+40
Design Grade: 6,404.2'
40+98
See Section C for details
See Section C for details
:0 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
-D p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 2 - SECTION D-D
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.9
SECTION E-E
LC
NO SCALE
Existing ground
Design Grade: 6,420.7'
38+18
Design Grade: 6,417.2'
38+78
See Section C for details
:0 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
-E p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 2 - SECTION E-E
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.10
US7
CP
CP
CP
LEGEND
Unstable Slope area No. 2
Unstable Slope area No. 1
Unstable Slope area No. 7
Unstable Slope area No. 6
Unstable Slope area No. 5
Unstable Slope area No. 9
Unstable Slope area No. 8
Unstable Slope area No. 4
F
G
G
H
H and outside of proposed trail construction area
Dispose of scaled debris south and southeast of indicated line
General scaling limits, US8
20 4001020
Scale in feet
Line to be constructed
"TRAIL"
TRAIL Construction Limit
Top edge of trail
3. See sheet D.14 for Section H-H.
2. See sheet D.13 for Section G-G.
1. See sheet D.12 for Section F-F.
NOTE:
:1 u ly
S
W
IT
C H
B A
C K
P L p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 3 - PLAN
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.11
SECTION F-F
LC
LC
LC
See Section I for details
See Section I for details
See Section I for details
See Section I for details
See Section I for details
NO SCALE
Existing ground
Design Grade: 6,365.1'
48+62
Design Grade: 6,328.7'
51+56
Design Grade: 6,323.9'
51+86
Design Grade: 6,301.0'
53+52
See Section C for details
See Section C for details
See Section C for details
See Section C for details
:1 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
-F p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 3 - SECTION F-F
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.12
SECTION G-G
See Section I for details
See Section I for details
See Section I for details
See Section I for details
See Section I for details
LC
LC
LC
LC
NO SCALE
Existing ground
Design Grade: 6,358.9'
49+35
Design Grade: 6,338.8'
50+81
Design Grade: 6,314.2'
52+58
Design Grade: 6,312.2'
52+77
See Section C for details
See Section C for details
See Section C for details
:1 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
-G p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 3 - SECTION G-G
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.13
SECTION H-H
LC
See Section I for details
See Section I for details
See Section I for details
Existing ground
NO SCALE
Design Grade: 6,352.5'
49+95
Design Grade: 6,348.5'
50+21
See Section C for details
See Section C for details
:1 u ly
S
W
IT
C H
B A
C K
S E
C T
IO
N
H -H p w w o r k \d
\c r la
P
L N
D
.d g n
SWITCHBACK 3 - SECTION H-H
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.14
Line to be constructed
"TRAIL"
Trail construction limits
CP
EAST RIM
DRIVE
see Section I for details
Rockery (dry stack, 2V:1H), 15+76 to 16+43 LT see Section N for details
Fixture, bench (stone), Remove of bench, 14+58 LT for details see Section N
(stone), Fixture, bench bench, Removal of
15+77 RT
see Section N for details
Fixture, bench (stone), Removal of bench, 12+19 LT
15+91 to 16+29 RT Rockery (dry stack, 2V:1H), see Section I for details see Section I for details
Rockery (dry stack, 2V:1H), 14+51 to 15+14 RT
14+51 to 15+14 LT
Mechanically stabilized earth wall, welded wire face, see Section I for details
13+55 to 13+88 RT
Gabions, see Section I for details see Section I for details
Soil nail retaining wall, 14+23 to 14+34 LT see Section R for details
Existing fuel line, for details
See sheet D.53
Alignment "WALL14+54LT"
Top edge of trail
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
12 1
10+48.00
OR NPS CRLA 2018(1)
El= Match Existing (6,822.80)
E= 4497630.963
N= 482506.946
BEGIN PROJECT
:4 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
10+48 TO 16+20
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.15
CP
CP
limits construction
Trail
Line to be constructed
"TRAIL"
17+88 to 18+42 LT Gabions, see Section I for details see Section I for details
Rockery (dry stack, 8V:1H), 17+02 to 17+35 LT see Section N for details
Fixture,bench (stone) (2), Remove of bench, 17+85 LT see Section I for details
Rockery (dry stack, 8V:1H), 17+88 to 18+42 RT see Section I for details welded wire face, Mechanically stabilized earth wall, 16+80 to 17+22 RT
16+23 to 16+78 RT
Remove and reset stone masonry (top course), Report stone masonry, see Section I for details
+00 to
+81
LT
Mech an ica lly st ab iliz ed ea rth w all weld ed w ire fa ce, see Se cti on I for de tai ls see Section I for details
Rockery (dry stack, 2V:1H), 17+22 to 17+68 RT see Section I for details
Soil nail retaining wall, 17+35 to 17+68 LT see Section I for details
Soil nail retaining wall, 18+42 to 18+90 RT see Section R for details
Existing fuel line, see Section N for details
Fixture, bench (stone), 19+40 RT see Section N for details
Fixture, bench (stone), 16+95 LT
See sheet D.54 for details
Alignment "WALL17+95 LT" see Section I for details
Mitigation, Landscaping, Log, 16+80 to 17+22 RT
Top edge of trail see Section R for details
Existing inline piping connnection manhole, 20+10 see Section N for details
Fixture, bench (stone), 18+97 RT
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
16+20 TO 20+40
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.16
Trail construction limits
Line to be constructed
"TRAIL"
22+51 to 22+
96 LT
Gabi ons, see S ectio n I fo r det ails
Removal of pavement, asphalt
22+05 to 22+20 see Section R for details
Existing fuel line, Top edge of trail see Section R for details connnection manhole, Existing inline piping
22+63
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
20+40 TO 23+00
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.17
Trail construction limits
Line to be constructed
"TRAIL"
protect in place
Existing bench, 24+85 LT
24+36 to 24+78 RT Rockery (dry stack, 8V:1H), see Section I for details see Section R for details
Existing fuel line, see Section N for details
Fixture, bench (stone), 23+85 LT
Top edge of trail see Section R for details
Existing inline piping connnection manhole, 25+05
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
23+00 TO 25+60
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.18
Line to be constructed
"TRAIL"
Trail construction limits see Section R for details
Existing fuel line, Top edge of trail see Section R for details
Existing inline piping connnection manhole, 27+42
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:0 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A t o p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
25+60 TO 28+20
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.19
"TRAIL"
Trail construction limits protect in place
Existing stone bench, 28+33 LT protect in place
Existing stone bench, 30+11 LT see Section R for details
Existing fuel line, see Section N for details
Fixture, bench (stone), 28+20 LT
Top edge of trail see Section R for details
Existing inline piping connnection manhole, 29+63
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
:3 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
28+20 TO 31+00
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.20
"TRAIL"
Trail construction limits see Section R for details
Existing fuel line, Top edge of trail see Section R for details
Existing inline piping connnection manhole, 32+10
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:0 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
31+00 TO 33+40
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.21
"TRAIL"
Trail construction limits see Section R for details
Existing fuel line, Top edge of trail see Section R for details
Existing inline piping connnection manhole, 34+64
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:0 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A t o p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
33+40 TO 36+20
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.22
"TRAIL"
Trail construction limits
+50 to
+19
LT
Ga bio ns se e S ec tio n I fo r d eta ils protect in place
Existing bench, 38+43 RT
Removal of fence
38+47 to 38+86 RT
39+20 to 39+80 RT Gabions, see Section I for details see Section N for details
Boulder, 38+45 to 38+85 RT
Top edge of trail
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
CP
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A t o p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
36+20 TO 41+00
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.23
"TRAIL"
Trail construction limits
Removal of pavement, asphalt
43+30 to 43+80 see Section R for details
Existing fuel line, Top edge of trail see Section R for details
Existing inline piping connnection manhole, 42+04
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
41+00 TO 43+60
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.24
"TRAIL"
Trail construction limits
Top edge of trail
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
4 4
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
43+60 TO 46+00
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.25
"TRAIL"
Trail construction limits
46+60 to 47+26 RTGabions,see Section I for details
+57 to 8+
R
T
Mec ha nic all y sta bil ize d ea rth w all weld ed w ire fa ce se e
Se cti on I fo r d et ail s
Top edge of trail
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
CP
6 4
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
46+00 TO 48+80
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.26
"TRAIL"
Trail construction limits see Section I for details welded wire face, Mechanically stabilized earth wall, 52+73 to 53+81 LT see Section I for details
Soil nail retaining wall, 51+70 to 52+64 LT see Section I for details welded wire face, Mechanically stabilized earth wall, 50+09 to 51+02 LT
Removal of fence
49+50 to 50+00 LT see section N for details
Fixture, bench (stone), Removal of bench, 52+65 LT
51+77 to 52+22 RT Mechanically stabilized earth wall, welded wire face, see Section I for details
48+80 to 49+40 RT
Gabions, see Section I for details
49+50 to 50+05 LT
Soil nail retaining wall, see Section I for details see Section I for details
Rockery (dry stack, 8V:1H)
52+79 to 54+00 RT see Section I for details
Soil nail retaining wall, 50+15 to 51+02 RT
Top edge of trail see Section I for details
Rockery (dry stack, 8V:1H)
52+64 to 52+67 LT
Protect tree
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
48+80 TO 53+40
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.27
"TRAIL"
Trail construction limits
53+81 to 55
+19 LT
Gabions, see Sect ion I for details
52+67 to 53+
81 LT
Mecha nical ly sta bilize d ear th wall, welded wire face see S ectio n I fo r det ails
+66 to
+93
LT
Ga bio ns see Se cti on I f or de tai ls
Top edge of trail
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
CP
9CP
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
53+40 TO 56+00
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.28
"TRAIL"
Trail construction limits
CRATER LAKE
56+75 to 58+43 LT
Mechanically stabilized earth wall, welded wire face, see Section I for detai ls
See Section R for details
Remove and reset (large existing fuel tank and utility storage), 57+80 to 58+00 RT see Section R for details
Existing fuel line, see Section R for details
Existing fuel line, Top edge of trail
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
56+00 TO 58+60
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.29
CRATER LAKE
CRATER LAKE
Line to be constructed
"TRAIL"
Trail construction limits see Section R for details
Existing fuel line, see Section R for details
Existing fuel line, Top edge of trail see Section R for details
Existing inline piping connnection manhole, 60+20
Large rocks
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
58+60 TO 60+40
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.30
"TRAIL"
Trail construction limits
CRATER LAKE
CRATER LAKE
see Section S for details Fixed Pier Struction, see Section T for details Floating Dock System, see Section P for details
(concessionaire building), Building, support building
61+17 to 61+33 LT see Section R for details
Remove and reset (small existing fuel tank), 60+90 LT see Section R for details
Existing fuel line, see sheet D.55 for details
Line to be constructed, "Marina pathway"
Top edge of trail see sheet D.58 for plan and profile Removal of existing bulkhead marina, NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
CP
126060
1 6
:4 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
60+40 TO 62+80
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.31
"TRAIL"
Trail construction limits
See Section Y for details
Existing restroom, do not disturb
Existing gauging system, CP
CP
see Section I for details
Rockery (dry stack, 2V:1H), 63+95 to 64+38 LT
Top edge of trail see sheet C.1 for details
End typical section, 64+50
NOTE:
2. See sheet D.52 for "TRAIL" alignment curve data information.
1. See sheets D.33-51 for "TRAIL" profile information.
10 200510
Scale in feet
END PROJECT
64+66.60
OR NPS CRLA 2018(1)
El= Match Existing (6,190.67)
E= 4495960.507
N= 481150.563
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
L A
T
O
.6 p w w o r k
\d
\c r la
P
L N
D
P la n .d g n
62+80 TO 64+66.60
CLEETWOOD TRAIL - PLAN -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.32
Profile grade
Existing ground
BEGIN PROJECT
10+00 11+0011+00 12+00 13+00
6,720 6,720
6,730 6,730
6,740 6,740
6,750 6,750
6,760 6,760
6,770 6,770
6,780 6,780
6,790 6,790
6,800 6,800
6,810 6,810
6,820 6,820
6,830 6,830
6,840 6,840
6,850 6,850
6,860 6,860
6,870 6,870
6,880 6,880
6,890 6,890
,8
.8
-26.405%
-15.500%
-14.000%
-12.700%
.3
.5
.5
.8
' VC20
2K =
'34.02HLSD =
' VC35
23K =
'INFHLSD =
' VC30
23K =
'INFHLSD =
' VC50
13K =
'144.17HLSD =
"TRAIL" 10+48.00
E= 4497630.963
N= 482506.946
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
10+48 TO 13+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.33
13+00 14+00 15+00 16+00
6,680 6,680
6,690 6,690
6,700 6,700
6,710 6,710
6,720 6,720
6,730 6,730
6,740 6,740
6,750 6,750
6,760 6,760
6,770 6,770
6,780 6,780
6,790 6,790
6,800 6,800
6,810 6,810
6,820 6,820
6,830 6,830
6,840 6,840
6,850 6,850
-2.200% -5.300%
-22.600%
-9.800%
-14.500%
-8.900%
.0
.0
.1
.4
.2
' VC20
6.45K =
'116.14SSD =
' VC10
0.58K =
'24.07SSD =
' VC10
2.13K =
'75.04SSD =
' VC30
4K =
'60.74HLSD =
' VC20
2K =
'29.84HLSD =
:4 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
13+00 TO 16+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.34
16+00 17+00 18+00 19+00
6,640 6,640
6,650 6,650
6,660 6,660
6,670 6,670
6,680 6,680
6,690 6,690
6,700 6,700
6,710 6,710
6,720 6,720
6,730 6,730
6,740 6,740
6,750 6,750
6,760 6,760
6,770 6,770
6,780 6,780
6,790 6,790
6,800 6,800
6,810 6,810
6,820 6,820
-8.800%
-16.200%
-14.500%
-16.200%
.8
.1
' VC30
4.05K =
'59.58SSD =
' VC40
7K =
'79.69HLSD =
:4 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
16+00 TO 19+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.35
19+00 20+00 21+00 22+00
6,610 6,610
6,620 6,620
6,630 6,630
6,640 6,640
6,650 6,650
6,660 6,660
6,670 6,670
6,680 6,680
6,690 6,690
6,700 6,700
6,710 6,710
6,720 6,720
6,730 6,730
6,740 6,740
6,750 6,750
6,760 6,760
6,770 6,770
6,780 6,780
-8.200%
-6.100%
-20.600%
-3.703%
-14.800%
.0
.4
.3
.6
.0
' VC40
3.60K =
'49.74SSD =
' VC50
3.73K =
'49.77SSD =
' VC50
4K =
'48.14HLSD =
' VC25
6K =
'93.30HLSD =
' VC30
3K =
'47.66HLSD =
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
19+00 TO 22+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.36
22+00 23+00 24+00 25+00
6,570 6,570
6,580 6,580
6,590 6,590
6,600 6,600
6,610 6,610
6,620 6,620
6,630 6,630
6,640 6,640
6,650 6,650
6,660 6,660
6,670 6,670
6,680 6,680
6,690 6,690
6,700 6,700
6,710 6,710
6,720 6,720
6,730 6,730
6,740 6,740
-19.500%
-14.300%
-11.400%
-11.000%
-17.800%
-19.500%
-20.700%
.3
.9
.1
.1
.2
' VC25
2.69K =
'48.04SSD =
' VC25
3.68K =
'61.01SSD =
' VC25
5K =
'77.08HLSD =
' VC25
9K =
'205.70HLSD =
' VC30
3K =
'43.69HLSD =
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
22+00 TO 25+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.37
25+00 26+00 27+00 28+00
6,510 6,510
6,520 6,520
6,530 6,530
6,540 6,540
6,550 6,550
6,560 6,560
6,570 6,570
6,580 6,580
6,590 6,590
6,600 6,600
6,610 6,610
6,620 6,620
6,630 6,630
6,640 6,640
6,650 6,650
6,660 6,660
6,670 6,670
6,680 6,680
6,690
-15.200%
-22.800%
-12.800%
-22.800%
.2
.6
' VC70
9.21K =
'78.92SSD =
' VC25
10K =
'274.05HLSD =
' VC30
3K =
'42.72HLSD =
.6
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
25+00 TO 28+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.38
28+00 29+00 30+00 31+00
6,460 6,460
6,470 6,470
6,480 6,480
6,490 6,490
6,500 6,500
6,510 6,510
6,520 6,520
6,530 6,530
6,540 6,540
6,550 6,550
6,560 6,560
6,570 6,570
6,580 6,580
6,590 6,590
6,600 6,600
6,610 6,610
6,620 6,620
6,630 6,630
-15.200%
-16.200%
-17.000%
-12.800%
-16.200%
.8
.2
.4
7' VC40
16.67K =
'157.28SSD =
' VC50
50.00K =
'354.30SSD =
' VC25
31.25K =
'423.92SSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
28+00 TO 31+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.39
31+00 32+00 33+00 34+00
6,410 6,410
6,420 6,420
6,430 6,430
6,440 6,440
6,450 6,450
6,460 6,460
6,470 6,470
6,480 6,480
6,490 6,490
6,500 6,500
6,510 6,510
6,520 6,520
6,530 6,530
6,540 6,540
6,550 6,550
6,560 6,560
6,570 6,570
6,580 6,580
6,590 6,590
-24.000%
-12.900%
-2.999%
-17.000%
-14.600%
.4
.2
.0
.5
' VC25
2.66K =
'47.73SSD =
' VC25
10K =
'354.42HLSD =
' VC10
1K =
'27.43HLSD =
' VC25
3K =
'39.77HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
31+00 TO 34+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.40
34+00 35+00 36+00 37+00
6,370 6,370
6,380 6,380
6,390 6,390
6,400 6,400
6,410 6,410
6,420 6,420
6,430 6,430
6,440 6,440
6,450 6,450
6,460 6,460
6,470 6,470
6,480 6,480
6,490 6,490
6,500 6,500
6,510 6,510
6,520 6,520
6,530 6,530
6,540 6,540
-17.100%
-18.900%
-15.000%
-2.999%
-17.100%
.4
.1
.3
.8
' VC25
1.77K =
'35.90SSD =
' VC50
27.78K =
'208.18SSD =
' VC10
2.86K =
'99.07SSD =
' VC30
8K =
'120.62HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
34+00 TO 37+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.41
37+00 38+00 39+00 40+00
6,340 6,340
6,350 6,350
6,360 6,360
6,370 6,370
6,380 6,380
6,390 6,390
6,400 6,400
6,410 6,410
6,420 6,420
6,430 6,430
6,440 6,440
6,450 6,450
6,460 6,460
6,470 6,470
6,480 6,480
6,490 6,490
6,500 6,500
6,510 6,510
-16.700%
+1.400% -1.500%
-7.000%
-9.000% -9.100%
.1
.4
.5
.4
.7
.3
.3
L
.3
' VC30
3.09K =
'49.03SSD =
' VC10
0.95K =
'36.34SSD =
' VC50
4K =
'50.25HLSD =
' VC10
1K =
'40.14HLSD =
' VC20
2K =
'35.16HLSD =
' VC30
4K =
'53.71HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
37+00 TO 40+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.42
40+00 41+00 42+00 43+00
6,320 6,320
6,330 6,330
6,340 6,340
6,350 6,350
6,360 6,360
6,370 6,370
6,380 6,380
6,390 6,390
6,400 6,400
6,410 6,410
6,420 6,420
6,430 6,430
6,440 6,440
6,450 6,450
6,460 6,460
6,470 6,470
6,480 6,480
6,490 6,490
-16.000%
-0.284%
-1.500%
-16.000%
.0
.8
' VC40
2.76K =
'42.78SSD =
' VC90
6K =
'59.07HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
40+00 TO 43+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.43
43+00 44+00 45+00 46+00
6,300 6,300
6,310 6,310
6,320 6,320
6,330 6,330
6,340 6,340
6,350 6,350
6,360 6,360
6,370 6,370
6,380 6,380
6,390 6,390
6,400 6,400
6,410 6,410
6,420 6,420
6,430 6,430
6,440 6,440
6,450 6,450
6,460 6,460
6,470 6,470
+4.750% -5.032% +4.397% -16.249%
+4.397%
-16.249%
.6
.5
.4
.8
.4
' VC20
2.04K =
'43.64SSD =
' VC40
1.94K =
'35.77SSD =
' VC20
4K =
'76.24HLSD =
' VC20
2K =
'38.33HLSD =
' VC50
5K =
'57.70HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
43+00 TO 46+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.44
46+00 47+00 48+00 49+00
6,280 6,280
6,290 6,290
6,300 6,300
6,310 6,310
6,320 6,320
6,330 6,330
6,340 6,340
6,350 6,350
6,360 6,360
6,370 6,370
6,380 6,380
6,390 6,390
6,400 6,400
6,410 6,410
6,420 6,420
6,430 6,430
6,440 6,440
6,450 6,450
-6.994%
-1.500%
-8.500%
-1.500%
.3
.8
' VC30
4.29K =
'62.02SSD =
' VC40
7K =
'82.80HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
46+00 TO 49+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.45
49+00 50+00 51+00 52+00
6,250 6,250
6,260 6,260
6,270 6,270
6,280 6,280
6,290 6,290
6,300 6,300
6,310 6,310
6,320 6,320
6,330 6,330
6,340 6,340
6,350 6,350
6,360 6,360
6,370 6,370
6,380 6,380
6,390 6,390
6,400 6,400
6,410 6,410
6,420 6,420
6,430 6,430
-16.000%
-16.300%
-8.500%
-16.000%
-10.400%
.0
.0
.6
' VC50
6.67K =
'69.06SSD =
' VC25
4.24K =
'68.37SSD =
' VC25
4K =
'70.29HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
49+00 TO 52+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.46
52+00 53+00 54+00 55+00
6,210 6,210
6,220 6,220
6,230 6,230
6,240 6,240
6,250 6,250
6,260 6,260
6,270 6,270
6,280 6,280
6,290 6,290
6,300 6,300
6,310 6,310
6,320 6,320
6,330 6,330
6,340 6,340
6,350 6,350
6,360 6,360
6,370 6,370
6,380 6,380
-14.500%
-25.270%
-16.300%
-4.700%
-14.500%
-11.500%
.0
.9
.1
.2
' VC20
2.04K =
'43.62SSD =
' VC30
2.79K =
'45.85SSD =
' VC20
2K =
'32.15HLSD =
' VC30
2K =
'34.12HLSD =
:1 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
52+00 TO 55+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.47
55+00 56+00 57+00 58+00
6,160 6,160
6,170 6,170
6,180 6,180
6,190 6,190
6,200 6,200
6,210 6,210
6,220 6,220
6,230 6,230
6,240 6,240
6,250 6,250
6,260 6,260
6,270 6,270
6,280 6,280
6,290 6,290
6,300 6,300
6,310 6,310
6,320 6,320
6,330 6,330
-24.151%
-20.423%
-24.151%
.7
.2
.2
' VC150
16.81K =
'105.85SSD =
' VC50
13.41K =
'113.85SSD =
' VC100
7K =
'68.91HLSD =
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
55+00 TO 58+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.48
58+00 59+00 60+00 61+00
6,110 6,110
6,120 6,120
6,130 6,130
6,140 6,140
6,150 6,150
6,160 6,160
6,170 6,170
6,180 6,180
6,190 6,190
6,200 6,200
6,210 6,210
6,220 6,220
6,230 6,230
6,240 6,240
6,250 6,250
6,260 6,260
6,270 6,270
6,280 6,280
6,290 6,290
-10.439%
-17.196%
-0.000%
-10.439%
-9.582%
.4
.0
.2
' VC20
2.96K =
'58.79SSD =
' VC20
3K =
'47.21HLSD =
' VC20
2K =
'37.79HLSD =
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
58+00 TO 61+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.49
61+00 62+00 63+00 64+00
6,110 6,110
6,120 6,120
6,130 6,130
6,140 6,140
6,150 6,150
6,160 6,160
6,170 6,170
6,180 6,180
6,190 6,190
6,200 6,200
6,210 6,210
6,220 6,220
6,230 6,230
6,240 6,240
6,250 6,250
6,260 6,260
6,270 6,270
6,280 6,280
+13.865
-0.000%
+13.865
.7
.2
.0
L
.9
' VC160
6.35K =
'64.71SSD =
' VC20
1K =
'27.99HLSD =
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
61+00 TO 64+00
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.50
END PROJECT
64+00
6,110 6,110
6,120 6,120
6,130 6,130
6,140 6,140
6,150 6,150
6,160 6,160
6,170 6,170
6,180 6,180
6,190 6,190
6,200 6,200
6,210 6,210
6,220 6,220
6,230 6,230
6,240 6,240
6,250 6,250
6,260 6,260
6,270 6,270
6,280 6,280
,1
.8
-11.349%
EL= Match Existing (6190.67)
E= 4495960.507
N= 481150.563
"TRAIL" 64+66.60
:2 u ly
C
L E
E T
W O
O D
T R
A
IL
P
R O
F
IL
E
T
O p w w o r k
\d
\c r la
P
L N
D p r o f il e .d g n
64+00 TO 64+67
CLEETWOOD TRAIL - PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.51
:3 u ly
A
L
IG
N M
E N
T C
U R
V E
D A
T A
T A
B L
E
T R
IL
p w w o r k
\d
\c r la
P
L N
D
C u r v e D a ta
T a b le s .d g n
TRAIL
ALIGNMENT CURVE DATA TABLE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.52
1+00 to 1+32 LT
Soil nail r etaining w all, see Sectio n I for det ails
Line to be constructed
"WALL 14+54LT"
Trail construction limit
1+32 to 1+40 LT
Rockery (dry stack, 8V:1H), see Section I for details
CP
Line to be constructed
"TRAIL"
Top edge of trail
Existing ground
Profile grade
S7 7°
'25
"E
S36°30'44"E
.8
.6
.0
P O
.8
P O
E
0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30
6,755 6,755
6,760 6,760
6,765 6,765
6,770 6,770
6,775 6,775
6,780 6,780
6,785 6,785
6,790 6,790
6,795 6,795
-2.014% -4.404%
.5
' VC20
8.37K =
'147.71SSD =
,7
.9
,7
.7
"WALL14+54LT" 1+39.88
OR NPS CRLA 2018(1)
END ALIGNMENT
"WALL14+54LT" 1+00.00
BEGIN ALIGNMENT
:0 u ly
P
L A
N A
N D
P R
O F
IL
W
L L
L
T
T O p w w o r k \d
\c r la
P
L N
D
W a ll
L
T .d g n
WALL14+54 LT - 1+00 TO 1+40
PLAN AND PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.53
3+00 to 3+22 LT
Soil nail retaining wall, see Section I for details
Line to be constructed
"WALL 17+95LT"
Trail construction limit Line to be constructed
"TRAIL"
Top edge of trail
Profile grade
Existing ground
S58°16'07"E
.0
P O
B
.0
P
2+60 2+70 2+80 2+90 3+00 3+10 3+20
6,710 6,710
6,715 6,715
6,720 6,720
6,725 6,725
6,730 6,730
6,735 6,735
6,740 6,740
6,745 6,745
-10.000%
,7
.5
,7
.3
"WALL17+95LT" 3+00.00
"WALL17+95LT" 3+22.00
:1 u ly
P
L A
N A
N D
P R
O F
IL
W
L
L
L T
T
O p w w o r k \d
\c r la
P
L N
D
W a ll
L
T .d g n
WALL17+95 LT - 3+00 TO 3+22
PLAN AND PROFILE -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.54
"MARINA"
Trail construction limit
Line to be constructed
"TRAIL"
see Section P for details
(concessionaire building), Building, support building
61+17 to 61+33 LT
Existing ground
Profile grade
CP
1+00 1+50 2+00
6,178 6,178
6,180 6,180
6,182 6,182
6,184 6,184
-1 .2
%6 ,1
.0
2+50
6,170 6,170
6,172 6,172
6,174 6,174
6,176 6,176
6,178 6,178
-1 .2
,1
.7
"MARINA" 2+70.00
"MARINA" 2+00.00
:5 u ly
P
L A
N A
N D
P R
O F
IL
E
M
A R
IN
A t o p w
-w o rk \d
\c rl a
P L
N
D
M
A R
IN
A
.d g n
2+00 TO 2+80
PLAN AND PROFILE - MARINA -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.55
N see Section T for details
Floating Dock System, see Section S for details
Fixed Pier Structure, Trail construction limit see Section P for details
(concessionaire building), Building, support building
61+17 to 61+33 LT see Sheet D.55 for details
Line to be constructed, "MARINA" see Sheet D.56 for details
Line to be constructed, "RIPRAP" see Sheets D.15-52 for details
Line to be constructed, "TRAIL"
:1 u ly
M
A R
IN
A
G R
A D
IN
G
P L p w w o r k
\d
\c r la
P
L N
D
G r a d in g
P la n .d g n
MARINA GRADING PLAN
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.57
see Section T for details
Floating Dock System, see Section S for details
Fixed Pier Structure, Trail Construction Limit see Section P for details
(concessionaire building), Building, support building
61+17 to 61+33 LT see Sheet D.56 for details
Line to be construction, "RIPRAP see Sheet D.55 for details
Line to be construction, "MARINA"
Line to be construction
"REGRADED"
see Section R for details
Existing fuel line, see Sheet D.15-52 for details
Line to be construction, "TRAIL"
S21°52'09"W
.0
P O
B
.7
P
0 15
-2+00 -1+50 -1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00
6,172 6,172
6,174 6,174
6,176 6,176
6,178 6,178
6,180 6,180
6,182 6,182
6,184 6,184
6,186 6,186
6,188 6,188
+0.000% +0.000%
,1
.5
"REGRADED" 1+40.00
"REGRADED" 0+00.00
:3 u ly
P
L A
N A
N D
P R
O F
IL
E
R
E G
R A
D E
D
T O p w
-w o rk \d
\c rl a
P L
N
D
R
E M
O V
A L
.d g n
0+00 TO 1+40
PLAN AND PROFILE - REGRADED -
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) D.58
GPS
10008
G
DI
G
RP
RP
RP
G
GPS
10008
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US9
US8
US7
US1
US2
US3-B
US4
US5
US6
US3-A
LEGEND
Unstable Slope area No. 2
Unstable Slope area No. 1
Unstable Slope area No. 7
Unstable Slope area No. 6
Unstable Slope area No. 5
Unstable Slope area No. 9
Unstable Slope area No. 8
Unstable Slope area No. 4
Unstable Slope area No. 3-B
Unstable Slope area No. 3-A
N
Rockfall limits
Turbidity curtain
Edge of water
100 200050100
Scale in feet
EAST R
IM
DRIV
E see Section F and J for details trailhead parking lot, Cleetwood cove
Line to be constructed
CRATER LAKE
CRATER LAKE
CRATER LAKE
BEGIN PROJECT
10+48.00
OR NPS CRLA 2018(1)
END PROJECT
64+66.60
OR NPS CRLA 2018(1)
Flow of Rockfall
7 4
:4 u ly
S
O
IL
E R
O S
IO
N
A N
D S
E D
IM
E
N T
C O
N T
R O
L P
L p w w o r k
\d
\c r la
E
P L
N
E .d g n
CONTROL PLAN
SOIL EROSION AND SEDIMENT
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) E.2
PLAN VIEW - INSTALLATION FOR PILE WORK
Clear water
Turbid water
Turbid water
Clear water
TYPE 1
USAGE CHART
TYPE 2
Existing shoreline (typ.)
PLAN VIEW - INSTALLATION FOR SHORELINE WORK
connection rope and grommits
-inch polypropylene 8
NOTES:
(galvanized) (typ.)
-inch ballast chain 16
FLOATING TURBIDITY CURTAINS
D e p th
S e e N o te
S e e N o te
D e p th D e p th
Nylon reinforced vinyl
Channel bottom
Nylon reinforced vinyl
Nylon reinforced vinyl
(6-inch equivalent) Supporting flotation
(8-inch equivalent) Supporting flotation load lines with heavy vinyl coating -inch dual galvanized wire rope16
(galvanized) (typ.)
-inch ballast chain 16
(12-inch equivalent) Supporting flotation
(galvanized) (typ.)
-inch ballast chain 8
Construction area
Construction area
TYPE
(FT/S)
CURRENT
MAXIMUM
0.0
3.5
5.0
ADDITIONAL CONDITIONS
No Wave/Wind/Tidal Action
Moving Water (One Direction)
SEE NOTE 9
TYPE 3
5.
4.
3.
2.
1.
(metal collar reinforced)
Slotted PVC connector pipe connectors (tool free disconnect) (18,400 lbs. breaking strength) with galvanized
-inch vinyl sheathed EAW steel cables 16
2 each grommet connection polypropylene rope and
Slotted connector pipe or
Water surface elevation (WSL)
Water surface elevation (WSL)
Water surface elevation (WSL)
10.
12" (min.)
m a x
See Note 7 flotation (typ.)
Mooring line with supporting
See Note 7 supporting flotation (typ.)
Mooring line with
6.
7.
9.
8.
See Note 6 Land anchoring disperse sediment into adjacent body of water.
to removing the floating turbidity curtains. Do not
Remove captured sediment behind the curtain prior recommendations and as approved by the CO.
turbidity curtains according to the manufacturer's as directed by the CO. Furnish and install Type 3 tidal actions are present, use Type 3 turbidity curtains
In areas subject to wind and wave actions or where present.
water (to the channel bottom) unless tidal actions are reinforced vinyl fabric through the entire depth of the
For Type 1 and 2 turbidity curtains, extend the nylon afloat under normal load conditions.
securely attached and is sufficiently buoyant to remain line for mooring system. Ensure the mooring line is inch nylon rope for adjustment2
Furnish minimum sediment may enter into the water body.
such as trees or…