This document is a Pre-Solicitation for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements project. The project is located in Crater Lake National Park, Klamath County, Oregon and involves the rehabilitation of the 1.1-mile Cleetwood Trail, rockfall scaling and mitigation, removal and replacement of a failed bulkhead/dock, replacement of composting toilets, and replacement of a temporary concessionaire booth. The contract is anticipated to be a Negotiated, Firm-Fixed-Price contract with a base and 4 options, with an estimated price range between $30,000,000 and $40,000,000. The project is anticipated to be solicited in winter 2024/2025, with a tentative completion date in fall 2027. The solicitation is offered for full and open competition on an unrestricted basis, and is being administered by the Department of Transportation Federal Highway Administration, a civilian agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
TP
SG1901
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2
P M
J u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T c p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 01
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.1
NPS Drwg No. 186271 NPS PMIS No. 264912
NOT FOR CONSTRUCTION
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 02
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.2
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 03
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.3
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 04
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.4
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 05
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.5
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 06
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.6
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 07
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.7
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 08
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.8
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 09
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.9
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 10
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.10
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 11
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.11
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 12
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.12
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 13
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.13
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 14
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.14
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 15
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.15
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 16
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.16
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 17
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.17
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 18
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.18
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 19
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.19
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 20
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.20
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:3 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 21
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.21
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 22
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.22
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 23
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.23
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 24
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.24
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 25
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.25
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 26
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.26
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 27
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.27
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 28
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.28
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 29
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.29
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 30
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.30
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 31
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.31
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 32
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.32
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US3-B
N
VICINITY MAP
7 4
NO SCALE
Direction of picture
:2 u n e
O P
T
IO
N Z
U
S
-B S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S B
.d g n
STABILIZATION LAYOUT 33
OPTION Z - US3-B SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZC.33
CP
10181
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 01
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.1
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 02
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.2
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 03
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.3
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 04
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.4
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 05
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.5
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 06
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.6
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 07
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.7
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 08
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.8
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 09
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.9
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 10
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.10
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 11
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.11
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 12
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.12
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 13
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.13
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 14
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.14
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 15
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.15
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 16
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.16
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 17
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.17
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 18
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.18
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 19
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.19
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 20
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.20
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 21
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.21
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 22
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.22
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 23
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.23
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 24
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.24
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 25
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.25
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 26
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.26
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 27
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.27
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w o r k \d
\c r la p ln
U
S .d g n
STABILIZATION LAYOUT 28
OPTION Z - US4 SLOPE
STATE PROJECT
NUMBER
SHEET
OR NPS CRLA 2018(1) ZD.28
CP
10182
CP
10183
CP
10184
CP
10185
G
DI
G
G
CP
10184
CP
10185
CP
10181
CP
10182
CP
10183
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
SG19-01
US4
N
VICINITY MAP
7 4
Shotcrete
Unstable slope (US) boundary
Potential reinforcement area
Intensive scaling
General scaling limits
LEGEND
3. Minimum reinforcement length shown next to each rock bolt or rock dowel.
to all areas shown on the plans and as directed by the CO.
2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete
1. General scaling limits for each unstable slope (US) are shown on sheet G.2.
NOTE:
Match point
Rock dowel
Installation direction
25 kip rock bolt
50 kip rock bolt
Tree removal
NO SCALE
Direction of picture
:2
M a y
O
P T
IO
N
Z
U S
S
L O
P E
S T
A B
IL
IZ
A T
IO
N
L A
Y O
U T p w w…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .