crla201801_95_PreAd_Plan_Section_4b.pdf

PDF 35 MB Posted

Attached to
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
Solicitation number
69056723R000010
Issued by

About this file

This document is a Pre-Solicitation for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements project. The project is located in Crater Lake National Park, Klamath County, Oregon and involves the rehabilitation of the 1.1-mile Cleetwood Trail, rockfall scaling and mitigation, removal and replacement of a failed bulkhead/dock, replacement of composting toilets, and replacement of a temporary concessionaire booth. The contract is anticipated to be a Negotiated, Firm-Fixed-Price contract with a base and 4 options, with an estimated price range between $30,000,000 and $40,000,000. The project is anticipated to be solicited in winter 2024/2025, with a tentative completion date in fall 2027. The solicitation is offered for full and open competition on an unrestricted basis, and is being administered by the Department of Transportation Federal Highway Administration, a civilian agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

TP

SG1901

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2

P M

J u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T c p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 01

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.1

NPS Drwg No. 186271 NPS PMIS No. 264912

NOT FOR CONSTRUCTION

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 02

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.2

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 03

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.3

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 04

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.4

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 05

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.5

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 06

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.6

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 07

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.7

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 08

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.8

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 09

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.9

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 10

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.10

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 11

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.11

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 12

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.12

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 13

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.13

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 14

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.14

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 15

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.15

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 16

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.16

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 17

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.17

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 18

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.18

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 19

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.19

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 20

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.20

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:3 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 21

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.21

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 22

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.22

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 23

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.23

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 24

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.24

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 25

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.25

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 26

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.26

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 27

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.27

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 28

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.28

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 29

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.29

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 30

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.30

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 31

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.31

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 32

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.32

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-B

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:2 u n e

O P

T

IO

N Z

U

S

-B S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S B

.d g n

STABILIZATION LAYOUT 33

OPTION Z - US3-B SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZC.33

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 01

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.1

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 02

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.2

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 03

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.3

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 04

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.4

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 05

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.5

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 06

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.6

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 07

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.7

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 08

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.8

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 09

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.9

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 10

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.10

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 11

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.11

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 12

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.12

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 13

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.13

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 14

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.14

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 15

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.15

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 16

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.16

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 17

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.17

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 18

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.18

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 19

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.19

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 20

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.20

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 21

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.21

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 22

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.22

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 23

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.23

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 24

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.24

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 25

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.25

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 26

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.26

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 27

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.27

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w o r k \d

\c r la p ln

U

S .d g n

STABILIZATION LAYOUT 28

OPTION Z - US4 SLOPE

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) ZD.28

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US4

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:2

M a y

O

P T

IO

N

Z

U S

S

L O

P E

S T

A B

IL

IZ

A T

IO

N

L A

Y O

U T p w w…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .