crla201801_95_PreAd_Plan_Section_2a.pdf

PDF 35 MB Posted

Attached to
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
Solicitation number
69056723R000010
Issued by

About this file

This document is a Pre-Solicitation Notice for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements project. The key details are:

The project will be located at Crater Lake National Park in Klamath County, Oregon and includes rehabilitation of the 1.1-mile Cleetwood Trail, rockfall scaling and mitigation, removal and replacement of the failed marina bulkhead/dock, replacement of composting toilets, and replacement of a temporary concessionaire booth. The contract type will be Negotiated, Firm-Fixed-Price with a base and 4 options. The estimated price range is between $30,000,000 and $40,000,000. This will be a full and open competition solicitation offered on an unrestricted basis, anticipated to be issued in winter 2024/2025. Preliminary plans and additional project information are available as attachments. Interested vendors must be registered in SAM.gov to access the Interested Vendors List.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

TP

SG1901

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:4

A

M

J u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T c p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 01

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.1

NPS Drwg No. 186271 NPS PMIS No. 264912

NOT FOR CONSTRUCTION

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 02

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.2

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 03

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.3

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 04

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.4

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 05

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.5

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 06

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.6

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 07

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.7

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 08

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.8

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 09

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.9

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 10

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.10

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 11

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.11

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 12

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.12

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 13

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.13

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 14

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.14

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 15

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.15

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 16

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.16

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 17

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.17

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 18

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.18

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 19

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.19

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 20

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.20

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 21

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.21

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 22

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.22

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 23

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.23

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 24

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.24

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 25

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.25

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 26

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.26

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 27

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.27

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 28

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.28

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 29

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.29

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 30

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.30

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 31

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.31

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 32

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.32

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 33

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.33

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 34

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.34

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 35

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.35

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 36

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.36

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 37

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.37

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 38

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.38

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 39

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.39

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 40

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.40

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 41

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.41

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 42

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.42

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 43

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.43

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 44

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.44

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 45

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.45

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 46

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.46

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 47

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.47

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 48

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.48

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 49

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.49

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 50

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.50

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 51

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.51

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 52

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.52

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 53

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.53

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 54

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.54

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 55

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.55

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 56

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.56

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 57

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.57

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 58

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.58

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US3-A

N

VICINITY MAP

7 4

NO SCALE

Direction of picture

:5 u n e

U S

-A

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S A

.d g n

LAYOUT 59

US3-A SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GA.59

CP

10181

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US7

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:0

P

M a y

U

S

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S .d g n

LAYOUT 01

US7 SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GB.1

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US7

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:0

M a y

U

S

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S .d g n

LAYOUT 02

US7 SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GB.2

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US7

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:0

M a y

U

S

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S .d g n

LAYOUT 03

US7 SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GB.3

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US7

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:0

M a y

U

S

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S .d g n

LAYOUT 04

US7 SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GB.4

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US7

N

VICINITY MAP

7 4

Shotcrete

Unstable slope (US) boundary

Potential reinforcement area

Intensive scaling

General scaling limits

LEGEND

3. Minimum reinforcement length shown next to each rock bolt or rock dowel.

to all areas shown on the plans and as directed by the CO.

2. Full extent of shotcrete areas are not shown on the plans. Apply shotcrete

1. General scaling limits for each unstable slope (US) are shown on sheet G.2.

NOTE:

Match point

Rock dowel

Installation direction

25 kip rock bolt

50 kip rock bolt

Tree removal

NO SCALE

Direction of picture

:0

M a y

U

S

S L

O P

E S

T A

B

IL

IZ

A

T

IO

N L

A Y

O U

T p w w o r k \d

\c r la p ln

U

S .d g n

LAYOUT 05

US7 SLOPE STABILIZATION

STATE PROJECT

NUMBER

SHEET

OR NPS CRLA 2018(1) GB.5

CP

10182

CP

10183

CP

10184

CP

10185

G

DI

G

G

CP

10184

CP

10185

CP

10181

CP

10182

CP

10183

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

SG19-01

US7

N

VICINITY MAP

7 4

Shotcr…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .