Project 655-20-202 - Drawings.pdf
PDF 19 MB Posted
- Attached to
- 655-20-202 Atrium Renovation Bldg 22 Federal contract opportunity
- Solicitation number
- 36C25024B0058
About this file
This document appears to be a set of drawings related to a federal contract opportunity. The contract opportunity is for Project 655-20-202, Atrium Renovation Building 22, located at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan. The solicitation number is 36C25024B0058 and the contract is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The work involves furnishing all necessary labor, tools, materials, equipment, and supervision to complete the atrium renovation project, which is divided into two phases. Phase 1 includes installing an exterior construction barrier, selective demolition of existing interior elements, constructing a new exterior canopy structure, sidewalk, and pavement repair, as well as new interior walls, finishes, and architectural elements. Phase 2 involves demolishing the temporary Phase 1 construction wall and removing and replacing all flooring finishes including wall base.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
COVER SHEET ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
GI001
FULLY SPRINKLED
SAGINAW, MICHIGAN
NORTH
LOCATION MAP
PROJECT TEAM DRAWING SHEET INDEX
ARCHITECTURE, MEP ENGINEERING, STRUCTURAL:
OWNER: DESCRIPTIONSHEET ISSUE DATE NOTES
PHONE: 269.927.0144
269.593.5933FAX:
ALLIANCE | 7GAE JV
KALAMAZOO, MI 49007
600 E. MICHIGAN AVENUE - SUITE B
WEB: WWW.7GENAE.COM
OFFICE OF CONSTRUCTION AND
FACILITIES MANAGEMENT
DEPARTMENT OF VETERANS AFFAIRS
MEDICAL CENTER
SAGINAW, MI 48602
1500 WEISS ST
PROJECT NO. 655-20-202 VA SAGINAW ATRIUM RENOVATION BUILDING 22
SAGINAW, MICHIGAN
ALEDA E. LUTZ VA MEDICAL CENTER
1 GI001 COVER SHEET 11.11.2021
2 GI002 GENERAL INFORMATION & SYMBOL LEGEND 11.11.2021
3 VA101 EXISTING SITE CONDITIONS 11.11.2021
4 GC101 FIRST FLOOR COMPOSITE PHASING PLAN 11.11.2021
5 GC102 FIRST FLOOR PHASING PLANS 11.11.2021
6 CS101 SIDEWALK REPAIR PLAN & DETAILS 11.11.2021
7 S001 FOUNDATION & FRAMING DETAILS 11.11.2021
8 AD101 FIRST FLOOR DEMOLITION PLAN 11.11.2021
9 AE101 FIRST FLOOR & ROOF PLAN 11.11.2021
10 AE200 EXTERIOR ELEVATIONS 11.11.2021
11 AE300 BUILDING SECTIONS & DETAILS 11.11.2021
12 AE301 METAL CANOPY PLAN & DETAILS 11.11.2021
13 AE320 PLAN & SECTION DETAILS 11.11.2021
14 AE321 PLAN & SECTION DETAILS 11.11.2021
15 AC121 FIRST FLOOR REFLECTED CEILING PLAN & DETAILS 11.11.2021
16 AI400 INTERIOR ELEVATIONS 11.11.2021
17 AI401 ENLARGED EQUIPMENT PLAN & SCHEDULE 11.11.2021
18 AI520 CASEWORK DETAILS 11.11.2021
19 ID700 FIRST FLOOR FINISH PLAN, KEY, & DETAILS 11.11.2021
20 ID701 ATRIUM FURNITURE PLAN 11.11.2021
21 FA101 FIRE ALARM PLAN 11.11.2021
22 FX101 FIRE SPRINKLER PLAN 11.11.2021
23 P001 PLUMBING GENERAL INFORMATION & SYMBOLS 11.01.2021
24 P101 FIRST FLOOR WASTE & VENT PIPING PLAN 11.01.2021
25 P500 PLUMBING RISER DIAGRAM, DETAILS, AND SCHEDULES 11.01.2021
26 M001 MECH GENERAL INFO, SYMBOLS, DETAILS, SCHEDULES 11.01.2021
27 M101 FIRST FLOOR MECHANICAL PLAN 11.01.2021
28 E001 ELECTRICAL GENERAL INFO. & SYMBOL LEGEND 11.01.2021
29 ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN 11.01.2021
30 EL101 FIRST FLOOR LIGHTING PLAN 11.01.2021
31 E201 FIRST FLOOR POWER PLAN 11.01.2021
32 TY101 LOW VOLTAGE PLAN - FIRST FLOOR 11.11.2021
ALEDA E. LUTZ VA MEDICAL CENTER
PHONE: 202.617.8485
WWW.ALLIANCE.US.COMWEB:
ALEXANDRIA, VA 22314
2850 EISENHOWER AVE - SUITE 310
PROJECT LOCATION
100% BID DOCUMENTS
DEDUCTIVE ALTERNATES
ALTERNATE #1: ELIMINATE NEW INTERIOR HANGING GREEN
WALL FROM PROJECT.
DIRECTOR
ASSOCIATE DIRECTOR
PROJECT #655-20-202 SIGNATURE DATE
CHIEF OF STAFF
CHIEF, FMS
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL MANAGEMENT SECTION
INFECTION CONTROL OFFICER
PATIENT SAFETY MANAGER
GEMS COORDINATOR
CHIEF, POLICE SERVICE
CHIEF, FIRE SERVICE
UNION SAFETY REPRESENTATIVE
CONTRACTING OFFICER
COR
SAFETY SPECIALIST
SEQ. NO.
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
95% CONSTRUCTION DOCUMENTS 09-08-2021
100% BID DOCUMENTS 11-11-2021
CONSTRUCTION TYPE: TYPE 1A
A300
A320
A420
A500
ARCHITECTURAL SYMBOLS & PLAN INDICATORS
ABBREVIATIONSBARRIER-FREE DESIGN INFORMATION
ROOMNAME
XXX
A
A
A
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
OBSTRUCTED APPROACH
UNOBSTRUCTED APPROACH
DRINKING FOUNTAIN REQUIREMENTS
SCALE: NONE
TYP. CODE REGULATED MOUNTING HEIGHTS
SCALE: NONE
TYP. EQUIPMENT MOUNTING HEIGHTS
SCALE: NONE
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
GENERAL NOTES:
ACCESSIBLE CONTROLS, OPERATING
MECHANISMS & HARDWARE SHALL COMPLY
WITH SECTIONS 1109.13 OF THE MBC AND
SECTION 309 OF ICC/ANSI A117.1.
ACCESSIBLE SIGNAGE FURNISHED BY OWNER,
SHALL COMPLY WITH SECTIONS 1110 OF THE
MBC AND SECTION 703 OF ICC/ANSI A117.1.
PORTABLE FIRE EXTINGUISHERS TO BE
PROVIDED IN ACCORDANCE WITH THE 2000
ICC INTERNATIONAL FIRE CODE. MBC (906.1).
REFER TO FLOOR PLAN SHEETS FOR
LOCATIONS OF FIRE EXTINGUISHER CABINETS
(FEC)
ELECTRIC WATER
COOLER
FRONT SIDE
RECEPTACLE
LIGHT
SWITCH
HVAC
CONTROLS
FIRE
ALARM
FEC
LESS THAN 40#
FEC
GREATER THAN 40#
TEL
PP
RH/CH
GBX
SH1
CL
OT
SPH
CRK SND
PT
SD
HS
XR COM4 MR
CRBG
WP
TP SNR
4'-4"
TV
MOUNTING HEIGHT GENERAL NOTES:
1. REFER TO SHEET AI400 FOR EQUIPMENT
ABBREVIATIONS AND LOCATIONS.
2. REFER TO INTERIOR ELEVATIONS FOR
ADDITIONAL INFORMATION.
3. ITEMS ON THIS SHEET ARE NOT NECESSARILY
INCLUDED IN THIS PROJECT.
4. CONTRACTOR TO VERIFY ALL EQUIPMENT
MOUNTING HEIGHTS WITH OWNER.
5. REFER TO MECHANICAL/ELECTRICAL
DRAWINGS FOR DEVICE MOUNTING
HEIGHTS.
XXXNORTH
M A
X
IF
B
A R
R
IE
R F
R E E
M
IN
/1
" 4
" 5
M A
X
/1
TO
O
R
IF
IC
E
/1
M
IN
6" MIN 11" MIN
7 15/16" MIN
TO
O
R
IF
IC
E
SIDE FRONT
M
A X
M
A X
20" - 25"
M A
X
FRONT
M
A X
20" MAX
SIDE
SIDE FRONT
M
IN
M
A X
M
IN
M
A X
@ AT
A/C AIR CONDITIONING/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
GLASS GUARDRAIL & HANDRAIL: "LIVERS BRONZE MIRAGE" GLASS &
STAINLESS STEEL HANDRAIL.
EXPANSION JOINT COVER ASSEMBLIES: "CONSTRUCTION
SPECIALTIES ASM 100 & 200 EXPANSION JOINT COVERS"
WINDOW FILM: "3M COMMERCIAL SOLUTIONS PRESTIGE SUN
CONTROL FILM"
PRE-ENGINEERED METAL CANOPY: "MAPES POST-SUPPORTED METAL
CANOPY, COLOR: CUSTOM VA COLOR [PRIMARY-ALT-DARKETS #
046B99]."
SAFETY GATE: "ALVARADO VSG-1 PEDESTRIAN GATE, CLEAR PANEL
INFILL, SELF-CLOSING"
WHEELCHAIR LIFT: "ASCENSION CLARITY 16E"
HANGING GREEN WALL: "LIVEWALL INTERIOR GREEN WALL SYSTEM"
BRAND NAME OR EQUAL
PRODUCTS
INFECTION CONTROL NOTES
GENERAL NOTES:
COORDINATE WITH ALEDA E. LUTZ VAMC CONTRACTING
OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN
INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN
AN INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH
PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO
THE START OF DEMOLITION AND CONSTRUCTION. COMPLY
WITH ALL INFECTION CONTROL REQUIREMENT FOR THE
DURATION OF THE CONSTRUCTION PROJECT. SEE ITEM LISTED
BELOW AND SPECIFICATION FOR ADDITIONAL INFORMATION.
1. FOLLOW THE INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROTOCOL. VERIFY ICRA PERMIT BEFORE STARTING WORK.
2. PREVENT DUST AND ODORS FROM MIGRATING INTO
ADJACENT AREAS BY USING NEGATIVE AIR SYSTEM. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. USE STICKY MATS AT POINTS OF EXIT TO ENSURE THAT FLOOR
CLEANLINESS IS MAINTAINED THROUGHOUT THE DURATION
OF CONSTRUCTION. USE SIGNAGE TO ALERT PEOPLE IN
AREA OF MAT.
4. INSTALLED SEALED BARRIERS (TEMPORARY 6 MIL. PLASTIC
BARRIER CEILING SYSTEM AS NEEDED DURING
CONSTRUCTION) TO LIMIT CONSTRUCTION DUST.
COORDINATE WITH COR.
5. TAKE PRECAUTIONS TO ENSURE DUST/DIRT IS NOT TRACKED
OUTSIDE OF WORK AREAS ON CLOTHING, CARTS, SUPPLIES,
AND RELATED ITEMS.
6. USE HEPA VAC TO VACUUM WORK AREAS, DAILY.
7. IN FINISHED AREAS, CLOSE CEILINGS (RESET TILE IN GRID)
BEFORE LEAVING AREA FOR MORE THAN 15 MINUTES. NO
CEILING SHALL BE LEFT OPEN OVERNIGHT.
8. FOLLOW ICRA RESPONSIBILITIES IN REGARDS TO CLEANING,
COVERING, AND CONTAINING. COVER ALL CONTAINERS
WHEN HAULING OUT DEBRIS.
9. PATH OF DEMOLITION/TRASH REMOVAL FROM RENOVATED
AREA TO BE COORDINATED WITH COR. ALL CONSTRUCTION
DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE
REMOVED IN ENCLOSED/SEALED CONTAINERS/GONDOLAS
AND FOLLOW THE ICRA REQUIREMENTS AS COORDINATED
WITH THE COR.
10. PROTECT PROPERTY FROM DAMAGE (DIRT, GRIME,
BREAKAGE).
11. INDOOR AIR QUALITY (IAQ) CONTROL MEASURES DURING
CONSTRUCTION NOTES:
A. SHALL COMPLY WITH THE LATEST EDITION OF SMACNA
IAQ GUIDELINES FOR OCCUPIED BUILDING UNDER
CONSTRUCTION.
GENERAL CONSTRUCTION NOTES
APPLICABILITY OF GENERAL CONSTRUCTION NOTES:
THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE
DRAWINGS AND SPECIFICATIONS AND TO ALL CONTRACTORS
AND/OR SUBCONTRACTORS THAT WORK IN, ON, OR AROUND
THIS BUILDING OR THE ADJACENT SITE.
1. CONSTRUCTION WORK HOUR SCHEDULE: CONTRACTOR SHALL
COORDINATE PROJECT SCHEDULE WITH COR. THE BUILDING
SHALL REMAIN FULLY OCCUPIED DURING CONSTRUCTION.
THEREFORE, EXISTING CORRIDOR ACCESS AND OPERATIONS
SHALL REMAIN OPEN FOR SERVICE CONTINUALLY DURING
CONSTRUCTION.
2. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT
OF ANY/ALL WORK, VERIFY THE LOCATION AND ENSURE THE
OBVIOUS MARKING OF ALL EXISTING UTILITIES AND RELATED
EQUIPMENT ON, ABOVE, OR BENEATH THE ADJACENT WORK
AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR
TO BE REMOVED. COORDINATE ALL VERIFICATION AND
MARKING WORK WITH THE COR.
3. BUILDING DUST AND INFECTION CONTROL: THE BUILDING
SHALL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THIS
PROJECT. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL
CONSTRUCTION DUST, DEBRIS, AND INFECTION CONTROL
MEASURES OUTLINES.
4. BUILDING ACCESS AND SECURITY: THE BUILDING SHALL
REMAIN FULLY OCCUPIED DURING ALL PHASES OF THIS WORK.
THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL
TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND
SECURITY OF THE EXISTING BUILDING AND THE WORK AREA
FOR THE DURATION OF CONSTRUCTION. COORDINATE
SPECIFIC INFORMATION WITH THE COR. SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE,
INSTALL, AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE
EXISTING SPACES ADJACENT TO THE WORK AREA FROM
CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY
PORTION OF THE EXISTING BUILDING OR ADJACENT SITE
INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS
WORK, AT NO ADDITIONAL COST TO THE VA. SEE
SPECIFICATION FOR ADDITIONAL INFORMATION.
6. EXITS TO BE MAINTAINED: MAINTAIN A MINIMUM OF ONE(1)
EXIT FROM ALL WORK AREAS AT ALL TIMES FOR THE DURATION
OF CONSTRUCTION. MAINTAIN A MINIMUM OF TWO(2) EXITS
FROM ALL WORK AREA THAT SERVE MORE THAN 49
OCCUPANTS FOR THE DURATION OF CONSTRUCTION.
7. GENERAL DEMOLITION NOTES AND INFORMATION: SEE
DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL
DEMOLITION NOTES AND INFORMATION INCLUDING
DISPOSAL AND/OR SALVAGE OF DEMOLISHED MATERIALS.
COORDINATE SPECIFIC INFORMATION WITH THE COR.
8. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE
DISCIPLINE DRAWINGS AND SPECIFICATION FOR GENERAL
CONSTRUCTION NOTES AND INFORMATION INCLUDING
STORAGE AND STAGING OF CONSTRUCTION MATERIALS.
COORDINATE SPECIFIC INFORMATION WITH THE COR.
9. EXISTING PLUMBING SYSTEMS AND EQUIPMENT: THE BUILDING
SHALL REMAIN FULLY OCCUPIED DURING CONSTRUCTION.
10. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE
BUILDING SHALL REMAIN FULLY OCCUPIED DURING
CONSTRUCTION.
11. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE
BUILDING SHALL REMAIN FULLY OCCUPIED DURING
CONSTRUCTION.
12. EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT:
A. THE BUILDING SHALL REMAIN FULLY OCCUPIED DURING
CONSTRUCTION. THEREFORE, COORDINATE ALL
TEMPORARY AND PERMANENT DISCONNECTING,
MODIFICATIONS TO, RE-ROUTING OF, AND
RECONNECTING OF EXISTING FIRE PROTECTION SYSTEMS
AND EQUIPMENT WITH THE COR AS NEEDED. THE FIRE
SPRINKLER SYSTEM SHALL BE FULLY OPERATIONAL AT THE
END OF DAY. SEE DRAWINGS AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
B. ALL FIRE-PROTECTION SYSTEM OR ZONE SHUTDOWNS ARE
TO BE LIMITED TO LESS THAN 4 HOURS PER 24 HOURS. IF
WORK WILL REQUIRE A SHUTDOWN LONGER THAN 4
HOURS, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE
FIRE WATCHES IN ALL EFFECTED ZONES AND WORK IS
REQUIRED TO BE CONTINUOUS UNTIL THE FIRE-PROTECTION
IS FULLY RESTORED. THE CONTRACTOR IS REQUIRED TO
DEVELOP THE SCHEDULE OF THE WORK OUTLINED AND
PROVIDE THE COR AT LEAST 2 WEEKS NOTICE PRIOR TO
TAKING ANY ZONE OFFLINE FOR ANY LENGTH OF TIME.
13. SAFETY IN CONSTRUCTION AREA:
A. KEEP ACCESS POINTS SECURED TO PREVENT INJURY OF
PATIENTS, STAFF OR VISITORS AND/OR THEFT OF PROPERTY.
WHEN WORKING OUTSIDE THE PRIMARY CONSTRUCTION
SITE, KEEP TOOLS AND MATERIALS UNDER CONTROL.
COVER UP TOOL CART, LOCK TOOL BOXES. NO
TOOLS/MATERIALS SHALL BE LEFT UNATTENDED.
B. KEEP UNATTENDED CARTS OUT OF STAIRWELLS AND
CORRIDORS TO PREVENT OBSTRUCTION OF EVACUATION
IN THE EVENT OF AN EMERGENCY. REQUEST HOT
WORK/FIRE ALARM PERMIT IN ADVANCE OF SOLDERING,
WELDING, FIRE ALARM MAINTENANCE, DEMOLITION(DUST
GENERATED IN SMOKE DETECTOR AREA), AND RELATED
ITEMS. HOT WORK/FIRE ALARM SHALL BE RENEWED EVERY
FOUR(4) HOURS IF FIRE ALARM IS REQUIRED TO BE
SHUTDOWN. NOTIFY COR IN ADVANCE (5 DAY MINIMUM)
FOR SHUTDOWN OR BLOCKING OF EGRESS ROUTE.
CONTRACTOR SIGNAGE SHALL BE POSTED SHOWING
ALTERNATE ROUTES BEFORE CLOSURE. SIGNAGE SHALL BE
PROVIDED BY CONTRACTOR FOR APPROVAL BY THE COR.
C. MAINTAIN INTEGRITY OF FIRE DOORS/WALLS TO ENSURE
CLOSING AND LATCHING OF DOORS FOR CONTROLLING
SPREAD OF SMOKE. SEAL ALL PENETRATING HOLES
IMMEDIATELY AFTER WORK COMPLETED IN AREA. NO
PROPPING, CHOKING, TYING DOOR OPEN.
D. KNOW THE LOCATIONS OF LOCAL SHUTOFF VALVES OF
WATER SYSTEMS (DOMESTIC AND SPRINKLER) TO ENSURE
QUICK RESPONSE IN THE EVENT OF PIPE BREAK. COR WILL
DETERMINE WHO HAS A NEED TO KNOW.
E. CONTRACTOR TO PATCH/REPAIR FIRE RATED WALLS
IMMEDIATELY AS A RESULT OF CONSTRUCTION TO ENSURE
THE RATING IS MAINTAINED.
INTERSECTION OF RATED WALLS
LOWER PRIORITY WALL
HIGHER PRIORITY WALL
HIGHER PRIORITY WALL
LOWER PRIORITY WALL
HIGHER PRIORITY
WALL
LOWER PRIORITY WALL
TAPE AND SEAL BEHIND
INTERSECTING
PARTITION (TYP.)
LOWER
PRIORITY WALL
HIGHER
PRIORITY WALL
GYP. BD. ON METAL
STUDS
LOWER PRIORITY WALL
HIGHER PRIORITY WALL
HIGHER PRIORITY WALLS
TO RUN CONTINUOUS PAST
A LOWER PRIORITY WALL
LOWER
PRIORITY WALL
ABUTMENT OF DISSIMILAR WALLS
NOTE: REFER TO FLOOR PLANS FOR
LOCATION OF CONSTRUCTION
PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
GENERAL INFORMATION &
SYMBOL LEGEND
ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
GI002
FULLY SPRINKLED
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
95% CONSTRUCTION DOCUMENTS 09-08-2021
MH1509
RIM=604.24
MH2592
RIM=603.99
CONCRETE
RAMP
GRASS
GRASS
GRASS
GRASS
GRASS
CONCRETE
STONES
GRASS
CONCRETE
ASPHALT
GRASS
GRASS
STONES
G R A S S
BUILDING
BUILDING
BUILDING
ASPHALT
ASPHALT
CONCRETE SIDEWALK
CONCRETE SIDEWALK
GRASS
C O N C R E
TE
S
ID
E W A
LK
C O N C R E
TE
S
ID
E W A
LK
CONC
CONC
CONC
CONC
CONC
CONC
CONC
STONES
STONES TRANSFORMERS
C O N C
W A
LL
B R
IC
K
W A
LL
C O N C
W A
LL
CONCRETE WALL
W A
LL
W A
LL
W A
LL
W A
LL W
A
LL
FF=606.69
SILL
FF=608.46
SILL
FF=606.41
SILL
FF=611.85FF=611.87
FF=610.18
SILL
FF=604.80
SILL
FF=606.66
SILL
FF=609.97
SILL
FF=606.46
SILL
1"
STEAM
YARD DRAIN
RIM=599.96
P O R C H
GRATE
GRATE
12"
SS
C O M B
S W R
C O M B
S W R
8"COMB.
SWR
12" COMB.
SWR
10" COMB.
SWR
C O M B
8" COMB.
SWR
C O M B
S W R
6" COMB.
SWR
6"
COMB.4"
COMB.
G U A R D R A
IL
C H A
IN
LI
N K
6' CHAINLINK
C H A
IN
LI
N K
C H A
IN
LI
N K
8' IRON
G A
TE
G A
TE
PED XING
STOP
STOP
3 ADMIN
4 ADMIN
HC
HC
YIELD
RESERVE PARKING
RESERVE PARKING
R E S
P K
IN
G
CB2266
RIM=603.20
CB3237
RIM=602.98
G
G
G G G G G
GGG
AC
AC
AC
AC
AC
AC
S
S
S
S
CO
CO
W
W
E
E
VERIFY UNDERGROUD
UTILITIES BEFORE EXCAVATION
FOR SIDEWALK AND CANOPY
FOOTINGS IS TO OCCUR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
EXISTING SITE CONDITIONS ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
VA101
FULLY SPRINKLED
NORTH
SCALE: 1/8" = 1'-0"
EXISTING SITE CONDITIONS
CALL MISS DIG 1-800-482-7171
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
UP
FF
WUTQK K.1 NL.5 U.8
Y.2
Y.6 Y.8 BB
0.1
K.2
11.10
11.11
L N
M
16.2
K.3J.3H.3G.3F.3E.3
17.2
AREA A
AREA B
BB
AREA A
AREA PLAN LEGEND
AREA NOT IN PROJECT SCOPE
AREA B
PUBLIC EGRESS TRAVEL PATH
GENERAL PHASING NOTES
1. PHASING SHALL BE DONE IN SEQUENCE ACCORDING TO
PLANS. NO PHASING OVERLAP SHALL BE ALLOWED. NO WORK
OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN
LOCKED AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE
STICKY WALK-OFF MATS ON INSIDE & OUTSIDE OF
WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEET AD101 FOR
ADDITIONAL INFORMATION ON DEMOLITION INTENT &
EXTENT.
7. CONTRACTOR TO REFER TO ARCHITECTURAL SHEETS AE101 &
AE401 FOR ADDITIONAL DOOR INFORMATION.
8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5.30
AM, MONDAY-FRIDAY, ALL DAY SATURDAY & SUNDAY.
9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER
STANDARD OPERATING HOURS. VERIFY AND COORDINATE
WITH COR.
10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS
INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER HOURS
AND COORDINATED WITH THE CONTRACTING OFFICERS
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING
WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,
THE CONTRACTOR SHALL CONTACT COR FOR ABATEMENT.
12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET
FOR EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
FIRST FLOOR COMPOSITE
PHASING PLAN
ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
GC101
FULLY SPRINKLED
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR PHASING
COMPOSITE PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
FF
WUTQK K.1 N
L.5 U.8 Y.2
Y.6 Y.8
BB
0.1
K.2
11.10
L N
M
16.2
K.3J.3H.3G.3F.3E.3
17.2
H.7G.4F.4
AREA A
NOTE:
CONTRACTOR SHALL INSTALL TEMPORARY
CONSTRUCTION WALL & DOOR PRIOR TO
ANY DEMOLITION TAKING PLACE; TEMP
WALL INSTALLATION TO TAKE PLACE AFTER
HOURS.
C1-14
ATRIUM
C1-7
CORRIDOR
STAIR
C
LR
CLR.
6' - 0"
BB
STAIR
22-1400A
CORRIDOR
22-1400
CORRIDOR
22-1405
DINING ROOM
INSTALL TEMPORARY
CONSTRUCTION BARRIER & GATE
PRIOR TO ANY DEMOLITION
TAKING PLACE.
NOTE:
DEMOLISH EXISTING RAMP
AND PARTIAL HEIGHT WALLS
NOTE:
DEMOLISH EXISTING
CONCRETE SIDEWALK SLAB,
CURB & GUTTER, AND
PORTION OF ASPHALT.
MAINTAIN WALKWAY
CLEARANCE FOR PEDESTRIANS
NOTE:
CONTRACTOR TO PAINT
TEMP WALL & DOOR
FRAME ON PUBLIC SIDE.
NOTE:
CONTRACTOR TO
TEMPORARILY REMOVE &
SAFELY STORE EXISTING
DECORATIVE FENCE.
REINSTALL AFTER PHASE 1 IS
COMPLETE.
C
LR
SECTION OF BARRIER
TO BE TEMPORARILY
REMOVED TO
ACCOMMODATE
NEW CURB &
SIDEWALK WORK
WUTQK K.1 N
L.5 U.8 Y.2
Y.6 Y.8
BB
0.1
K.2
11.10
11.11
L N
M
16.2
K.3J.3H.3G.3F.3E.3
17.2
AREA B
BB
STAIR
22-1400A
CORRIDOR
22-1400
CORRIDOR
22-1405
DINING ROOM
PRIOR TO BEGINNING OF PHASE 2
DEMOLITION & CONSTRUCTION,
DEMOLISH TEMPORARY PARTITION WALL
& DOOR.
NOTE: CONTRACTOR TO HAVE
GUARDRAIL, SECURITY GATE, AND
BUMPER RAIL INSTALLED BEFORE
PHASE 2 CAN BEGIN.
NOTE:
WORK IN THIS AREA IS TO BE COMPLETED
AFTER HOURS
NOTE:
CONTRACTOR TO STOP
FLOOR FINISH UPGRADES AT
THIS POINT.
NOTE:
CONTRACTOR TO STOP
FLOOR FINISH UPGRADES AT
THIS POINT.
NOTE:
CONTRACTOR TO STOP
FLOOR FINISH UPGRADES AT
THIS POINT.
NOTE: CONTRACTOR PROVIDE DUST
SEPARATION BETWEEN CORRIDOR
AND ATRIUM DURING THIS PHASE
CORRIDOR TO REMAIN
OPERATIONAL TO STAFF AND
PATIENTS AT ALL TIMES
GENERAL PHASING NOTES
1. PHASING SHALL BE DONE IN SEQUENCE ACCORDING TO
PLANS. NO PHASING OVERLAP SHALL BE ALLOWED. NO WORK
OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN
LOCKED AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE
STICKY WALK-OFF MATS ON INSIDE & OUTSIDE OF
WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEET AD101 FOR
ADDITIONAL INFORMATION ON DEMOLITION INTENT &
EXTENT.
7. CONTRACTOR TO REFER TO ARCHITECTURAL SHEETS AE101 &
AE401 FOR ADDITIONAL DOOR INFORMATION.
8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5.30
AM, MONDAY-FRIDAY, ALL DAY SATURDAY & SUNDAY.
9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER
STANDARD OPERATING HOURS. VERIFY AND COORDINATE
WITH COR.
10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS
INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER HOURS
AND COORDINATED WITH THE CONTRACTING OFFICERS
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING
WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,
THE CONTRACTOR SHALL CONTACT COR FOR ABATEMENT.
12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET
FOR EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.
• INSTALL THE EXTERIOR CONSTRUCTION BARRIER & GATE TO
ENCLOSE THE AREA OF EXTERIOR WORK AND THE
CONTRACTOR'S LAYDOWN AREA.
• CONSTRUCT TEMPORARY CONSTRUCTION WALL TO ENCLOSE
AREA A
• AREA A - SELECTIVELY REMOVE EXISTING INTERIOR
ARCHITECTURAL ELEMENTS, INCLUDING BUT NOT LIMITED TO:
WALLS, CEILINGS, FINISHES, ELECTRICAL, PLUMBING, & HVAC.
• CONSTRUCT NEW CANOPY STRUCTURE.
• AREA A - CONSTRUCT NEW WALL FURRING AS NOTED; INSTALL
NEW FINISHES AND CEILING; SPACE TO BE FULLY FINISHED PRIOR
TO OPENING EGRESS TO PUBLIC & STAFF.
• DIMENSIONS ON THIS PLAN ARE REPRESENTING CLEAR EGRESS
WIDTH ONLY.
NOTE:
• ALL TEMPORARY CONSTRUCTION WALLS ARE TO BE 1-HR RATED
& CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS AND SHALL
BE SMOKE & DUST TIGHT; WALLS ARE TO BE 3-5/8" MTL. STUDS W/
TYPE 'X' GYP. BD. ON BOTH SIDES; PROVIDE CONSTRUCTION
SIGNAGE "DANGER - CONSTRUCTION AREA, AUTHORIZED
PERSONNEL ONLY".
PHASE 1 DESCRIPTION
• DEMOLISH TEMPORARY CONSTRUCTION WALL BEFORE
COMMENCING BALANCE OF PHASE 2 WORK.
• AREA B - REMOVAL & REPLACEMENT OF ALL FLOORING FINISHES
INCLUDING WALL BASE. AFTER DEMOLITION IS COMPLETE,
INSTALL ALL NEW FINISHES FOR DESIGNATED AREA; PATCH &
REPAIR ADJACENT FLOORING TO PROVIDE UNIFORM FINISH.
NOTE:
• CONTRACTOR IS TO PROVIDE DUST SEPARATION FOR THE
CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT; AT THE
END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST
SEPARATION AND CLEAN AREA AS REQUIRED; PROVIDE STICKY
WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA;
PROVIDE CONSTRUCTION SIGNAGE "DANGER-CONSTRUCTION
AREA, AUTHORIZED PERSONNEL ONLY".
• DUE TO WORK TAKING PLACE AFTER BUSINESS HOURS,
CONTRACTOR IS TO PROVIDE TEMPORARY FLOORING OVER
CONSTRUCTION AREA DURING BUSINESS HOURS TO ENSURE
PATIENT & STAFF SAFETY.
• CORRIDOR C1-7 TO REMAIN OPERATION AT DURING
CONSTRUCTION
PHASE 2 DESCRIPTION
AREA A
AREA PLAN LEGEND
AREA NOT IN PROJECT SCOPE
AREA B
PUBLIC EGRESS TRAVEL PATH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
FIRST FLOOR PHASING PLANS ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
GC102
FULLY SPRINKLED
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR PHASING PLAN -
PHASE 1
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR PHASING PLAN -
PHASE 2
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
WUTQK K.1 NL.5 Y.2
0.1
K.2 E.3
CS101
Sim
CS101
Sim
CS101
Sim
6'
6"
AREA OF
RAMP FLARE
(PAINT BLUE)
TACTILE DOME
WARNING STRIP
AREA OF
DETECTABLE
WARNING (PAINT
YELLOW)
NEW CURB &
GUTTER; MATCH
EXISTING PROFILE
NEW CONCRETE
SIDEWALK; SEE
STRUCTURAL
PATCH EDGE OF ASPHALT AS
REQ'D; BLEND GRADES FOR
POSITIVE DRAINAGE
RAMP FLARE (PAINT
BLUE); CONSTRUCT
FLARE LENGTH AS
REQD. TO HAVE MAX.
SLOPE OF 1:12
TACTILE DOME
WARNING STRIP
1:12
MAX.
AREA OF DETECTABLE
WARNING (PAINT YELLOW)
1:12
MAX.
1:12 MAX.
1:12
MAX.
1:12
MAX.
607' - 9 1/2"
607' - 9 1/2"
605' - 9 1/2"
MATCH EXISTING SIDEWALK
& CURB ELEVATIONS
5' - 0"
607' - 9 1/2"
605' - 10"
605' - 3"
CONSTRUCT FLARE LENGTH
AS REQD. TO HAVE MAX.
SLOPE OF 1:12
605' - 9 1/2"
2 1/2"
2' - 0"
7" 1' - 5"
/2
5/
8"3"
5 1/2" 1 1/2" BATTER
TOE OF GUTTER
TOE OF GUTTER
4"
EPOXY COATED
#4 BAR
M
IN
/2
FOR USE WHEN PAVEMENT
SLOPE IS TOWARD CURB
FOR USE WHEN PAVEMENT
SLOPE IS AWAY FROM CURB
GUTTER LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
SIDEWALK REPAIR PLAN &
DETAILS
ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 MR NTF
100% BID
DOCUMENTS
CS101
FULLY SPRINKLED
SCALE: 12" = 1'-0"CS101
CURB RAMP02
SCALE: NTSCS101
CURB ACCESS RAMP - CORNER03
NORTH
SCALE: 1/4" = 1'-0"
SIDEWALK REPAIR PLAN
SCALE: 1 1/2" = 1'-0"CS101
STANDARD CROWN 24" CURB AND GUTTER01
SCALE: NTSCS101
TRUNCATED DOME TACTILE - WARNING STRIP04
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
d d
4d OR
2~8" MIN
d
O R
M
IN
6d O
R 4" M
IN
12d d d d d d d
O R
M
IN
d
O R
M
IN
6d O
R
4" M
IN
6d OR
4" MIN
ALL REINFORCING EXCEPT COLUMN TIES AND BEAM STIRRUPS
BEAM STIRRUPS AND COLUMN TIES
BEAM OR COLUMN CROSSTIES
45°
45° d = BAR DIAMETER, D = BEND DIAMETER
90° D D
135°
DD
STIRRUP
D
D 180°
D
D
90°
90° D
180° D
STIRRUP OR TIE
135°
D
90°
D
D
D 180°
D = 6d FOR #3 THRU #8 D = 8d FOR #9, 10 & 11
D = 4d FOR #3, 4 & 5 D = 6d FOR #6, 7 & 8
OTHER BARS
MIN DEVELOPMENT
LENGTH "Ld"
MIN LAP SPLICE
LENGTH "Ls"
TOP BARS
MIN DEVELOPMENT
LENGTH "Ld"
MIN LAP SPLICE
LENGTH "Ls"
BAR
SIZE
MIN EMBEDMENT
LENGTH FOR
STANDARD END
HOOK "Ldh"
#3
#4
#5
#6
#7
#8
#9
#10
#11
CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS = 3000 psi
NOTES:
1. VALUES ARE IN INCHES FOR UNCOATED REINFORCING AND NORMAL WEIGHT CONCRETE WITH
CLEAR SPACING > db, CLEAR COVER > db AND MINIMUM STIRRUPS OR TIES THROUGHOUT Ld
OR CLEAR SPACING > 2db AND CLEAR COVER > db.
2. DEVELOP ALL REINFORCING IN STRUCTURAL SLABS WITH MINIMUM DEVELOPMENT LENGTH Ld.
3. TOP BAR = HORIZONTAL BAR WITH MORE THAN 12" OF FRESH CONCRETE BELOW OR AS NOTED
ON DOCUMENTS AS "TOP BAR".
4. LAP SPLICES SHOWN ARE CLASS B.
5. THIS TABLE IS NOT FOR COLUMNS OR SHEAR WALLS. SEE SPECIFIC SCHEDULES.
(1,2,4,5)
(3)
SAW CUT JOINT
NOTES:
1. USE "EARLY ENTRY DRY-CUT SAW" AS SOON AS POSSIBLE WITHOUT
CAUSING RAVELING OF CONCRETE EDGES. SAWCUT ALONG SHORT
DIRECTION OF POUR FIRST.
1/8" WIDE X t/4 SAW CUT DEPTH
OR 1-1/2" PRE-MOLDED JOINT.
FILL CUT JOINT w/ MASTIC
RUN EVERY OTHER REINF.
CONTINUOUS THRU JOINT AND
STOP REMAINING REINF. 4" CLR.
FROM JOINT.
SNOW LOADS (PER ASCE 7-10):
• GROUND SNOW LOAD (pg): 35 lb/ft2
• EXPOSURE FACTOR (Ce): 1.0
• THERMAL FACTOR (Ct); 1.0
SEISMIC LOADS (PER ASCE 7-10):
• SITE CLASS D
• MCER GROUND MOTION (PERIOR=0.2s) (Ss): 0.069
• MCER GROUND MOTION (PERIOR=1.0s) (S1): 0.04
• NUMERI SEISMIC DESIGN VALUE AT 0.2s (SDS): 0.074
• NUMERIC SEISMIC DISIGN VALUE AT 1.0s (SD1): 0.064
WIND LOADS (PER ASCE 7-10):
• EXPOSURE CATEGORY: C
• ULTIMATE WIND SPEED: 120 lb/ft2
FROST DEPTH:
• FROST DEPTH: 42 inches
DESIGN LOAD REQUIREMENTS
U
TQK K.1 NL.5
U.8
0.1
K.2
S001
Sim
4X4 CANOPY
COLUMN BY CANOPY
MANUFACTURER, TYP.
8" 6' - 10" 6' - 11 3/4" 8' - 3 1/2" 8' - 3 1/2" 8' - 3 1/2" 8' - 3 1/2" 8' - 3 3/4" 5' - 9" 5' - 9"
1' - 4 5/16"
" 5
/2
/4
/2
/2
01 02
TYP.
EXISTING CONC.
FOUNDATION
WALL
1'-6"
1'-2"
2"CLR
TYP
8" 1 1/2"
TYP
3/16
PIER SECTION
FIELD WELD COL
TO EMBED PLATE
FIELD WELD COL
TO EMBED PLATE
PLATE TO REINF
#3 SPIRAL @3° PITCH
(4) #6 VERTICAL
CONCRETE PIER
6" CONC SLAB ON GRADE
W/#3 REBAR @18"OC EACH
WAY OVER 6" OF
COMPACTED CRUSHED
ROCK PER PLAN
HSS4x4x1/4
STEEL COLUMN
CL COL
CL PIER
CL COL
EMBED PLATE 1/2 x 8" x 8"
W/(4) 3/4 " x 6" WHS
EMBED PLATE
EMBED PLATE 1/2 x 8" x 8"
W/(4) 3/4 " x 6" WHS
HSS4x4x1/4
STEEL COLUMN
(2)#5
(A706)
WELDABLE REINF
8"
EMBED PLATE
1/2 x 1'-0" x 1'-0"
1/4
EMBED PLATE
1/4
1/4
#4x1'-0" LONG STAINLESS STEEL
THREADED ROD W/4" MIN EMBED
INTO EXISTING
1/2 PRE-MOLDED JOINT FILLER
NOTES:
1. CONTRACTOR TO COORDINATE DETAIL WITH CANOPY
MANUFACTURER PRIOR TO CONSTRUCTION.
2. SUBMIT CANOPY BASE REACTION FOR REVIEW PRIOR
TO FABRICATION AND CONSTRUCTION.
3. CANOPY MANUFACTURER TO SUBMIT SIGNED AND
SEALED DRAWINGS FOR CANOPY AND FOUNDATIONS.
1' - 0"
M
IN
1' - 0"
TY
P
TY
P
C
LR
1' - 6"
1' - 0"
FOUNDATION & ROOF
FRAMING KEYNOTES
01 INDICATED OUTLINE OF EXISTING STRUCTURE.
02 EXISTING WALL.
03 HSS 6X4X1/4 BEAM BELOW.
04 HSS 4X4X1/4 COLUMN BASE PLATE BY METAL
CANOPY MANUF.
05 6" CONCRETE SLAB ON GRADE w/ #3 @18" o.c. REBAR
EACH WAY OVER 6" COMPACTED CRUSHED ROCK.
06 12" DIA. CONCRETE PIER
07 12" X 6" CONCRETE SLAB EDGE. DRILL & EPOXY
DOWEL WALL AND FOOTING HORIZONTAL
REINFORCING 4" MINIMUM INTO EXISTING, TYP.
WHERE NEW MEETS EXISTING.
U
TQK K.1 NL.5
U.8
0.1
K.2
C.J.
4' - 1 3/4" 4' - 1 3/4"4' - 1 3/4" 4' - 1 3/4" 4' - 1 3/4" 4' - 1 3/4"3' - 5 7/8" 3' - 5 7/8" 4' - 1 3/4" 4' - 1 3/4"3' - 5" 3' - 5" 4' - 1 7/8" 4' - 1 7/8" 5' - 9" 5' - 9"
C.J.C.J.C.J.C.J. C.J. C.J. C.J.
C.J.
C.J.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
FOUNDATION & FRAMING
DETAILS
ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 GM NTF
100% BID
DOCUMENTS
S001
FULLY SPRINKLED
SCALE: NTSS001
STANDARD HOOKS, BENDS, STIRRUPS, AND TIES02
SCALE: NTSS001
CONTROL JOINT DETAIL03
NORTH
SCALE: 1/4" = 1'-0"
METAL CANOPY FOUNDATION
PLAN
SCALE: 1" = 1'-0"S001
FOOTING DETAIL AT METAL CANOPY01
NORTH
SCALE: 1/4" = 1'-0"
METAL CANOPY CONTROL
JOINT PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
OS
S
S
M
WUTQKK.1 NL.5 U.8
Y.2 Y.6 Y.8 BB
0.1
K.2
11.10
11.11
L N
M
16.2
K.3J.3H.3G.3F.3E.3
17.2
AD101
1195 SF
C1-7
CORRIDOR
1204 SF
C1-14
ATRIUM
51 SF
#7
STAIR
10 09
GENERAL DEMOLITION NOTES
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED
TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS
TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO
FACILITATE NEW CONSTRUCTION.
2. CONTRACTORS SHALL VERIFY FIELD CONDITIONS, IF
CONDITIONS DO NOT REFLECT WHAT IS NOTED IN THE
CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET
OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS
WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL
TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS.
LOCATION OF DUMPSTERS TO BE DETERMINED BY COR WITH
CONTRACTORS INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
DEMOLISHED MATERIALS. DO NOT ALLOW MATERIALS AND
DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO
ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE
OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OF
REMOVED ITEMS IS PERMITTED.
6. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS
TO ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKERS ON
THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON
ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR
SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND
REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF
ACCIDENTS.
7. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SUPPORT,
INSULATION, WATERPROOFING, EMERGENCY LIGHTING,
SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH
ARE TO REMAIN.
8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED
MATERIALS OR ITEMS. CONTRACTOR TO COORDINATE WITH THE
COR.
9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A
MANNER THAT COULD CHANGE THEIR LOAD-CARRYING
CAPACITY OR LOAD-DEFLECTION RATIO.
10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY
DEMOLITION, REWORK AS REQUIRED, PREPARE FOR NEW
CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING
SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING
PATTERN.
11. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS
THAT FALL WITHIN THE WALLS &/OR CEILINGS ARE TO BE
REMOVED OR REROUTED. REFER TO MECHANICAL, ELECTRICAL,
AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION NOT
SHOWN ON THIS SHEET.
12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM
OCCUPIED AREAS WITH A ONE-HOUR FIRE RATED ASSEMBLY,
AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL OFF ALL
RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA.
PROVIDE RE-CIRCULATING HEPA FILTER IN CONSTRUCTION
AREA. ALL DEMOLISHED MATERIAL IS TO BE REMOVED FROM
SITE IN A COVERED CONTAINER. NEGATIVE AIR PRESSURE TO BE
MAINTAINED WITHIN CONSTRUCTION ZONE.
13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING
DEMOLITION, CONTRACTOR SHALL CONTACT THE COR FOR
ABATEMENT.
14. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND
SURFACES CUT OR DAMAGED DURING DEMOLITION, BY
METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING
WARRANTIES.
15. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING
ARE PERFORMED.
16. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED
FIREPROOFING MATERIAL IN AREAS LEFT UNPROTECTED DUE TO
REMOVAL OF EXISTING ELEMENTS OR AREAS DAMAGED
DURING NEW WORK AND DEMOLITION. MATCH EXISTING
FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN
REQUIRED LEVEL OF PROTECTION.
17. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS
INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER HOURS
AND COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
DEMOLITION KEY NOTES
01 REMOVE EXISTING RAMP CONSTRUCTION AS
SHOWN, INCLUDING QUARRY TILE FINISH, CONCRETE
RAMP SLAB, CONCRETE FOUNDATION WALLS, AND
DIRT INFILL. PATCH & REPAIR ADJACENT SURFACES
TO REMAIN AS NECESARY TO PREPARE FOR NEW
CONSTRUCTION AND/OR NEW FINISHES.
02 REMOVE SECTION OF EXISTING CONCRETE
SIDEWALK.
03 REMOVE & SALVAGE EXISTING DOOR & HARDWARE.
EXISTING FRAME TO REMAIN. TURN OVER TO OWNER
UNLESS DIRECTED OTHERWISE BY THE COR.
PREPARE FRAME AS REQUIRED TO RECEIVE NEW
DOOR & HARDWARE.
04 REMOVE EXISTING CEILING TILE & GRID.
CONTRACTOR TO SALVAGE TILE & GRID FOR
RECYCLING.
05 REMOVE EXISTING WALL FINISHES, WALL BASE, AND
ALL ITEMS ATTACHED TO WALLS. TURN OVER TO
OWNER, UNLESS DIRECTED OTHERWISE BY THE
COR. PATCH & REPAIR EXPOSED SURFACES TO
REMAIN AS REQUIRED FOR NEW CONSTRUCTION
AND/OR NEW FINISHES.
06 REMOVE EXISTING FLOORING AND FLOOR FINISHES
INCLUDING ALL ADHESIVES, SETTING MATERIALS
DOWN TO EXISTING SUBSTRATE. GRIND CONCRETE
FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND
UNIFORM SURFACE FOR NEW FINISHES.
07 REMOVE EXISTING MECHANICAL, PLUMBING, &
ELECTRICAL ITEMS - REFER TO MECH, PLUM, & ELEC
DEMOLITION PLANS FOR FURTHER INFORMATION.
PATCH & REPAIR EXPOSED SURFACES TO REMAIN
AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND
FINISHES.
08 SAWCUT & REMOVE EXISTING CONCRETE FLOOR
SLAB. COORDINATE OPENING SIZE WITH RELATED
TRADES. REFER TO STRUCTURAL DRAWINGS FOR
RELATED FRAMING REQUIRED.
09 REMOVE EXISTING STAIR TREAD, NOSING, RISER,
AND LANDING FINISHES INCLUDING ALL ADHESIVES
AND SETTING MATERIALS DOWN TO EXISTING
SUBSTRATE. GRIND CONCRETE TREADS AND
LANDINGS AS REQUIRED TO PROVIDE A SMOOTH
AND UNIFORM SURFACE FOR NEW FINISHES.
10 REMOVE EXISTING FURNITURE. SALVAGE & TURN
OVER TO OWNER UNLESS DIRECTED OTHERWISE BY
THE COR.
11 REMOVE SECTION OF EXISTING CONCRETE CURB
AND GUTTER.
12 CAREFULLY SAWCUT AND REMOVE AREA OF
EXISTING ASPHALT PAVEMENT.
B22 - SECOND FLOOR
ELEV. 624' - 0"
B22 - FIRST FLOOR
ELEV. 611' - 4"
10.1
B22 - FIRST FLOOR - ATRIUM
ELEV. 607' - 9 1/2"
REMOVE EXTERIOR FABRIC AND
ALUMINUM TUBE AWNING SYSTEM.
REPLACE EXISTING MULLION CAPS.
REMOVE INTERIOR RAMP STRUCTURE
INCLUDING; BRICK, CMU, QUARRY TILE,
CONCRETE, AND COMPACTED FILL.
SALVAGE SELECT NUMBER OF BRICKS FOR
WALL INFILL.
REMOVE EXISTING PENDANT LIGHT
FIXTURES: REFER TO ELEC.
REMOVE CONC. SIDEWALK AS
NECESSARY FOR CONSTRUCTION OF NEW
CANOPY.
REMOVE & REPLACE RADIANT HEATER;
REFER TO MECH.
EXISTING PLANTER TO REMAIN.
EXISTING ATRIUM CURTAIN WALL SYSTEM
TO REMAIN. REMOVE & REPLACE
CRACKED/DAMAGED GASKETS.
D E M
O
DEMO EXISTING FINISH
QUARRY TILE
DEMO THINSET MORTAR
DEMO REINFORCEMENT
MESH
DEMO +/- 1 1/2" THICK MUD
BED
EXISTING CONC. FLOOR
SLAB TO REMAIN
WU U.8 Y.2
0.1
NOTE:
ELECTRICAL, MECHANICAL, & DATA
DEVICES/FIXTURES TO REMAIN IN PLACE,
TYP.
DEMOLITION PLAN LEGEND
AREA NOT IN PROJECT SCOPE
REMOVE EXISTING QUARRY TILE AND
COMPLETE MORTAR BED INCLUDING REINF.
MESH. IN-FILL SLAB WITH CONC. AS
REQUIRED TO PROVIDE A SMOOTH AND
UNIFORM SURFACE FOR NEW FINISHES.
REFER TO DETAIL 02/AD101.
AREA OF REMOVAL OF CONCRETE
AREA OF REMOVAL OF ASPHALT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
FIRST FLOOR DEMOLITION
PLAN
ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
AD101
FULLY SPRINKLED
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
SCALE: 1/4" = 1'-0"AD101
BUILDING SECTION - DEMOLITION01
SCALE: 6" = 1'-0"AD101
EXIST. QUARRY TILE DEMO02
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR REFLECTED
CEILING DEMOLITION PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
WUTQK K.1 NL.5
U.8 Y.2 Y.6 Y.8 BB
0.1
K.2
11.10
11.11
L N
M
16.2
K.3J.3H.3G.3F.3E.3
17.2
AE200
AE200 02
10' - 0" 58' - 10"
CHARGING
STATION
1204 SF
C1-14
ATRIUM
51 SF
#7
STAIR
NEW FLOOR
SLAB
NEW
GUARDRAIL &
HANDRAILS
AE300
AI400
04 02
AI400 05
AE300
1195 SF
C1-7
CORRIDOR
AI400 08
NEW BUMPER
RAIL
NEW
FIREPLACE
ENCLOSURE
NEW
SIDEWALK,
CURB &
GUTTER
607' - 9 1/2"
611' - 4"
NEW WHEELCHAIR
LIFT
AE321
UTQK K.1 NL.5 U.8
0.1
K.2
NEW PRE-ENGINEERED MTL.
CANOPY W/ INTEGRAL DRAINAGE.
BASIS OF DESIGN: MAPES POST
SUPPORTED CANOPY W/ 4X4 POSTS.
68' - 9 13/16" V.I.F.
AE300
AE300
GL1
GL1
GL1GL1GL1
GL1 GL1
GL1 GL1 GL1 GL1 GL1
GL1
GL1 GL1
GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1 GL1 GL1 GL1 GL1
GL1GL1GL1GL1
GL1 GL1 GL1 GL1
REMOVE & REPLACE
COUNTER FLASHING
REMOVE & REPLACE
COUNTER FLASHING
NEW CUSTOM BREAK
MTL. DRIP EDGE
DRAINAGE TO
INTERNAL
BEAMS, TYP.
DRAIN ONLY AT OUTER POST
LOCATIONS TOWARD CURB
FLOOR PLAN LEGEND
EXISTING NON-FIRE RATED WALL
NEW NON-FIRE RATED WALL
EXISTING DOOR
NEW DOOR
1-HOUR FIRE RATED PARTITION - UL DES U419
2-HOUR FIRE RATED BARRIER - UL DES U419
2-HOUR SMOKE BARRIER - NFPA 101 - 8.3
AREA NOT IN PROJECT SCOPE
GENERAL NOTES
1. ALL WALLS ARE WALL TYPE W1 UNLESS NOTED OTHERWISE.
2. EXTERIOR WALL FURRING TO BE WALL TYPE W2 UNLESS
NOTED OTHERWISE.
3. ALL COUNTERTOP OUTSIDE CORNERS TO BE 2" RADIUS
UNLESS NOTED OTHERWISE.
4. PROVIDE BLOCKING IN WALLS FOR OWNER PROVIDED
EQUIPMENT AS SHOWN ON ENLARGED PLANS AND ON
INTERIOR ELEVATIONS. COORDINATE FINAL LOCATIONS
WITH OWNER.
5. ALL WALL BOARD CARRYING CERAMIC TILE SHALL BE
CEMENT BOARD - REFER TO FINISH SCHEDULE.
6. ALL WALLS CARRYING PLUMBING FIXTURES SHALL BE 5/8"
MOISTURE RESISTANT FIRECORE GYP BOARD UNLESS NOTED
OTHERWISE.
7. SEE ENLARGED PLANS ON A1400 FOR DIMENSIONS.
8. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL
APPLIED FIREPROOFING MATERIAL IN AREAS LEFT
UNPROTECTED DUE TO REMOVAL OF EXISTING ELEMENTS
OR AREAS DAMAGED DURING NEW WORK AND
DEMOLITION. MATCH EXISTING FIREPROOFING MATERIAL
TYPE AND THICKNESS TO MAINTAIN REQUIRED LEVEL OR
PROTECTION.
ROOF PLAN LEGEND
INDICATES ROOF PITCH
GENERAL NOTES - ROOF PLAN
1. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL OPENINGS, IF ANY, IN ROOF(S).
PRE-ENGINEERED METAL CANOPY ROOF
GLAZING NOTES
GL1 - EXISTING GLASS TO RECEIVE NEW TINTED FILM
GL2 - 1" TINTED TEMPERED INSULATING GLASS (LOW-E)
GL3 - 1/2" CLEAR LAMINATED MONOLITHIC GLASS
WUTQK K.1 NL.5
U.8 Y.2
0.1
K.2
E.3
ID700
TYP.
HATCH INDICATES AREA OF DEEP FILL
FLOOR SLAB INFILL AT REMOVAL OF
EXISTING QUARRY TILE & MUD BED. SEE
DETAIL 01/ID700.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
FIRST FLOOR & ROOF PLAN ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 DS NTF
100% BID
DOCUMENTS
AE101
FULLY SPRINKLED
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR ATRIUM FLOOR
PLAN
NORTH
SCALE: 1/4" = 1'-0"
ROOF PLAN
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR ATRIUM SLAB
INFILL FLOOR PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
B22 - SECOND FLOOR
ELEV. 624' - 0"
B22 - FIRST FLOOR
ELEV. 611' - 4"
B22 - ROOF
ELEV. 636' - 6"
UTQK K.1 NL.5 U.8K.2
B22 - FIRST FLOOR - ATRIUM
ELEV. 607' - 9 1/2"
NEW PRE-ENGINEERED
MTL. CANOPY, BASIS OF
DESIGN: MAPES POST
SUPPORTED CANOPY W/
4X4 POSTS.
EXIST. GLAZED ROOF
( REPAIR ALL SEAMS &
APPLY NEW UV FILM TO
SLOPED GLAZING)
NEW CUSTOM ALUM.
BREAK METAL DRIP
EDGE.
AE300
AE300
GL1 GL1
GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1 GL1
GL1
GL1 GL1
GL1
GL1
GL1
GL1GL1
GL1
AREA OF
DAMAGED/WEATHERED
MORTAR JOINTS TO BE
REPOINTED AND/OR
SPALLED BRICK TO BE
REPLACED.
REMOVE & REPLACE
ALUMINUM MULLION
CLOSURE BRACKETS &
GASKETS, TYP. AT ALL EXIST.
VERTICAL MULLIONS.
GL1
GL1
GL1
GL1GL1
NEW PERFORATED ALUM.
WINDSCREEN
PROVIDE MOCKUP OF TUCK
POINTING, MASONRY UNIT
REPLACEMENT, AND
CLEANING
B22 - SECOND FLOOR
ELEV. 624' - 0"
B22 - FIRST FLOOR
ELEV. 611' - 4"
0.1
B22 - FIRST FLOOR - ATRIUM
ELEV. 607' - 9 1/2"
NEW PRE-ENGINEERED
MTL. CANOPY, BASIS OF
DESIGN: MAPES POST
SUPPORTED CANOPY W/
4X4 POSTS.
GLAZING NOTES
GL1 - EXISTING GLASS TO RECEIVE NEW TINTED FILM
GL2 - 1" TINTED TEMPERED INSULATING GLASS (LOW-E)
GL3 - 1/2" CLEAR LAMINATED MONOLITHIC GLASS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
EXTERIOR ELEVATIONS ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
AE200
FULLY SPRINKLED
SCALE: 1/4" = 1'-0"AE200
EXTERIOR ELEVATION - SOUTH01
SCALE: 1/4" = 1'-0"AE200
EXTERIOR ELEVATION - WEST02
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
B22 - SECOND FLOOR
ELEV. 624' - 0"
B22 - FIRST FLOOR
ELEV. 611' - 4"
10.1
B22 - FIRST FLOOR - ATRIUM
ELEV. 607' - 9 1/2"
1204 SF
C1-14
ATRIUM
REMOVE & REPLACE STEP FLASHING.
PROVIDE NEW SEAL BETWEEN SKYLIGHT
FRAME AND BRICK INCLUDING NEW
BACKER ROD & SEALANT.
AE300
Sim
B22 - SECOND FLOOR
ELEV. 624' - 0"
B22 - FIRST FLOOR
ELEV. 611' - 4"
1 0.1
B22 - FIRST FLOOR - ATRIUM
ELEV. 607' - 9 1/2"
REMOVE & REPLACE STEP FLASHING.
PROVIDE NEW SEALS BETWEEN SKYLIGHT
FRAME AND BRICK INCLUDING NEW
BACKER ROD & SEALANT.
1195 SF
C1-7
CORRIDOR
1204 SF
C1-14
ATRIUM
AE321
AE300
NEW
BUMPER
RAIL
NEW
GUARDRAIL
NEW
GUARDRAIL
/HANDRAIL
AE300
0.1
EXISTING CURTAIN WALL
SYSTEM TO REMAIN
NEW CUSTOM .090"
EXTRUDED ALUM. OR BREAK
MTL. DRIP EDGE
NEW 090" ALUM. STIFFENER
BEYOND @ EVERY VERTICAL
MULLION
CAREFULLY REMOVE
EXISTING RIVETS & REPLACE
WITH NEW IN SAME
LOCATIONS; ALIGN WITH
EXISTING HOLES
CUSTOM .031" ALUM. BREAK
MTL. SPLICE PLATE
NEW RIVET @ 16" O.C. MAX.
NEW RIVET @ 16" O.C. MAX.
(CONTRACTOR'S OPTION TO
UTILIZE SCREWS, TYP.)
CAREFULLY REMOVE
EXISTING RIVETS & REPLACE
WITH NEW IN SAME
LOCATIONS; ALIGN WITH
EXISTING HOLES
NOTE:
FIELD VERIFY EXISTING
CONDITIONS AND
IMMEDIATELY REPORT ANY
DISCREPANCIES TO COR FOR
FURTHER DIRECTION.
6"
B22 - SECOND FLOOR
ELEV. 624' - 0"
U
REMOVE & REPLACE
COMPRESSIBLE INSULATION BOTH
EXTERIOR & INTERIOR
REMOVE & REPLACE BREAK MTL.
FLASHING; USE EXISTING BED
JOINTS
APPLY NEW BACKER ROD &
SEALANT FULL DEPTH TO WEDGE
REMOVE & REPLACE CLOSURE
PLATE
EXISTING ALUM. SLOPED GLAZING
SYSTEM TO REMAIN
NEW BUTYL TAPE
NEW SEALANT
MECHANICALLY FASTEN NEW
FLASHING TO EXIST. WALL
NEW ALUM. COVER PLATE
CRITICAL - IF REAR DRAIN LEAVE A 1 1/2" (38.1
MM) GAP BETWEEN THE BOTTOM OF THE
FURRING STRIP AND THE BOTTOM OF THE
RAINRAIL,
(SEE L1 FOR DRAIN TYPE)
RAINRAIL
LARGE SIZE
PLANTER (WALLTER )
SPRAY NOZZLE OR DRIP
EMITTER ASSEMBLY
REAR DRAIN 1/2" (12.7 MM)
INTERIOR REAR DRAIN
ASSEMBLY SITS BETWEEN
LIVEWALL AND PROTECTIVE
BACKING.
RECOMMENDED PROTECTIVE
BACKING
ATTACHED TO BUILDING WALL
MATERIAL
SLOT RAIL(H-RAIL)
16.0" [1'-4"]
(406.4 MM)
16.0" [1'-4"]
(406.4 MM)
16.0" [1'-4"]
(406.4 MM)
7.88" (200 MM)
PLANTER ONLY
9.38" (238 MM)
TOTAL WIDTH
1.5"
(38.1 MM)
8.0"
(203.2 MM)
FURRING STRIP
(1.5" (38.1 MM) VERTIRAIL)
1.5" (38.1 MM)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 32
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
BUILDING SECTIONS &
DETAILS
ATRIUM RENOVATION
BUILDING 22
ALEDA E. LUTZ VA MEDICAL CENTER
655-20-202
11.11.2021 JD NTF
100% BID
DOCUMENTS
AE300
FULLY SPRINKLED
SCALE: 1/4" = 1'-0"AE300
BUILDING SECTION01
SCALE: 1/4" = 1'-0"AE300
BUILDING SECTION02
SCALE: 3" = 1'-0"AE300
DETAIL @ NEW DRIP EDGE03
SCALE: 3" = 1'-0"AE300
DETAIL @ STEP FLASHING REPLACEMENT04
Revisions: Date:
35% SCHEMATIC DESIGN 11-15-2020
65% DESIGN DEVELOPMENT 05-06-2021
95% CONSTRUCTION DOCUMENTS 09-08-2021
100% BID DOCUMENTS 11-11-2021
SCALE: NTSAE300
DETAIL @ HANGING GREEN WALL - ALTERNATE #105
ELEV. 607' - 9 1/2"
B22 - FIRST FLOOR - ATRIUM
AE301
AE301
6' - 10 1/8" 6' - 11 5/8" 8' - 3 1/2" 8' - 3 1/2" 8' - 3 1/2" 8' - 3 1/2" 8' - 3 3/4" 11' - 6"
/2
/4
/2
LINE OF CANOPY
ROOF PERIMETER
ABOVE
12" DIA. X 42"
CONC. FOOTING
TYP. @ OUTSIDE
POSTS; REFER TO
STRUCT.
4"X4"X.125
EXTRUDED ALUM.
POST TYP.; BY PRE-
ENGINEERED MTL
CANOPY MANUF.
/2
/2
/2
/2
5' - 9" 5' - 9"
66' - 9 1/2"
4" X 4" X .125 EXTRUDED ALUM. POST
W/ 4" FACTORY NOTCH @ TOP
EXTR. ALUM. STRUCTURAL BEAM END
CLOSURE (SEAL ALL AROUND, BY
CANOPY INSTALLER)
12" X 12" X 42" CONC. FOOTING,
TYP.; REFER TO STRUCT.
2' - 0"
VARIES 3 1/2"
TY
P
6" CONC. SLAB; REFER TO STRUCT.
LINE OF EXISTING ATRIUM STRUCTURE
TO REMAIN
AE301
Sim
12" X 6" THICKENED CONC. SLAB
EDGE W/ 1/2" PRE-MOLDED
EXPANSION JOINT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .