Project 655-20-202 BID SCHEDULE.pdf
PDF 100 KB Posted
- Attached to
- 655-20-202 Atrium Renovation Bldg 22 Federal contract opportunity
- Solicitation number
- 36C25024B0058
About this file
This document is a Bid Schedule for a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 (VA VISN 10) for Project 655-20-202, Atrium Renovation Building 22 at the Saginaw VA Medical Center.
The solicitation requires furnishing labor, tools, materials, equipment, and supervision to complete the atrium renovation project. The work includes removing an underground storage tank, replacing it with an above ground tank, and modernizing the mechanical, electrical, plumbing, and technology systems. The performance period for the Base Bid, Entire Project is 120 calendar days. The Bid Schedule includes a Base Bid as well as a Deductive Bid Item No. 1 for removing a masonry wall trellis system. Pricing is required to be submitted as a lump sum amount. No set-asides or incumbent information is provided.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
36C25024B0058
Project 655-20-202 Atrium Renovation Building 22 at the Saginaw VA Medical Center
ALL ITEMS MUST BE PRICED IN ORDER TO BE RESPONSIVE TO THE SOLICITATION
Per Veterans Affairs Acquisition Regulation (VAAR) Provision 852.236-92 – NOTICE TO BIDDERS – ADDITIVE OR
DEDUCTIVE BID LINE ITEMS (APR 2019) The low bid shall be the Bidder that—
(i) Is otherwise eligible for award; and
(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.
The included Deductive Bid Items are listed in descending order of priority in the event funds are not available to award Bid Item I, Base Bid, Entire Project. Deductive No. 1 is the highest priority, and Deductive No. 2 second highest priority.
BID ITEMS
Bid Item No. I, Base Bid, Entire Project: Work includes, but is not limited to, general construction, alterations, roads, walks, grading, drainage, and necessary removal of existing structures and construction and certain other items. The intent of the project is to remove Tank 5, a 4,000- gallon underground storage tank (UST) and replace it with an above ground storage tank (AST) feeding the generator in Building 19. Building 19 Generators must remain in service so that the hospital remains functioning while replacement is occurring. A temporary tank is required during construction so VA personnel can manually fill day tanks if needed. Work shall include preparation and submission of all environmental permits and reports, environmental testing, excavation, site restoration/improvements, physical security upgrades, and modernization of the mechanical, electrical, plumbing and technology systems to/from the new AST to the generator. A phasing plan must be developed to prevent disruptions to the medical center’s operations during the switch over of the Building 19 generator fuel tank from the UST to the AST. Environmental remediation of contaminated soil or other hazardous conditions discovered during the project shall also be included.
Performance Period for Bid Item I, Base Bid, Entire Project is One Hundred Twenty (120) Calendar Days after receipt of Notice to Proceed.
Total Bid Item No. I Base Bid, Entire Project: $________________________ (Lump Sum)
Bid Item No. II, Deductive No. 1: BASE BID except delete masonry wall trellis system.
Deduction for Bid Item No. II, Deductive No. 1: Subtract -$________________________
END OF BID SCHEDULE