Profile_Vint_Blvd.pdf

PDF 278 KB Posted

Attached to
MT NP GLAC P HQ(1), GLAC HQ Parking Area Rehabilitation
Solicitation number
69056724B000010
Issued by

About this file

This document is a Vertical Alignment Review Report for the GLAC HQ Parking Area Rehabilitation project. The report details the horizontal and vertical alignment specifications for the Vint Blvd roadway, including station details, elevation, tangent grades, parabolic curves, and length measurements.

The related federal contract opportunity is an Invitation for Bidders (IFB) for the MT NP GLAC P HQ(1), GLAC HQ Parking Area Rehabilitation project. The IFB has two bid schedules, with only one schedule to be awarded. The solicitation documents, including plans, physical data, and the Construction Contract Administration Document per FAR 36.211, are provided as attachments. The solicitation is being issued by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabulation_MT NP GLAC P HQ(1).pdf PDF
BidSum_MT NP GLAC P HQ(1).pdf PDF
QA_05-29-2024.pdf PDF
Amendment A001.pdf PDF
QA 5_23_24.pdf PDF
ML_HQ2_YellowTop_XYZ.xlsx XLSX spreadsheet
IFB_69056724B000010_MT NP GLAC P HQ(1).pdf PDF
Vint_Blvd_RedTop_XYZ.xlsx XLSX spreadsheet
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
Const_Limit_VintMaint_Area.pdf PDF
HZ_Vint_Blvd_Alignment.pdf PDF
Const_Stake_ML_HQ2.xlsx XLSX spreadsheet
Const_Limit_ML_HQ2.pdf PDF
MT_NP_GLAC_P_HQ(1)-Vint_Blvd_X-sections.pdf PDF
Glacier_HQ_controlsheet.xlsx XLSX spreadsheet
glac-p-hq1_-Planset.pdf PDF
glac-p-hq1-ORD_Quantity-Calcs-NB.pdf PDF
MT NP GLAC P HQ (1)_Amended Final Pavement Memo.pdf PDF
NPS HQ and Swiftcurrent Geotech Rpt.pdf PDF
Const_Stake_Vint_Blvd.xlsx XLSX spreadsheet
Vint_Blvd_Earthwork.pdf PDF
HZ_ML_HQ2_Alignment.pdf PDF
Physical Data.zip ZIP file
ML_HQ2_RedTop_XYZ.xlsx XLSX spreadsheet
Vint_Blvd_YellowTop_XYZ.xlsx XLSX spreadsheet
super_Vint_Blvd.xlsx XLSX spreadsheet
Const_Limit_VintBlvd.pdf PDF
Const_Limit_Emp_Pkng.pdf PDF
MT_NP_GLAC_P_HQ(1)-HQ Road_X-sections.pdf PDF
ML_HQ2_Earthwork.pdf PDF
ML_HQ2_BlueTop_XYZ.xlsx XLSX spreadsheet
Vint_Blvd_BlueTop_XYZ.xlsx XLSX spreadsheet
Profile_ML_HQ2.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vertical Alignment Review Report

Report Created: Friday, March 29, 2024 Time: 12:55:21 PM

Project: Design IntlFt

Description:

File Name: c:\pw-work\d0562619\glac-p-hq1_ali_phase2.dgn

Last Revised: 3/29/2024 12:31:42

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: HZ_Vint_Blvd

Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: Vt_Vint_Blvd

Vertical Description:

Vertical Style: Alignment\Baseline

Station Elevation

Element: Linear

START 100+00.000 3199.840

VPC 100+75.000 3199.309

Tangent Grade: -0.007

Tangent Length: 75.000

Element: Symmetrical Parabola

VPC 100+75.000 3199.309

VPI 101+10.000 3199.061

PVRC 101+45.000 3199.252

VLP 101+14.549 3199.169

Length: 70.000

Entrance Grade: -0.007

Exit Grade: 0.005 r = 100 * (g2 - g1) / L: 1.790

K = l / (g2 - g1): 55.856

Middle Ordinate: 0.110

Element: Symmetrical Parabola

PVRC 101+45.000 3199.252

VPI 101+70.000 3199.389

VPT 101+95.000 3199.222

VHP 101+67.478 3199.313

Length: 50.000

Entrance Grade: 0.005

Exit Grade: -0.007 r = 100 * (g2 - g1) / L: -2.425

Page 1 of 2MT NP GLAC P HQ (1) GLAC HQ Parking Area Rehabilitation

Horizontal Alignment: HZ_Vint_Blvd

Horizontal Description:

Horizontal Style: Alignment\Baseline

K = l / (g2 - g1): 41.231

Middle Ordinate: -0.076

Element: Linear

VPT 101+95.000 3199.222

VPC 102+05.000 3199.155

Tangent Grade: -0.007

Tangent Length: 10.000

Element: Symmetrical Parabola

VPC 102+05.000 3199.155

VPI 102+30.000 3198.988

VPT 102+55.000 3199.126

VLP 102+32.357 3199.064

Length: 50.000

Entrance Grade: -0.007

Exit Grade: 0.006 r = 100 * (g2 - g1) / L: 2.440

K = l / (g2 - g1): 40.984

Middle Ordinate: 0.076

Page 2 of 2MT NP GLAC P HQ (1) GLAC HQ Parking Area Rehabilitation

File details come from the government source that posted it. Updated .