glac-p-hq1-ORD_Quantity-Calcs-NB.pdf
PDF 829 KB Posted
- Solicitation number
- 69056724B000010
About this file
This document appears to be a Quantities Report by Named Boundary for the MT NP GLAC P HQ(1), GLAC HQ Parking Area Rehabilitation project. The report provides detailed quantities information for materials such as subexcavation, pavement layers, fill, and turf establishment across various named boundaries and stations. Key details include:
The project involves the rehabilitation of the GLAC HQ Parking Area. The report provides quantities calculations for materials like pavement, subexcavation, fill, and turf establishment across the HQ Employee Parking Area, HQ Approach Apron, and Vintage Boulevard Maintenance Area. The report includes station-level details on the lengths, top sloped areas, and volumes for each material. This information appears to be in support of the Invitation for Bidders (IFB) solicitation for this project, which has a Solicitation Number of 69056724B000010 and is being managed by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantities Report by Named Boundary
Report Created: Monday, February 12, 2024 Time: 12:39:32 PM
Named Boundary Group:
Quantitys
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
1+45.000 ML-HQ2
Subex_Backfill1: 2068.307 38.286
Pavement Layer 2: 109.832 1.355
Pavement Layer 4: 2068.307 51.076
Turf Establishment: 548.404
Fill: 34.814
Pavement Layer 1: 1958.475 24.162
Volumes_Fill: 31.152 0.107
Volumes_Cut: 2068.532 105.513
Subex_Backfill1: 653.721
Centerline 1: 108.785
Centerline: 108.785
Centerline 4: 108.785
Prop Clearing: 109.598
Edge of Shld 1: 109.797
Edge of Shld: 109.797
Edge of Shld 4: 109.797
Lane Line A1: 217.570
Lane Line A: 217.570
Lane Line A4: 217.570
Centerline Exist: 108.785
DNC: 456.044
Centerline 3: 108.785
Edge of Shld 3: 109.797
Lane Line A3: 217.570
Fill: 109.724
Edge of Pavt 1: 217.570
Edge of Pavt 3: 217.570
Edge of Pavt 4: 217.570
Edge of Pavt: 217.570
Baseline: 254.360
Volumes Report 95% FINAL REVIEW
Page 1 of 1MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
Time: 12:47:28 PM
Named Boundary Group:
Quantities
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
N.A. HQ_Employee_Prkng_Area
Fill: 335.758
Sidewalk Layer 1: 5568.942 68.751
Turf Establishment: 5540.061
Pavement Layer 2: 201.891 2.495
Sidewalk Layer 2: 5568.942 68.751
Curb Bottom: 1780.361 32.969
Pavement Layer 4: 26241.339 647.918
Curb Top: 2367.541 47.557
Cut: 45.224
Subex_Backfill1: 28021.701 518.997
Pavement Layer 1: 26039.449 321.416
Volumes_Fill: 324.287 1.266
Volumes_Cut: 34179.605 1693.032
Prop Sidewalk: 1410.466
Edge of pavement: 1194.397
Terrain_Breakline: 901.220
Curb Back Agg Bot: 1192.481
Curb Back Bot: 1192.481
Curb Face Agg Bot: 1192.914
Curb Face Bot: 1192.914
DNC: 1186.291
Curb Face Top: 1192.028
Curb FL: 1191.929
Sidewalk 1: 1426.505
Sidewalk 2: 1426.505
Approach road match line: 0.000
Baseline: 273.553
Prop Clearing: 1681.075
Cut: 328.687
Subex_Backfill1: 6142.799
Edge of Pavt 1: 3563.833
Edge of Pavt: 193.566
Edge of Pavt 3: 193.566
Edge of Pavt 4: 3563.833
Page 1 of 3MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Edge of Shld 1: 193.571
Edge of Shld: 201.571
Edge of Shld 3: 193.571
Edge of Shld 4: 193.571
Curb Back Top: 844.620
Ditch_Ctr: 59.831
Fill: 1154.343
Sidewalk: 1128.223
Forced Slope Tie: 55.894
Centerline 1: 0.000
Centerline 4: 0.000
N.A. HQ_App_Apron
Subex_Backfill1: 950.659 17.603
Pavement Layer 2: 98.350 1.214
Pavement Layer 4: 950.659 23.473
Turf Establishment: 368.655
Fill: 38.322
Pavement Layer 1: 852.309 10.520
Volumes_Fill: 35.180 0.169
Volumes_Cut: 957.856 43.593
Terrain_Breakline: 118.906
Approach road match line: 18.000
Edge of Pavt 1: 80.300
Edge of Pavt: 79.353
Edge of Pavt 3: 79.353
Edge of Pavt 4: 80.300
Subex_Backfill1: 381.001
Edge of Shld 1: 81.129
Edge of Shld: 81.129
Edge of Shld 3: 81.129
Edge of Shld 4: 81.129
Prop Clearing: 87.271
Fill: 77.476
Forced Slope Tie: 7.386
Centerline 1: 219.571
Centerline 4: 219.571
Baseline: 78.869
Sidewalk Layer 1:
Sidewalk Layer 2:
Curb Bottom:
Curb Top:
Cut:
Prop Sidewalk:
Edge of pavement:
Curb Back Agg Bot:
Curb Back Bot:
Page 2 of 3MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
Curb Face Agg Bot:
Curb Face Bot:
DNC:
Curb Face Top:
Curb FL:
Sidewalk 1:
Sidewalk 2:
Cut:
Curb Back Top:
Ditch_Ctr:
Sidewalk:
Page 3 of 3MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
Time: 1:49:11 PM
Named Boundary Group:
Quantities
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume
N.A. Vint_Blvd Maint Area
Turf Establishment: 9192.328
Cut: 10665.827
Pavement Layer 2: 3568.232 39.300
Foreslope: 1946.780
Pavement Layer 4: 84869.504 1939.288
Subex_Backfill1: 80982.715 1500.130
Fill: 83.013
Pavement Layer 3: 24.861
Subex_Backfill2: 1005.978 92.131
Subex_Exc1: 1407.320 224.186
Pavement Layer 1: 72650.230 896.720
Volumes_Fill: 78.244 0.166
Volumes_Cut: 91384.684 5268.676
Baseline: 91.448
Edge of Shld 1: 1517.871
Edge of Shld: 1533.863
Edge of Shld 4: 1509.146
Edge of Shld 3: 679.679
Prop Clearing: 2115.190
Subex_Backfill1: 10268.533
Fill: 410.666
AUX_03: 387.412
Terrain_Breakline: 1142.266
Approach road match line: 72.821
Edge of Pavt 1: 8805.008
Edge of Pavt: 1535.953
Edge of Pavt 3: 726.457
Edge of Pavt 4: 8805.008
AUX_02: 277.852
Terrain_Exterior: 4429.758
Edge of pavement: 404.319
Paved Ditch 1: 515.840
Subex_Exc1: 153.433
DNC: 1680.745
Page 1 of 3MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
Ditch: 1647.627
Cut: 1011.889
Forced Slope Tie: 24.572
Ditch_Bottom_Center: 1336.197
Special Ditch LT: 751.773
Edge of Pavt 2: 45.621
N.A. Vint_Blvd
Turf Establishment: 2049.856
Fill: 132.992
Cut: 16.544
Pavement Layer 4: 7039.381 173.830
Subex_Backfill1: 7039.943 130.348
Pavement Layer 2: 867.702 10.712
Pavement Layer 1: 6263.917 77.303
Volumes_Fill: 126.834 0.535
Volumes_Cut: 7150.904 339.767
Baseline: 252.389
Centerline 1: 154.198
Centerline: 154.198
Centerline 4: 154.198
Edge of Shld 1: 437.163
Edge of Shld: 437.163
Edge of Shld 4: 437.163
Lane Line A1: 308.396
Lane Line A: 308.396
Lane Line A4: 308.396
Centerline Exist: 154.198
Centerline 3: 154.198
Edge of Shld 3: 437.163
Lane Line A3: 308.396
DNC: 705.505
Prop Clearing: 433.056
Subex_Backfill1: 2281.995
Approach road match line: 11.648
Cut: 50.435
Fill: 366.086
Edge of Pavt 1: 1382.238
Edge of Pavt 3: 536.792
Edge of Pavt 4: 1382.238
Edge of Pavt: 536.792
Terrain_Exterior: 529.596
Terrain_Breakline: 215.783
Forced Slope Tie: 13.201
Foreslope:
Pavement Layer 3:
Subex_Backfill2:
Page 2 of 3MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
Subex_Exc1:
AUX_03:
AUX_02:
Edge of pavement:
Paved Ditch 1:
Subex_Exc1:
Ditch:
Ditch_Bottom_Center:
Special Ditch LT:
Edge of Pavt 2:
Page 3 of 3MT NP GLAC P HQ(1) - GLAC HQ PARKING AREA REHABILITATION
| glac-p-hq1_qty_Phase1 |
| glac-p-hq1_qty_Phase1b |
| glac-p-hq1_qty_Phase2 |
File details come from the government source that posted it. Updated .