PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls

XLS spreadsheet 38 KB Posted

Attached to
Deland Courthouse CEP Upgrades and Efficiency Improvements
Solicitation number
25-B-144LL
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for Volusia County, Florida's DeLand Courthouse Central Energy Plant (CEP) Upgrades and Efficiency Improvements project, identified as ITB No. 25-B-144LL and Contract No. C-2014. The project scope encompasses the replacement of existing dedicated chillers, pumps, and associated components at the courthouse located at 101 N. Alabama Avenue, DeLand, Florida. The procurement requires installation of two new 500-ton water-cooled chillers using R-514A refrigerant, two primary and secondary chilled water pumps with variable frequency drives, new piping, and integration with the existing building automation system using Alerton Controls. The pre-bid meeting was scheduled for July 24, 2025, at 1:00 pm, with bid responses due by August 14, 2025, at 3:01 pm. The total contract time is 180 days, and the estimated construction cost is $950,000.

All bidders must complete and return the Prime/Subcontractor Form to avoid a non-responsive bid designation. The form requires bidders to identify all proposed subcontractors with their company names, addresses, dollar values, and percentages of work performed, organized by discipline (HVAC/Mechanical, Electrical, BAS/Controls, Masonry/Structural, and other trades as applicable). The prime contractor's dollar value and work percentage must be entered in the green-shaded cells, with all other calculations generated automatically, ensuring the total work allocation equals 100%. The total bid amount must match the bid price sheet and include any applicable performance or payment bonds. Bidders must hold valid Florida General Contractor, Building Contractor, or Mechanical Contractor licenses, provide a 5% bid bond with surety companies rated "A" and Financial Category "Class X" by Best's, and demonstrate business operations for at least six months. The county reserves approval authority over any subcontractor changes during project execution and will apply local business preference criteria in accordance with Section 2.8, D of the solicitation.

View the file

Other files

File Type Posted
Deland_Courthouse_CEP_Upgrades_and_Efficiency_Improvements_(Addendum_#6_Revision).pdf PDF
Electrical_Diagram.pdf PDF
Page_M201,_Key_Note_#9_Detail.pdf PDF
Exhibit_F,_Technical_Specifications_25-B-144LL.pdf PDF
Deland_Courthouse_CEP_Upgrades_and_Efficiency_Improvements_(Addendum_#1_Revision).pdf PDF
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
Sales_Tax_Exemption_Procedure_25-B-144LL.pdf PDF
Special_Conditions_25-B-144LL.pdf PDF
Basic_Insurance_Requirements_25-B-144LL.pdf PDF
Basic_Insurance_Requirements_25-B-144LL.pdf PDF
MASTER_Construction_Contract_25-B-144LL.pdf PDF
Bid_Documents_25-B-144LL.pdf PDF
Payment_and_Performance_Bond_25-B-144LL.pdf PDF
Sales_Tax_Exemption_Procedure_25-B-144LL.pdf PDF
Special_Conditions_25-B-144LL.pdf PDF
Bid_Documents_25-B-144LL.pdf PDF
Exhibit_E,_CEP_Upgrades_100%_Construction_Drawings.pdf PDF
MASTER_Construction_Contract_25-B-144LL.pdf PDF
Payment_and_Performance_Bond_25-B-144LL.pdf PDF
Exhibit_E,_CEP_Upgrades_100%_Construction_Drawings.pdf PDF
Volusia_County_Government_-_Deland_Courthouse_-_CEP_Upgrades_100%_Construction_Drawings_(5).pdf PDF
Volusia_County_Government_-_Deland_Courthouse_-_CEP_Upgrades_100%_Construction_Drawings_(5).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pre-Bid_Meeting_Invitee_Listing.docx DOCX document
SPECIAL_CONDITIONS_DEVCC_Chiller.docx DOCX document
Pre-Bid_Meeting_Invitee_Listing.docx DOCX document
SPECIAL_CONDITIONS_DEVCC_Chiller.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
HVAC/Mechanical$ - 00.00%
Electrical$ - 00.00%
BAS/ Controls$ - 00.00%
Masonry/Structural$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .