This is a Prime/Subcontractor Form for Volusia County, Florida's DeLand Courthouse Central Energy Plant (CEP) Upgrades and Efficiency Improvements project, identified as ITB No. 25-B-144LL and Contract No. C-2014. The project scope encompasses the replacement of existing dedicated chillers, pumps, and associated components at the courthouse located at 101 N. Alabama Avenue, DeLand, Florida. The procurement requires installation of two new 500-ton water-cooled chillers using R-514A refrigerant, two primary and secondary chilled water pumps with variable frequency drives, new piping, and integration with the existing building automation system using Alerton Controls. The pre-bid meeting was scheduled for July 24, 2025, at 1:00 pm, with bid responses due by August 14, 2025, at 3:01 pm. The total contract time is 180 days, and the estimated construction cost is $950,000.
All bidders must complete and return the Prime/Subcontractor Form to avoid a non-responsive bid designation. The form requires bidders to identify all proposed subcontractors with their company names, addresses, dollar values, and percentages of work performed, organized by discipline (HVAC/Mechanical, Electrical, BAS/Controls, Masonry/Structural, and other trades as applicable). The prime contractor's dollar value and work percentage must be entered in the green-shaded cells, with all other calculations generated automatically, ensuring the total work allocation equals 100%. The total bid amount must match the bid price sheet and include any applicable performance or payment bonds. Bidders must hold valid Florida General Contractor, Building Contractor, or Mechanical Contractor licenses, provide a 5% bid bond with surety companies rated "A" and Financial Category "Class X" by Best's, and demonstrate business operations for at least six months. The county reserves approval authority over any subcontractor changes during project execution and will apply local business preference criteria in accordance with Section 2.8, D of the solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| HVAC/Mechanical | $ - 0 | 0.00% | ||||
| Electrical | $ - 0 | 0.00% | ||||
| BAS/ Controls | $ - 0 | 0.00% | ||||
| Masonry/Structural | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |