About this file
This is a Prime/Subcontractor Form for Contract No. C-2014, ITB No. 25-B-##XX, issued by Volusia County, Florida, for Design Services related to the Orange Camp Road Widening Segment 1 project. The project encompasses professional engineering design services for a 3.5-mile roadway expansion from Woodland Boulevard (US 17/92) to Kirkaldry Court, including the preparation of complete construction contract plans, specifications, and special provisions. The typical sections include a 4-lane divided urban section with bike lanes and a shared-use path, a 2-lane divided urban section with similar amenities, and a single-lane roundabout at Princeton Road/Wellington Woods Avenue with an 135-foot inscribed diameter. The form requires all bidders to identify and list all proposed subcontractors and their respective disciplines, with failure to complete and return the form resulting in a non-responsive bid designation.
The Prime Contractor must account for the total bid price, including any performance or payment bonds, with all dollar values and work percentages assigned to both the prime contractor and subcontractors required in the form's designated green-shaded cells, totaling 100 percent. Prime contractors are responsible for ensuring all subcontractors maintain appropriate licenses, and any subcontractor changes during project execution require prior written approval from the County Project Manager. The County reserves the right to clarify subcontractor information but will not permit changes to the total submitted base bid pricing. The form will also be utilized to determine local bid preference in accordance with Section 2.8, D of the solicitation documents.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |