This document is a Technical Specifications exhibit for Volusia County roadway construction projects in Florida, establishing standards that supplement the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (Divisions II and III). The specifications were effective as of August 11, 2025, and are authored by County Engineer Tadd Kasbeer, P.E. (License No. 54678). The document outlines requirements for mobilization and demobilization activities, including movement of personnel and equipment to project sites, establishment of temporary facilities, procurement of all required permits (including National Pollutant Discharge Elimination System permits), and preparation of permit application packages. Additional specifications require contractors to provide pre-construction video documentation of existing conditions including adjacent structures, driveways, mailboxes, roadways, drainage structures, and all areas affected by the project scope. Project signage requirements are detailed, specifying that contractors must install, maintain, and relocate signs as directed by the County Engineer under the County's supervision, with signs remaining contractor property throughout project duration.
The specifications establish that mobilization costs encompass bonds, insurance, preconstruction expenses, and permitting fees, excluding construction materials. Pre-construction video must document the full extent of project areas and any maintenance of traffic operations. Project signs must be installed at County Engineer-designated locations within right-of-way, positioned for high visibility without obstructing pedestrian or vehicular traffic or creating roadside hazards. The contractor assumes responsibility for sign removal at each construction phase conclusion and project completion. These specifications apply to the Orange Camp Road Widening Segment 1 project from Woodland Boulevard (US 17/92) to Kirkaldry Court, which includes design and construction of a four-lane divided urban section, a single-lane roundabout, and a two-lane divided urban section with various lane widths, bike lanes, raised medians, shared-use paths, and sidewalks.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
VOLUSIA COUNTY
ROADWAY
TECHNICAL SPECIFICATIONS
August 11, 2025
TADD KASBEER, P.E.
County Engineer
P.E. No.: 54678
VOLUSIA COUNTY
ROADWAY TECHNICAL SPECIFICATIONS
Divisions II and III of the Florida Department of Transportation (FDOT) Standard Specifications for
Road and Bridge Construction in effect at the time of project bid opening will apply to this project, with the exception of the following revisions.
1. Mobilization / Demobilization (Replaces FDOT Specification Section 101, Mobilization, in its entirety)
1.1. Mobilization and Demobilization includes any and all preparatory work and operations in mobilizing for beginning work on the project, including, but not limited to, those operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site and for the establishment of temporary offices, buildings, safety equipment and first aid supplies, and sanitary and other facilities.
1.2. This item includes the costs of bonds and any required insurance and any other preconstruction expense necessary for the start of the work, excluding the cost of construction materials.
1.3. This item shall include the costs of obtaining all required permits, including the National Pollutant Discharge Elimination System permit, and any preconstruction expense necessary for the start of the work, excluding the cost of construction materials. Permitting costs shall include preparing the necessary application packages, permit application fees and all work necessary to obtain the permits in a timely manner.
1.4. Pre-Construction Video: A pre-construction video shall be provided to the County that covers all aspects of existing project area including adjacent houses, driveways, mailboxes, roadways, drainage structures and other adjacent items to the full extent of this project including any
MOT that extends beyond the limits shown on the plans.
1.5. Project Signs: The Contractor shall install under the County's direction, signs conforming to the
Specifications and sample provided in the General Conditions, as supplied by the County. The signs shall be the property of the Contractor for the duration of the project and shall be maintained by the Contractor to the satisfaction of the County Engineer. The Contractor shall be responsible for the relocation of the signs during the progress of construction as directed by the County Engineer. Contractor shall be responsible for removal of signs as appropriate at the end of each phase of construction and/or at the end of the project.
1.5.1.Project Sign Location:
1.5.1.1. At Locations designated by the County Engineer.
1.5.1.2.
1.5.1.3.
1.5.1.4.
1.5.1.5.
Within Right-of-Way.
To be highly visible.
At a position which will not obstruct pedestrian or vehicular traffic.
At a location where they will not be a roadside hazard.