Exhibit_A_-Roadway_Concept_Plan_Orange_Camp_Road_Segment_1_Rollplot.pdf
PDF 3 MB Posted
- Attached to
- Design Services for Orange Camp Road Widening Segment 1 (Woodland Boulevard (US 17/92) to Kirkaldry Court)
- Solicitation number
- 26-SQ-107SR
- Issued by
- Volusia County, Florida
About this file
This is a roadway concept plan document for the County of Volusia, Florida, prepared by Dewberry Engineers Inc., depicting the design specifications for Orange Camp Road Segment 1 widening project extending from Woodland Boulevard (US 17/92) to Kirkaldry Court. The project encompasses approximately 4,900 linear feet of roadway improvements beginning at station 522+90.00 and concluding at station 571+95.00. The design illustrates a combination of typical sections including a 4-lane divided urban section with two 11-foot travel lanes in each direction, 5-foot bike lanes, a 22-foot raised median, and an 8-foot to 10-foot concrete shared-use path on the north side from Woodland Boulevard to Bentley Green Drive/Glen Eagles Drive, transitioning to a 2-lane divided urban section with one 11-foot travel lane in each direction from Bentley Green Drive to Kirkaldry Court, and a single-lane roundabout with a 135-foot inscribed diameter at the Princeton Road/Wellington Woods Avenue intersection. The plan includes concrete curb and gutter, concrete sidewalks, traffic separators, paved shoulders, and new pavement construction throughout the segment. Multiple retention ponds are depicted as existing or proposed features within the right-of-way and easement areas.
The document serves as Exhibit A to the design services contract opportunity, prepared under the direction of Sean M. Gibbins, P.E. (License Number 82262) as Engineer of Record. The plan reflects engineering analysis and survey work completed for the construction phase, incorporating existing utility easement lines and right-of-way boundaries along the corridor. The project addresses capacity issues, operational safety, and multi-modal transportation needs by accommodating bicycle and pedestrian facilities throughout the improved segment, with particular attention to coordination with surrounding commercial and residential land uses identified in the vicinity including retail establishments and developed neighborhoods.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
$DATE$ $TIME$ $MODELNAME$ $FILE$$USER$
O
R A
N G
E
C
A M
P
R
O A
D
P
H A
S E
E
T
N
O F
C O
U N
Y
P A
V E
D
S
H O
U L
D E
R
N E
W
P
A V
E M
E N
T C
O N
C R
E T
E
T
R A
F F I C
S
E P
A R
A T
O R
C O
N C
R E
C U
B
G
T T
E R
C O
N C
R E
T E
S I D
E W
A L
K
L E
G E
N D
S E
M
G I B
B I N
S
P .E
L I C
E N
M B
E R
D E
W B
E R
R Y
E
N G I N
E E
R S
I N
C
R
G N
O L I
V
E
S U I T
E
O R
L A
N D
O
F L
E N
G I N
E
F
C O
R D
P O
N D
E X I S
T I
G
W
L I N
E
E X I S
T I N
G
E
A S
E M
E N
T
L I N
E
P
520 525 530 535 540 545 550 P
A
.9
555 560 565 570 575
N
Feet
100200
U S
S
G
L E
N
E
A G
L E
S
D
R B
E N
T L E
Y
G
R E
E N
D
R
D A
R T
M O
U T
H
R
D
P R I N
C E
T O
N
R
D W
E L L I N
G T
W
O D
S
A
V E
H A
R V
A R
D
R
D
O X
F O
R D
R
D
P O I N
T
P
L E
A S
A N
T
R
D
S
O
A K
P
A R
K
D
R
C L
Y
R K
L
N
K I R
K A
L D
R Y
C
T
U S
D Y S
O N
D
R
£ SURVEY ORANGE CAMP RD.
STA. 522+90.00
£ SURVEY ORANGE CAMP RD.
BEGIN CONSTRUCTION
BEGIN PROJECT
PUBLIX
TJMAXX
BELK
CVS
CLIPS
GREAT
STARBUCKS
DENTAL CARE
WOODLAND
CHIPOTLE
CAFE
BREAKFAST
KEKE'S
SUPERMARKET
PET
ROSS
PET SMART
STA. 571+95.00
£ SURVEY ORANGE CAMP RD.
END CONSTRUCTION
END PROJECT
RETENTION POND
EXISTING DRY
EXISTING RETENTION POND
RETENTION POND
EXISTING DRY
EXISTING DRY RETENTION POND
WET RETENTION
POND 2B
DRY RETENTION
POND 2C
DRY RETENTION
POND 3
WET RETENTION
POND 2A
File details come from the government source that posted it. Updated .